Loading...
HomeMy WebLinkAbout15.B.4. Additional Surveying for the Dean Lkae Control Structure and Channel, 1999-8 JSfGI~ .- CITY OF SHAKOPEE - -. Memorandum CONSENT TO: Mayor & City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director SUBJECT: Authorize Additional Surveying for the Dean Lake Control Structure and Channel Improvement Project DATE: September 7, 2004 INTRODUCTION: Attached to this memo is an extension agreement with WSB & Associates, Inc. to perform additional surveying on the Dean Lake Outlet Channel for additional information in determining the final design and location of the Dean Lake Control Structure. BACKGROUND: On September 21, 1999, Resolution No. 5236 was adopted and a feasibility report was prepared for the improvement of the Dean Lake Outlet by installation of a control structure. This report was received by the City Council on that date and preparation of plans and specifications were ordered for Project No. 1999-8. WSB & Associates, Inc. was authorized to perform this work. A preliminary design has been completed with questions on the exact runoff elevation and how the control structure would function with Dean Lake. Staff has collected data on elevations and also water quality studies to provide more information on the performance and the. functioning of Dean Lake with the hydrology in the area. Staff has received a DNR permit for the construction of a control structure at a runoff elevation of 745.7 and has received several extensions from the DNR. There have been several inquiries from residents around Dean Lake and a meeting was held on September 2, 2004 with the DNR, Prior Lake - Spring Lake Watershed District, Lower Minnesota Watershed District, Scott County, residents along Dean Lake and City staff to discuss the proposed Dean Lake Outlet Channel and Control Structure Improvement Project. Based on this meeting, it is desirable to perform additional survey information to see what the existing channel elevations are as of 2004 as compared to 1999, and to take additional cross section information to determine the best location of the control structure for the Dean Lake area. Attached to this memo is an extension agreement from WSB & Associates, Inc. to perform this survey work and it is a cost not-to-exceed $3,700.00. ALTERNATIVES: 1. Authorize the appropriate City officials to execute the extension agreement with WSB & Associates, Inc. to perform additional surveying for the Dean Lake Outlet Control Project No. 1999-8. 2. Do not approve the extension agreement with WSB & Associates, Inc. at this time. 3. Table for additional information. RECOMMENDATION: Staff would recommend Alternative No.1, to authorize additional surveying for the design ofthe Dean Lake Control Structure for this project. ACTION REQUESTED: Authorize the appropriate City officials to execute the extension agreement with WSB & Associates, Inc. to perform additional surveying for the Dean Lake Outlet Control Project No. 1999-8. ~ Bruce Loney Public Works Director BUpmp ENGR/EMPLOYEEFOLDER/PPENNINGTON/COUNCIIJDEANLAKE .6.. WSB & Associates, Inc. WSB 4150 Olson Memorial Highway, #300 Minneapolis, MN 55422 (763) 541~4800 & Associates, Inc. (763) 541~1700 (fax) September 3,2004 Mr. Bruce Loney City of Shakopee 129 Holmes Street S Shakopee, MN 55379-1328 Re: Deans Lake Outlet Survey Proposal Project No. 1014-00 Dear Mr. Loney: According to our Agreement for Professional Services with the City of Shakopee and Section 1- C-2 (Major Projects), this extension agreement is written to provide for construction surveying and engineering services for the above-referenced project. Weare pleased to submit to you this proposal to provide professional services associated with providing outlet recommendations for the ponding areas located within the Dominium Hills Development. The proposed project area is shown on the attached figure, along with the ponding areas proposed to be included into.this proposal. The tasks anticipated to be completed and the project schedule is proposed as follows: I. Collect Background Information We have prepared a cost estimate and timeline to complete the survey of the Deans Lake Outlet Channel. This survey would include surveying the cross section ofthe outlet including the centerline of the channel, the top-of-bank, and approximately 100 feet from the centerline. This work would be completed from the outlet structure under TH 169 to the south and west approximately 1,000 tol,500 feet. This information can be used to compare with the previous survey of the outlet channel to determine if conditions have changed. Anticipated cost to complete this task: $2,900 II. Coordinate Survey with Review Agencies WSB & Associates, Inc. proposes to review the findings of the survey with City staff and representatives from PLSL WD, LMRWD, and the MDNR. Anticipated cost to complete this task: $750 C:\Documents and SettingslBLoneylLocal Settings\Temporary Internet FileslOLK4D3\090304 bl.doc Mr. Bruce Loney September 3, 2004 Page 2 We anticipate the total cost ofthis project to not exceed $3,700. The City of Shakopee agrees to reimburse WSB & Associates, Inc. for these services in accordance with Section N ofthe Agreement for Professional Services. If this agreement meets with your approval, please sign below and return one copy to our office. Sincerely, WSB & Associates, Inc. Todd E. Hubmer, P.E. Associate City Administrator Attachment sm City Clerk cc: Steve Ische, WSB & Associates, Inc. Bret Weiss, WSB & Associates, Inc. Mayor Date C:IDocuments and Settings\BLoneylLocal SettingslTemporary Internet FileslOLK4D3\090304 bl.doc