CITY OF SHAKOPEE
MEMORANDUM
To: Mayor and City Council
Mark McNeill, City Administrator
-..
From: Mark Themig, Parks, Recreation, and Facilities Director
Meeting Date: January 18, 2005
Subject: Huber Park Phasing Plan
INTRODUCTION
At the December 21 City Council meeting, Council directed staff to prepare an alternate
phasing plan that would provide for the riverbank stabilization first, and park
development second. This plan is attached (Attachment A).
In addition, this report also contains cost deduction options for your consideration, as
well as a list of additional funding sources that are being explored.
BACKGROUND AND DISCUSSION
Huber Park Phasing
At the December 21 Council meeting, Stuart Krahn from Bonestroo Rosene & Anderlik
and I presented a phasing plan and updated cost estimates that would provide for
construction of the park first, and riverbank stabilization second (Attachment B). At that
meeting, we were directed to prepare a phasing plan that provided riverbank work first,
with the option of some park infrastructure to accommodate the proposed community
playground.
The Huber Park Design Committee reviewed two alternates for dOing the riverbank work
first. One alternate provided a gravel parking lot and the other a paved lot. There was
consensus that in order to comply with the standards the city asks from private
developers, we should pave the lot. However, City Council could provide itself a variance
to that requirement if it chose to do so.
Either phasing approach to this project works from a construction standpoint. The park
improvements can be constructed separately from the riverbank stabilization.
Project Deductions
The project costs for either phasing plan are similar. The costs have increased from the
proposed CIP budget due to the scope of the project, better cost estimates from the
detailed design work, and a better understanding of the site conditions from geotechnical
work.
Since the total project costs are higher than the CIP estimate, the design committee
prepared a list of deductions for .council considerations. Although these reductions may
be noticed, they won't necessarily impact how the proposed park functions. Additional
reductions in the project will impact park function.
The following is a summary of that list. These items are also noted on the cost estimate
sheet:
Proposed Reduction Cost Savings Comments
Picnic Shelter $40,000 Could be constructed later
Picnic Tables ... $44,000 Eliminates all tables
Interoretive Sianaae - - $6,000
Eliminate two river overlooks $15000 Plan retains central overlook.
Sound and lighting $92,000 Could provide conduit for future
installation
Benches $15,000 Possible community project (e.g.
Eagle Scout)
Pedestrian entry from Hwy 101 $44,000 Retains $5,000 for crossing
improvements. Could be a capital
campaian item.
Landscapina - Perennials $4,500 Possible women's prison proiect
Landscaping - Trees $50,000 Reduction of 100 trees. Could be
olanted at another time.
Total $310,500
Performance Area
There was consensus from the design committee that the performance area is the focal
point of the park and should remain as planned, with the exception of sound and lighting.
Restroom/Storaae Buildina
The design committee also discussed eliminating or reducing the size of the
restroom/storage building, but recommended against that at this time.
Riverbank Stabilization
The committee had significant discussion about the riverbank stabilization. Terry
Schwalbe from the Lower Minnesota River Watershed District noted that the stabilization
work should be tied in to the work that was done upstream for best results. However,
there was a strong opinion that park reserve fund shouldn't be required to fund riverbank
work outside of the park area.
The riverbank work along the park extends approximately 1,310 feet. The total proposed
riverbank stabilization is 2,091 feet. If the park reserve fund was to be charged for only
the park area work, the cost would be reduced approximately $360,000.
Finally, Mr. Schwalbe noted that there is a new technique (and less costly) that is being
used on the Mississippi River to stabilize the riverbank. Apparently it involves stringing
cables in the water that catch floating trees, and sediment deposits within and behind the
trees recreating the riverbank. This may only be useable on the east side of the park, but
it is worth investigating. He is getting more information on this technique and will forward
that information to the city and Bonestroo.
Additional Funding Options
Finance Director Voxland has provided the following overview of city funding sources
that could be considered for this project:
Source Eligible? Comments
General Fund Fund Balance Yes Currently at target balance, excluding
an 2004 unders end
Interfund Loan Yes Voxland recommends 5 year payback
--~ plan frol'!1 any of the following sources:
. General levy
. Park reserve
Sanitary Sewer Fund Yes Has only been used for sanitary in the
past. Using it for riverbank work would be
a chan e in hiloso h .
Storm No Not Ie al
CIF No Not Ie al
Buildin No Inade uate resources
In addition, several individuals are working on other outside potential funding options.
These include grant funds (Bonestroo), state or federal dollars (Councilor Lehman), Rahr
Malting credits (Bruce Loney), Lower Minnesota River Watershed District (Mark Themig)
and capital campaign (Mark Themig).
REQUESTED ACTION
City Council is asked to provide direction regarding the phasing plan and cost
reductions.
I
I
\
I
!
~\'\I~~
Oi~
~S I
~\~~ ~ ! I
I !
OPEN
I Lt.v.yN, ~.- ~,. I
\ ~. -- I
L_ --
I
...... ,.,.' </~-";.,..:.;...'-'
I
~ I
'U. I
'1 - \
i l; ~
EMERGE I
\ ACCESS WITH !
'GATE ARM
~Jo"_. I
PARKING' I
._46'. SPACES
,p- I
,:~".:^~ \
I
I
I
= tl/' C'~ Cl I
=
..-J' I
I
;:> I
I
r I
<Illr .:> i
ROAD 101 O~ rf/
CI ~
91 -------C.- -.~.:~-"" :\~
o .J>>_'"
0 ,,' 50' ,.,.
Iwj
lJCAIL:" ,-. 5Cf
I
I
I
I
I
A
... :.I Huber Park J(]J ==roo
U Ande<llk &
SHAKOPEE Park & Riverbank Project Schedule As.sod;ltcs
...................A.^>'.hol...r...
10 i Task Name ~'ii4...tm.jan;oiiJ..F.;b~os..lmM,;.'o5J.IiP,~iisTnMaY'o5TJun-cOii2005ju,'oGmAuil:osJ;S'eil;oiiT6ct"osmrNOV';oS.T.bec'osij,n'06:::lleb. ,06...r....Ma';oom.lm.APr'ii6TMaY'osDuri"os2Qq6jul;iJS__]..Aug'06T"sep'ooTOct"06:-lj
,PHASE I PARK PROJECT ",,.,J,1_',"'''',, ",,' ,,', '" , I",,,,,, ;;,.i., ",., ""),.,.".,, i, """"-",,,_.,..."',,, ".","~,"",~",,,,",,,,,,,, 1> ";,_""",,,,,,,,,,A.,,,,,.,,,, ."",. :,,, ,'" 'OJ,.,,]
, 1111111111111111111111111111111111111I1111I111111111111111111111111111111111111111111111111111111111111111111111111I1111111111111111111111111111111111111111111111111I .
~:j PHASE' CONSTRUCTION DOCUMENTS ... I
1 f I
3 I PHASE' BIDDING & AWARD CONTRACT
mJ ~ 1
4 i PHASE' CONSTRUCTION
I
5 I PHASE' CONSTRUCTION COMPLETE '* 9/30
I . .... .. ~,~. I
· f-".rr"umw~"~ -
~i' PLAYGROUND CONSTRUCTION COMPLETE
!
8 RIVERBANK ST ABIUZA TION I
I ....
9 I RIVERBANK CONSTRlJCTION DOCUMENTS I
10 I RIVERBANK BIDDING & AWARDCDNTRI\CT' I
mi1l RIVERBANK CONSTRUCTION nnn......
':11 RIVERBANK CONSTRUCTION COMPLETE '* 6/21
.-
i
iY: PHASE 2 PARK PROJECT
I
14~ PHASE 2 CONSTRUCTION DOCUMENTS i
I
'5l PHASE 2 BIDDING & AWARD CONTRACT ,
I I
'61 PHASE 2 CONSTRUCTION
I 10/6 I
I
17' PHASE 2CONSTRUCTlON COMPLETE
I mnmmm.m__ -.-J
--------..--
Task I Phase 1111111111111111111111111111111111111 Deadline @ Milestone . External Task 1 :;;17'\, ,I Completion Date '* Closeout .
1
.- ---- ---
HUBER PARK
Final Phasing Cost Estimate - Riverbank Work First
January 2005
PHASE 2
ITEM QUANTITY UNIT UNIT COST SUBTOTAL I DONATION DEDUCTIONS COMMENTS
EAIlTHWORI( & EROSION CONTROL
SILT FENCE 2091 LF $3.00 $6,273 I
EARTHWORK & EROSION CONTROL SUBTOTAL COST $6 273 I
HARDSCAPE ELEMENTS
4" CONCRETE WN..IWVAYS 5055 SF $5 $25,275 I
BITUMINOUS TRAILS 1869 SY $15 $28,035 I I Df.R trail reconstructed in Phase 1
HANDRAILS 245 LF $100 $24500
HARDSCAPE ELEMENTS SUBTOTAL CDST $77 810
LANDSCAPING
CANOPY TREES 205 EA $500 $102,500 $50 000
SH'lUBS 240 EA $5Q $12,000
PERENfoIN..S 3()QEA $15 $4,50Q $4,500
SOD 1174SY $4 $4,696
LAWN SEEDING 25343 SY $2 $5Q,686
NATIVE PU\NTINGS - SEEDING 2.4M; $4,OQQ $9,BOQ
STEEL EDGING 550 LF $10 $5 500
EROSION CONTROL BLANKET 7871 SY $1.50 $11807
IRRIGATION 56275 SF $Q.60 $33,765 $33 765 Toro Co Donation
LANDSCAPING SUBTOTAL COST $235054
PERFORMANCE STAGE & AREA
ClRVED POURED CONCRETE SEATWN..L -ABOVE GRADE 1382 SF $35 $48,370 18" h x 1.5' wide" wI inteQl'al color
ClRVED POURED CONCRETE SEATWAlL - BELOW GRADE 3225 SF $25 $80,625 Frost footing
CONCRETE MOW STRIP AT SEATWAU. 952 LF $15 $14,280 l'wlde
4" CONCRETE PAD FOR f\DA SEATING 257 SF $4 $1,028 ..- concrete
CONCRETE STAIRS 501 SF $25 $12 525 I
CONCRETE STAGE + STAIRS 1965 SF $50 $98,250 $50000 Rota Donation
CONCRETE RAMP AT STAGE 125 SF $50 $6,250
FREESTANDING BRICK COLl-"INS 3EA $IQ,OQQ $3Q,OQQ
OVERI-EAD METN.. STRUCTIRE 143Q SF $50 $71 500 WI acoustical GOQ1Ponenls
STAGE STRUCTlRE POSTS 6EA $10,000 $5Q 000
METN.. lETTERING 45LF $200 $9,000
PERFORMANCE STAGE & AREA SUBTOTAL COST $431 828
ENTRY
BRICK COll-"lNS WI FOOTING -SMALL 4EA I $8 ooQ $24,QOO $24 OOQ
BRICK COll-"lNS WI FOOTING -lARGE 2EA I $10,000 I $2G,Qoo $20,000 T
CROSSING IMPROVEMENTS 1 LS I $5.000 I $5.000 ~otential Scott Comtv fundina
ENTRY SUBTOTAL COST I $49 000
INFRASTRUCTURE
BITUMINOUS ROADWAY 1096 SY $20 $2.1.920 All & pmklng
CURB & GUITER FOR ROADWAY 814LF $14 $10989
BITUMINOUS FOR PARKING lOT 2083 SY $20 $41,660
CIRB & GUITER FOR PARKING lOT 665LF $14 $9,310
STORMWATER PIPE 220LF $30 $6,600
CATCH BASINS 2EA $1,800 $3 600
INFRASmUCTURE SUBTOTAL COST $94 079
AMEMTlES i
PRE.FABRlCATED BENCtES 10 EA $1,500 $15,000 $15000
TRASH RECEPTACLES 5EA $500 $2500
BIKE RACKS 4EA $400 $1,600
PICl\lC SI-E1. TER lEA $40,000 $40 000 $40,OOQ
PICl\lC TABLES 20 EA $2,20Q $44,000 $44 000
INTERPRETIVE SIGNAGE 4EA $1,500 $6,Qoo $6,000
AMENITIES SUBTOTAL COST $109 100
ELECTRICAL
ELECTRiCAl HOOKUPI SERVICE lLS $15,QOQ $15,000
PEDESTRIAN SCN..E UPRIGHT LIGHT FIXTUlES 15 EA $3,500 $52,500
PARKING lOT LIGHT FIXTURES 4EA $5,000 $2Q,OQO
lANDSCAPE lPUGHTS 4EA $100Q $4 ooQ
SPECIAL LIGHTING AT STAGE 10 EA $2 OOQ $2G,OOO $20,OOQ
PROJECTION SCREEN lEA $2 QOQ $2,Qoo $2 000
SOUND SYSTEM lLS $7Q,QQQ $70,Qoo $70,OQQ
ElECTRICN.. OUTLETS, SLEEVES eTC. 1lS $5 000 $5 000
ELECTRICAL SUBTOTAL COST $188 500
RESmOOM & STORAGE BU/LOING
RESTROOM & STORAGE BUlLDNG l5QO SF $230 $345,OOQ I
RESTROOM SUBTOTAL COST 5345 000 I $295 500 I
I SUBTOTAL I $1,536.644 I
MOBILIZATION 5% OF COS $76 832 I I
DEMOLITION 2% OF cosn $30,733 I I I
PHASE 2 CONSTRUCll0N TOTAL $1,644.209 I . T T
DESIGN & CONSTRUCTlON ADMINISTRA nON
RESTROOM/STORAGE BUILDING DESIGN $27 600
GEOTECI-NCAl. SERVICES-DESIGN PHASE $2 40Q
GEOTECfNCAl. SERVICES-SIRCHARGE PHASE $4,150
CONSTRUCTION ADMINSTRATION-BUllDlNG $6,400
CONSTRUCTION ADMINSTRATION-PARK 2-4% $51.968 estimate reftects 4% cost
II PHASE 2 PARK PROJECT COST $1,736,727 II
Less Toro Co. Donation
Less Rota Donation
TOTAL PHASE 2 PARK RESERVE/CAPITAL IMPROVEMENTS FUNDING I $1,357,462 I
HUBER PARK
Final Phasing Cost Estimate - Riverbank Work First
January 2005
PHASE 1
ITEM I QUANTITY UNIT UNIT COST SUBTOTAL DONATION DEDUCTIONS COMMENTS
EARTHWORK & EROSION CONTROL
IGRADE SITE I lLS $25,000 $25,000 Ms. r aradinnfshaping mder separate proiect
EARTHWORK & EROSION CONTROL SUBTOTAL COST $25000
RIVER STABlUZA7ION
RIPRAP W/ GEOTEXTILE FILTER 20911i:F $450 $940,950 WIIow stakes. Q80nrld in selected areas terrace
FLOTATION SILT CURTAIN 2091 LF $15 $31,365
RIVER STABlUZA7ION SUBTOTAL COST $972,315
HARDSCAPE ELEMENTS
BITUMINOUS TRAILS 2566 SY $15 $36,490 Reconstruct Dl'fl trail
4" CONCRETE WALKWAYS 3966 SF $5 $19,630
PRE-FABRICATED BENCt-ES 5EA $1,500 $7 500
TRASH RECEPTACLES 3EA $500 $1,500
CONCRETE OVERLOOK PlAZA 669 SF $25 $16733
STEPS AT OVERLOOK PlAZA 88 SF $25 $2,212
CONCRETE PlAZA AT RIVER 340 SF $25 $8,495 Reinforced concrete with I
CONCRETE STEPS AT RIVER 80 SF $25 $1,998
CONCRETE FISHNG PAD 230 SF $8 $1840 $1840
RECYCLED MATERIAL STRLCTLflE OVERLOOK AT RIVER 536 SF $25 $13,403 $13403
GUARDRAIL AT PlAZA 65LF $150 $9,750
HAROSCAPE ELEMENTS SUBTOTAL COST $121 750
INFRASTRUCTURE
BITUMINOUS ROMNVAY 1174SY $20 $23,480 drive only
CURB & GUTTER FOR ROPoDWAY 662 LF $14 $8,937
BITUMINOUS FOR PARKING LOT 2148 SY $20 $42 960 West D8rldnn lot orlv
CURB & GUTTER FOR PARKING LOT 946 LF $14 $13,272
BURY EXISTING ELECTRiCAL $150,000 $150 000 SPUC Donation
STORMWATER PIPE 280 LF $30 $8,400
CATCH BASINS 2EA $1800 $3 600
INFRASmlJCTlJRE SUBTOTAL COST $250 649
I SUBTOTAL I $1.369,714 I
MOBILIZATION (5% OF cas 566,466 I I
DEMOUTlON /2% OF cosn $27 394 T
Less SPUC Donation -$150,000 I I I
PHASE 1 CONSTRUCTION TOTAL! $1,315,694 I I $15,243 I
DESIGN & CONSTRUCTION ADMINISTRATION
DESIGN NO ENGINEERING-EXPMOED PROJECT COST/SCOPE $31,975 I I I More riverbank 3 overlooks. iJe co e
CONSTRUCTION ADMINlSTRATlONl2.4%1 562,624 I . I Ho...rv, estimate reflects 4% cost
U PHASE 1 PARK PROJECT COST $1,400,193 II . $1,384.950 B
\
-- ~- ----
0
......... Huber Park Jdj e.:w..uroo
.......~
Phase 1 & 2 Project Schedule lj;~
SllAKOl'FE H",,~".LAn""<<"
10lTaSkName fiif(r~r-':ijl'n:QS "'TLTf_ef~~--'IL.r..M.II{~"T-:r---iP;~5r"~_::IMa,y '05 -..l_,:~u''''~f:F~~~:~tC~r...LT'''Ull'Of---.--i.....wP:ps ':'-'\.'-"f~'05,_. ,]J T NQY.:Q:S 'ir:CQ&.;-;P$I-._.~;~~fVb;Q6--_]L_I-_.Mar'06"ruL._ Apf '~~:M~'t':06~_,.J .uJ.u_":~. .~ ____JlIl:06.,....'.'..r"'\lJl~j
ru/ciiY.cOU.NCIlMfETIN-G---------- _1lL.2.6. .2.. ~.h6.123. ,30 .e.. .13.J10 n.:.lLL1~l2Q. 2l.....t 10. Z:U4.iJ l!jj.~Jni.4i.L~jn .1.QJ.2G..+~. HHH. 24.,31 .1_.i_1'I.,~.U.~8.L~ .1....1J1.;2SLt..l..? HL,n ~i..!U1~.12!l_ ~lL4_.L1.lJjl! 25,._.l..l6.h~112.11~.i...~U.12.l.tQ 2,1;i.~~.11211V'_2fi.i_:UJI~1~I23..i}O.J.l.11.d2Llili.llLl11I25. .2..U! iJ.6.;ZH3lLe-L1:ii
-2"- PARI< BOA.RD REVIEW nm. ....m... ....-.. ..~:.~.~~:~~~~...:-_.._.. ....-... '212'
3 PHASE 1- P.,. Project ...--..-..__....__..
4 PRE-CONSTRUCTION SITE PREPARATION 1
, Solicit QUoies for Surcharging Under Bu~dirig & PertOrmaoolSia.ge-"
. SUrCharge'lJnder Buikling &'Pe'rforma'riceStage'-'
7 DESIGN DEVELOPMENT
. 100% Design Development Drawings (50% CD)
9 Specification Section Outlin'e' ....,... . ..... .
10 DD Construction Cost Estirrlate" ....-..
11 CONSTRUCTION DOCUMENTS'
-:;r 50'110 Construction OOClJment. (100'110 DO)
13 95'110 Con.truction Document. =
1'i' 100"'" Construction Documents [.~:::..l
" Final Construction Cost Estimate
16 REGULATORY REVIEW
17 Lower Minnesota River Watershed Review & Comment
18 DNR Review & Comment
'9 City Counc~ Meeting -Authorize Advertising lor Bid .. 1
2'0' ASSEMBLE & PRINT BIDDING DOCUMENTS I
2-1 PRE-BIDDING ACTIVITIES u
2f OPEN BIOS +tN' I
2-3 REVIEW & AWARD CONSTRUCTION CONTRACT
24 CONSTRUCTION CONTRACTOR'S NOTICE TO PROCEE 0 -~"-'- .;
25 CONSTRUCTION MANAGEMENT SUPPORT ----..-----.
26" . Revkiw Sh(jp Drawinga ....-- -- ----.-.-._- -._-,-
27 . Process ci'liinge QrdelS &-Field Modifications ...-..-.-........ .-.
28 PHASE 1'SUBSTANTlAl COMPLETION \.t'I'~
29 PUNCH LIST rrEMS ..... ",_u_,_u_", -L==:::4.
30 PHASE 1 CONSTRUCTION'COMPlETE (Fii-lat-Pavein'Summer2006) ~-1OJi ,
31 PHASE 1 PROJECT CLOSEOUT ..........-......--.-..-... IN'
32 PHASE 2---'- River Edge Si;;billz.tion P~!....~~.~.._.._..m_m
33 PHASE 2 CONSTRUCTION DOCUMENTS
" . 50% Conitruction Documeriiii'. Phase 2 .---.-.....-.....-..
" 95% CorisiNctiOri Document. - - Phase 2 --.-.... ......-........ ~l
J6 . 100%-Con5tNction Documents - Phase 2 ...._.__._.. _.__.m"
':;7 Final Construction Cost Estimate - Phase 2
38 PHASE 2 REGULATORY REVIEW
39 Watershed District Review ~ Phase 2
'4"0 DNR Technical Review _ Phase 2 h'
.. City Courlci Meeting. AultKinie Advertising fOf Bld . Phase 2 .n,
42 PHASE 2 ASSEMBLE & PRINT BIDDING DOCUMENTS
43 PHASE 2 PRE-BIDDING ACTIVITIES -~- ,---
44 PHASE 2 OPEN BIDS .-....- ------ "".-. ~
45 PHASE 2 REVIEW & AWARD CONSTRUCTION CONTRACT
-46 PHASE 2 CONSTRUCTION CONTRACTOR'S NOTICE TO PROCEED .'9
47 PHASE 2 CONSTRUCTKJN MANAGEMENT SUPPORT --.--......-. I
4. Review Shop Drawings
49 Process 'Ch~nge Ordera & Field Modifications rI
.SO.'PHASE is'U-BSTANTIALC6'MPlHION . .................-... (.~':'2123
'Si'PHASE'ip'U'NC-H'LISr'lTE-MS .-. ................................_... "~
'Sr PHASE 2 CONSTRUCTION COMPLETE" .. .... '.- ~
.S3".PHASe.2'p.R.OJECfcLOS'e"Oi:rT.... ....... ....-.. ....,..-... ...-.....
5~ PHASE 2 PROJECT COMPLETE . 2122
To'" I I Ph.M 1111111111111111111111111111 O"dl.... @ Milestone . E~lemlllTask I I Completion Dale * Closeout .
1
HUBER PARK
Final Phasing Cost Estimate. Park Development First
December 2004
PHASE 1
ITEM QUANTIiY I UNIT UNIT COST I SUBTOTAL I DEDlJCTIDONATlON I COMMENTS
I I I I
EARTHWORK & EROSION CONTRO~
GRADE SITE I 1 LS $25 000 I $25 000 I Ma or nradlnn/sha n under seDarate ect
SILT FENCE ' I 2091 LF -<3.00 I $6 273 I I
EARTHWORK & EROSION CONTRO~ SUSTOTA~ COST I 131 273 I
HAROSCAPE ELEMENTS
4' CONCRETE W/>J..twlfAYS I 9021 SF $5 I $45 105 I
BITUMINOUS "!RAILS I 2073 SY $15 I $31 095 l\Jse eldsU-- DNR trail
HANDRAILS I 245 LF $100 I $24 500 I
HARDSCAPE ELEMENTS SUSTOTA~ COSTI 5100700 . I '- ..
LANDSCAPING
CANOPY 1REES 205 EA $500 $102 SOD
SHRUBS 240 EA $50 $12000
PERENNIALS 300 EA $15 $4 500
SOD 1174 SY $4 $4696
LAWN SEEDING 25343 SY $2 550 686
NA11VE PLANTlNGS. SEEDING 2.4 AC $4 000 $9 600
STEEL EDGING 550 LF -"10 $5 500
EROSION CONTROL B~ET 7871 SY 51.50 511607
IRRIGATlON 56275 SF <0.60 533 765 $33 765 Toro Co-~ Donation
LANDSCAPING SUBTOTA~ COST $235 054
PERFORMANCE STAGE & AREA
CURVED POURED CONCRETE SEA"lW/>J..L. ABOVE GRADE 1382 SF $35 $48 370 18' hl"h x 1.5' wide' w/lmeorel color
CURVED POURED CONCRETE SEATW/>J..L. BELOW GRADE 3225 SF $25 <60 826 F",.t raotl""
CONCRETE MOW S1RIP A SEATW/>J..L 952 LF $15 $14 280 "WIde
4' CONCRETE PAD FOR ADA SEATlNG 257 SF $4 $1028 4- concrete
CONCRETE STAIRS 501 SF $25 <12 525
coNC'REfE STAGE + STAIRS 1965 SF $50 $98 250 $50 000 Rota.v Donetlon
CONCRETE RAMP AT STAGE 125 SF $50 56 250
FREESTANDING BRICK COLUMNS 3EA $10000 $30 000
OVERHEAD MET/>J.. SlR1JCiURE 1430 SF $50 $71 500 WI acousllcal cOrmt')nents
STAGE S1RUCTURE POSTS SEA '10000 $60 000
MET/>J.. LE1TERING 45 LF $200 $9 000
PERFORMANCE STAGE & AREA SUBTOTA~ COST $431 828
ENTRY
BRICK COLUMNS WI FOOTING .sMALL 4EA $6 000 $24 000
BRICK COLUMNS WI FOOTING .LARGE 2EA $10 000 $20 000
CROSSING IMPROVEMENTS 1 LS T $5 000 55 000 Potentlal SOOIl Counlv I1mdl""
ENTRYSUBTOTA~COST $49 000
INFRASTRUCTURE
BITUMINOUS ROADWAY 2605 SY 520 $52 100
CURB & GlTITER FOR ROADWAY 1527 LF 514 $20 615
BITUMINOUS FOR PARKING LOT 4071 Sf $20 581 420
CURB & GlTITER FOR PARKING LOT 1948 LF $14 <27 '44
BURY EXISTING ELEC1RIC/>J.. $150 000 5150 000 SPUC Donetlon
STORMWATER PIPE 500 LF <30 $15 000
CATCH BASINS 4EA $1800 $7 200
INFRASTRUCTURE SUBTOTAL COST 5363 679
AMENmES
PRE.FABRICATED BENCHES 10 EA 51500 $15 000
TRASH RECEPTACLES SEA $500 $2 500
BIKE RACKS 4EA $400 $1600
PICNIC SHELTER lEA $40 000 $40 000
PICNIC TABLES 20 EA $2 200 $44 000
Ii'lTERPRETlVE SIGNAGE 4EA $1500 $6 000
AMENmES SUBTOTA~ COST $109100
ELECTRICA~
ELECTRIC/>J.. HOOKUPI SER\IlCE 1 LS 015 000 $15 000
PEDESlRIAN SC/>J..E UPRIGHT LIGHT FIXTURES 15 EA 53 500 $52 500
PARKING LOT LIGHT FIXlURES 4EA $5 000 $20 000
LANDSCAPE UPLIGfiTS 4EA $1000 $4 000
SPECIAL LIGHTING AT STAGE 10 EA 52 000 $20 000 520 000 POlenllel deduct
PROJECTION SCREEN lEA $2 000 52 000 52 000 Polenllal deduct
SOUND SYSTEM 1 LS 570 000 070 000 570000 Potential deduct
ELEC1RIC/>J.. OIJTLETS SLEEVES ETC. 1 LS <5 000 $5 000
El.ECTRIC,llL SusroTAL COST $188 SOD
RESTROOM & STORAGE BU/~DING
RES1ROOM & STORAGE BUILDNG I 1500 SF '230 $345 000 I I
I RESTROOMSUBTOTA~ COST $346 000 I I
I SUSTOTA~I 51.844,033 I
MOBILIZATION 5% OF COS'" I $92 202 I I
DEMOLI11ON "'% OF COS" I $36 881 I
PHASE 1 CONSTRUCTION TOTAL I $1,973,116 I I
DESIGN & CONSTRUCTION ADMINISTRA770N
RES1RooMlSTORAGE 6UILDING DESIGN $27 600
GEOTECHNIC/>J.. SERVICES-DESIGN PHASE 52 400
GEOTECHNICAL SERVICES-SURCHARGE PHASE 54150
CONS1RUCTlON ADMINSTRA110N-BUILDING $5 400
CONS1RUCTlON ADMINSTRATlON-PAAK 2-4%\ $65125 Hourlv e5t1""le reflects 4% cost
~ PHASE 1 PARK PROJECT COST $2,078,790 U
DEDUCT ALTERNATES $92,000
Toro Co, Donation $33,765
Rotary Donation $50,000
SPUC Donation $150,000
.... TOTAL PHASE 1 PARK RESERVE/CAPITAL IMPROVEMENTS FUNDING $1,753,025
HUBER PARK
Final Phasing Cost Estimate. Park Development First
December 2004
PHASE 2
ITEM I QUANTITY I UNIT I UNIT COST SUBTOTAL DEDUCT ALT. COMMENTS
I I
RIVER STA8IUZATlON
RIPRAP WI GEOTEXllLE FIL'lER I 20911LF 6450 $940 950 Willow stakes. aeaarid In selected ereas terrace
FLOTATION SilT CURTAIN I 20911LF I $15 . $31 365
RIVER STABlUZA T10N SUBTOTAL COST $S12 315
HARDSCAPE a.EMENTS
BITUMINOUS iRAlLS 2364 SY $15 $35 4S0 RecanstnJct DNR trail
PR"'.FABRICAiED BENCHES 5EA $1500 $1 500
TRASH RECEPTACLES 3EA $500 $1500
CONCRETE OIlERLOOK PLAZA 669 SF $25 $16133
STEPSATOIlERLOOK PLAZA . 66 SF -. $25 - - $2212 .. -
CONCRETE PLAZA AT RIVER 340 SF $25 $6 495 Reinforced ooncrele wllh a1i1nas
CONCRETE STEPS AT RIIlER 60 SF $25 $1998
CONCRETE FISHING! PAD 230 SF $8 $1840
RECYCLED MATERIAL STRUCTURE OVERLOOK AT RlllER 538 SF $25 $13403
GUARDRAIL AT PLAZA 65 LF $150 $9150
HARDSCAPE ELEMENTS SUBTOTAL COST $SS S90
I SUBTOTAL I $1.011.205 I
MOBILIZATION 15% OF COSTI I $53 580
DEMOLmON"% OF cosn I $2.1424
IUIAL $1.146,190
DES/GN & CONSTRUCTION ADMINISTRATION
DESIGN AND ENGINEERING-EXPANDED PROJECT COST/SCOPE $31 915 More riverban"- 3 overiooks. nIle eamnlexltv
CONS'lRUCTION ADMINISTRA110N 2.-4%\ I $45 648 Hourtv. estimate reflects 4% cost
N PHASE 2 PARK PROJECT COST $1.224,012 I
Cit of Shakopee Capital Improvement Program 2005 . 2009
Project Manager Project Type: Project Title: Total Project Cost:
Mark Tl1emig Community Park Development Huber Park Development 1.815,000 "
t
A. Expenditure Items: 2004 2005 2006 2007 2008 2009
Land & ROW
Construction 440.000 885,000 200,000
Improvements 150,000
,Engineering/Admin. 110,000 10,000 20,000
Total 550.000 1,045,000 220,000 - -
B. Funding Source:
General FLind
Capital Improvement Funds
Park Reserve Fund 500,000 745,000 220,000
Grants (specify) 50,000
Donations (specify) 250,000 I
State Aid
Assessments 50,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
-....J Tax Levy
I
w Total 550,000 1,045,000 220.000 - - -
.p.. Description
This project continues development of Huber Park, including grading, installation of a performance
area, landscaping, trail connections, and parking.
2004/5 _ Construction: River bank stabilization, $600.000 (Park Reserve and Grant Funding)
2004 _ Engineering/Admin: Design and construction of bank stabilization and park design.
$110,000 (Park Reserve)
2005 - Construction: Grading and remaining fill (if needed), installation of performance area,
landscaping, trails, parking and roadway $635,000 ($585,000 Park Reserve, $50,000 Rotary
donation, $50,000 (?) assessments) I
2005 -Improvements: Undergrounding of utility lines, $200,000 (Donation by Public Utilities) i
2005 _ Engineering/Admin: Completion of design and construction of performance area,
landscaping, trails, and parking Jots: $10,000 (Park Reserve)
2006 - Construction: Restroom and storage building, $200,000 (Park Reserve)
2006 _ Engineering/Admin: Design and construction of building, $20,000 (Park Reserve)
Justification
Redevelopment of focal park for the community.
Comments
Cost for perfomance area, seating, landscaping, power, and irrigation is based on recent
construction costs for similar facilities. River bank stabilization needed. Cost based 08 recent
stabilization upstream ($400/ft X 1,500 ft.).
OperatiriQ Costs:
g~t!m~t~9~Y.eal',:operatingco~ts:Labor $15,000 + Equip/Supplies $5,000 == $20,000
geiftrr:ma:CEireo~f$laQa'fundihg 'are unknown. at this time.
-. :. ,!I II 1I .. III F
" ' ';-;;;:(;.'0'