CITY OF SHAKOPEE
Memorandum
TO: Mayor and City Council
FROM: Mark McNeill, City Administrator
SUBJECT: Downtown Fire Station Stucco Bid
DATE: July 23, 2004
INTRODUCTION:
The Council is asked to authorize staffto seek bids for the removal and replacement of
the exterior stucco at Downtown Fire Station No. 50.
BACKGROUND:
Last year, the Council directed staffto make improvements to the Downtown Fire Station
to extend its useful life to the City by five years. The roof has been replaced; several
doors still need to be replaced.
The major item remaining is the replacement ofthe exterior stucco. From what can be
determined, the stucco appears to have been added after the building was constructed,
possibly to deal with water infiltration that was otherwise occurring because ofthe
concrete block construction material. The stucco on the east side ofthe building has been
removed, as it was a safety hazard having the extension delaminating that had occurred.
Initially working with former Councilmember Clete Link, and more recently with Oertel
Architects (who has drawn up plans and specifications), we arrived at an estimate
showing that the entire project will likely be in excess of $50,000. As a result oftms,
there will need to be a formal bid taken.
Note that the estimates that have been received indicate that removing the remaining
stucco will add approximately up to $14,000 to the proj ect. One possible solution that
was investigated was to have Sentence to Service do that removal work. However, it
would notreduce the overall cost ofthe project below the $50,000 formal bid threshold.
In addition, there appear to be some coordination problems between the time that the
stucco would be removed, and when it could be replaced. Therefore, the
recommendation of staffis that the removal be bid as partofthe contract itself, rather
than having it done separately by the Sentence to Service laborers.
BUDGET IMPACT:
We estimate the cost to be in the $65,000 to $70,000 range. Money for this is budgeted,
and is available in the Building Fund.
RECOMMENDATION:
I recommend that the Council adopt the plans and specifications as put together by Oertel
Architects, and direct that formal advertisement be made.
The bids would be opened on September 3rd, and that it be brought back to Council for
award at the regular meeting of September ih. Given the anticipated time needed to do
the project, it is important to proceed with this soon, so that cold weather does not impact
the project.
ACTION REQUIRED:
If the Council concurs, it should, by motion, approve the plans and specifications for the
removal and replacement ofthe exterior stucco at Downtown Fire Station No. 50, and
direct that formal advertisement for bids be made.
Y"VL1\~
Mark McNeill
City Administrator
MM:th
INVITATION FOR BIDS
FIRE STATION STUCCO PROJECT
NOTICE IS HEREBY GIVEN that sealed bids will be received by the City Council for
the City of Shakopee, Minnesota, until 1 0:00 A.M. on Friday, September 3, 2004, at which
time bids will be opened, for construction of the following: Fire Station Stucco Project.
The contract includes the installation of complete stucco system including building paper,
lath, accessories, stucco, removal and re-setting of equipment/components and related work
for a complete installation.
Bids should be submitted and specifications may be obtained at the office of the City Clerk,
City Hall, 129 South Holmes Street, Shakopee, Minnesota, 55379, (952-233-3800). Bids
must be sealed and the envelope clearly marked on the outside that it is a bid for this
improvement.
Each bid shall be accompanied by a bid bond, cash deposit, certified bank letter of credit, or
certified check made payable to the City of Shakopee, Minnesota, in the amount of five
percent (5%) of the total bid amount, as a guarantee that the bidder will enter into the
proposed contract within the time specified and at the price bid. No bids may be withdrawn
for a period of forty-five (45) days from the date of opening of bids.
The City Council of the City of Shakopee reserves the right to rej ect any or all bids, to waive
any defects or technicalities in bidding, and to determine whether a bid is responsive or non-
responsive. The City Council further reserves the right to make a bid award to the lowest
and most responsible bidder as determined by the City Council.
Published by authority of the City Council of Shakopee, Minnesota the lih day of August,
2004.
Judith S. Cox, City Clerk
CITY OF SHAKOPEE
Published in: Shakopee Valley News on August 12 and August 19,2004
BID PROPOSAL FORM
CITY OF SHAKOPEE
FIRE STATION STUCCO PROJECT
SHAKOPEE, MINNESOTA
Bid due time and date: 10:00 AM CDT-Friday, September 3,2004
Bid opening: 10:00 AM CDT-Friday, September 3, 2004
SUBMITTED TO: City of Shakopee
SUBMITTED BY:
Company
Address
Telephone number
Dear Mayor, Council Members and City Administrator,
The undersigned understands and agrees that the Instructions to Bidders, General Conditions and
Supplementary Conditions are a binding part of this proposal to perform the Work, and that the
Contractor has:
1. become familiar with the site, site conditions, existing features, existing work to remain
and all related components of the Work.
Z. reviewed the construction documents as prepared by Oertel Architects, dated 5/11/2004,
including specification sections 0 I 0 I 0, 02060, 07900, 09225 and drawings AI. 0, AI.l, A2.1,
A2.2 and A2.3.
3. reviewed all addenda.
4. included all items necessary to complete the project as shown and described in the
Construction Documents, including construction schedule listed in the Summary of Work.
1
BASE BID
Base Bid Amount:
Dollars ($ .00)\
CHANGES IN THE WORK
For elements ofthe work that are not in the Base Bid, the general contractor's and sub-contractor's
overhead and profit shall be limited to the following percentages, which are added/deducted to the
subcontractor's or sub-subcontractor's direct cost:
Add/extra: Ten percent (10%) to the Contractor
Deduct/credit: No change (0%) to the Owner or Contractor
AGREEMENT:
The Contractor/bidder agrees that this Bid may not be withdrawn for a period of 45 days. A Bid
Bond in the amount of5% of the total bid is attached and shall be accepted by the City of Shako pee
in the event of a withdrawal or forfeiture by Bidder.
The Owner reserves the right to accept or reject all bids and to waive any informalities or
irregularities, and to accept or reject any discrepancies in the bidding procedures or documents.
ADDENDUM RECEIPT
The following addenda were reviewed and incorporated into the bid:
Addendum #1 :
Addendum #2:
BID ACCEPTANCE
The Contractor/bidder agrees to execute a standard City of Shakopee contract and shall furnish
Performance and Material and Labor Payment Bonds with such surety or sureties as the Owner may
approve. Cost ofthese bonds is included in the base bid amount. Attach Bid Bond to this Bid Form.
2
The undersigned bidder represents that the information and assurances are accurate to the best of
their knowledge:
Signed and sealed this _ day of ,2004.
Business name
Address
SEAL (if applicable):
Phone: Fax:
By: Title:
Signature:
3
SHAKOPEE FIRE STATION STUCCO PROJECT 5/11/2004
SECTION 01010 - SUMMARY OF THE WORK
PART 1- GENERAL
RELATED DOCUMENTS:
Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-l Specification
section, apply to work of this section.
SCOPE OF WORK:
The contract includes the installation of complete stucco system including building paper, lath, accessories. stucco, removal and
re-setting of equipment/components and related work for a complete installation. The work also includes the demolition and off-
site removal of the existing stucco. The contractor shall work around the existing electrical conduits and equipment, and re-set
items as shown or as required.
The new work includes all coordination, temporary facilities, clean up, and all other requirements for a complete job. At a
minimum, this includes barricades, temporary fencing, signage, temporary power, toilets, safety items, and other items necessary to
manage and supervise this project.
Contractor shall be responsible for obtaining all permits for their relative project. The fees that are to be paid for by the Contractor
include all permits, fees, surcharges typically charged for all roof type construction projects. The City does not waive these fees.
SCHEDULE:
It is imperative that the work be started promptly, with early ordering oflead items and submittal of sho? drawings, in order to
achieve the following schedule noted in the front end of this specifications.
Bid Due Date (verify exact date with the City of Shako pee): Septmber 3,2004
Tentative A ward of Contract: September 7, 2004
Pre-con meeting, Start-up, begin ordering shop drawings for critical items: September 10, 2004
Substantial Completion of work (45 days): October 25, 2004
Total Project Completion and Close-out: November 5, 2004
OWNER / CONTRACTOR USE OF PREMISES:
General: During the entire schedule, the Contractor shall have use of the premises but allow the city to use the site and arrange for
the demolition of the existing stucco work, ifnot completed. Do not proceed with new stucco work until the demolition of existing
stucco is completed, under this contract.
SHOP DRAWINGS. SUBMITTALS AND PAY REOUESTS:
The contractor shall arrange all submittals and close-out documents with the designated representative authorized by the City. The
required submittals include the following:
Shop drawings
Requests for additional information
Payment requests
Proposed schedule
Close-out items: warranty, completed punch list, IC-134 forms
SUMMARY OF WORK 01010-1
SHAKOPEE FIRE STATION STUCCO PROJECT 5/11/2004
Allow time for processing these documents. Plan ahead on the lead items, allowing for a one week review of shop drawings and
up to 30 days for processing of progress payments.
Do not begin work until the required shop drawing submittals are reviewed and approved.
PART 2 and 3 - PRODUCTS AND EXECUTION (Not applicable).
END OF SECTION 01010
SUMMARY OF WORK 01010-2
SHAKOPEE FIRE STATION STUCCO PROJECT 5/11/2004
SECTION 02060 - SELECTIVE DEMOLITION
PART 1 - GENERAL
RELATED DOCUMENTS:
Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-l Specification sec-
tions, apply to work of this section.
DESCRIPTION OF WORK:
Section includes miscellaneous demolition of the existing stucco, lath and associated work as specified herein, as summarized
below and as required for the stucco contractor to perform an adequate installation of new materials.
Protect portions of the building that are to remain. Include identification and protection of utilities and adjacent property,
barricades and all precautionary procedures.
Coordinate the demolition work with the staging requirements so that the work proceeds in a logical and uniform manner. Do not
demolish or remove portions of the existing stucco that cannot be covered, corrected or replaced, in order to secure and protect the
existing building shell.
RELATED WORK:
Section 09225. Stucco
SUBMITTALS:
Schedule: Prior to the start of any demolition work, submit schedule indicating proposed methods and sequence of operations for
selective demolition work to Architect and Owner's Representative for review prior to commencement of work. Include coor-
dination for shut-off, capping, and continuation of utility services as required, together with details for dust and noise control
protection.
.JOB CONDITIONS:
Occupancy: The owner shall be occupying the building during the proj ect, but protections are to be maintained. Note that as it is
a fire station, the access to the building by both foot and vehcle traffic must be maintained at all times-if vehicle doors are must
be blocked, that shall be coordinated with the Fire Department in advance. Contractor shall provide temporary barricades and
other forms of protection as required to prohibit unauthorized persons from entering work site area and area offall-out from the
demolished materials. At no time should the public be allowed access into the work areas. Remove protections at completion of
construction work.
Damages: Promptly repair damages caused to adjacent materials by demolition work at no cost to Owner.
Provide signage to caution the public of the ongoing demoliton operations..
At the end of each work day, ensure that building is enclosed and secured through temporary walls and construction.
Ex{>losives: Use of explosives will not be pennitted.
Utility Services: Maintain existing utilities indicated to remain, keep in service, and protect against damage during selective
demolition and construction operations.
SELECTIVE DEMOLITION 02060 - 1
SHAKOPEE FIRE STATION STUCCO PROJECT 5/11/2004
Do not interrupt existing utilities serving occupied or used facilities, except when authorized in writing by authorities
having jurisdiction. Provide temporary services during interruptions to existing utilities, as acceptable to governing
authorities.
Environmental Controls: Use temporary enclosures, and other suitable methods to limit dust and dirt rising and scattering in
air to lowest practical level. Comply with governing regulations pertaining to environmental protection.
Perform demolition work in such a manner as to prevent all fIres. Burning on the site will not permitted.
Instruct workers in the use of fIre protection equipment and safety procedures.
PART 2 - PRODUCTS (Not Applicable).
PART 3 - EXECUTION
INSPECTION:
Prior to commencement of demolition work, inspect areas in which work will be performed. Photograph existing conditions to
structure surfaces, equipment or to surrounding properties which could be misconstrued as damage resulting from demolition
work; fIle with Owner's Representative prior to starting work. Otherwise, the contractor may be accountable for previously unseen
damage.
PREPARATION:
Identify items to be saved, and carefully removed and stored.
DEMOLITION:
Perform demolition work in a systematic manner. Use such methods as required to complete work indicated on Drawings in
accordance with demolition schedule and governing regulations.
If unanticipated mechanical, electrical or structural elements which conflict with intended function or design are encountered,
investigate and measure both nature and extent of the conflict and contact the owner.
Do not use save demolished or salvaged materials unless specified or approved in writing by the Owner or Architect at the
beginning o/the project. There is no intent to re-use any materials.
DISPOSAL OF DEMOLISHED MATERIALS:
Remove debris, rubbish and other materials resulting from demolition operations from building site. Transport and legally dispose
of materials off site.
Ifhazardous materials are encountered during demolition operations, notify Owner immediately. If allowed to continue,
comply with applicable regulations, laws, and ordinances concerning removal, handling and protection against exposure
or environmental pollution.
CLEAN-UP AND REPAIR:
Upon completion of demolition work, remove tools, equipment and demolished materials from site.
Repair adjacent materials soiled or damaged by demolition work.
SELECTIVE DEMOLITION 02060 - 2
SHAKOPEE FIRE STATION STUCCO PROJECT 5/11/2004
END OF SECTION 02060
SELECTIVE DEMOLITION 02060 - 3
SHAKOPEE FIRE STATION STUCCO PROJECT 5/11/2004
SECTION 09225 - EXTERIOR STUCCO
PART 1 - GENERAL
RELATED DOCUMENTS:
Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division-l Specification
sections, apply to work of this section.
DESCRIPTION OF WORK:
Section includes exterior stucco system, including building paper, lath, fasteners, base coat, finish coats and accessories as needed
for a complete installation.
Coordinate the demolition and removal of existing stucco, which is under this contract, with the new stucco work. The contractor
must verify the existing conditions and comply with the existing details, conditions, surface mounted items (conduits, boxes, lights,
etc.) and include the cost of working around these items as a part of the bid.
The owner recently installed a new roof and sheet metal work. Allowances were made for the stucco work to be installed given
that the stucco is proceeding after the sheet metal work.
RELATED WORK:
Sealants are specified in Section 07900.
QUALITY ASSURANCE:
1. Manufacturer shall have a minimum of five years of satisfactory experience at manufacturing and specifying stucco.
2. Installer shall have a minimum of five years successful experience installing exterior stucco systems.
3. Single Source Responsibility: Provide all components of exterior stucco system as manufactured by single supplier.
SUBMITTALS:
1. Shop Drawings: Submit complete shop drawings indicating details, connections, joints and related items. The contractor cannot
start the work until the shop drawings have been submitted and reviewed.
2. Samples: Submit full line of color selections for review and approval. After selection, provide two 12" x 12" samples of
texture / finish selected. One shall be retained for quality control.
DELIVERY, STORAGE, AND HANDLING:
Deliver systemmaterials to job site in original containers with labels intact.
Store materials in cool, dry location out of sunlight, protected from sunlight and from temperatures below 40oF.
Handle all materials according to label directions and manufacturer's printed recommendations. Handle system components
supplied by other according to those manufacturer's directions.
EXTERIOR STUCCO 09225 - 1
SHAKOPEE FIRE STATION STUCCO PROJECT 5/11/2004
JOB CONDITIONS:
Inspection: Inspect site conditions before beginning work. Report any unsatisfactory conditions to the contractor and Architect in
writing prior to starting work. Examine the existing stucco system in place for the locations of control joints, texture and related
items so that the new work matches the existing work.
Environmental Conditions: Do not begin installation unless ambient temperature is at least 40oF. and rising, and is expected to
remain so for at least 24 hours. Do not apply system materials to frozen or frost covered substrates.
PART2-PRODUCTS
MANUFACTURERS:
Subiect to compliance with requirements provide systems from the following manufacturer. Other manufacturers shall be
considered if documentation is submitted to the Architect.
Sonobom (SonoWall Hard Coat System)
Approved Equal.
MATERIALS:
Building Paper: #30 asphalt saturated felt.
Metal Lath: Provide self-furring, expanded metal lath as approved by the manufacturer, as follows:
Wire mesh: Selffurring galvanized woven wire mesh.
Expanded metal lath: Self furring ASTM C 847 , galvanized lath.
Strip mesh: Expanded metal lath in size as manufactured or recommended by manufacturer.
Metal Accessories: Beads, joints and related items as required by the manufacturer for a complete installation.
Adhesive: Vapor permeable product as recommended by the manufacturer.
Primer Coat: 100% acrylic based adhesive as recommended by the manufacturer.
Bond Coat: Pre-mixed acrylic based product as recommended by the manufacturer.
Base Coat: Cement based fiber-reinforced stucco base coat.
Finish Coat: Pre-mixed vapor permeable 100% acrylic finish coat with fme texture in standard color as recommended by the
architect. Provide samples for selection.
Fasteners: ASTM C 1063, type and size as required for the installation.
Water: Clear and potable, as needed, if allowed by the manufacturer.
Sealant: Specified in Section 07900, and complying with manufacturer's recommendations.
SYSTEM PERFORMANCE:
EXTERIOR STUCCO 09225 - 2
SHAKOPEE FIRE STATION STUCCO PROJECT 5/11/2004
Stucco System shall have been tested for moisture resistance, rain resistance, absorption-freeze, accelerated weathering, mildew
resistance, salt spray resistance, chemical resistance, abrasion resistance.
Stucco system shall have been tested to meet or exceed the following:
Property Test Results
Vapor Permeability ASTM 1653 3.8 dry perms and 9.7 wet perms
Tensile Strength ASTM D 412 6.8% eight loss
Elongation ASTM D 412 200 psi non-textured film
Wind driven rain TT-C-555B pass at 98 mph
Freeze-thaw lab method pass
Dirt pickup lab method none
PART 3 -EXECUTION:
INSPECTION:
Inspect substrate prior to application of system and verify that conditions are consistent with the manufacturer's requirements.
Notify the Contractor and Architect in writing of any unsatisfactory conditions prior to beginning work.
Coordinate work with the demolition of existing materials, and arrange for access to the work with the General contractor.
INSTALLATION:
Prior to installation, ensure that adjacent materials and surfaces are protected.
Install stucco system in strict compliance with approved shop drawings and manufacturer's printed recommendations and
instructions. The contractor shall work around the existing conditions and devices on the building. Provide standard and special
details to work with these existing conditions.
Comply with the manufacturer's recommendations for the primers and adhesives that are to be used on the project. Install building
paper as recommended by the manufacturer. Refer to manufacturer's literature for installation procedures and methods of
installing lath, base and fmish coats. If any items need to be removed to perform an adequate stucco job, this contractor shall
remove and re-install the same under this contract cost.
The drawings do not indicate specific beads. screeds. framing and lath that will be required to perform a complete installation.
Provide products as required, based on the design intent shown on the drawings, for a complete installation. Do not re-use any
existing materials that may be on site unless approved in writing by the Architect.
Allow coats and primers to dry before proceeding to the subsequent work. Cut out and remove any coats that do not comply with
the sample area.
CLEANING AND PROTECTION
At end of work, clean area, remove all materials, equipment and trash from site.
Instruct Owner and General Contractor in procedures for protecting completed stucco panels. Erect temporary protection as
necessary to protect bases of walls, projections, ledges and fascia from soiling and damage from splashed mud or dirt, or staining
from run-off of construction procedures.
EXTERIOR STUCCO 09225 - 3
SHAKOPEE FIRE STATION STUCCO PROJECT 5/11/2004
END OF SECTION 09225
EXTERIOR STUCCO 09225 - 4
ALL DIMENSIONS Sl-lOWN ARE FOR REFERENCE PURPOSES. -
SHADED AREAS INDICATE CONTRACTORS ARE EXPECTED TO VERIFY SIZES AND
AREAS FOR NEW STUCCO LOCATIONS PRIOR TO BIDDING 1 41'-"" r
OERTEL
ARCHITECTS
l-l
I EXI~irING WALL PACK LIGHT L 51'-0" I I. 1795 SAINT CLAIR AVENUE
I I TO BE REMOVED IF 1.0 'I ST. PAUl., MINNESOTA 551 05
! I NECESSARY AND (651) 696-51 B6 TEL.
~______ 1 I REINSTALLED AFTER SIGNAGE TO BE (651) 696-51 BB FAX
I -- -'--_..T-CON5TRUCtTW "REM€lVED AND -1 WWW.QERTELARCHITECTS.COM
! \ REIN~TALLED BY CITY
I I PROJECT NAME:
111111111111111111111111111111111111111111 4" CHANNEL REVEALI ~ Shakopee
b CONTROL JOINT
~ ~ Fi re Station
SEE@
A2:3
ro 334 2nd Ave W
EMERGENCY LIGHTS AND \ Shakopee, Minnesota
CAlL BOX TO REMAIN ~
DURING CONSTRUCTION AND 1.0 EXTERIOR STUCCO
BE STUCCOED AROUND
CD ELEV A TION -
NORTH 1/1~"=11
-
D PROJECT NUMBER:
REMOVE NEWLY INSTALLED EXISTING 03-28
DOWNSPOUTS AND REINSTALL AFTER DATE ISSUED:
NEW STUCCO SEE~ MAY II, :2004
DRAWN BY:
RAe
CHECKEO BY:
JLO
REVISIONS:
CO
I
= Co
"\ l"-
I"-
~
EXISTING LIGHT WALL PACK. lNDOWS WNISION ULL HEIGHT INSET
REMOVE LIGHTS AND CONDUIT GLASS THIS SIDE- METAL CORNER
IF NECESSARYj REIN5T ALL TYP. GAURDS.-EXISTING
VERIFY NEW LOCATIONS OF DOWNSPOUTS. TO BE SIG
@ ELEVATION REINSTALL BY STUCCO CONTRACTOR
1I1~1l==11 J
SOUTH I. f ee' ~' lse40
-/ -.1 REGISTRAll0N
1
SHEET NAME:
,- CITY TO REMOV~ ] Fire Station
PLAN NT.S. FENCE TO ALLOW Elevations
ACCESS TO WALL
SHEEr NO:
FILE: AL0328B.dwg A 1.1
o
OERTEL
ARCHITECTS
, 795 SAINT CLAIR AVENUE
ST. PAUL. MINNESOTA 551 D5
(65') 696-51 B6 TEL
(651) 696-51 BS FAX
WWW.OERTEI-ARCHITECTS.CCM
r
~ PROJECT NAME:
I 51GNAGE AND EMERGENCY
I LIGHTS TO BE REMOVED AND h
4J1 CI-IANNEL REVEAL ICONTROL CAULK AROUND WINDOW-STUCCO 1 REINSTALLED BY CITY W Sakopee
JOINT ALIGNED WITI-l O.H. DOOR INTERSECTION AFTER STUCCO IS \@
I-IEAD ON NORTI-I SIDE OF BUILDING COMPLETE-TIP Fire Station
PAINT INSET 334 2nd Ave W
OF 4" REVEAL Shakopee, Minnesota
Or ~
~ ~ EXTERIOR STUCCO
00
N5ET DOOR N5ET 5TEEL CORNER
JAMB-FOLLOW TYP. PROTECTOR5- TYP
CORNER DETAIL TI-I15 ELEVATION
-EXISTING
@ ~;VATION 1116"=1' _=,,_,
03-:28
DAlE ISSUED:
MAY 11, :2004
j~----~-----'
I I EXISTING DRAWN BY: RAe
XBRICK- NO
.,/ I WORK CHECKEO BY:
I JLO
! 5
! A2:2 REVISIONS:
AULK AT UNDERSIDE OF SHEETMETAL FLASH NG
v-JI-IERE MEETS STUCCO-TIP W j
\@ t-
EXISTING
BRICK-NO?
v-JORK :,
CONTROL JOINTS APROX EVERY Ie'
OR 300 SQ/FT -TYP.EAST ANDW
SOUTH ELEVATION~
@ ~;VATION 1116"=1' -Fire Station
Elevations
SHEET NO:
A 1.0
ALE: Al_OJ28B.dwg
-,...----.,--~-.-. .,..---.-.- --------.------ ---._,,__.________.____.._._____.___~_ ____, _ _________.____ __U' ____.____ ___-. _~_____.____~__ _____.____.___.._________~.____
o
OERTEL
ARCHITECTS
1 795 SAINT CLAIR AVENUE
ST. PAUL. MINNESOTA 551 D5
4 . d (651) 696-5186 TEL
I ~ STUCCO (651) 696-5188 FAX
... . ..</. . METAL LAT14 WWW.DERTELARC:HITECTS.CDM
-. Ll, SELF-FURRING Y.l GAP PROJECT NAME:
~ (2) LAYERS GRADE
1 </. Ll dD' BUILDING PAPER Shakopee
: ~ DRIP/WEEP Fire Station
. . CASING OR EQUIV. 334 2nd Ave W
., -- AT HEAD. JAMB Shakopee, Minnesota
(2) LAYERS GRADE.' ,- - AND SILL RETURN EXTERIOR STUCCO
IIDII BUILDING PAPER __' .,- WITH STANDARD
(.." CASING
SELF-FURRING f~ ~ INSIDE CORNERS
METAL LATH-~" ,:,' TO BE BUILT WITH EXISTING GLASS
FURRING RELIEF CASING BLOCK WINDOW
JOINTS
~II 3 LAYER BUILT-UP STUCCO RETURNS
CEMENT STUCCO ON TO JAMB, HEAD,
AND SILL- TYP PROJECT NUMBER:
CONTINUOS WEEP .4 03-28
OATE ISSUED:
SCREED 21 ABOVE 4 RETAIN/REBUILD MAY 11,2004
</
PAVED SURFACES, 411 EXISTING SILL DRAWN fIr:
ABOVE NON-PAVED SHAPE. RETURN AAB
SURFACES APPLY WIRE CORNER . STUCCO ON SILL CHECKED BY:
AID AT ALL OUTSIDE ." .... ~ . ~ .. ENDS JLO
CORNERS. STUCCO </. REVISIONS: -
AROUND . .
GRADE CORNERS _ TYP AT Ll Sill PROTRUSION
DOORS . .4 . L\ . CONSTRUCTION
UNKNOWN
</ I HEREBY CERTIFY THAT THIS
DOCUMENT WAS PREPARED
BY ME OR UNDER MY DIRECT
SUPERVISION AND THAT I AM
A DULY REGISTERED ARCHITECT
IN THE STA MINN SO
CD LOWER WEEPS 0 TYPICAL CORNERS WINDOWDOOR OPENING
TYP. 1_1/211=1'_011 1-1/211=11-011 TYP. 1-1/211=1'-011
DAlE
REGIS1RAlION 1S840
SHill NAME:
Fire Station
Roo f Details
SHEEr NO:
A2.1
FILE: AlU1328.dwg
e
OERTEL
ARCHITECTS
1795 SAINT CLAIR AVENUE
ST. PAUL, MINNESOTA 55105
l551l 595-5185 TEL
iJ2"+/- (551) 595-51 SS FAX
WWW.OERTE.LARCHITECTS.CQM
rc PROJECT NAME:
~ EXISTING NEWLY Shakopee
.~ INSTALLED
~, FLASHING
Fire Station
MUD RING AT 334 2nd Ave W
ELECTRICAL BOXES. Shakopee, Minnesota
- ~.. GRADE dOl
EXISTING BLOCK \ CASING
BACK-UP WALL 4 ~ ~ BEAD-A1.1.OW AIR BUILDING PAPER EXTERIOR STUCCO
. t GAP ABOVE OVERLAPS FLANGE
STUCCO CASINGI i_ CAULK BETWEEN t:
.,
CORNER BEAD STUCCO AND DRIP ~
-CONTROL JOINTS AT EDGE <1 ;:, ~ PIPE
SOME LOCATIONS -SEE -ggSdfJ5tf]q?,gf?d?/l.8Z?qCl<? '> ifgOf?cii?, . ;; PENETRATIONS
ELEVATIONS SNUG FIT -CAULK
AROUND ENTIRE
STUCCO RETURNS ~I STUCCO PIPE
AROUND JAMB- PROJECT NUMBER:
METAL LATH. 03-2e
CAULK STUCCO, SELF-FURRING ~u DATE ISSUED:
WIN~ JOINT MAY II, 2004
STUCCO COVERED GAP DRAWN BY:
(2) LAYERS GRADE STUCCO RAe
SILL 10d BUILDING PAPER CONTRACTOR TO CHECKED BY:
EXISTING GLASS REINSTALL JLO
BLOCK WINDOW TO DOWNSPOUTS REVISIONS:
REMAIN AFTER
COMPLETION.
CAULK ALL STUCCO
PENETRATIONS
8) TYPICAL Y-JINDOY-J JAMB @ TYPICAL PARAPET @ PENETRATION DETAILS
1-1/211=11-0" 1-1/2"=11-011
1-1/211=1'-011
REGISTRATION 15840
SHEEr NAME:
Fire Station
Roof Details
SHEET NO:
A2.2
ALE: Ni 0328.dwg
0)
OERTEL
ARCHITECTS
1795 SAINT CLAIR AVENUE
ST. PAUL, MINNESOTA 55105
(651) 696-5186 TEL
(651) 696-51 SS FAX
WWW.OERTEL-ARCHITECTS.COM
PROJECT NAME:
Shakopee
Fire Station
(2) LAYERS GRADE 334 2nd Ave W
uDu BUILDING PAPER Shakopee, Minnesota
METAl LATH. EXTERIOR STUCCO
SELF-FURRING )411
GAP
*d TRADITIONAL METAL LAT~.
CEMENT STUCCO SELF-FURRING )4d
GAP
411 REVEAL C~ANNEL ~ *11 TRADITIONAL
SCREED W/WEEP CEMENT STUCCO
HOLES 4-811 O.C.
UPPER SCREED ",. f--- CONTROL JOINT PROJECT NUMBER:
03-2&
ONLY-PAINT REVEAL DATE ISSUED:
RED MAY", 2004
DRAWN BY:
RAe
AT HEAD OF CHECKED BY:
OVERHEAD DOORS JLO
REMOVE eoTTOM RE\IlSIONS:
LEG AND KEY TO
ACT AS DRIP EDGE
A60VE DOORS
(j) CONTROL JOINT DETAILS @ CONTROL JOINT DETAIL
7 REVEAL JOINT 1 1/211=11-011 1 1/211=1'-011
REGISTRA110N 1&&40
SHEET NAME:
Fire Station
Roof Details
SHEET NO:
FlLE: A6_0328.dwg A2.3