CITY OF SHAKOPEE
Memorandum
CON "'E "n
.l 'ii". ...
TO: Mayor & City Council .. . \) ,11& iJ';:
Mark McNeill, City Administrator
FROM: Bruce Loney, Public Works Director
SUBJECT: Establishment of a Lateral Sewer Connection Charge
Ordinance No. 775
DATE: January 2, 2006
INTRODUCTION:
In conjunction with the CSAH 83 sanitary sewer extension, from Church Addition to
River Valley Estates,. a lateral sewer connection charge needs to be established. Attached
is Ordinance No. 775, an ordinance establishing a lateral sewer connection charge for the
City of Shakopee.
BACKGROUND:
With the CSAH 83 sanitary sewer extension feasibility report, it was proposed to have a
lateral sanitary sewer connection charge versus a lateral sewer assessment on properties
adjacent to CSAH 83 so as not to place an assessment on properties that are not
contemplating development at this time. City Council recently adopted a new assessment
policy, in which either an assessment or lateral sewer connection charge could be
established or a lateral sewer benefit associated with trunk: sewer line extensions.
Attached to this memo is Ordinance No. 775, an ordinance that has been prepared by Jim
Thomson, City Attorney, in order to establish a lateral sewer connection charge for the
City of Shakopee.
ALTERNATIVES:
1. Adopt Ordinance No. 775 .
2. Do not adopt Ordinance No. 775.
3. Table for additional information.
RECOMMENDATION:
Staff would recommend Alternative No.1, so a lateral sewer connection charge can be
established.
ACTION REQUESTED:
Offer Ordinance No. 775, An Ordinance Establishing a Lateral Sewer Connection Charge
and move its.adoption.
~n~
Public Works Director
BUpmp
ENGRlEFIPPENNINGTON/COUNClUSEWERCONNECTION
CSAH 83 SANITARY SEWER I
PROJECT NO: 2006-6
. COST APPORTIONMENT I
i
I I
ITEM I I I I CONTRACT I EXTENDED
!
NO. 'ITEM DESCRIPTION I QUANTITY I UNITS I UNIT PRICE I TOTALS
8" EQUIVELENT I I I
i
1 !MOBILlZATION (49%) 1 [LUMP SUM: $ 12,985.00 $ 12,985.00
I REMOVE BITUMINOUS PAVEMENT 117.3 I SO YD i $ I
2 2.00 i $ 234.60
3 SAWCUT BITUMINOUS PAVEMENT 8! L1N FT I $ I 32.00
4.00! $
4 POT HOLE UTILITIES 5 I EACH $ 100.00 $ 500.00
I
5 AGGREGATE SURFACING CLASS 5 MOD i 22 CUYD $ 24.50 $ 539.00
6 I GRANULAR FOUDATION AND/OR BEDDING I 73 I CU YD $ 27.65 $ 2,018.45
130 ! I
7 10" DUCTILE IRON PIPE SEWER CL 52 L1N FT , $ 36.85 ! $ 4,790.50
8 18" CCFRPM PIPE SEWER 2011 L1N FTI $ 29.00 ! $ 58,319.00
9 24" CCFRPM PIPE SEWER .. 20 L1N FT $ 29.00 $ 580.00
.
10 CONNECT TO EXISTING MANHOLES (SAN) 1 i EACH 1$ 12,700.00 $ 12,700.00
11 18" PVC PIPE SEWER - SDR 35 190 L1N FT $ 29.00 $ 5,510.00
12 18" PVC PIPE SEWER - SDR 26 619 L1N FT $ 29.00 $ 17,951.00
13 20" STEEL CASING PIPE (JACKED) 120 L1N FT $ 415;00 $ 49,800.00
14 30" STEEL CASING PIPE (JACKED) I 153 L1N FT $ 372.00 I $ 56,916.00
15 SANITARY SEWER INSPECTION(TELEVISING) 2950 L1N FT $ 1.75 $ 5,162.50
16 CASTING ASSEMBLY (SANITARY) 9 EACH $ 500.00 $ 4,500.00
17 CONST 48" DIA SAN SEWER MANHOLE 108 L1N FT $ 214.60 $ 23,176.80
18 2.5" BITUMINOUS WALK 1056 SOFT $ 2.00 i $ 2,112.00
19 TRAFFIC CONTROL 1 LUMP SUMI $ 1,650.00 I $ 1,650.00
20 INSTALL SIGN PANEL TYPE C 9 EACH $ 78.60 $ 707.40
21 SILT FENCE, TYPE MACHINE SLICED , 2850 L1N FT $ 1.50 $ 4,275.00
22 SEEDING(INCL TOPSOIL, FERT,MULCH,DISC ANCHOR) 5 ACRE $ 566.50 $ 2,832.50
23 EROSION CONTROL BLANKET 200 SOYD $ 1.40 $ 280.00
24 EASEMENTS (30%) I 1 iLUMP SU~ $ 15,581.47 $ 15,581.47
25 PROJECT COSTS (49%) I 1 ILUMP SUMi $ 48,029.13 $ 48,029.13
SUBTOTAL I , $ 331,182.35
I I
-IOVERSIZING ! l I
I
1 MOBILIZATION (51%) i 1 [LUMP SUM: $ 13,515.00 $ 13,515.00
i
2 118" CCFRPM PIPE SEWER I 2011! L1N FT i $ 101.00 $ 203,111.00
-- 3 -!24" CCFRPM PIPE SEWER I 20 I L1N FT 1 $ 116.00 $ 2,320.00
I
4 118" PVC PIPE SEWER - SDR 35 I 190 I L1N FT I $ 23.65 $ 4,493.50
i 18" PVC PIPE SEWER - SDR 26 , 619! L1N FT I $ 39.00 $ 24,141.00
5 i
, CONST 48" DrA SAN SEWER MANHOLE I 158.92 I L1N FT I $ 214.60 $ 34,104.23
6 !
7 SEEDING(INCL TOPSOIL, FERT,MULCH,DISC ANCHOR) I 21 ACRE i$ 566.50 $ 1,133.00
8 I EROSION CONTROL BLANKET I 100 I SO YD i $ 1.40 $ 140.00
9 IEASEMENTS (70%) 1- 1 :LUMP SUM! $ 36,356.78 $ 36,356.78
10 !PROJECT COSTS (51%) I ~MP SUMi $ 49,989.50 $ 49,989.50
i
, $ 369,304.01
I SUBTOTAL I
! I I ,
I
i ,- I
I i I I $ 700,486.36
I TOTAL , I
,
CITYOF SHAKOPEE
CSAH 83 SANITARY SEWER EXTENSION
LATERAL SEWER CHARGES
I I I
. ! I I
Total lateral sewer charge =1$331,182.35 I I
West Side of CSAH 83 =1$165,591.18 (Cost to the City if land goes into trust) i
East Side of CSAH 83 = I $165,591.17 (see below for apportionment) i
Lateral Charge per Unit = 1$1,212.94 !
City Cost = 1$534,895.19 . \ i
I
I !
PID i PROPERTY OWNER AREA UNITS i LATERAL
,
! 1 (acres) i CHARGE
279160130 , Harold & Roberta Schneider 29 I 58 i $70,350.52
i I
I 3300 Valley View Road !
! I
\ Shakopee, MN 55379 , I
i i
: , i
, I
279160131 i Harold & Roberta Schneider 0.46 I 1 I $1,212.94.
i
i i
I 3300 Valley View Road ,
I ,
I Shakopee, MN 55379 I .
! i
I ! I
I I I
279160060 I Harold & Roberta Schneider 26.7 I 53 I $64,285.82
I 'I
I 3300 Valley View Road i I
I
I Shakopee, MN 55379 I I
i !
I I I
i
279160090 I Beverly Koehnen 12.1 I 24 I $29,110.56
i
, 2036 County Road 83 I ,
I
i I !
I Shakopee, MN 55379 I I
I I
I Total 68.26 I 136 1$164,959.84
ORDINANCE NO. 775, FOURTH SERIES
AN ORDINANCE AMENDING FEES BY ADDINGA LATERAL SANITARY SEWER
CONNNECTION CHARGE FOR THE CSAH 83 SANITARY SEWER PROJECT
Whereas, by Ordinance No. 772, the City Council adopted a Fee Schedule forthe
fiscal year 2007; and
Whereas, Minnesota Statutes, Chapter 444 and Section 3.02 of the City Code authorize the City
Council to fix rates and charges for sanitary sewer services, including but not limited to establishing sanitary
sewer availability and connection charges; and
Whereas, the city council has detennined that a lateral sanitary sewer connection charge should be
established for the CSAH 83 sanitary sewer project from the south plat line of Church Addition to the north
plat line of River Valley Estates so that properties that can be served by public sanitary sewer as a resutt of
the construction of that project pay for the their fair share of the costs of the project;
Whereas, the Public Works Director has calculated the amount of the charge that should be
established, and the City Council has concluded that the proposed charge is just and equitable.
THE CITY COUNCIL OF lHE CITY OF SHAKOPEE, MINNESOTA ORDAINS:
Section 1. The 2007 Fee Schedule, adopted by Ordinance 772 is amended by adding the
following charge under "Engineering" on page 21 of the Fee Schedule:
L. Lateral Sanitary Sewer Connection Charae for CSAH 83 Sanitary Sewer Proiect from
the south plat line of Church Addition to the north plat line of River Vallev Estates
$ 1.212.94 per SAC unit as calculated usino the most recent version ofthe Metropolitan
Council SAC Procedures Manual
The charae is to be collected when a property within the proiect area connects to the CSAH
83 sanitary sewer line or when a final plat is recorded for a development within the proiect
area. whichever occurs first.
Section 2. The current paragraph "L" entitled "Other Fees" is re-Iettered as paragraph "M."
Section 3. This ordinance becomes effective from and after its passage and publication.
Mayor of the City of Shako pee
ATTEST:
City Clerk
Published in the Shakopee Valley News on the _ day of ,2007.