Loading...
HomeMy WebLinkAbout3.B. CIP-Municpal Projects (Buildings) 3.b. CITY OF SHAKOPEE Memorandum TO: Mayor and Council Mark McNeill, City Administrator FROM: Gregg Voxland, Finance Director SUBJ: CIP - Building Fund DATE: September 14, 2004 Introduction & Background Attached for Council discussion is the CIP for municipal/building projects. Various pieces of this part of the CIP have been discussed. The projected status of the building fund needs to be discussed. Action Discuss and give staff direction. 0 j6) Gregg Voxland Finance Director CITY OF SHAKOPEE < MN CIP PROJECTS BY TYPE 2005 BUDGET Type No. Project Cost Estimate Funding Source 2005 2006 2007 2008 2009 MUNI Emergency Vehicle Siqnal Premption 50,000 CIF 30,000 20,000 MUNI Community Signage Monuments 50,000 General Fund 25,000 25,000 MUNI Building Expansion Public Works 6,000,000 Bonding 6,000,000 MUNI Building Expansion PUblic Works 300,000 Sewer - B 300,000 MUNI Building Expansion Public Works 300,000 Storm - B 300,000 MUNI Fire Station 3 Site Building MUNI Fire Station 4 Site 300,000 Building 300,000 MUNI Fire Station 5 Site 150,000 Building 150,000 MUNI Aquatic Park Service Bldg & Site Improv 760,000 BUilding 660,000 100,000 MUNI Comm Ctr Expansion 11,000,000 Tax Levy 11,000,000 MUNI Community Center Multi Use 2,250,000 Tax Levy 2,250,000 MUNI Community Center Multi Use 500,000 Donations 500,000 MUNI Construction of Fire Station 3 2,500,000 Bonding 2,500,000 MUNI Construction of Fire Station 1.1 2,500,000 Bonding 2,500,000 MUNI City Hall 6,300,000 Building 2,900,000 3,400,000 MUNI Construction of Fire Station 4 3,000,000 Bonding - 3,000,000 MUNJ Construction of Fire Training Tower 1,000,000 Bonding 1,000,000 MUNI Total 36,960,000 7,765,000 13,795,000 2,500,000 5,500,000 7,400,000 9/14/20041:33 PM City of Shakopee Capital Improvement Program 2005- 2009 Project Manager Project Type: Project Title: Total Project Cost: Terry Stang Public Safety - Fire Emergency Vehicle Signal Premption 70,000 A. Expenditure Items: 2005 2006 2007 2008 2009 Land & ROW Construction Improvements 30,000 20,000 Engineeringl Admin. Total 30,000 20,000 - - - - B. Funding Source: General Fund Capital Improvement Fund 30,000 20,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy Total 30,000 20,000 - - - - Description: Provides for shared installation of traffic signal modifications. An emergency vehicle sending unit that causes traffic signals to change to "green" mode in the direction that the emergency vehicle is traveling. Justification: Increasing traffic congestion slows emergency vehicle response times. Preemptive system increases levels of safety and facilitates traffic flow. Requires 1 sending unit per vehicle, and traffic signal controller modification. Other Comments: Can also be used on police, ambulance, and snow removal vehicles in emergency situations. , Operatina Costs: IS- CIP Projects 2003 - 2008+ City of Shako pee Capital Improvement Program 2005 . 2009 Project Manager Project Type: Project Title: Total Project Cost: R. Michael Leek Community Sign age Monuments 50,000 A. Expenditure Items: . 2005 2006 2007 2008 2009 2010 Land & ROW Construction Improvements 25,000 25,000 Engineering/Admin. Total 25,000 25,000 - - . - - B. . Fundina Source: General Fund 25,000 25,000 Capital Improvement Funds Tax Increment Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Flow Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy Total 25,000 25,000 - - - - Description: Design, placement of community entrance monument(s) and community trailblazing and identification signs , Justification: The proposed project implements the intent of the City's Comprehensive Plan to protect and enhance the City's visual character and separateness from its neighbors. It is also a continuation of a recent sign age project in the downtown. Other Comments: OperatinQ Costs: jfo Project Manager Project Type: Project Title: Building Remodeling Total Project Cost: Bruce Loney Facilities & Expansion-Public Works $6,000,000 A. Expenditure Items: 2005 2006 2007 2008 2009 Land & ROW Construction 6,200,000 Improvements Engineering/Admin. 400,000 Total 6,600,000 - - - - - B. Funding Source: General Fund Capital Improvement Funds Tax Increment Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base 300,000 Sanitary Sewer Fund-Flow Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 300,000 Storm Drainage Fund-Trunk Tax Levy 6,000,000 Total 6,600,000 - - - - - Description: Remodeling and Expansion of the existing Public Works Facility t Justification: The existing Public Works/Police Station facility will be out of necessary space to meet the Public Works needs. Other Comments: A building space analysis has determined the cost of remodeling and expansion of the existing facility at the present location. Project is shown over a two year period assuming design and construction would take at least two years. Existiing SPUC building will be demolished and a new Public Works Building will be built and also existing building utilized. Operating Costs: Estimate roughly twice the existing costs for utilities and maintenance. 17 City of Shakopee Capital Improvement Program 2005 - 2009 Project Manager Project Type: Project Title: Total Project Cost: Mark Themig Facility Improvements Aquatic Park Improvements 760,000 A. Ex enditure Items: 2005 2006 2007 2008 2009 Land & ROW Construction Improvements 600,000 100,000 Engineering/Admin. 60,000 Total 660,000 - - 100,000 - - B. Fundin Source: General Fund Capital Improvement Funds Building Fund 660,000 100,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Flow Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy Total 660,000 - - 100,000 - - Description: This project would replace the existing service building, as well as add additional play features to enhance attendance. 2005 -Improvements: Demolish and replace existing building, add play features, $600,000 (Building Fund) 2005 - Engineering/Admin: Design and engineering services for project, $60,000 (10% of total project costs) (Building Fund) 2008 - Improvements: Waterslide has 3-5 year life expectancy remaining. Will need to be replace Justification: The service building was constructed in 1968, and has reached its life expectancy. Due to the typ of construction (cinder block and concrete), little can be done to make improvements. The plumbing needs significant upgrading to repair leaks. Other Comments: Building demolition and replacement is estimated to cost $500,000. The additional $100,000 would be used for play features such as sprays, waterfalls, etc. that would enhance attendance. f More accurate estimates would be needed once scope of project is determined. ~ Operatin!:l Costs: No significant increase in operating costs anticipated over existing costs. /8 City of Shako pee Capital Improvement Program 2005 - 2009 Project Manager Project Type: Project Title: Total Project Cost: Terry Stang Public Safety - Fire Fire station 4 site 100,000 A. Expenditure Items: 2005 2006 2007 2008 2009 Land & ROW 300,000 Construction Improvements Engineering/Admin. Total 300,000 - - - - - B. Funding Source: General Fund Capital Improvement Fund Building Fund 300,000 Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy Total 300,000 - - - - - Description: Acquisition of a satellite station site in the southern part of the city. Justification: To provide a central location for the coverage zone of the southern part of the city for shorter response and proper ISO insurance rating. Other Comments: Dependant upon land availibility in the area and projected staffing availability from the neighborhood. Operatina Costs: J7 City of Shakopee Capital Improvement Program 2005 - 2009 Project Manager Project Type: Project Title: Total Project Cost: Terry Stang Public Safety - Fire Fire station 5 site 100,000 A. Expenditure Items: 2005 2006 2007 2008 2009 Land & ROW 150,000 Construction Improvements Engineering/Admin. Total 150,000 - - - - - B. Funding Source: General Fund Capital Improvement Fund Building Fund 150,000 Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy Total 150,000 - - - - - Description: Justification: To provide a central location for the coverage zone of the part of the city for shorter response and proper ISO insurance rating. , Other Comments: Dependant upon land availibility in the area and projected staffing availability from the neighborhood. Operating Costs: ~6 City of Shakopee Capital Improvement Program 2005 - 2009 Project Manager Project Type: Project Title: Total Project Cost: Mark Themig Facility Improvement Community Center Expansion 11,000,000 A. Expenditure Items: 2005 2006 2007 2008 2009 Land & ROW Construction 10,000,000 Improvements / Engineering/Admin. 1,000,000 Total - 11,000,000 - - - - B. Funding Source: General Fund Capital Improvement Funds Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Flow Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy 11,000,000 Total - 11,000,000 - - - - Description This project involves expansion of the Community Center. Although potential amenities would not be known until a decision is made to proceed with an attempt at funding, some general costs based on construction of similar facilities include the following: Indoor Leisure Pool: $5,000,000 (Shoreview, Maple Grove, Maplewood) Fitness Facility (Strength training, aerobics, cardio area) : $2,500,000 (Shoreview) Indoor Playground:? Banquet and Meeting Rooms:? Teen Center:? Senior Center: ? Engineering/Admin: Architectural and design services: $1,000,000 (10% of project costs) Justification: The city conducted a needs analysis in 2003 that found strong support for an expanded facility to serve the growing communities needs. other Comments: I A citizen task force is analyzing options for the future of the Community Center. A ~ recommendation is expected in late summer 2004. Operatina Costs: Unable to determine until facili amenities are identified. ;)./ City of Shakopee Capital Improvement Program 2005 - 2009 Project Manager Project Type: Project Title: Total Project Cost: Mark Themig Facility Improvement Community Center Multi-Use Facility 2,750,000 A. Expenditure Items: 2005 2006 2007 2008 2009 Land & ROW Construction 2,500,000 Improvements Engineering/Admin. 250,000 Total - 2,750,000 - - - - B. Funding Source: General Fund Capital Improvement Funds Park Reserve Fund Grants (specify) Donations (specify) 500,000 State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Flow Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy 2,250,000 Total - 2,750,000 - - - - Descriotion This project involves the Hockey Association's efforts to create a multi-use facility that would serve as a second sheet of ice during the winter, and other uses during the spring, summer, and fall. 2005 - Construction: $2,500,000 ($2.25M tax levy; $50000 donations by Shakopee Hockey Association) 2005 - Engineering/Admin: Architectural and design services: $250,000 (10% of project costs) Justification: The Shakopee Hockey Association has identified a significant need for additional ice in the near future. They are working with other user groups on a multi-use facility concept that could serve a number of different user groups, and enhance revenue for the existing rink. Other Comments: A citizen task force is analyzing options for the future of the Community Center. A recommendation is expected in late summer 2004. I ~ OoeratinQ Costs: Unable to determine until facility amenities are identified. 1:1 City of Shakopee Capital Improvement Program 2005 - 2009 Project Manager Project Type: Project Title: Total Project Cost: Terry Stang Public Safety - Fire Construction of Fire Station 3 2,500,000 A. Expenditure Items: 2005 2006 2007 2008 2009 Land & ROW Construction 2,500,000 Improvements Engineering/Admin. Total - - 2,500,000 - - - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy 2,500,000 Total - - 2,500,000 - - - Description: Construction of a satellite station in the eastern part of the city. Justification: To provide a central location for the coverage zone of the eastern part of the city for shorter response and proper ISO insurance rating. Other Comments: Dependant upon land availibility in the area and projected staffing availability from the neighborhood. OperatinQ Costs: ~3 City of Shako pee Capital Improvement Program 2005. 2009 Project Manager Project Type: Project Title: Total Project Cost: Terry Stang Public Safety - Fire Construction of Fire Station 1.1 2,500,000 A. Expenditure Items: 2005 2006 2007 2008 2009 Land & ROW . Construction 2,500,000 Improvements Engineering! Admin. Total - - - 2,500,000 - - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy 2,500,000 Total - - - 2,500,000 - - DescriDtion: Replace downtown fire station with one located at Lions Park on Vierling Drive. Justification: To provide a central location for the coverage zone of the western part of the city. Other Comments: Dependent on the completion of Vierling Drive to Adams Street. ODeratinQ Costs: . 'd-Lf City of Shakopee Capital Improvement Program 2005 - 2009 Project Manager Project Type: Project Title: Total Project Cost: Mark McNeill Facilities Replacement City Hall 6,300,000 A. Exoenditure Items: 2005 2006 2007 2008 2009 Land & ROW Construction Improvements 2,600,000 3,200,000 Engineering/Admin. 300,000 200,000 Total - - - 2,900,000 3,400,000 - B. ; Funding Source: General Fund Capital Improvement Funds Building Fund 2,900,000 3,400,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Flow Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy Total - - - 2.900.000 3,400,000 - Description: This would provide for the replacement of the exisiting City Hall on the Gorman ~H\l(\r\ \ \ \ \ \ \\ I I \ \ I~ItITI \ l TIlt1!1 Street site adjacent to the Police Station. ~~-limr:~T >\U '1----f--1} i--!ffiB I Justification: The City has occupied the current City Hall building since 1993. The growth of I. I: ~: ~:i I l"fJJ13- \ \---.-.. the City is causing the building to become overcrowded. An analysis of the . ~ L il r _. 'i1 II ,....--..-\ ", current building determined that it was unfeasible to add on to the existing , 0 I u.. Tr ., 'L1 (/)', t . ....,.. .jJ ' , I : l..tr: ~i Ii . I'~";~:;f'/'" building. . ~ I I L-. ::Ej 11............_-,;1, ~": 1\\:;~LJ!i b!J~i~ Other Comments: The sitewas chosen after reviewing other alternatives. The propose site is Jage enough, assuming that the City Hall building is a multi-level structure. A City Hall at this location would complete the public building "campus", started by the /~s'j ..<....tl Ii I Police/Public Works building. ~'j7!:;J--1 /u~~cr \~~:,~_m OperatinQ Costs: Constructed as a joint Police/City Hall facility, it would provide some savings as compared to two separate buildings. ~S- City of Shakopee Capital Improvement Program 2005 . 2009 Project Manager Project Type: Project Title: Total Project Cost: Terry Stang Public Safety - Fire Construction of fire station 4 3,000,000 A. Exoenditure Items: . 2005 . 2006 2007 2008 2009 2010+ Land & ROW Construction 3,000,000 Improvements Engineering/Admin. Total - - - - - 3,000,000 B. Funding Source: . General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy I 3,000,000 Total . - - - - - 3,000,000 Description: Construction of a satellite station in the southern part of the city. Justification: To provide a central location for the coverage zone of the southern part of the city for shorter responsE and proper ISO insurance rating. Other Comments: Dependant upon land availibility in the area and projected staffing availability from the neighborhood. Operatinn Costs: ;2' City of Shakopee Capital Improvement Program 2005 - 2009 Project Manager Project Type: Project Title: Total Project Cost: Terry Stang Public Safety - Fire Training Tower 1,000,000 A. Expenditure Items: 2005 2006 2007 2008 2009 Land & ROW Construction 1,000,000 Improvements Engineering/Admin. Total - - - - 1,000,000 - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy 1,000,000 Total - - - - 1,000,000 - Description: Construction of a training tower for firefighter annual training Justification: OSHA regulations require that we have an annual live burn training. But the DNR and State regulations are making it difficult to burn any buildings. Also the availibility of these buildings is diminishing. Other Comments: Operating Costs: . ~? City of Shako pee, Minnesota Building Fund Projected Fund Levels 2005-2009 Capital Improvement Program REVENUES: 2005 2006 2007 2008 2009 Rentals $784,000 $810,000 $990,000 $1,040,000 $1,100,000 Donations 500,000 Bond proceeds - Public Works 6,000,000 Storm and Sewer contributions 600,000 Bond Proceeds - Fire 2,500,000 4,000,000 Bond Proceeds - Park Referendum 13,250,000 Transfers 500,000 500,000 500,000 500,000 500,000 Interest 116,772 109,403 147,179 93,666 20,012 Total Revenue 8,000,772 15,169,403 1,637,179 4,133,666 5,620,012 EXPENDITURES: Maintenance Type Debt Service 475,000 475,000 475,000 475,000 475,000 Construction Type Pool Bathhouse Building 660,000 Comm Center Expansion 11,000,000 Comm Center Multiuse 2,750,000 PW Expansion 6,600,000 Fire station 3 2,500,000 New City Hall 2,900,000 3,400,000 Fire station 1.1 2,500,000 Pool Slide 100,000 Fire station 3 Site Fire station 4 Site 300,000 Fire station 4 3,000,000 Fire station 5 Site 150,000 Fire Training Tower 1,000,000 Total Expenditures 8,185,000 14,225,000 2,975,000 5,975,000 7,875,000 Excess (Deficiency) (184,228) 944,403 (1,337,821) (1,841,334) (2,254,988) Cash Balance 1/1 2,919,293 2,735,065 3,679,468 2,341,646 500,312 Balance 12/31 $2,735,065 $3,679,468 $2,341,646 $500,312 ($1,754,675) Interest is calculated at 4% of PY Fund Balance Rental Charges are calculated at PY Rent Rates Plus the Additions divided by an Avg Usefulllife of 25 year: City of Shakopee Building Depreciation/Rental Charges Need to Compound 2005 BUDGET Year Amount Annual Rent Monthly Rent Monthly 2005 21% Total Total Buildin Purch Life Pro ram Paid Char e Char e Maintenance 3% Inflator Monthl Rent Annual Rent Cit Hall 1991 20 0181 1,463,145.93 73,157.30 6,096.44 416.67 1,370.00 7,883.00 94,600 Libra 2003 40 182 4,404,604.00 110,115.10 9,176.26 500.00 2,030.00 11,706.00 140,470 Public Works 1975 50 441 835,000.00 16,700.00 1,391.67 750.00 450.00 2,592.00 31,100 Police 2003 40 311 5,618,734.00 140,468.35 11,705.70 750.00 2,620.00 15,076.00 180,910 Fire Station # 1 1950 50 0321 204,021.00 4,080.42 340.04 416.67 160.00 917.00 11,000 Fire Station # 2 1998 50 0324 2,729,416.53 54,588.33 4,549.03 791.67 1,120.00 6,461.00 77,530 Youth Buildin 1989 50 0628 120,000.00 2,400.00 200.00 416.67 130.00 747.00 8,960 Youth Bid Remod 2001 38 0628 75,000.00 1,973.68 164.47 - 30.00 194.00 2,330 Civic Center 1995 50 0753/0754 5,458,701.97 109,174.04 9,097.84 1,250.00 2,170.00 12,518.00 150,220 Pool Filter Bldg 1975 30 7752 9,720.00 324.00 27.00 416.67 90.00 534.00 6,410 Bath House Bldg 1975 40 7752 59,400.00 1,485.00 123.75 416.67 110.00 650.00 7,800 Pool 1975 25 7752 100,000.00 4,000.00 333.33 416.67 160.00 910.00 10,920 Pool s stem Recon 1999 20 7752 900,000.00 45,000.00 3,750.00 500.00 890.00 5,140.00 61,680 Total 563,466.22 46,955.52 7,041.67 11,330.00 65,327.00 783,920 Assumes 40% charge to Ice Arena and 60% charge to Civic Center