HomeMy WebLinkAbout15.C.2. Award Contract for River District Sewer Reconstruction, PRoject 2003-1-Res. No. 6046 /0, c. L , CITY OF SHAKOPEE Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director SUBJECT: Consider A warding the Contract for the River District Reconstruction, Project No. 2003-1 DATE: April 20, 2004 INTRODUCTION: Attached is Resolution No.6046, which accepts the bids and awards the bid for the River District Reconstruction, Project No. 2003-1. Also included is an extension agreement with Bonestroo, Rosene, Anderlik & Associates, Inc. to provide engineering services on the construction phase associated with this project. BACKGROUND: On March 1, 2004, City Council adopted Resolution No. 6020, which approved the plans and specifications and authorized staff to advertise for bids for Project No. 2003-1 for the River District sewer line improvements, Phase I, from the Lewis Street bridge to the Metropolitan Council Environmental Services lift station, L-16. Bonestroo, Rosene, Anderlik and Associates, Inc. is the consulting firm that completed the design and on April 15, 2004 a bid opening was held on this project. A total of five bids were opened for this improvement project. The bids are summarized in the attached resolution. From the bid opening, the low bidder is Barbarossa & Sons, Inc. with a bid of $1,395,829.80. The Engineer's estimate for this project is $1,540,000.00 and the low bid received is under the estimate. The design engineer's recommendation is to award the contract on the base bid and not accept the Alternate No.1 substitution of Flowtite Pipe. Attached to this memo is the recommendation from Bonestroo, Rosene, Anderlik & Assoc. This project has been on the schedule for many years, to replace the River District sewer line, which has many defects in the line allowing substantial amounts of river infiltration into the system, which is then paid for by the City with its treatments at the Metropolitan Council treatment system. In addition to awarding this contract, City staff would need to authorize consultant engineering services to provide surveying and construction administration services necessary for this project. Attached to this memo is an extension agreement with Bonestroo, Rosene, Anderlik & Associates for construction, surveying and engineering services. If Council awards the contract, staff is also requesting a contingency amount equal to 5% of the contract to cover minor change orders and quantity adjustments that may occur on the project. ALTERNATIVES: 1. Accept the low bid of$1,395,829.80 and adopt Resolution No. 6046. 2. Reject the low bid and award the bid to another bidder. 3. Reject all bids and rebid. 4. Authorize the appropriate City officials to execute an extension agreement with Bonestroo, Rosene, Anderlik & Associates, Inc. for consultant services on this project. 5. Approve a 5% contingency amount on this project for use by the City Engineer in authorizing change orders or quantity adjustments on this project. 6. Table for additional information. RECOMMENDATION: Staff recommends Alternative No.1, 4 and 5 for this project to commence. ACTION REQUESTED: 1. Acceptthe low bid of$I,395,829.80 and adopt Resolution No. 6046. 2. Authorize the appropriate City officials to execute an extension agreement with Bonestroo, Rosene, Anderlik & Associates, Inc. for consultant services on this project. 3. Approve a 5% contingency amount on this project for use by the City Engineer in authorizing change orders or quantity adjustments on this project. ~~ Public Works irector BUpmp ENGRl2002PROJECTSIRIVERDISTRlCTIWORDlMEMO RESOLUTION NO. 6046 A Resolution Accepting Bids For The River District Trunk Sewer Reconstruction, From Adams Street To 900 Feet East ofL-16 Project No. 2003-1 WHEREAS, pursuant to an advertisement for bids for the River District Trunk Sewer Reconstruction, from Adams Street to 900 feet east of L-16, Project No. 2003-1, bids were received, opened on April 15, 2004, and tabulated according to law, and the following bids were received complying with the advertisement: Bidder Amount Barbarossa & Sons, mc. $1,395,829.80 Utility Systems of America, Inc. $1,403,001.75 S.J. Louis Construction, Inc. $1,543,438.50 Lametti & Sons, Inc. $1,651,703.50 S.R. Weidema, mc. $1,740,215.24 WHEREAS, it appears that Barbarossa & Sons, Inc., P.O. Box 367, Osseo, MN 55369 is the lowest responsible bidder for the River District Trunk Sewer Reconstmction improvements. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA: 1. The appropriate City officials are hereby authorized and directed to enter into a contract with Barbarossa & Sons, Inc. in the name of the City of Shakopee for the River District Trunk Sewer Reconstruction Project according to the plans and specifications therefore approved by the City Council and on file in the office of the City Clerk. 2. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposits of the successful bidder and the next lowest bidder shall be retained until a contract has been signed. Adopted in session of the City Council of the City of Shako pee, Minnesota, held this day of , 2004. Mayor of the City of Shako pee ATTEST: City Clerk n Bonestroo, Rosene, Anderllk and AssocIates, Inc. Is an Affirmative Action/Equal ;::. ~> Opportunity Employcr and Employec Owncd .' -..' .....,. Bonestroo Principals: OlloG Bonestroo.PE,'MarvlnL Sorvata.PE 'GlennR Cook,PE 'RobertG , ' Scl1unlcht. P E . Jerry A Bourdon. P E ,Wl/ ,;;,,', Rosene SenlorConsullan/s: RobertW Rosene.PE .,JosephC Anderlik,PE 'RlclmrdE Turner. ,. _ t. . P E 'Susan M Eberlin, CPA 1"Bl",'~i>'Kl1" An derJIJ< & Assocla/e Principals: Keith A. Gordon, P E 'Robert R. Pfeffcrle, P E . Richard W, Foster. -~' .' P,E ,Oavld 0 Loskola. P E ,Mark A Hanson. P.E . Michael TRautmann. P E ,Ted K i!!ill! ..- . Field, P.E 'Kenneth P, Anderson, P E 'Mark R Rolls. P E 'DavId A Boneslroo. M.B A ' . '. Assoc,"ates Sidney P WllliamsDn. P E . L S. . Agnes M Ring. M B A . Allan Rick Schmidt. P E ' Thomas "., .~ W PelersDn. P E . James R Maland. P E . Miles B ,Jensen. P.E . l Phillip Gravel Ill. P E . " Daniel ,J. Edgerton. P E . lsmael Martinez. P E . Thomas A. Syfko, P.E . Sheldon J Johnson' _ . Dale A Grove. P E . Thomas A Roushar. P E . Robert J DeverI', P E Engineers &. Architects Ofllces: St Paul.S/ Cloud. RochesterandWiIlmar.MN'Milwaukee.WI'Chlcago.IL Rochester Branch Manager: Richard M HeftI. P E . M a A WebsI/o: W'MV bDneslrDo com April 15, 2004 Mr, Bruce Loney City of Shakopee 1.29 Hohnes Street So. Shakopee,NnN 55379 Re: West River Interceptor Replacement & Improvements City of Shakopee File No, 77-03-104 Dear Mr. Loney: According to our Agreement for Professional Services within the City of Shakopee and Section C-2, this extension agreement is written to provide construction administration/engineering on an as needed basis and construction surveying services for the above-referenced project. We are proposing to complete the work as detailed on the attached scope of services, Exhibit A, Construction surveying services will be completed on a cost-reimbursable basis as necessary in accordance with our attached cunent fee schedule. The total cost for these surveying services in estimated to be in the $28,000 to $34,000 range. Please note these costs are for surveying services only, time spent on record drawings will be completed on a cost-reimbursable basis as necessary in accordance with our attached current fee schedule. The City of Shakopee agrees to reimburse Bonestroo & Associates for these services in accordance with Section IV of the Agreement for Professional Services. If this agreement meets with you approval, please sign below and return on copy to our office. Yours ve~uly, Q4- 'i-j.fi-r- DanD, BoyuV 0 City Administrator City Clerk Mayor Date 112 7th Street N.E. . Rochester, MN 55906.507.282.2100. Fax: 507-282~3100 Exhibit A West River Interceptor Replacement & Improvements Sbakopee Project No. 2003-1 File No. 77-03-104 SCOPE OF SERVICES . Construction Administration/Engineering - This task includes con'espondence with the City of Shakopee on an as needed basis to provide teclmical direction on aspects of the project. Other responsibilities will include the review of payment vouchers and interpretation of design as needed during constructioll. This work will be completed on a cost-reimbursable basis at the rates in the attached rate schedule. . Construction Staking - Bonestroo & Associates will provide a full time survey crew to do all construction staking for this pr~ject including sanitary sewer, sewer services, stonn sewer, and trails, Our crews will coordinate with the on site City inspector to insure that construction staking operations are conducted in a timely and efficient manner. Staking will be performed as detailed in the Project Management and Coordination section of the Project Manual. . Record Drawings - Upon completion of the project, Bonestroo & Associates will prepare the final record drawings, based on the field information provided by the City's inspector. Prior to submitting Mylar's and electronic files, photocopies of the drawings will be submitted to the City for review and approval. This work will be completed 011 a cost- reimbursable basis at the rates in the attached rate schedule. 2004 RATE SCHEDULE (Municipal) Classilication 2003 ChI!. 2004 Senior Principal $ 105.00 - $ 115.00 2% - 2% $107,00 - $ 117.00 Principal I Senior Project Manager $ 101.00 - $ 111.00 2% - 3% $ 10300 - $ 11400 Specialist* $ 90,00 - $ 150.00 2% - 0% $ 9200 - $ 15000 Project Manager I Planner $ 9600 - $ 10600 2% - 3% $ 98.00 - $ 109,00 Registered Engineer/Architect/Landscape Architect I Sf GIS Designer $ 84.00 - $ 96,00 2% - 2% $ 86.00 - $ 98,00 Project Engineer/ Architect/Scientist/Landscape Architect $ 74,00 - $ 85.00 2% . 2% $ 7500 - $ 87,00 GIS Designer I Senior Designer $ 71.00 - $ 80_00 2% - 4% $ 7200 - $ 83,00 Graduate Engineer! ArchitecVScientistlLandscape Architect $ 69.00 - $ 7800 2% - 3% $ 70 00 - $ 80,00 Senior Draftsperson $ 59.00 - $ 73,00 2% - 3% $ 60,00 - $ 7500 Draftsperson $ 55,00 - $ 67.00 2% - 3% $ 56.00 - $ 69.00 Project Technician $ 38.00 - $ 4400 2% - 3% $ 39,00 - $ 45.00 Senior Field Supervisor $ 76,00 - $ 8700 3% - 6% $ 78.00 - $ 9200 Field Supervisor I Senior Crew Chief $ 67.00 - $ 80,00 3% - 6% $ 69.00 - $ 8500 Senior Inspector $ 60.00 - $ 74.00 2% - 4% $ 61.00 - $ 7700 Inspector I Crew Chief I Senior Technician $ 56.00 . $ 6900 2% - 3% $ 57,00 - $ 7100 Technician $ 38.00 - $ 54.00 2% - 3% $ 39.00 - $ 56.00 Two Person Survey Crew = $124 per hour "Specialist: Experts in highly technical disciplines, These rates are adjusted annually in accordance with the Honnal review procedures of Bonestroo, Rosene, Anderlik and Associates, Inc City of Shakopee 2004 INDIVIDUAL RATES Individual Classification 2004 Dan Boyum Project Manager $98 00 Angela Popenhagen Project Manager $98,00 Mike Hirsch Senior Field Supervisor $85.00 Peter Eckert Senior Crew Chief $85.00 Randy Herter Senior Draftsperson $68.,00 City of Shakopee JLlA Bonestroo Bonestroo, Rosene, AnderJil( and Associates, 'nc. is an Affirmative Action/Equal Opportunity Employer and Employee Owned Principals: Otto G, Bonestroo. PE. . Marvin L Sorvala. PE. . Glenn R. Cook. PE, . Robert G, Schunicht. PE, . _ .. Rosene Jerry A. Bourdon. PE. . Mark A. Hanson, PE. '1\11 Anderlik & Senior Consultants: Robert W. Rosene. P.E, . Joseph C. Anderlik. P.E, , Richard E. Turner. PE, . Susan M. Eberlin. C.PA Associates Associate Principals: Keith A. Gordon. P.I:. . Robert R. Pfefferle. P.E. . Richard W. Foster, P,I:, . David O. Loskota. PI:, " Michael T, Rautmann, PI:. . Ted ~. Field. P.I:, . Kenneth P. Anderson. PI:, , Mark R, Rolfs, PE, . David A. Bonestroo. M,B.A. . Engineers & Architects Sidney P, Williamson. P,E.. LS, . Agnes M, Ring. M.B.A. ' Allan Rick Schmidt. PE. . Thomas W, Peterson. pE, . James R, Maland. PE. . Miles B, Jensen, PE,. Lfhillip Gravel III. P.I:, . Daniel J, Edgerton. PE. . Ismael Martinez. PE. , TI10mas A. Syfko. P.E, , Sheldon j, Johnson. Dale A. Grove. P.E. . Thomas A. Roushar. PE.' Robert J. Devery. PE, Offices: St. Paul. St. Cloud. Rochester and Willmar. MN' Milwaukee. WI 'Chicago. IL Website: www,bonestroo,com Apri115, 2004 ) ~ C. )J Mr. Bruce Loney Director of Public Warks City of Shakopee 129 Holmes Street South Shakopee,~~ 55379 Re: West River Interceptor Replacement and Improvements City Project ~o. 2003-1 Bonestroo File ~o. 77-03-104 Recommendation of Contract A ward Dear Bruce: Bids were ope'iled for the above referenced project on Thursday, April 15, 2004 at 10:00 A.M. There were a total of five (5) bids., The low bidder on the project was Barbarossa & Sons with a Base Bid of $1,395,829.80. The base bid was for furnishing and installingHobas pipe. Barbarossa offered a deduct of $4,584.50 under Alternate ~o. 1 for Flowtite pipe. Hobas pipe has provided over three and a half million feet of pipe in the United States. The City of Chaska installed Hobas pipe for a very similar project (high groundwater and infiltration) approximately five years ago. Chaska has been very happy with the Hobas pipe and its ability to exclude infiltration. Flpwtite pipe has been manufactured internationally for several years. Their United States plant has only been in operation a short time, though. Flowtite still has not completed the ASTM D3262 strain corrosion testing for pipe manufactured in the United States. Based on Hobas pipe's long track record in the United States and compared to Flowtite's recent entry into the market, Bonestroo's opinion is the Hobas pipe represents the best value forthe City of Shakopee. We therefore recommend award of the West River Interceptor Replacement and Improvements Project to Barbarossa and Sons on the basis of the base bid (Hobas Pipe) in the amount of $1,395,829.80. Should you have any questions, please feel free to contact me at (651) 604-4829. Yours very truly, BONESTROO, ROSENE, ANDERLIK & ASSOCIATES, INe. Cj)~ GOr- Dan D. Boyum, P.E. CC: Tom Roushar, Bill Johnson- Bonestroo . 2335 W:estHighw.ay36~St.~auJ,MN 551P.- ,651-636-4600 · Fax: 651-636-1311