HomeMy WebLinkAbout10.C.1. Update on CR69 & TH169 Interchange Project and Consider a Detour Plan Utilizing Vierling Drive General Business 10. C. 1.
SHAKOPEE
TO: Mayor and City Council
Mark McNeill, City Administrator
FROM: Bruce Loney, Public Works Director
DATE: 03/05/2013
SUBJECT: Update on CR69 & TH169 Interchange Project and Consider a Detour Plan Utilizing Vierling Drive (D,
E)
Action Sought
For Council to discuss and approve a detour plan using Vierling Drive. Also to discuss the bridge lights on CR69
and what agency should pay for power on those lights.
Background
A proposed attached layout for the CR69 & TH169 has been selected and final design plans are being prepared.
With the preparation of plans the City was asked to provide lights for the bridge. Attached are drawings showing
the location of bridge lights and the recommended light and pole. Also, with the final preparation of plans, a traffic
control plan needs to be developed to handle traffic during construction.
Scott County and their consultant have a detour plan that utilizes Vierling Drive from CR69 to CR15 and would
require constructing a temporary connection from CR69 to Taylor Street. The following documents are attached for
Council information:
1. Detour Route Plan
2. Memo on traffic impacts from County Traffic Engineer
3. Temporary Vierling Drive Connection Drawing
The reasons for the temporary connection on Vierling Drive would be safer for the construction workers and
motoring public, less cost to the project, and reduced project time -line for completion. County staff will be
available to present an update on the project including schedule and to discuss the detour plan. If acceptable to the
City Council, the County will conduct a neighborhood meeting to the adjacent neighborhoods along Vierling Drive.
Finally, staff has been working with MnDOT on acquiring excess property along the TH169 & CR69 and will have
an update for City Council at the meeting.
Recommendation
Staff would recommend approving a motion approving the proposed detour plan that utilizes Vierling Drive from
CR69 to CR15; and approve a motion for the City to pay for electric power for the six lights for the bridge.
Staff feels the construction of the interchange will be safer and less expensive if traffic is removed from the work
zone. The electric power area is currently Minnesota Valley Electrical Corporation (MVEC) and outside the City
limits. It is anticipated that this area will be in SPUC's territory and the City of Shakopee limits someday. The
County will not pay for power of the bridge lights.
Budget Impact
The use of Vierling Drive can handle the additional traffic including trucks as it is a 4 lane State Aid route. The cost
for power of six bridge lights is approximately $300 / year.
Relationship to Vision
This supports goals D: Maintain, improve and create strong partnership with other public and private sector
entities; and E: Deliver effective and efficient public services by a staff of well - trained, caring, and professional
employees.
Requested Action
1. Approve a motion approving the proposed detour plan that utilizes Vierling Drive from CR 69 to CR 15.
2. Approve a motion for the City to pay for electric power for the six lights on the CR 69 bridge.
Attachments: DETOUR
LAND ACQUISITION
CR 69 Bridge Lights
' .
t t n
IOth Ave W
4 +r
, ft
de''',"/ .
4
t
Ilt.tt Ave W 4 ...,....... ..., ,,
to 0 11 - ft. - tot
• t c 7; ...
/ tx va
(A 0 L.
i (t4 f!„-Or---:n-7i2-7.1; - 1-
., .
JS
.%
e ib 9W _ ' _ ,,,, g A C , 0
..., v - 2 0,
0
,... ..4 20 rtot . '‘'.! ° f E
45 : I C , ft:4Z icUlgiOttlf ''''''''
. . ., ' t:
4
,... m .,.....„6„,„_. „,......_.
T
12th Ave V.' '- - "-' ' - - 4
tt .7f
,...
- / 1
a - -. -
1* - 4 7416 ,4
'
l 4_, I--
t ,
10c.1, 7
1 lth Ave W ' - -.. .....--
4.4.. 13 . -a b
...,<.`
4 ' Vierling Drive
....,- ...Littler Pt. •
t• — Ar„......,,, n
- .
" , 4 gat c...) ‘ : la h pa h
) '
•.i. Pa rk
ts 1
alsped .. .„ . „ . ...
. ........., .,...„,_ . ,
.. . . . ..
. . ....
'`•-• ' -
. ....._.- ................0 . > --r----,,.
169i
7
Coburn
to --
-'--- 7k0 Piedlibisomil t:11 (II 70
n
US 169 / CH 69 Interchange Construction Project
...... - — . 1
, ... .
.. ,
.,-
. ..: '
• :: :, `,: " - ' 4.' 7
. ,
7=7'.
1. —
„f-
... - . .
1 . .. .. ,
. . .
e i r.. ,, '-,,, ..--, • '',.-' . - - 4 t - - 7. ' i r: ■1 k -,..
/ . .- ,,. • . t , „,,,,,,„,.,
,..„,,,,), , . 4 ' '' - " . ... , - _,._-----..Z ____I ;.± .,, ,-; ' r , ■ ' ''.: 4 . 4 . 4 4 :i 1 '11
''? ' . • ' 4
. 4 0: , ''.. ' . . ,.. • W
. '''' .7:1 ”:': . e .. .... .■ .. . r,........ ...,,,, ■■■■■• •-■ ■ ,T..., ........,
■■• i'' .:■., ,,,
.....,■■ . .- - ■ '''''....." ■...... ' e ' ' ''- r !.■ : , ' 4
.,..,......,......... . .,... ,.. . `. .. ... ' .... ' .
/
‹.- ' ' , _____-__: - - - ' !EP I — —
. 410 e
/.
, ,
/
1
Alli
1 * g'
,t1 ,
. .
■;'. '- ''',i
1 . ., - , ' •.
. .
i
IF 4 ,71 IN g Temporary Vierling Drive Connection
,,,---.,,,,,,,,, TH 169 / CR 69 Interchange
• r--/-•1/ runs o 1 ikl
:4 .
it
; f ■
ir
a
v
r ..
y
s
a J
!Y _.-- - --____-------- ----- - - ------......L..: - - - -_--,-.77.--_.. '', ..! -°-: ...-,' . it ‘: .,, III
'
/ .._� _ VIER', ?NG I) ,
. % '
<. � ,�u. . ,i,...... a are
,,a
I
•
4
IF :j,4I Temporary Vierling Drive Connection
“-4,-44,-",., TH 169 / CR 69 Interchange
.. RrNI cnunb 11M
" SCOTT COUNTY COMMUNITY SERVICES DIVISION
PHYSICAL DEVELOPMENT 600 COUNTRY TRAIL EAST JORDAN, MN 55352-9339
' _'' (952) 496 8346 Fax: (952) 496 8365 www.co.scott.
LEZLIE A. VERMILLION MITCHELL J. RASMUSSEN, P.E. JAMES L. HENTGES
COMMUNITY SERVICES DIRECTOR COUNTY ENGINEER COUNTY SURVEYOR
Memo
Date: February 27, 2013
To: Bruce Loney, PE
City of Shakopee, Public Works Director
From: Tony Winiecki, PE, PTOE
Traffic Engineer
Subject: SAP 70- 669 -005, CP 69 -03
CSAH 69 at TH 169; Detour Traffic
With respect to the subject project and consideration of Vierling Avenue as a detour, I offer the following
comments and projected traffic volumes.
It is proposed that a 2 -lane temporary roadway is built from CH 69 to existing Vierling Drive at Taylor
Street. The existing Vierling Drive is a 4 -lane segment.
Existing Daily Volumes:
• CR 69 north of TH 169 is 7,500
• Vierling west of CSAH 15 is 2,500
Estimate of the TH 169/CH 69 intersection movements detouring to a Vierling route:
• SB Left / WB Right— 90-100% (most direct route compared to current)
• NB Thru / SB Thru — 80 -90%
• EB Left / SB Right — 50 -70% (least direct route, backward movement, some will use CH 15 and CH 17)
In addition, existing traffic in the Vierling Drive area would likely use the new connection (even without the TH
169 access open). We are estimating a total of 5,000 to 6,000 additional trips on Vierling Drive during the
detour stage.
The 2 -lane temporary roadway portion and the existing 4 -lane Vierling Drive will provide an adequate level of
service. The all -way stop intersection at CH 15 and Vierling Drive will provide appropriate intersection control
for the detour. It is expected that the northbound approach may experience some delay during the peak
traffic periods.
C: Lisa Freese, Scott County
Craig Jenson, Scott County
An Equal Opportunity /Safety Aware Employer
^4 ; -�" ,
It ' � x ^ ', ,,, - _ • �.
yie %. ; — �+v�
, . "5 •C ' 1 . 4. mil'
.
4
• ' 4 ' 11 . **.4 ' ' * A 4 7, *. ' ' `.; erif . ,,,,4,,,, 0 ... ,.
4
A - Iry 4 . „ ..,,.... , , _.,....____ „....
.. ,
.. ,A,„,,, ,,,,;..., e. 7 % , - -,-, - ', „ „ .., , qv*" ' ig.
sit:',. \ t 4 .. • . ..,s,-, ., : .0\ ‘.....- 1. --- - .
��`
" J A � 11 ,f!' !v t Mkt y {, . � . .- 44 : s St
•
. ; d1
r
.. ry , / • �
a
.\ ri Ate. - ,t � M P , A ,
^^: 4 ., a ` � ` S •
.� r sv i' + 4, ^ '+, ' , N " ,
i
•
R ^ ,
d 4 .
• '.. -. x •: 1 -'
! ■ PROPOSED 40117 1 "
� P °'° 19nDOT RON PARCELS
4.
OM 11alcal
Q C.S.AJ1.� c. S. _'
69 N.B.
t Y Y
4 C69 N.d S.A. 8 . I 69 S.B.^ —I 1 —M ME 1111 IN
ELEVATION VIEW A -A ELEVATION VIEW B -B
PIER ABUTMENT FACE
—i A
►B
• 1 111111111141111 1�111111IIIIU111bIdIl1U11111111 •1111111111I11111g 11111111111mini�Up�l1111111111 �1g1�1�1( i�, �IIIIUIIIJIINII@ IIIIIIIIIIIII I�Illllll�llllllf�llplllllllll IIIIIIIIIIE) PIIIIY�IUIIIIIIIfIIIN1111�IIlUllllllmi m.9..,Nia
}
NORTH ABUT AP NT _.—. -A Ye1f'
.M ,- �- ;CU,H ABUTMENT
F' MM
o 8
4 T.N. I69 0.8. --1 I - - - -C T.R. 169 C.B.
A
WEST ELEVATION
o ,o •
NOT FINAL
AESTHETIC CONCEPT 4 M.A.S. 1 " 0 -6.N- BRIDGE NO.
STATE PROJECT NO. 7005 -70007 SHEET NO. 1 OF 2 SHEETS 70007
_ 4 C.S.Ax
69 N.S. I r ' 69 S.I.
i I .---.,
IX -..q
-
I dl► i d ► " Al.
/l m i ► di 1, A J
I �� ARCHITECTURAL CONCRETE TEXTURE
IICUT STORE) (TYP.)
L — 1
PIER ELEVATION
ARCNITECT1 AL CONCRETE TEXTURE
/!ITNIN BRlCItI
!
'ARCHITECTURAL CONCRETE TEXTURE
i1fV' S' ,If )
f �A
A ELT
ABUTMENT ELEVATION
NOT FINAL
AESTHETIC CONCEPT 4 I WAS. CHK O.A.H. BRIDGE NO.
STATE PROJECT NO. 7005 -70007 I SHEET NO. 2 OF 2 SHEETS 70007
Washington Postiite Enhanced LED Utility Washington Posttite LED State Street LED
________Ali ti
Cast Aluminum Finial
Prismatic Reflector
Prismatic
Refractor
\'(k f
•
' 07 ` r �� Electrical Ho it } _ c -
Or 1 / e Pole Options 11.111,111/ , I r o u,
e
1
s..
'trial and Cover Options for the Classic and Premier Optics offers a variety in
luminaire shapes. decorative trim and uptight options
t r ve
3
y^
1 W
':-...r..,i‘Mi W
r
Olt
C.
- l-hotacell v.r c1o,.• Slipfitter mounts to 3 " D x 3"H
is hidden to maintain pole tenon, and is secured in
Internal LED stake design offers v._.. architectural form place through the use of six hex
state -of- the -art light control and NI i . socket screws
thermal management
AG:cess Door for easy access
to the electronic driver
(Enhanced and Utility model: s=ole Options include a variety
of pole materials and styles
available to complement
luminaire and site architecture
4 HOLOPHANE"" • DCCoitdJIVE 1 Washington Series LED
r
XX - XX "
1 �
,t =
H H 01 6.0"