Loading...
HomeMy WebLinkAbout15.A.3. Emergency Vehicle Preemption System at CR 101 and Stagecoach Road CITY OF SHAKOPEE IS: /1,3- Fire Department CONSENT Memorandum TO: Honorable Mayor and City Council -- Mark McNeill, City Administrator FROM: Terry Stang, Fire Chief BY: Dan Hughes, Chief of Police ~ SUBJECT: Emergency Vehicle Preemption System DATE: December 2, 2004 INTRODUCTION: The Council is asked to authorize appropriate city staff to enter into a contract with Design Electric, Inc. for the purchase and installation for the City's Emergency Vehicle Preemption System (EVPS). BACKGROUND: The EVPS allows emergency vehicles with emitters to control EVPS equipped signaled intersections, allowing emergency vehicles to pass through intersections safely and unimpeded by other vehicle traffic. In essence, it allows the emergency vehicle to have a green light. Shakopee's Fire and Police Departments have been equipped with these emitters and are currently using them at intersections that are equipped with these systems. On February 3, 2004, City Council authorized WSB Engineering to perform the installation design and obtain quotes for the installation of the EVPS at County Road 101 & Stagecoach Road. WSB has completed the installation design and requested quotes from seven firms for the purchase and installation of EVPS at this intersection. Quotes were received from only four vendors. The low bid being from Design Electric, Inc. in the amount of $8,570.00. RECOMMENDATION: Staff recommends that Design Electric, Inc. be awarded the contract for the purchase and installation of EVPS at County Road 101 and Stagecoach Road. December 2, 2004 1 Emergency Vehicle Preemption System BUDGET IMPACT: The Fire Department has funds budgeted for this expense in their capital expenditure budget. ACTION REQUESTED: If the Council concurs, they should, by motion, authorize the appropriate City officials to enter into a contract with Design Electric, Inc. to purchase and install the EVPS system, in the amount of $8,570, at County Road 101 & Stagecoach Road. DH:pm Attachments: 1. Quotes letter dated December 2, 2004, from WSB & Associates DH:pm December 2, 2004 2 Emergency Vehicle Preemption System Received: 121 2104 14:29; -> HP LaserJet 3100; Page 2 DEC. 2. 2004 1: 11 PM 7632877180 NO. 1235 P. 2 ~ WSB & A.rsocjate~i. InC). Infrastructure I Engineering I Planning I Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 December 2, 2004 Tel: 763.541.4800 Fax: 763-541-1700 Mr. Dan Hl.lghes Police Chief City of Shakopee 129 Holmes Street South Shakopee, MN 55379-1328 Re: CSAH 101 at Stagecoach Road EVP System City of Shakopee, MN WSB Project No. 128l~70 Dear Mr. Hllghes: Quotes were received for the above-referenced proj ect on December 1, 2004. A total of four (4) quotes were received. The quotes were checked for mathematical accuracy and tabulated. Please find enclosed the tabulation indicating the low bidder as Design Electric, Inc., St Cloud, MN in the amount of $8,570. We recommend that the City Council consider these quotes. and award a contract to Design Electric, Inc., based on theCityls best interests. Sincerely, WSB & Associates, Inc. ~~ CharlesT. Rickart, P.E., P.T.O.E. Project Manager Enclosures cc: DesigD. Electric, Inc. lh Minneapolis. St. Cloud K: I01281-70IAdminIDoc.rILTR-dh-120204.tioc Ellual QDDortunitv Emelover Extension of Bids Jl (I) 0 (I) i<;(, 1< ~i~* .*~~~~~ . -x t - -(~: 1-" . - -- = < m (I) C> C. CSAH '101 AT STAGECOACH ROAD EVP SYSTEM .. PROJECT: "" ..... l.OOATION: SHAKOPEE, MN ~I\) = ..... PROJECT NO's. 1231.70 DATE: Der:;ember 2, 2004 =1\) -P-..... 0 $10,000.00 $8,&70.00 $9,1eO.OD ~ .;. .. COST OPINION l.OW BIDDER 2ND LOW BIDDER ~ ..... ~.;. --0 .. ELECTRICAL INSTALLATION SI\) r.o DESIGN ELECTRIC, INC. g MAINTENANCE .. LINE ITEM ESTIMATED UNIT ESTIMATED UNIT UNIT NO NUMBER DESCRIPTION UNIT QUANTITY PRICE COST PRICE. COST PRlCE\ COST ---.J , , "'" LJ..> IsCHEDULE A. J "" ClC> ---.J 1 EVP SYSTEM lUMP SUM 1.00 $10.000.00 10,000.00 $&.570.00 8,570.00 :58.100.00 lJ,t6().OO ---.J ~ 2 ClC> = !TOTAL SCHEDULE A I $10,00D.00 I I $8,510.001 I $9,1liO.OOI f GRAND TOTAL II $8,570.00 I II $9,1eo.oO I , v :r 1l $10,774.llD $11,925.0D r OJ COST OPINION 3RD LOW J:llDDER 4TH LOW BIDDER CJl (I) , L KII.LMER El.ECTR1C CO. EGAN ELECTRICAl. (I) rt LINE ITEM ESTIMATED UNIT ESTIMATED UNIT UNIT Ul ..... NO NUMBER OESCRIPTION UNIT QUANTI"N' PRICE COST PRICE COST PRICE COST 0 0 .. SCHEDULE A 1 EVP SYSTEM LUMP SUN $10,774.00 10,n4.00 $11,925.00 11,925.00 1l 1.00 $10,000.00 10,000.00 = OJ 9co 2 i ~ (I) ! ~Ul TOTAL SCHEDULE A $10,000.00 I I $10,n4.0ol ! $11,925.00 I \Jl . --0 IGRANDTOTAL ~ II $10,000.00 I I $10,774.00 I I $11,925.00 I LJ..> Pap" 1 oC 1 K:\01281.7ll'lA<1rn;n\E>ocellBid TabBilHabS;d Delail