Loading...
HomeMy WebLinkAbout15.B.1. Agreement with Scott County for Participation and Installation of Epoxy I IS. G ./ . CITY OF SHAKOPEE Memorandum TO: Mayor & City Council CONSENT Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director SUBJECT: Consider Approval of Scott County Agreement for Participation and Installation of Epoxy Pavement Markings DATE: September 7, 2004 INTRODUCTION: Attached to this memo is an agreement for Participation and Installation of Epoxy Pavement Markings on County roads for pedestrian crosswalks at signalized intersections. This agreement was prepared by Scott County in cooperation with other Cities and Scott County in order for the County to participate in pavement markings for pedestrian crosswalks in the Cities of Scott County. BACKGROUND: The City of Shakopee has several traffic control signals on County roads in the City of Shakopee. At the signalized intersections there are pedestrian crosswalks on these County roads to delineate the crosswalks area for pedestrians to safely cross the County roads. In past policies, it was 100% of the responsibility of the City to pay for the construction of pavement markings across roadways within the City limits. As part of meetings between County engineers and City engineers throughout the County, the County has undertaken a construction project to perform the pedestrian crosswalk pavement markings across the County roads in order to gain more effective pricing for the Cities. In this agreement, the City is responsible for 100% of the construction costs of the pavement markings across the County roads and to pay 8% of extra for the County's inspection of the work. The pavement markings that were utilized were epoxy coated markings, which have a longer life span that the latex paint normally used in the Joint Powers Agreement with the City of Burnsville. Also, the traffic control costs were minimized throughout the County by a volume-pricing contract. The City has budgeted $6,500.00 for painting of crosswalks along County roads. The cost for the pavement markings, per this agreement, is $7,529.50. However, it should be pointed out that epoxy coated markings are a higher cost and also have a longer life span than regular paint markings. Staff believes that this is an excellent agreement in cooperation between the City and the County, in order to minimize costs between the Cities and the County in accomplishing the necessary pavement markings. for safe crosswalks at signalized intersections. ALTERNATIVES: 1. Authorize the appropriate City officials to execute the agreement for Participation and Installation of Epoxy Pavement Markings with Scott County. 2. Do not authorize the appropriate City officials to execute this agreement. 3. Table for additional information. RECOMMENDATION: Staff recommends Alternative No.1, as the agreement is a cost effective agreement in accomplishing the crosswalk markings at signalized intersections throughout the City of Shakopee and in Scott County. ACTION REQUESTED: Authorize the appropriate City officials to execute the agreerent for Participation and Installation of Epoxy Pavement Markings between Scott County and the City of Shakopee. I .~ ~neY . Public Works Dirbctor I I j BUpmp i I ENGRlEMPLOYEEFOLDERlPPENNINGTON/COUNClUEPOXYMARKINGS I I I I I i I i I I I i i I i i I i i I I i i i i I I i I I I < - . * I~~" !., SCOTT COUNTY PUBLIC WORKS DIVISION Scott HIGHWAY DEPARTMENT. 600 COUNTRY TRAIL EAST' JORDAN, MN 55352-9339 (952) 496-8346 . Fax: (952) 496-8365 . WWW.co.scott.mn.U5 LEZLlE A. VERMILLION PUBLIC WORKS DIRECTOR August 20, 2004 Mark McNeill City of Shakopee 129 S Holmes Shakopee,MN 55379 SUBJECT: CP 2004-SE Dear Mr. McNeill: Enclosed are two copies of the Participation Agreement for CP 2004-SE. Please have both copies signed and returned to this office. One fully executed copy will be sent to you. Please call us if you need additional information. Sincerely, Greg M. Ilkka, P .E. Acting County Engineer GMI/mah Enclosures mh- W:\WORD\PROJECT\CP 2004-SE\CITYSIGN _ SHAKOPEE.DOC An Equal Opportunity/Safety Aware Employer 1311 CP 2004-SE Various County Roads City of Shako pee Scott County AGREEl\1ENT FOR PARTICIPATION IN THE INSTALLATION OF EPOXY PAVEMENT MARKINGS THIS AGREEMENT, Made and entered into this _day of ,20_, by and between the County of Scott, a body politic and corporate under the laws of the State of Minnesota, hereinafter referred to as the "County" and the City of Shakopee, a body politic and corporate under the laws of the State of Minnesota, hereinafter referred to as the "City". WITNESSETH: WHEREAS, It is considered mutually desirable to install epoxy pavement markings to indicate pedestrian crosswalks at signalized intersections within the City; and WHEREAS, the City has expressed its desire to participate in a pavement marking contract with the County; and ......... . WHEREAS, Said work shall be carried out by the partiesheretolll1derthe provisions of Minn. Stat. Sec. 162.17. NOW, THEREFORE, IT IS AGREED AS FOLLOWS: I The County shall perfonn the required engineering andinspecti()p;(lI1dsball iI1stal1,orcause thejn~tallation of epoxy pavement markings format at intersections specifically requested by the city, listed in Exhibit A attached hereto. Such installation, as described immediately above, sl1all be identified and accomplished under County Project No. CP-2004-SE, hereinafter referred to as the "project", all in accordance with said project specifications which specifications are by this reference made a part hereof. II The term specifications as used herein shall mean the 2000 Edition of the Minnesota Department of Transportation "Standard Specifications for Construction" and the project special provisions. III The County shall advertise for bids for the construction of this project, receive and open bids pursuant to said advertisement and enter into a contract with the successful bidder at the unit prices specified in the bid of such bidder, according to law in such case provided for counties. The contract includes the specifications prepared by the County or its agents, which said specifications are by reference made a part hereof. CP 2004-SE Various County Roads City of Shakopee Scott County IV The construction cost of the project shall be the contract cost. It is understood that the estimated construction cost stated hereinafter is for informational purposes only. The estimated construction cost of this project is $89,330.00. V The City shall reimburse the County for its share in the construction cost of the contract work. The total final contract construction cost shall be apportioned as set forth in the Division of Cost Summary in said Exhibit "A" attached hereto. It is further agreed that the Engineer's Estimates referred to in this agreement are estimates of the construction cost for the contract work on said project and that the unit prices set forth in the contract with the successful bidder and the final quantities as measured by the Engineer shall govern in computing the total final contract construction cost for apportioning the cost of said projects according to the provisions of this paragraph. VI The final amount of the City's share of construction and engineering costs of these projects shall be determined and any amount due paid to the County upon completion of the projects and submittal to the City of the County's final, itemized, statement of the projects costs. . VII The City shall, as its share of the construction costs, pay the County 100 percent (100%) of the actual construction cost of the pavement markings across roadways under the jurisdiction of the City, and zero percent (0%) of the actual construction cost of the pavement markings across roadways under jurisdiction of the County. The City shall pay the County 8 percent (8%) of such share of the construction cost as payment for inspection of County Project No. CP-2004-SE. VIII The construction of this project sha1l be under the supervision and direction of the County. However, the City Engineer shall cooperate with the County Engineer and his staff at their request to the extent necessary, but shall have no responsibility for the supervision of the work. CP 2004-SE Various County Roads City of Shakopee Scott County IX Neither the County, its officers, agents or employees, either in their individual or official capacity, shall be responsible or. liable ih any manner to the City for any claim, demand, action or cause of action of any kind or character arising out of, allegedly arising out of or by reason of the perfonnance, negligent perfonnance or nonperfonnance of the hereinbefore described maintenance, restoration, repair or replacement work by the City, or arising out of the negligence of any contractor under any contract let by the City for the perfonnance of said work; and the City agrees to defend, save and keep said County, its. officers, agents and employees harmless from all claims, demands, actions or causes of action arising out of negligent performance by the City, its officers, agents or employees. X It is further agreed that neither the City, its officers, agents or employees, either in their individual or official capacity, shall be responsible or liable in any manner to the County for any claim, demand, action or cause of action of any kirtdor character arising out of, allegedly arising out of or by reason of the performance, negligent performance or nonperformance of the hereinbefore described maintenance, restoration, repair or replacement work by the County; or arising out of the negligence of any contractor under any contract let by the County for the performance of said work; and the County agrees to defend, save and keep said City, its officers, agents and employees hannlessfrOln aIldaims, demands, actions or causes of action arising out of negligent performance by the County, its officers, agents or employees. XI It is further agreed that each party to this agreement shall not be responsible or liable to the other or to any other person whomsoever for any claims, damages, actions, or causes of actions of any kind or character arising out of, allegedly arising out of or by reason of the performance, negligent performance or nonperfonnance of any work or part hereof by the other as provided herein; and each party further agrees to defend at its sole cost and expense any action or proceeding commenced for the purpose of asserting any claim of whatsoever character arising in connection with or by virtue of performance of its own work as provided herein. XII It is further agreed that any and all employees of the City and all other persons engaged by the City in the performance of any work or services required or provided herein to be performed by the City shall not be considered employees, agents or independent contractors of the County, and that any and all claims that mayor might arise under the Workers' Compensation Act or the Unemployment Compensation Act of the State of Minnesota on behalf of said City employees while so engaged any and all claims made by any third parties as a consequence of any act or omission on the part of said City employees while so engaged in a~y of the work or CP 2004-SE Various County Roads City of Shako pee Scott County services provided to be rendered herein shall be the sole responsibility of the City shall in no way be the obligation or responsibility of the County. Any and all employees of the County and all other persons 'engaged by the County in the perfoffi1ance of any work or services required or provided for herein to be performed by the County shall not be considered employees, agents or independent contractors of the City, and that any and all claims that mayor might arise under the Workers' Compensation Act or the Unemployment Compensation Act of the State of Minnesota on behalf of said County employees while so engaged and any and all claims made by any third parties as a consequence of any act or omission on the part of said County employees while so engaged in any of the work or services provided to be rendered herein shall be the sole responsibility of the County and shall in no way be the obligation or responsibility of the City. XIII The provisions of Minn. Stat. Sec. 181.59 and of any applicable local ordinancerelatil1gtoCivilRights and discrimination and the affinnative action policy statement of Scott County shall he considered. a part of this agreement as though fully set forth herein. CP 2004-SE Various County Roads City of Shako pee Scott County IN TESTIMONY WHEREOF, The parties hereto have caused this agreement to be executed by their respective duly authorized officers as of the day and year first above written. CITY OF SHAKOPEE (SEAL) By And John Schmitt, Mayor Mark McNeilJ, City Administrator Date Date COUNTY OF SCOTT By By ..J1uItAtJ/ 1JUAtJ1!~.1l Da\ d Unmacht, County Administrator Barbara Marschall, Chair of Its County Board Date~13JDV Date g/3/tJ'/ Upon proper execution, this agreement RECOMMEND FOR APPROV AL: will be legally valid and binding. .' . ....J .<{ l' /../'. .;/".:7 ,; /1 y. By ~_.r.'. /I'!!. /;{ C'/-?I R' t .."'. ",',-_red . "'~lr'>v " ,e, :;(4i-;iPatrick Ciliberto, County Attorney /' . D 9/ ) ') 1}( ate .) i .,,~. / i I " APPROVED AS TO EXECUTION: .,-, '''~-'}/~. " I: ,,: .'-)' '....,/~?.. .",')" <? l' By '---....j? //// C..c.tc:./l:f!..-t"""ov'-'---.- ,;tt/1Patrlck Ciliberto, County Attorney . Y///7/;'c/ Date / .//7-/ rj. . ; , / , jg-w:\word\project\CP2004-SE\Striping Cooperative Agmt 04 - Shakopee.doc Rev.7123i04 CP 2004.SE REFLECTORIZED EPOXY PAVEMENT MARKING VARIOUS COUNTY ROADS AND CITY STREETS BID DATE: 6115/04 I EXHIBIT A . SHAKOPEE I ESTIMATED ESTIMATED ESTIMATED ESTIMATED ESTIMATED SPEC. EST. UNIT TOTAL COUNTY COUNTY CITY OF SHAKO PEE CITY OF SHAKO PEE NUMBER Intersection ITEM UNIT QUANT. PRICE COST QUANTITY COST QUANTITY COST 2564.603 CSAH 15 all0th Ave. 24" STOP LINE WHITE. EPOXY lIN.FT 73 $ 5.50 $ 401.50 25 $ 137.50 48 $ 264.00 2564.603 CR 79 al10th Ave. 24" STOP LINE WHITE. EPOXY lIN.FT 75 $ 5.50 $ 412.50 20 $ 110.00 47 $ 258.50 2564.603 CSAH 101 atCSAH 17 12" SOLID CROSSWALK WHITE LINE lIN.FT 546 $ 3.50 $ 1.911.00 444 $ 1,554.00 102 $ 357.00 2564.603 CSAH 15 at 10th Ave. 12" SOLID CROSSWALK WHITE LINE lIN.FT 546 $ 3.50 $ 1,911.00 236 $ 826.00 310 $ 1,085.00 2564.603 CSAH 15 at 11lh Ave. 12" SOLID CROSSWALK WHITE liNE lIN.FT 130 $ 3.50 $ 455.00 130 $ 455.00 0 $ . 2564.603 CR 79 al Vierlina Drive 12" SOLID CROSSWALK WHITE LINE lIN.FT 412 $ 3.50 $ 1.442.00 188 $ 658.00 224 $ 784.00 2564.603 CR 79 al10lh Ave. 12" SOLID CROSSWALK WHITE LINE lIN.FT 378 $ 3.50 $ 1.323.00 92 $ 322.00 286 $ 1.001.00 2564.604 CSAH 17 at Vierlina Drive ZEBRA CROSSWALK WHITE. EPOXY SO.FT 1116 $ 3.50 $ 3.906.00 612 $ 2,142.00 504 $ 1.764.00 2564.604 CSAH 17 at 17th Ave. ZEBRA CROSSWALK WHITE. EPOXY SO.FT 1278 $ 3.50 $ 4.473.00 702 $ 2.457.00 576 $ 2,016.00 2564.604 CSAH 101 al1st Ave. ZEBRA CROSSWALK WHITE. EPOXY . SO.FT 321 $ 3.50 $ 1.123.50 288 $ 1,008.00 0 $ S 16.544.50 S 9,422.00 $ 7,529.50