Loading...
HomeMy WebLinkAbout5.E.2. Authorization to Advertise for Bidding the Construction of Riverside Fields Park-Res. No. 7279 Consent Business 5. E. 2. SI IAKOI'EF TO: Mayor and City Council Mark McNeill, City Administrator FROM: Jamie Polley, Parks, Recreation & Natural Resources Director DATE: 03/19/2013 SUBJECT: Authorization to Advertise for Bidding the Construction of Riverside Fields Park - Res. No. 7279 (A) Action Sought The City Council is asked to offer Resolution No. 7279, A Resolution of the City of Shakopee Approving Plans and Specifications for Riverside Fields Park and Authorize to Advertise for Bidding. Background On May 3, 2011 the City Council approved the final schematic design for Riverside Fields Park including two tennis courts, hockey rink w/ basketball court, pleasure skating area, sand volleyball, playground and picnic shelter /warming house. The playground was installed in 2011 and therefore is not part of the construction bid. The picnic /warming facility is also not part of the construction bid. The City hired Stantec to complete the final schematic design and develop the plans and specifications to bid the construction of the park. The project was bid in April of 2012 however the bids came in extremely over budget and were rejected by the City Council. It was identified that the unknown soil condition was the number one factor for the higher bids. Recommendation The City Council authorized funding for soil borings and additional consulting. The Council directed staff to rebid the project in 2013. The soil borings identified that extensive earthwork is needed under the paved areas. The plans and specifications have been revised to reflect the work required. The contractors bidding the project will now be able to bid the project accurately. It is recommended that the bidding of the project take place at the end of March, beginning of April to encourage competitive bids from contractors that are working to obtain projects for the 2013 construction season. Budget Impact The current CIP allocation for this project is $770,000.00. The main components of this budget include: earthwork, trails, hockey /basketball, paved /fenced tennis courts, parking paving and utility connections to the building pad. Site furniture includes pedestrian lighting and bike racks. Other amenities include hockey lighting, basketball court and volleyball court. $25,000 is budgeted for staff time (Engineering/Public Works will be in charge of the Construction Administration) testing, and Trunk Water Charges (estimated). A 6% project contingency is also factored into the budget. The CIP allocation for this project does include the $135,000 to construct the picnic shelter /warming facility. PARK CIP $770,000 PICNIC SHELTER/WARMING $135,000 DESIGN & CONSTRUCTION DOCUM. $30,000 CONSTRUCTION ADMIN & FEES $15,000 AMENDED CIP $590,000 CONTINGENCY 6.0% $35,400 CONSTRUCTION BUDGET $554,600.00 The estimate construction budget total is $661,262.00 which includes all of the amenities in the City Council approved plan. This estimate is $106,662.00 over budget. The estimated construction budget total is $541,427.00 if the hockey rink is unpaved, the basketball court is moved to the volleyball area and the sand volleyball court is eliminated. This estimate is $13,173.00 under budget. It is the recommendation of the consultant to bid the hockey rink paving alternate as a deduct alternate to obtain more favorable bids due to higher quantities. A) Eliminate hockey rink paving and move the basketball court to the volleyball area and eliminate the sand volleyball court, - $119,834.00 Timeline The proposed timeline for this park is to have advertisements run in the Shakopee Valley News on March 21st and 28th, and online beginning March 21st. The Bid Opening is scheduled for April 9, 2013 and Award of Contract will be presented at the April 10 City Council meeting. The completion date for the park is October 1, 2013. Relationship to Vision A. Keep Shakopee a safe and healthy community where residents can pursue active and quality lifestyles. Requested Action 1. If Council concurs, offer Resolution No. 7279, A Resolution of the City of Shakopee Approving Plans and Specifications for Riverside Fields Park and Authorization to Advertise for Bidding. 2. Move to authorize the bid opening on April 9, 2013 at 11 a.m. Attachments: Resolution No. 7279 Approved Concept Plan Spec Plans RESOLUTION NO. 7279 A Resolution Approving Plans and Specifications and Ordering Advertisement For Bids For Riverside Fields Park Construction Project No. PR2012 -1 WHEREAS, The City of Shakopee has hired Stantec to prepare plans and specifications for improvements for the Riverside Fields Park Construction, and any appurtenant work, and has presented such plans and specifications to the Council for approval. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA: 1. Such plans and specifications, a copy of which is on file and of record in the Office of the City Engineer, are hereby approved. 2. Stantec shall prepare and cause to be inserted in the official paper and online an advertisement for bids upon the making of such improvement under such approved plans and specifications. The Advertisement for Bids shall be published as required by law. Adopted in session of the City Council of the City of Shakopee, Minnesota, held this day of , 2013. Mayor of the City of Shakopee ATTEST: City Clerk • \ t= c \ Existing water main o > . ' t u_ ce Existing gas line Potential Future Current Park Crossings Boulevard __.._ r______ Park Area = Dedication- ,, _,. ) f ' i Parking (40 stalls) ` �, •arkiri (20 stallsi `� g( ( t r a) �� �s )I Gnus t i' . - I I 1 _',: Tenni. 4 I 1 a 1 1 1 Warming House and 1 I 1 /J- Picnic Shelter (Phase 2) _ – I I 1 Hockey — 7 a 1200' x 85 p. � ' R 1 u 1 ' 1 (Phase 2) .� _ .i 1 Free Skate L I Existing Channel (, 11 1 _ (Phase 2) .•` ;„t, ¢{� Mill , (72 Easement)- 1 -ill 1 — [ if) ' n=11111 Basketball t '�' „, ,„ Proposed Channel Crossing – I —� ♦ _ _ E arJ CI�a l! Backstop (Future Phase) 1 11 1 �—. 1€ � ' 21' i .. l t, ' , ' ' ilS ' \ Athletic Use 1 v 1 1 < y. Open Field ♦ \ ' (Future Phase) I 1 1 1 1 * . � • • \\ 1 1 1 lb' ADA Accessbile r %..,.., 1 \ 1 1 Ttail (h'p) I t ; 1 1 a PARK IMPROVEMENT Ili ii \ \ 1 II_ 1 c PHASE 1 ' Athletic Use 11-1 Il I • Swings and Play Area re Phase) I (Phase 2) i Sand Volleyball (Futu ' 1_11 �, PHASE 2 1 , V I . Swings and --, , • Tennis Courts – I , ' Play Area I (Phase 1) ' • Hockey Rink and Basketball Court , ; , -- - -- -- - -) / J - r J • Free Skate - % ` + • Sand Volleyball /. 1 • Warming house / picnic shelter / restroom ji—L ___i, I 1 a building /Grills - - -- -- -- -- - - • Parking (20 stalls) Prior Lake / Spring Lake Outlet Channel - � . • Trails _ 1 T. ter _,.. _ - POTENTIAL FUTURE PHASES _ j • Athletic Use (Soccer /Lacrosse /Baseball /Other) NORTH Tree placement and quantities are approximate and subject to change _ • Parking (40 stalls) so 25' o 50' lo • Trails > SCALE: 1 " =50' P116.1656"-„,,a1111 RIVERSIDE FIELDS / RIVERSIDE BLUFFS PARK CONCEPT A2 - EXISTING CHANNEL •• SHA •. - SHAKOPEE, MINNESOTA MAY 2, 2011 i 1 L J I' - 1 L _ _ J __ _ I \ `� \ c • _, COMMERCIAL DRIVEWAY &CROSS PAN PER 1 -> —� _ _ _ _ _ _ 1 \ \\ SE CON LllYSIANUARDD RIL3006.EXltND a lit, /�/ /�//.�)��� ` SEE DETAIL H/C8.05 - - 111 ��II / �\ 0 • CONC » RETE APRON TO SOUT�i SIDE OF nix. . .. PED RAMPS PE » » » » » » » E EXISTING GAS EASEMENT _ • STAND/1' DETAIL 5003. BICYCLE RACKS. SEE PECIFICATIONS. CR oSSINGS BOULEVARD • J • 1 I 1 1- io -- - - �,[e 1 1 1 1 1 1 1- I 5 �lCa, B618 CURB AND GUTTER e - r d - - / i _GB_ 3 J GHl &B - : - _GJT C �B -- _ -_ O ` d BITUMINOUS PARKING I r +T � I ( I I r T / CONCRE WALK. SEE DETAIL I LOT PER SEE DETAIL W ) i � 1 I I • I I 1 1 ' ` / ` I � SB #7 5" • 1 , 1 .0 EXISTI • 1 ' // I 1 1 I /C8.05 1 �� I C WALK G/C8 AND A ATCH .GN WITH EDGE AT NG , • 17' WIDE DROP CURB I - ' i "E 11 •' I CONNECTI• POINT ; 1 i I TAPER TO FULL HT. I V 56 #2 I „ I ' i i I AT20:1 MAX EXISTING S I 1 v env stantec com ' _ L11]_ L1 1 �I 1 � EWALK ). L. i ` ` _ - -- STANTEC 2o12 � �� „ � , ALONGCR�.SINGS ° / 6" CONCRETE PAD s.,- ev� � cr��ess r ma ka S' 6111 BOULEVARD / i \�� � - l SEE DETAIL H /C8.05 'NNE 119 / ' \ `���`\, `-_� ��_ 8 5" CONCRETE WALK, , 1 .. �� 1 / ,1 I - F OO H o SEE DETAIL G C8.05 1 TENNIS CO RT, SEE SHEETS ° / , 8 / i I I C8 - C8. 7 FOR LAYOUT & / / /' 7 I DETAILS IL \A`. / 1 f PED RAMP W/ TRUNCATED I SB #6 / `.� _ _ _ _ It' i L To FUTURE PARK SB #3 / DOMES D. DETAIL 5 003 SEE CITY I BUILDING (N.I.C.) � / / �`��\ / / � -� ` _ 1 t STD. 5 1 ` // `�\ `` , , / ' ,\`\ ` ` ',P : To THICKENED SECTION i m `` ' w BITUMINOUS TRAIL, SEE J ` \ \ / ` .. - FREE SKATE AREA, SEE SHEET \ \ /� / / SB #5 03.02 FOR GRADING • • \� �� / / ` ` �� , • � / / FULL COURT BASKETBALL IN HOCKEY .i � ` � \\ \\ �\ 4 '' / / `�■ / ' RINK WITH POSTS OUTSIDE DASHER ;' �`�`�`� �`� \ ` ✓'' �� / / BOARDS, SEE SHEETS C8.04 - 08.05 FOR ., ° `�\\` / ma " \ \ \ y LAYOUT AND DETAILS. _ _ _ _ DEDUCT ALTERNATE NO. 1 11 `. \ \\ ` //' `��\ \ i' DELETE FULL COURT BASKETBALL 1.-1 COURT FROM PROJECT 0 „ \\ ` `. \\ . %� / .�\ `. 3 / SB #4 BITUMINOUS HOCKEY RINK, SEE SHEETS / ' \ '` > \ C8.04-C8.05 FOR LAYOUT AND DETAILS. `\\ `. \ . : ,\ N "� / 0 W DEDUCT ALTERNATE NO. 1 x( 0 \ \ \ `\ / ' \ \ � � \ / / w W D BITUMINOUS PAVING AND SAIL I 1 '' � / / / \ ` \ �`� / Z CORRECTIONS FROM PROJECT l s \ \ ` ' / / ` .� \, N./ - 2_ , / 1 •'''''' ' \ • / \ \ / - 1-i a //// \- - TYPICAL SECTION 1 y+ / / ' / ° / ' ` �/ / /4\\\\ `� \� \\ // d SEE DETAIL J /8.05 I 1 / \ /� / \ \. . \ / Q In • SAND VOLLEYBALL, SEE SHEET i:l 1 / /'' ��/ / \ <-.. ` \ \` / Q t W - 1 ii) 4 E ° EXISTING PLAY ARE „ \ . \ \� / _ C8.08 FOR LAYOUT AND DETAILS 1'1- t l < A / / / `�; ' W / • \ `� \\ / W DEDUCT ALTERNATE NO. 1 t � - ` ` ' ss 1 �� `. \ / 0 PROVIDE HALF COURT �� , / / `` \ \ , \ BASKETBALL COURT INSTEAD OF i 0 -- `` / / W SAND VOLLEYBALL, SEE SHEET ;� ��� �' / / ` `,' `, / / H C8.08 FOR LAYOUT AND DETAILS . r / / �` N. / / I i fa • / 1, ❑ ` `. \ \ \ \ // / 1f / I - ALIGN WITH EXISTING TRAIL & I j � � / , /// MATCH EDGE AT CONNECTION POINT ; 1 / ''--7."--... / 1 1 i / ■ ■ \� Lr - - - U 1 / � / / • - r i / NO. REVISION DATE EXISTING TRAIL I �' c ___ / 1 o i • I i r J ✓ / NOTES: ' I ` C~ ---_/ X I Vi , �__ 1. PARKING LOT STRIPING AND SIGNAGE TO BE DONE BY /' ! �F 1 1 1 1 1 ° I OTHERS AND NOT IN CONTRACT , X / .I I / , i�t m �;j ° /" avr ' - s / I ! iiii•iiiii) SURVEY P3E ALP � 0 ��J , 1 r ____ i ` \ \�- ---��_��_- _ -_ -_, S DFSIGN® ll /MMK _ __ T i r 1 r 1 I \ `�\ " l I I - 1 I r-O -4 -_ _ ` 4 0 40 80 APPROVED SMK / 1 1 1 I PRO]. NO. 193802066 i I I \ I 1 1 1 Horizontal Scale In Feet Ear N UMBER TN ! . I \ 1 1 1 . C1.01 •