HomeMy WebLinkAbout15.A.1. Awarding Contract for Weinandt Acres Reconstruction, 2004-1-Res. No. 6090
I 5. A. r
CITY OF SHAKOPEE
Memorandum
TO: Mayor & City Council
Mark McNeill, City Administrator
FROM: Jeff Weyandt, Assistant City Engineer
SUBJECT: Consider A warding a Contract for the
Weinandt Acres 1 st Addition Street Reconstruction,
Project No. 2004-1
DATE: July 20, 2004
INTRODUCTION:
Attached is. Resolution No. 6090, which accepts the bids and awards a contract for the
Weinandt Acres 1st Addition Street Reconstruction, Project No. 2004-1. Also included is
an extension agreement with WSB & Associates, Inc. to provide engineering services on
the construction phase associated with this project.
\
BACKGROUND:
On June 15,2004, City Council adopted Resolution No. 6064, which approved the plans
and specifications and authorized staff to advertise, for bids for the Weinandt Acres 1st
Addition Street Reconstruction, Project No. 2004-1. The project includes reconstructing
the streets located in Weinandt Acres 1 st Addition.
On July 19, 2004, a bid opening was held on the Weinandt Acres 1st Addition Street
Reconstruction Project, in which there were four bids opened for this improvement
project. The bids are summarized in the attached resolution. From the bid opening, the
apparent low bidder is Wm. Mueller & Sons, Inc. with a bid of $307,927.90. The
Engineer's estimate for this project is $260,000.00.
The feasibility study contained a construction cost estimate of approximately
$260,000.00 and a project cost estimate of approximately $323,000.00. Adding a 5%
contingency to the actual low bid the projected project cost is approximately
$384,000.00, which is 16% above the estimated project cost in the feasibility study. The
increase in project cost would increase the projected assessments from $4,747.00 per lot
to $5,650.00 per lot, and would increase the projected City costs from $242,100.00 to
$288,000.00. Since the feasibility study, two feet of granular borrow and draintile have
been added to 29th Avenue.
ill addition to awarding this contract to the low bidder, City staff will need to authorize
consultant engineering services to provide surveying and construction administration
services necessary for this project. Attached to this memo is an extension agreement with
WSB & Associates, Inc. to perform the necessary services.
If Council awards the contract, staff is also requesting a contingency amount equal to 5%
of the contract to cover minor change orders and quantity adjustments that may occur on
the project.
ALTERNATIVES:
1. Accept the low bid ofWm. Mueller & Sons, Inc. and adopt Resolution No. 6090.
2. Reject the low bidder and award to another bidder.
3. Reject all bids and rebid.
4. Authorize the appropriate City officials to execute an extension agreement with
WSB & Associates, Inc. to perform consultant services on this project.
5. Approve a 5% contingency amount on this project for use by the City Engineer in
authorizing change orders or quantity adjustments on this project.
6. Table for additional information.
RECOMMENDATION:
Staff recommends Alternative No.1, No.4 and No. 5 in order for this project to
commence.
ACTION REQUESTED:
1. Offer Resolution No. 6090, A Resolution Accepting Bids on the Weinandt Acres
1 st Addition Street Reconstruction, Project No. 2004-1 and move its adoption.
2. Authorize the appropriate City officials to execute an extension agreement with
WSB & Associates, Inc. to perform consultant services on this project.
3. Approve a 5% contingency amount on this project for use by the City Engineer in
authorizing change orders or quantity adjustments on this project.
,
Jeff Weyandt
Assistant City Engineer
BUpmp
ENGR/2004PROJECT/WEINANDTACRES/WORD/MEM6090
RESOLUTION NO. 6090
A Resolution Accepting Bids For
For Weinandt Acres 1st Addition
Street Reconstruction
Project No. 2004-1
WHEREAS, pursuant to an advertisement for bids. for Weinandt Acres 1 st Addition Street
Reconstruction, Project No. 2004-1, bids were received, opened on July 19, 2004, and tabulated
according to law, and the following bids were received complying with the advertisement:
Bidder Amount
Wm. Mueller & Sons, Inc. $307,927.90
Bituminous Roadways, Inc. $316,677.00
Hardrives, Inc. $354,059.30
Midwest Asphalt, Inc. $373,864.25
WHEREAS, it appears that Wm. Mueller & Sons, Inc., 831 Park Avenue, P.O. Box 247,
Hamburg, MN 55339 is the lowest responsible bidder for the Weinandt Acres 1st Addition Street
Reconstruction Project improvements.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
SHAKOPEE, MINNESOTA:
1. The appropriate City officials are hereby authorized and directed to enter into a
contract with Wm. Mueller & Sons, Inc. in the name of the City of Shakopee for the Weinandt
Acres 1st Addition Street Reconstruction Project according to the plans and specifications therefore
approved by the City Council and on file in the office of the City Clerk.
2. The City Clerk is hereby authorized and directed to return forthwith to all bidders
the deposits made with their bids, except that the deposits of the successful bidder and the. next
lowest bidder shall be retained until a contract has been signed.
Adopted in session of the City Council of the City of Shakopee,
Minnesota, held this day of , 2004.
Mayor of the City of Shakopee
ATTEST:
City Clerk
~
WSB
& Associates,Inc.
July 19, 2004
Mr. Bruce Loney, P.E.
Public Works Director/City Engineer
City of Shakopee
129 Holmes Street South
Shakopee, MN 55379-1376
Re: Extension Agreement to Provide Surveying Services
Weinandt Acres 1 st Addition Street Reconstruction
City Project No. 2004-1
WSB Project No. 1566-04
Dear Mr. Loney:
According to our Agreement for Professional Services within the City of Shakopee and Section 1-
C-2 (Major Projects), this extension agreement is written to provide construction surveying
services for the above-referenced projects.
Construction surveying services will be completed on a cost-reimbursable basis as necessary in
accordance with our attached current fee schedule. The total cost for these surveying services will
be in the $5,000.00 to $6,300.00 range. Please note these costs are for surveying services only, time
spent on construction management and record drawings will be completed on a cost-reimbursable
basis as necessary in accordance with our attached current fee schedule. The City of Shakopee
agrees to reimburse WSB & Associates for these services in accordance with Section N of the
Agreement for Professional Services.
If this agreement meets with your approval, please sign below and return one copy to our office.
Sincerely,
WSB & Associates, Inc.
City Administrator
Tom Voll, P.E.
City Clerk
Mayor
Date
c: \Documents and Settings \JW eyandt\Desktop \extltr -071904.doc
~
WSB 2004 Rate Schedule
& Associates, Inc.
"' " , Billing
"
, ;
~F Rate/Hour
Principal $116.00
Associate $109.00
Sr. Project Manager $101.00
Project Manager/Engineering Specialist III $91.50
Registered Engineer/Engineering Specialist II $82.50
Project Engineer/Engineering Specialist I/Sr. Construction Observer $74.00
Graduate Engineer $65.00
Construction Observer $67.00
Engineering Technician IV/Scientist III $60.50
Engineering Technician III/Scientist II $55.00
Engineering Technician II/Scientist I $49.00
Engineering Technician I $43.00
Office Technician II $53.00
Office Technician1 $29.50
Registered Land Surveyor $103.00
Survey (Two-Person Crew) $122.00
Survey (Three-Person Crew) $145.00
GPS Equipment $39.00
All costs associated with word processing, vehicle mileage, cell phones, reproduction
of common correspondence and mailing are included in the above hourly rates.
Reimbursable expenses include costs associated with plan, specification and report
reproduction, permit fee, delivery cost, etc.
Rate Schedule is adjusted annually.