HomeMy WebLinkAbout2.A. Fire 2005 Budget
CITY OF SHAKO PEE
2005 GENERAL FUND BUDGET
DIVISION: FIRE
MISSION STATEMENT:
To provide cost effective, efficient, and state of the art Fire and Rescue
protection for the citizens and businesses within the Shakopee fire
district.
ACTIVITY:
Activity includes fire prevention, inspection, training, fire fighting
hazardous material response and water and high level rescue. Maintenance of
station and equipment on a 24-hour basis in order to insure the safety and
protection of the City of Shakopee and Jackson and Louisville Townships.
GOALS:
1. Keep department expenditures equivalent with increase in population in
the fire protection district.
2. Provide quality community service in an effective and efficient manner.
3. To provide for the placement of a first-due engine company within a 1.5
mile radius of any built upon area of the city.
MEASUREMENT OF GOALS:
1. Departmental expenditures per capita:
Budgeted
2002 2003 2004
Department Expenditures $ 665,700 $ 751,990 $ 885,020
Equipment Rental Rate 223,690 223,670 223,680
Population** 25,316 26,837 28,337
Cost Per Capita (Exclude Eqpt) 26.30 28.02 31. 23
Cost Per Capita Eqpt Rentals 8.84 8.33 7.89
Total Cost Per Capita 35..14 36.35 39.12
** - population based on the City of Shakopee and Jackson &
Louisville Township estimates.
2. Cost per call of service:
Budgeted
2002 2003 2004
Variable Costs (Labor & Fuel) $ 185,615 $196,700 $233,150
Fixed Costs 703,776 798,870 875,550
Total Cost 889,391 995,570 1, 108 ,700
Number of Calls 446 482
Cost per call (Variable Cost) $ 416 $ 376
Cost per call (All Costs) $1,994 $2,024
3. Maximum travel distance of engine company:
2002 2003
Travel Distance to furthest City Dwelling 6 Miles 6 Miles
OBJECT DESCRIPTION: Description of lines items:
Wages & Benefits:
50 Fire Fighters. No personnel increase for the 2005 budget. Increase in
salaries for 2 additional training officers $3,000.
Operating Supplies:
Includes: Fire fighting gear $16,000 ($1,300 each set), fire fighting
foam $2,000, rope rescue equipment $2,000, haz-mat equipment $15,000,
SCUBA gear $5,000, truck radios replacement $5,600, portable radio
replacement $ 6, 400, pager replacement $3,000, 4 SCBA air packs $20,000,
rescue saw $2,500, uniform acquisition $2,000, fire fighting hose $10,000,
Cert program $2,000, public education $2,000, Preplan emergency program
$2,000. To enhance further education from homeland grants, software
equipment, air monitoring equipment $15,000, rescue tools replacement
$20,000.
Equipment Maintenance:
No increase over 2004 budget. Includes: Air pack flow testing &
calibration $4,000, pump flow testing $4,000.
Professional Services:
Line item 6327: 50 OSHA mandated physical screenings $9,000.
Dues/Training/Travel:
Fire fighter I & II classes un t il 50 fire fighters on, refresher
courses, sectional schools and conferences for fire fighters $5,000,
rental of burn trailer/tower for live fire training $2,000, first
responder refresher courses for 50 fire fighters $2,000.
Equipment:
R5509BUD tilO05 CITY OF .PEE 8/.15:10:17
Fiscal Period: 7 1 04 Budget Report Page- 1
Level Of Rollup 7
2001 2002 2003 7/31/2004 2004 2005 2005 2005
Actual Actual Actual YTD Final Requested Approved Final
Object Code 1 Description Amount Amount Amount Actual Budget Budget Budget Budget
01000 GENERAL FUND
32 FIRE
6000 EXPENDITURES
6001 WAGES & BENEFITS
6002 WAGES 1,453 1,280 2,464 4,081 8,590 19,500 19,500 19,500
6005 OVERTIME-FT 5,416 328 195 53 1,000 1,000 1,000 1,000
6015 WAGES - PART TIMEITEMP 149,408 163,406 155,766 104,097 200,000 200,000 200,000 200,000
6002 WAGES 156,276 165,014 158,425 108,231 209,590 220,500 220,500 220,500
6100 BENEFITS
6122 PERA 72 89 147 272 360 440 440 440
6124 FICA 2,692 2,846 2,668 2,056 3,700 3,810 3,810 3,810
6128 FIRE PENSION 65,211 99,441 222,471 224,770 222,810 222,810 222,810
6135 HEALTH 134 180 316 800 800 800
6139 POST EMPLOYMENT HEALTH PLAN 8 14 34 80 80 80
6140 L1FE/L TD 7 12 18 50 50 50
6145 DENTAL 11 17 25 70 70 70
6170 WORKERS COMPENSATION 5,674 9,844 10,747 8,742 10,000 12,000 12,000 12,000
6100 BENEFITS 73,648 112,380 236,255 11 ,464 238,830 240,060 240,060 240,060
6001 WAGES & BENEFITS 229,924 277,394 394,680 119,695 448,420 460,560 460,560 460,560
6200 SUPPLIES AND SERVICES
6201 SUPPLIES & SERVICES
6202 OPERATING SUPPLIES 76,987 114,665 80,627 67,247 106,300 180,350 180,350 180,350
6210 OFFICE SUPPLIES 2,433 8,250 3,703 3,023 4,200 4,000 4,000 4,000
6222 MOTOR FUELS 8. LUBRICANTS 9,681 7.662 9,089 6,592 9,500 10,500 10,500
6230 BUILDING MAl NT SUPPLIES 18,541 3,539 2,926 1,042 1,600 1,600 1,600 1,600
6240 EQUIPMENT MAINTENANCE 25,999 32,625 30,796 12,778 32,000 32,000 32,000 32,000
6201 SUPPLIES & SERVICES 133,641 166,741 127,140 90,683 153,600 228,450 217,950 228,450
6300 PROFESSIONAL SERVICES
6314 COMPUTER SERVICES 1,088 253 268 210 500 500 500 500
6315 BUILDING MAl NT. 10,847 11,094 5,433 17,880 10,000 10,000 10,000
6316 EQUIPMENT MAINTENANCE 4,188 9,949 12,243 14,787 3,000 10,000 10,000 10,000
6318 FILING FEES 22
6327 OTHER PROF SERVICES 7,532 9,612 6,128 5,587 9,000 9,000 9,000 9,000
6300 PROFESSIONAL SERVICES 12,808 30,683 29,734 26,017 30,380 29,500 29,500 29,500
6330 COMMUNICATIONS
R5509BUD LOGIS005 CITY OF SHAKOPEE 8/17/2004 15:10:17
Fiscal Period: 7 / 04 Budget Report Page - 2
Level Of Rollup 7
2001 2002 2003 7/31/2004 2004 2005 2005 2005
Actual Actual Actual YTD Final Requested Approved Final
Object Code / Description Amount Amount Amount Actual Budget Budget Budget Budget
6332 POSTAGE 59 107 78 120 120 120 120
6334 TELEPHONE 5,599 6,981 6,313 4,146 7,200 7,200 7,200 7,200
6336 PRINTING/PUBLISHING 77 117 410 33 1,000 1,000 1,000 1,000
6339 COMPUTER ACCESS 510 840 480
6330 COMMUNICATIONS 5,735 7,714 7,641 4,659 8,320 8,320 8,320 8,320
6350 INSURANCE
6352 LIABILITY 11,693 2,526 6,866 9,740 7,000 7,140 7,140 7,140
6354 PROPERTY 3,544 2,586 2,837 4,203 3,400 4,210 4,210 4,210
6356 AUTO 20,443 20,333 20,124 23,420 22,000 23,320 23,320 23,320
6350 INSURANCE 35,680 25,445 29,827 37,363 32,400 34,670 34,670 34,670
6360 UTILITY SERVICE 18,047 17,207 17,084 17,279 19,000 45,000 45,000 45,000
6362 ELECTRIC 1,365
6364 WATER 671 804 849 494
6365 GAS 17,504 12,894 17,380 9,148 25,000
6366 SEWER 17
6367 REFUSE 432 60
6368 STORM 53
6360 UTILITY SERVICE 36,654 30,965 35,312 28,356 44,000 45,000 45,000 45,000
6400 RENTALS
6420 EQUIPMENT RENT 112 105
6425 EQUIPMENT RENT (IS FUND) 223,440 223,692 223,668 130,480 223,680 219,310 219,310 219,310
6430 BUILDING RENT (IS FUND) 58,668 80,496 83,229 50,386 86,400 88,530 88,530 88,530
6400 RENTALS 282,108 304,300 307,002 180,866 310,080 307,840 307,840 307,840
6470 DUESiTRAININGiTRAVEL
6472 CONFERENCE/SCHOOL/TRAINING 5,300 12.127 10,530 12,709 29,000 20,000 20,000 20,000
6475 TRAVEUSUBSISTENCE 6,593 9,470 11,464 6,916 11,000 17.000 17,000 17,000
6480 DUES 750 655 330 2,003 1,000 2,000 2,000 2,000
6490 SUBSCRIPTIONS/PUBLICATIONS 55 307 500 250 250 250
6470 DUESfTRAININGiTRAVEL 12,643 22,307 22,631 21,628 41,500 39,250 39,250 39,250
6200 SUPPLIES AND SERVICES 519,269 588,156 559,286 389,572 620,280 693,030 682,530 693,030
6500 DEPRECIATION
6600 MISCELLANEOUS
. . .
R5509BUD LOGIS005 CITY OF SHAKOPEE 8/17/200415:10:17
Fiscal Period: 7 / 04 Budget Report Page" 2
Level Of Rollup 7
2001 2002 2003 7/31/2004 2004 2005 2005 2005
Actual Actual Actual YTD Final Requested Approved Final
Object<::~~_~i~:.~~~iption . Amount Amount Amount Actual Budget Budget __ ~~dget _______.!'l.~~~~t
6332 POSTAGE 59 107 78 120 120 120 120
6334 TELEPHONE 5,599 6,981 6,313 4,146 7,200 7,200 7,200 7,200
6336 PRINTING/PUBLISHING 77 117 410 33 1,000 1,000 1,000 1,000
6339 COMPUTER ACCESS 510 840 480
.-.-----
6330 COMMUNICATIONS 5,735 7,714 7,641 4,659 8,320 8,320 8.320 8,320
6350 INSURANCE
6352 LIABILITY 11.693 2,526 6,866 9,740 7,000 7,140 7,140 7,140
6354 PROPERTY 3,544 2,586 2,837 4,203 3,400 4,210 4,210 4,210
6356 AUTO 20,443 20,333 20,124 23,420 22,000 23,320 23,320 23,320
-..----
6350 INSURANCE 35,680 25,445 29,827 37,363 32,400 34,670 34,670 34,670
6360 UTILITY SERVICE 18,047 17,207 17,084 17,279 19,000 45,000 45,000 45,000
6362 ELECTRIC 1,365
6364 WATER 671 804 849 494
6365 GAS 17,504 12,894 17,380 9,148 25,000
6366 SEWER 17
6367 REFUSE 432 60
6368 STORM 53
--..---- ---.--..-
6360 UTILITY SERVICE 36,654 30,965 35,312 28,356 44,000 45,000 45,000 45.000
6400 RENTALS
6420 EQUIPMENT RENT 112 105
6425 EQUIPMENT RENT (IS FUND) 223,440 223,692 223,668 130,480 223,680 219,310 219,310 219,310
6430 BUILDING RENT (IS FUND) 58,668 80,496 83,229 50,386 86,400 88,530 88.530 88,530
------- -----.-.. ...--------
6400 RENTALS 282,1 08 304,300 307,002 180,866 310,080 307.840 307,840 307,840
6470 DUESITRAININGITRAVEL
6472 CONFERENCE/SCHOOLITRAINING 5,300 12.127 10,530 12,709 29,000 20,000 20,000 20,000
6475 TRAVEUSUBSISTENCE 6,593 9,470 11 ,464 6,916 11,000 17,000 17,000 17,000
6480 DUES 750 655 330 2,003 1,000 2,000 2,000 2,000
6490 SUBSCRIPTIONS/PUBLICATIONS 55 307 500 250 250 250
-...-----." ----.---.---
6470 DUESITRAININGITRAVEL 12.643 22.307 22,631 21,628 41,500 39,250 39,250 39,250
.._~ ---. -._.------~-_......
6200 SUPPLIES AND SERVICES 519,269 588,156 559,286 389,572 620,280 693,030 682,530 693.030
6500 DEPRECIATION
6600 MISCELLANEOUS
R5509BUD .005 CITY OF .PEE 81. 15:10:17
FisCal Period: 7 1 04 Budget Report Page - 3
Level Of Rollup 7
2001 2002 2003 7/31/2004 2004 2005 2005 2005
Actual Actual Actual YTD Final Requested Approved Final
Object Code I Description Amount Amount Amount Actual Budget Budget Budget Budget
6700 CAPITAL OUTLAY
6740 EQUIPMENT 17,868 23,840 21,689 40,000
6700 CAPITAL OUTLAY 17,868 23,840 21,689 40,000
6800 DEBT SERVICE
6000 EXPENDITURES 767,062 889,391 975,655 509,267 1,108,700 1,153,590 1,143,090 1,153,590
--
32 FIRE 767,062 889,391 975,655 509,267 1,108,700 1,153,590 1, 143,090 1,153,590
-~-- ~--~-
01000 GENERAL FUND 767,062 889,391 975,655 509,267 1,108,700 1,153,590 1,143,090 1,153,590
Fire 2005 Budget
0321 0323 0324 Budget
Object # Description Management Custodian Fire Station 2 Total 2004 Diff
6002 Wages FT - Reg. 11,590 7,910 19,500 8,590 10,910
6005 Wages OT - Reg. 1,000 1,000 1,000 -
6015 Wages PT - Temp 200,000 200,000 200,000 -
6122 PERA 440 440 360 80
6124 FICA 3,200 610 3,810 3,700 110
6128 Fire Pension 222,810 222,810 224,770 (1,960)
6135 Health & Life 850 850 - 850
6139 PEHP 80 80
6145 Dental 70 70 - 70
6170 Workers Comp 12,000 12,000 10,000 2,000
6180 Compensated Absences - - -
Retirement Benefit - - -
Total Personnel 451,600 8,960 - 460,560 448,420 12,140 2.71%
6202 Operating Supplies 180,000 350 180,350 121,300 59,050
6210 Office Supplies 4,000 4,000 4,200 (200)
6222 Motor Fuels & Lubricants 10,500 10,500 9,500 1,000
6230 Building Maintenance - 1,600 - 1,600 1,600 -
6240 Equipment Maintenance 32,000 32,000 32,000 -
6314 Computer Services 500 500 500 -
6315 Building Maintenance - 10,000 10,000 18,880 (8,880)
6316 Equipment Maintenance 10,000 10,000 2,000 8,000
6327 Other Prof Services 9,000 9,000 9,000 -
6332 Postage 120 120 120 -
6334 Telephone 7,200 7,200 7,200 -
6336 Printing/Publishing 1,000 1,000 1,000 -
6352 Liabitlity Insurance 7,140 7,140 7,000 140
6354 Property Insurance 4,210 4,210 3,400 810
6356 Vehicle Insurance 23,320 23,320 22,000 1,320
6360 Utility Service - 45,000 - 45,000 44,000 1,000
6365 Gas - - - - -
6400 Rentals - - -
6410 LOGIS - - -
6425 Equipment Rent (IS Fund) 219,310 219,310 223,680 (4,370)
6430 Building Rent (IS FUND) - 88,530 - 88,530 86,400 2,130
6435 Other Rent - - -
6472 Conf / School/Training 20,000 20,000 14,000 6,000
6475 Travel/Subsistence 17,000 17,000 11,000 6,000
6480 Dues 2,000 2,000 1,000 1,000
6490 Subscriptions/Publications 250 250 500 (250)
Total Supplies & Services 547,550 145,480 - 693,030 620,280 72,750 11.73%
6740 Capital Expenditures - - 40,000 (40,000)
-
6498 Expenses Charged Back - - - -
Total $ 999,150 $ 154,440 $ - $1,153,590 $1,108,700 $44,890 4.05%
City Shakopee
Projected Fire Service Shared Costs
8/20/2004
Print date
8/19/2004
2002 2003 2004 2005
Actual Actual ~ ~
Budget - Original
Personnel $ 277,394 $ 394,680 $ 448,420 $ 460,560
Supplies & Services 583,767 559,286 620,280 693,030
Capital (w/o trucks) 23,840 21,689 40,000
Subtotal 885,001 975,655 1,108,700 1,153,590
Less Fuel (7,662) (9,088) (9,500) (10,500)
Less pre 95 truck rent (135,390) (135,390) (133,585) (114,120)
Less Total Wages (165,014) (158,425) (209,590) (220,500)
Less rental station #1 & #2 (80,496) (84,090) (86,400) (88,530)
Plus Officer Salary 19,800 19,800 21,900 21,900
Subtotal (368,762) (367,193) (417,175) (411,750)
Total yearly 516,239 608,462 691,525 741,840
prior allocation 636,010
Prior budget (under) over spent (119,771) (34,228) (34,228)
Total to allocate 396,468 574,234 657,297 741,840
City standby fee $ 359,742 $ 527,740 $ 601,200 $ 678,528
Jackson standby fee 15,648 19,716 22,561 25,463
Louisville standby fee 21,078 26,779 33,535 37,849
City share of value 90.74% 91.90% 91.47% 91.47%
Jackson share of value 3.95% 3.43% 3.43% 3.43%
Louisville share of value 5.32% 4.66% 5.10% 5.10%
City Value $17,883,155 $24,935,341 $23,694,026 $23,694,026
Jackson Value 777,901 931,552 889,171 889,171
Louisville Value 1,047,811 1,265,274 1,321,666 1,321,666
19,708,867 27,132,167 25,904,863 25,904,863
2005 2006 2007 2008 2009
Fire
Truck - Pumper 400,000 450,000
Equipment/Rescue Truck 210,000
Truck - Mini Pumper 225,000
Truck - Tanker 250,000
Truck - Heavy Rescue 400,000
Truck - Command Center 200,000
Zodiac Boat
Truck - Telesquirt 700,000
One Ton4x4 With Grass Pak 60,000
Chiefs Truck 45,000
I Fire I
.1
2005: Truck - Telesquirt ($700,000). This unit will replace the 1985 pumper
#9522. We moved this out from the 1999 budget.
Tanker Truck ($250,000). This unit will replace the 1986 Mack. This
unit is used for rural areas that do not have a water supply. The 2004
mechanical evaluation of the truck is an "8" for the chassis and a "4"
for the tank, pump and valve assemblies.
2006: Heavy Rescue ($400,000). This unit will replace the 1986 rescue in the
fleet right now. This unit is used for (fires, auto accidents, medicals,
high and low level accidents, hazardous spills, etc.)
One Ton 4x4 with Grass Pak ($60,000). This unit will replace the
current 1990 Ford 4x4 pick-up with grass pak. This unit is for fighting
grass fires, towing the rescue boat, and hauling hoses and equipment.
The 2004 mechanical evaluation of the truck is an "8".
2007: Pumper ($450,000). This unit will replace the 1993 pumper. This unit
will have a foam system. This unit will possibly be first unit out in
station (4).
Mini Pumper ($225,000). This unit will be an addition to the fleet and
will be housed at station (3). This unit will be a F-450 series four
door 4x4 truck. This unit will have a pump and
Chief's truck ($45,000). Replace 1999 Dodge.
2008: Command Center ($200,000). This unit will be an addition to the fleet
and would be used as a command post. The truck would house resources
that are needed at chemical and fire scene situations such as a chemical
assessment library, computers, phones, area land maps with topography,
and work areas.
2009:
Shakopee Fire Department
Monthly Responses
Responses include exposure fires
70
60
50 - . 2000
40 - - - D 2001
D 2002
30 - f- - - - -
. 2003
20 - - f- - - - - - D 2004
10 - - f- - - - - -
0 I I I I I I I I I I I I
")'b>~ ~J> +~ ,.~'4. +'b>~ ")~~ ")~ ,.~Oj "'~ 06- +o~ <:l~CJ
- - - __ - __ __ _____ H_ __ __ __ _ "___ _ _ _ __ __,_ _ __'___
.
Shakopee Fire Department
Cumulative Responses by Month
600 - 1998
550 -- 1999
500 - 2000
450 - 2001
400
350 - 2002
300 - 2003
250 - 2004
200
150
100
50
0
c .c l- I.. >- C - en Q. ..., > ~
fa CD fa Q. fa = = = ~ u 0
.., LL. :E cc ~ .., .., cc 0 Z Q
.
Emergency Calls by Time of Day
2004 calls (January 01 - June 31)
131
2004
234
I 2
)
I
I " h' <. -.' ~ , . ....,,, ",
2003 : , . . -./ j 200
., , ; " ,
i 4
o Day - 6:00 am to 6:00 pm
269 iii Night - 6:00 pm to 6:00 am
o Total
2002
446
2001 207
4 8
0 100 200 300 400 500 600
.
.
Shakopee Fire Department
Annual Personnel Hours
2004 6552
2003
I
I
I
2002
I 2001 12698
6000 8000 10000 12000 14000
--- - --
. - "-"_._--~- -------,~ --.
~
Shakopee Fire Department Present Response Analysis N
With possible future station placement \
,
i
" ,
......., "'.
.' ., "", .' ." .,
._.rf'i' \. .,..... ~ ,. "'" &' .......
\ (
----~---==-__I
_._~---
--------......-..
I J -, 5 ~
L--Lr ,-
\ ~ I I
~ ~+ 1
~
L,-~ I Note: This assumes firefighters respond to
\-D I station in two minutes.
T'~avel time f 0 ,- the
FIRST-IN company
If station labeled 2 is built as first phase of plan - phase 2 would be either station 3 or ... ( 3.0 minutes
-'
1.1 depending on growth and level of service required. Stations 3, 4, 5 locations and . < 6.0 minutes
construction dates can be adjusted as level of service requires. . > 6.0 minutes
_u__.'_,...___._.__
- ~._-
CITY OF SHAKOPEE < MN CIP PROJECTS BY TYPE 2005 BUDGET
i
~ Type No. Project Cost Estimate Funding Source 2005 2006 2007 2008 2009
MUNI Emergency Vehicle Signal Premption 50,000 CIF 30,000 20,000
MUNI Community Signage Monuments 50,000 General Fund 25,000 25,000
MUNI Building Expansion Public Works 6,000,000 Bonding 6,000,000
MUNI Building Expansion Public Works - Sewer - B
MUNI Building Expansion Public Works . Storm - B
MUNI Fire Station 3 Site Building
MUNI Fire Station 4 Site 300,000 Building 300,000
MUNI Fire Station 5 Site 150,000 Building 150,000
MUNI Aquatic Park Service Bldg & Site Improv 760,000 Building 660,000 100,000
MUNI Comm Ctr Expansion 11,000,000 Tax Levy 11.000,000
MUNI Community Center Multi Use . 2,250,000 Tax Levy 2,250,000
MUNI Community Center Multi Use 500,000 Donations 500,000
MUNI Construction of Fire Station 3 2.500,000 Bonding 2,500,000
MUNI Construction of Fire Station 1.1 2,500,000 Bonding 2,500,000
MUNI City Hall 6;300,000 Building 2,900,000 3,400,000
MUNI Construction of Fire Station 4 3,000,000 Bonding 3,000,000
MUNI Construction of Fire Training Tower 1,000,000 Bonding 1,000,000
MUNI Total 36,360,000 7,165,000 13,795,000 2,500,000 5,500,000 7,400,000
.
.'.
.
,
8/24/04 9:33 AM