Loading...
HomeMy WebLinkAbout15.A.4. Authorize Feasibility Report for 2005 Bituminous Overlay Project-Res. No. 6177 /SfJ.'f CITY OF SHAKOPEE CO~i.~~~F'r Memorandum " 'l~ q) C, ' TO: Mayor & City Council Mark McNeill, City Administrator FROM: Jeff Weyandt, Assistant City Engineer SUBJECT: Ordering Feasibility Report for 2005 Bituminous Overlay Project DATE: January 18, 2005 INTRODUCTION: Attached is Resolution No. 6177, which orders the feasibility report to be prepared for the following streets: . Quincy Street - 11 th to 12th Avenue . Jefferson Street - 11 th to 12th Avenue . Madison Street - 11 th to 1 ih Avenue . Monroe Street - 11 th to 1 ih Avenue ' BACKGROUND: Staffhas completed the review of the proposed 2005-2009 Capital Improvement Program which includes street preservation projects on the streets listed above. The above streets have deteriorated and are candidates for a bituminous overlay, which would extend the life expectancy of these streets. Attached is a map showing the proposed study area for the 2005 Bituminous Overlay Project. In the feasibility report, staff will investigate street rehabilitation along with utility repairs. In order to reconstruct these streets during the summer months of the 2005 construction season, the feasibility report should be authorized at this time. ALTERNATIVES: 1. Adopt Resolution No. 6l77. 2. Deny Resolution No. 6177. 3. Table for additional information. RECOMMENDATION: Staff recommends Alternative No.1, so that the proposed bituminous overlay project feasibility study can be initiated for possible construction. ACTION REQUESTED: Offer Resolution No. 6177, A Resolution Ordering a Feasibility Report for the 2005 Bituminous Overlay Project and move its adoption. CJ1f wr Jeff Weyandt Assistant City Engineer JW/rth ENGRl2005PROJECT/20050VERLAYIWORDlMEMOXXXX RESOLUTION NO. 6177 AR,~sQluti()n Ordering The PreparatiOIJ,QfA Report For Improvements To Quincy Street, Jefferson Street, Madison Street and Monroe Street between 11th Avenue to 12th Avenue WHEREAS, it is proposed to improve Quincy Street, Jefferson Street, Madison Street and Momoe Street between 11 th A venue to 1zth A venue by reconstruction of sanitary sewer, watermain, storm sewer, concrete curb & gutter, aggregate, bituminous paving and all appurtenant work and to assess the benefited property for all or a portion of the cost of the improvement, pursuant to Minnesota Statutes, Chapter 429. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA, that the proposed improvement be referred to Bruce Loney, PublicW orks Director, for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvement is feasible and as to whether it should best be made as proposed or in connection with , some other improvement, and the estimated cost ofthe improvement as recommended. Adopted in session of the City Council of the City of Shakopee, Minnesota, held this day of ,2005. Mayor of the City of Shakopee ATTEST: City Clerk City of Shako pee Capital Improvement Program 2005 - 2009 Project Manager Project Type: Project Title: 2005 Pavement Total Project Cost: Bruce Loney Street Construction Preservation Program $110,000 A. Expenditure Items: 2005 2006 2007 2008 2009 Land & ROW Construction 90,000 Improvements Engineering/Admin. 20,000 Total 110,000 - - - - - B. Funding Source: General Fund Capital Improvement Funds Tax Increment Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 27,500 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Flow Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy 82,500 Total 110,000 - - - - \' //iI ,/;-'1-'1 11 \~11 'L U1]' Description: (/' /~ 1. , /f' ~1/r ~ '-I !- A~~I\ II ';( i Mill and overlay of bituminous pavement on Quincy Street, Je,fferson Street, \.",/.,[1. /'/ Ji' ~:( Ul1,l/),U1L-j 10th d! Md" St t dM S f 1 hA .\.;, / "1\" r.~~ /'<=-'~:-~If-=:I'--=-)F=lrln' \1 a Ison ree an onree treet, rom 1t venue to 12th Avenue. ',' ,. :'i\ ~ <, jr \I \;/ /; I i / { ,~\: 1$:// . <,'i' \ ~j\ : 'l :\\ (( I "II ,) ; I: ;~' ,'/ ' , II ,,'I If If) I ...J I . /P/ (/) I I '~ l~,;/*,/__ I _Jlw" l__ll1.lr'JLJ~ ~YE I~ / .;:;:;F/1300I \1"--1\- 11~7 I\-:;::~~~ :z I-'~I~ ' JUsti,fication.,'" , y ---l -- , 1 '" 0 0 0 U1 I ~. , i"~ "> '~'II I Ii ~ ~ ~ 8 ~ ~ \ M~:~KE1' Upgrading of pavement to prolong service life. ',"1'/,:': IV'" (,) \'J I - W -' 1'",1 .' -< "5 0 lo.. L . ,',1.' ,/ I I ~"") I - <.(' LL 5 .' ..1 I"~ J\ J'w II <( I ~ "I, 2, W 0 AvE. .-= ;" ',:/ t'::'.1L?,~~~- --,- :,. ^_I, ,,~,,-. :C:_I_. 1'----'r-:-lDn~ I' / ,1/ ('} '/ ! - ' l ~ I i _ ~l . ,"f;/ !,}.,/ ",I', II 6:L o"\'zs, ~'~ ) II ~'\ / ,. I , ,y U1l--~ ,!)'" ,~ ~I ' '::-', 0 1 ,J 0: i !1: If ~'-./v/; 01 ""- :/ '::~/ III II >: ~ I 0 '1/.;-4/. I~I ~ I Ot,her Comments: ,/ .. f '~^V[ , ~ VI ~\. _w. _!,::,go J\l- L'~="-5 r I Could be combined wnh another project or done Independen~y. ;c?u~,)~,,=.J _".",.D" ~=- ',:9~ S I Iii E Anal~sis of p~~ement man.agement un~erway. ~ ;" Il"K~~f' .J s:]I~~i;\~' 'II\! I POSSIble additional street lIghts per polley. "if' ,_..,.........., """)'/' ~~'~'''LOCATlaN ~~ ': '_ _._~_ __ _ ...;;:=:;:.... \j J> . (It:~\ ',' .. '~~~>. r~( ':l ,......,,~~_.. I~ Operatin!:J Costs: ~, I' -,..-.,.,. '-"--'--'~-iT ,:::::;;,,,, '~ January 8, 2005 Bruce Loney City of Shakopee 129 Holmes Street South Shakopee,MN 55379 Dear Bruce, In regard to your letter of January 4th, I would like to indicate my support for the bituminous pavement overlay project for Monroe, Madison, Jefferson, and Quincy Streets, between 11 th Avenue and 12th Avenue. Since this is a particularly bad time of year to go from door to door to gain support, I believe it would be in the best interests of all, if the city were to send letters to all residents of the four blocks mentioned above. There are 96 homes affected by the overlay, so it might be good to include in the letter the approximate cost per household. Also, I believethat residents, and the City Counsel, should be aware that the longer the repair is delayeq, the more it would cost them in the long run. Please accept this letter in support of a feasibility study by the City of Shakopee and thank you for your help inthis matter. Sincerely, ~9.4~ Harold J. Bierlein 1181 Monroe Street South Shakopee,MN~5379