Loading...
HomeMy WebLinkAbout15.D.1. Approval of Grading Permit and Corrected Easements for the PLSLWD Channel Restoration IS. D. II CITY OF SHAKOPEE Memorandum CONSEt~T TO: Mayor & City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director SUBJECT: Approval of Grading Permit and Corrected Easements for Prior Lake - Spring Lake Watershed District Channel Restoration DATE: February 1, 2005 INTRODUCTION: Attached is a grading permit application and corrected easements from the Prior Lake - Spring Lake Watershed District (PLSLWD) for a channel restoration project, from CSAH 16 to 1500 feet south on the Prior Lake Outlet Channel. BACKGROUND: The City of Shakopee and the PLSLWD have been working towards a revised Joint Powers Agreement (JP A) on upgrading the Prior Lake Outlet Channel from Prior Lake to Blue Lake. The PLSLWD has received a grant to restore the channel from CSAH 16 to 1500 feet south. Plans have been completed to restore the channel using various techniques to handle the ultimate flow that has been determined with the Prior Lake Outlet Feasibility Report. The PLSL WD has done an EAW for channel improvements and has a negative declaration on an EIS. Grants have been received to facilitate this project moving forward at this time. In order for this project to be constructed and since there will be more than 50 cubic yards of excavation, a grading permit is required. Attached to this memo is the grading permit application and staffs conditions to the permit. Since this is a public improvement project, benefiting the City of Shakopee as well as the PLSL WD, staff is recommending that the permit fee be waived and no security be required, as the PLSL WD's contractor will have a performance bond. This project is similar to a County Highway Project and the City and County usually enter into a cooperative agreement. Staff is working with the PLSLWD's staff on a revised JPA and hopefully will have a new agreement later this spring. Also, corrected easements are needed to construct the improvements. Previously, easements were granted to the PLSL WD and the City of Shakopee. Attached are corrected easements, which need execution signatures by the City. This project has been reviewed by the Environmental Advisory Committeeand_wef~h -^'~o...supportive."in.-the.-.pr:oject and the use . of . bioengiaeering.,,;teclmiques . to-stabmz'e;:"tfte~;';?o;;,'-"'~""-""""'- channel. ALTERNATIVES: 1. Approve a motion approving the grading permits for the PLSL WD channel restoration, from CSAH 16 to 1500 feet south, with the permit fee and security requirements waived for this proj ect. 2. Authorize the appropriate City officials to execute the corrected easements for the Prior Lake Outlet Channel Restoration. 3. Do not approve permit or corrected easements at this time. 4, Table for additional information. RECOMMENDATION: Staff recommends Alternative No. 1 and No.2, in order to stabilize the Prior Lake Channel and prevent future erosion; The channel design is for ultimate flow of ultimate development of the area. It should be noted that the channel restoration is for drainage only. Future green way corridor and maintenance trail would be part of future development propos:;tls, ACTION REQUESTED: 1. Approve a motion approving the grading permits for the PLStWD channel restoration, from CSAH 16 to 1500 feet south, with the permit fee and security requirements waived for this project. . 2. Authorize the appropriate City officials to execute the corrected easements for the Prior Lake Outlet Channel Restoration. ~neY BUpmp Public Works ENGRlEMPLOYEEFOLDERlPPENNINGTON/COUNCIUPL$L \VDCHANNEL Jan. 26. 2005 4: 08 PM Prior lake -Sprin Lake Watersh No. 1612 P. 2 , EASEMENT IMPROVEMENT AGREEMENT This agreement ("Agreement") is made as of the _ day of ---.:...., --' 2005, between STEVEN D. MUHLENHARDT and KATHLEEN V. MUHLENHARDT, husband and wife (collectively "Owners"), the PRlOR LAKE. SPRING LAKE WATERSHED DISTRICT, a political subdivision of the State of Minnesota ("District"), and the CITY OF SHAKOPEE, a municipal corporation under Minnesota law ("City"). RECITALS A. The District is presently engaged in a project, iq.entitied as the Outlet Channel Improvement Project, Segment 4B, to repair. certain portions of the Prior Lake Channel , ("Channel") within the City, originally constructed as part of the Prior Lake Outlet Project No. WD 76-4. B. The parties previously entered into a Deed of Drainage and Utility Basement, dated November 26, 1982, recorded. March 5, 1984, as document 199712 ("Original Easement"), in connection with improvements proposed, and easements to be acquired, in connection with the original construction of the Prior Lake Outlet Project. C. The Owners have now agreed to grant the District and the City (collectively "Grantees") amended easement rights to conform the Original Easement to the present location of the Channel on the condition that the District agree to repair and improve the Channel as hereinafter specified. AGREEMENT In considerdtion of the mutual covenants herein, the parties agree as follows: . 1. REelT ALS. The foregoing recitals atetrue and correct and incorpomted herein by reference. 2. GRANT OF AMENDED EASEMENT lUGHTS. Concurrently with the execution of this Agreement, the Owners shall execute and del iver to the Grantees an Amended Deed of Drainage and Utility Eascmen~ conveying to the District and the City a perpetual easement for flowage and utility purposes and a temporary construction easement for a term of 18 months substantially in the fonn of the attached Exhibit A. 3. IMPROVEMENTS TO BE CONSTRUCTED BY DISTRlCT. InpartiaI consideration of this Agreement., the District shall at its cost and expense make the improvements to the Channel more particularity specified on the plans attached hereto as Exhibit B ("Channel Improvements"). The District will indemnify and hold the owners .1- Jan.26. 2005 4:08PM Prior Lake - Spring lake Watersh No. 1612 P. 3 harmless from any liability for the cost and expense incidental to the conS1J1lction of the Channel Improvements. 4. ENTIRE AGREEMENT. This Agreement and the Amended Deed of Drainage and Utility Easement contain the entire understanding oflhe parties with respect to the grant of the amended easement rights and supercedes any and all prior agreements and understandings. No representations, warranties or promises have been made or relied upon by either party unless expressly stated in this Agreement. 5. PERSONS BOUND. This Agreement shall bind and inure to the benefit of the parties hereto and there respec..iive successors, heirs, representatives and assigns. 6. MISCELLANEOUS. Time is oflhe essence for this Agreement. This Agreement is made in Minnesota and shall be governed by its law. Paragraph headings arc for convenience only and are not intended to explain or res1rict the scope or substance of the provisions of this Agreement. Wherever used herein, the singular shall include the plural, the plural shall include the singular, and pronouns shall be read a..q masculine, feminine or neuter as the context requires. The prevailing party in any litigatioD, arbitration, or mediation relating to this Agreement shall be entitled to recover its reasonable attorneys) fees from the other party for all matters, including but not limited to appeals. Scott County, Minnesota, shall be the proper venue for any litigation, arbitration or mediation relating to this Agreement. OWNERS DISTRICT - PRIOR LAKE-SPRING LAKE STEVEN D. MUHLENHARDT WATERSHED DISTRlCT BY KATHLEEN V.MUHLENHARDT ITS PRESIDENT AND ITS SECRETARY CITY OF SHAKOPBE BY .. ..... ITS MAYOR AND '. .-....... ITS CITY ADMlNlSTRATOR -2- Jan. 26. 2005 4: 08 PM Prior lake - Spring lake Watersh No. 1612 P. 4 EXHIBIT A [To Easement Improvement Agreement between Steven D. Muhlenhardt and Kathleen V. MuhlenhardtJ Grantors, and Prior Lake-Spring Lake Watershed District and City ofShakopec, Grantees] . - AMENDED DEED OF DRAINAGE AND UTILITY EASEMENT BY THIS INDENTURE, the undersigned, STEVEN D. MUHLENHARDT and KATHLEEN V. MUHLENH AWT, husband and wife ("Grantors"), hereby grant, warrant and convey to the PRIOR LAKE~SPRTNG LAKE WATERSHED DISTRICT, a political subdivision of the State of Minnesota, and the CflY OF SHAKOPEE, a municipal corporation under Minnesota law, and their successors and assigns (collectively "Grantees"), the following easements (collectively "Easements"): A A pqrpelual drainage, flowage and :utility easement ("Drainage and Utility Easement") and right to construct, install, maintain, repair, use, enlarge, modify, monitor and service any and all improvements or facilities which may he from time to time made to or installed within, over, under, across and upon the following desCribed land, to-wit: A stripofland, 35.00 feet in width, located in the East Half of the Southeast Quarter of Section 14, Township 115, Range 22, Scott County, Minnesota, the centerline ofwmch is described as follows: Conunencing at the southwest comer of said Southeast Quarter; thence on an assumed bearing of South 89 degrees 04 minutes 44 seconds East, along the south line of said Southeast Quarter a distance of 385.00 feet; thence North 04 degrees 37 minutes 16 seconds East a distance of310.00 feet, thence North 29 degrees 50 minutes 16 seconds East a distance of217.00 feet; thence North 56 degrees 25 minutes 16 seconds East a distance of 105.00 feet; thence North 83 degrees 45 minutes 16 seconds East a distance of155.00 feet; thence North 07 degrees 33 minutes 16 seconds Ea~t a distance of240.00 feet; thence North 32 degrees 35 minutes 15 seconds East a distance of80 feet; thence South 89 degrees 04 minutes 44 seconds East a distance of 120.00 fcct; thence South 61 degrees 14 m.inutes 44 seconds a distmce of 120.00 feet; thence South 50 degrees 14 012505 1 Jan. 26. 2005 4: 09PM Prior lake - Spring lake Watersh No. 1612 P. 5 minutes 44 second" East a distance of220.00 feet; thence North 85 degrees 05 miIiutes 16 seconds East a ~iance of 1 00.90 feet, more or less, to the west line of said. East Half of the Southeast Quarter, the point of beginning of the centerline to be descnbed; thence North 64degrces 00 m.inutes 00 scconds East a distance of300.00 feet; thcnceNorth 18 degrees 00 minutcs 00 seconds East a distance of90.00 feet; thence North 08 degrees 00 minut.e.~ 00 seconds West a distance of 110.00 feet; thence North 03 degrees 00 minutes 00 secondc; ~t a distance of80.00 feet; thenee North 16 degrees 00 minutcs 00 seconds East a distance of 80.00 feet; thence North 40 degrees 00 minutes 00 seconds East a distance of 40.00 feet; thence North 01 degree 00 minutes 00 second" East a distance of , 40.00 fcet; thence North 71 degrees 00 minutes 00 seconds East a distance of205.00 feet; thence North 40 degrees 00 minutes 00 seconds East a distance of 160.00 feet; thence North 07 degrees 00 minutes 00 second<; W cst a distance of 40.00 feet; thcnce North 40 degrees 00 minutes 00 seconds West a distance of 65.00 feet; thence North 60 degrees 00 minutes 00 seconds West a distance of90.00 feet; thence North 76 degrees 00 minutes 00 seconds West a distance of 115.00 feet; thence North 04 degrees 00 minutes 00 second" East a distance of 55.43 feet to a point on the centerline of County Road Number 16 as traveled, the same point bei'\, on the westerly extension of the northerly line of the plat of HORIZON HEIGHTS 2 ADDITION, distant 56720 feet westerly of the northwest comer of said plat, and said centerline there terminating. The sidelines of the casement area shan be lenhrthcned or shortened to begin on the west line of said East Half and t:enninatc at said centerline of County Road No.16. B. A temporaxy construction easement for a term of 18 'months from the date hereof for construction, hauling) and access purposes over) under, across and upon the following described land, to-wit: A strip of land, 200.00 feet in width, located in the East Half of the Sout:b.emit Quarter of Section 14, Township 115, Rangc 22, Scott County, Minnesota, the centerline of which is described as follows: Commcncing at the southwest comer of said Southeast Quarter; thence on an asSlUTIed bearing of South 89 degrees 04 minutcs 44 seconds East, along the south line of said Southeast Quarter a distance of 385.00 feet; thence North 04 degrees 37 minutes 16 seconds East a distance of310.00 teet; thence North 29 degrees 50 minutes 16 seconds East a distance of217.00 feet; thence North 56 degrees 25 minutes 16 second<; East a distance of 105.00 feet; thence North 83 dehlTeeS 45 minutes 16 seconds East a distance ofl55.00 teet; thence North 07 degrees 33 minutes 16 seconds East a distance of240.00 feet; thence North 32 degrees 35 minutes 15 seconds East a distance of80 feet; thenec South 89 degrees 04 minutes 44 seconds East a distance of 120.00 feet; thence South 61 degrees 14 minutes 44 seconds a distance of 120.00 feet; thenee South 50 degrees 14 minutes 44 seconds East a distance of220.00 feet; thence North 85 degree!; 05 minutes 16 seconds East a distance of 100.90 feet, more or less) to the west line of said East Half of tIle Southeast Quarter, the point of beginning of the centerline to be described; thence North 64 degrees 00 minutcs 00 seconds East a distance of300.00 feet; thence North 18 degrees 00 minutes 00 seconds East a distance of90.00 feet; thence North 08 degrees 00 minutes 00 seconds West a distance of 11 0.00 feet; thence North 03 degrees 00 minutes 2 Jan. 26. 2005 4:09PM Prior lake - Spring lake Watersh No. 1612 P. 6 " 00 seconds East a distance of80.00 feet; thence North 16 degrees 00 minutes 00 seconds East a distance of 80.00 feet; thence NorthAO degrees 00 minutes 00 seconds East a distance of 40.00 teet; thence Norlh 01 degree 00 minutes 00 seconds East a distance of 40.00 feet; thence North 71 degrees 00 minutes 00 seconds East a distance of205 .00Jeet; thence North 40 degrees 00 minutes 00 seconds Ea<;t a distance of 160.00 feet;, thence North 07 degrees 00 minutes 00 second~ West a distance 01'40.00 feet; thence North 40 degrees 00 minutes 00 seconds West a distance of 65.00 feet; thence North 60 degrees , 00 m.inutes 00 seconds W cst a distance of90.00 feet; thence North 76 degrees 00 minutes 00 secO,nds West a distance of 1 I 5.00 feet; thence North 04 degrees 00 minutes 00 seconds Eac;t a distance of 55.43 feet to a point on the centerline of County Road Number 16 as traveled, the same point being on the westerly extension of the northerly line of the plat of HORIZON HEIGHTS 2ND ADDITION, distant 56720 feet westerly of the northwest comer of said plat, and said centerline there tenninati.og. 1. This easement grant includes the right of reasonable access to the Easements and the right to remove therefrom any structures, trees, sluubbery or other objects or obstroetion.~ which in Grantees' opinion interferes with their improvements or facilities or the removal of which may be reasonably necessary tor the construction or maintenance thereof. Grantees' right of access shall be over only the unimproved portion of adjoining land owned by Graptors, and. Grantees are obligated to restore any damage to Grantors' adjoining property caused by Grantees' use of this right of access. 2. This easement grants to Grantees the right to eonstrud such fencing or other barriers within or on the boundaries of the Drainage and Utility Easement a<; Grantccs may deem necessary or d~sirable to limit access to the easement area and to protect any improvements or facilities constructed, placed or installed thereon by Grantees. 3. This easement!,7IaIlt includes the right of Grantees to build a temporary crossing over, across and through the J-o.:asementc:; to allow Grantors to cross the Easements from their adjoining land with their livestock and fann equipment. This crossing will be for agricultural use and pUIposes only. If Grantors sell or convey all or any portion of their land, Grantees, at their discretion, may remove the crossing from the Easements. Such crossing will be constructed and installed at Grantees' cost and expeosc. Grantees shall be responsible, at their cost and expense, tor any repair, maintenance or replacement of the crossing, ~llbject to the provisions of Paragraph 5 below. 4. Grantors reserve the right to enter upon and use the r:.ascments for any purpose; provided however, Grantors shall not excavate, fill, dump, drain, cultivate or graze livestock within) modify, damage or othetWise interfere with. the use, operation, repair, maintenance or replacement of any improvements or facilities constructed, placed or installed within the r~cments by Grantees, or otherwise interfere with the intended use of the Easements by Grantees. 5. If the Ea<;ements or any improvements constrocte~ placed or installed within the Ea.,ements by Grantees are damaged or destroyed by actions of Grantors, or those of the contractors, agents, en.1ployees or invitegs ofGnmtors, Grantors shall pay to Grantees upon due demand therefor the reasonable cost incurred by Grantees, or either of them, to reconstroct, ., " Jan.26. 2005 4: 10PM Prior Lake - Spring Lake Watersh No. 1612 P. 7 iospec.,i, repair. replace or restore such damage or destruction. 6. Tbis ea<;ement grant is non-exclusive. Grantors may grant additional easements to others, over, under, ,across and upon the Easements, but any subsequent grant shall not permit a use or purpose prohibited by Paragraph 4. 7. This easement grant is made subject to all existing easements of record. 8. All improvements and other facilities installed 'upon the Easements by Grantees shall remain their exclusive property and may be removed at any time and at the sole option of Grantees. 9. Grantors further covenant to Grantees that they are the owners of the Easements and have the right to sell and convey these Easements. 10. This Indenture shall bind and inure to the benefit of the parties hereto and their respective heirs, representatives, successors and assigns. 11. This Amended Dccd of Drainage and Utili1y Easement is given by Grantors and accepted by Gtantecs in complete substitution for the easement acquired by Grantees pursuant to a Deed ofDrainage and Utility Easement, dated November 26, 1982, recorded March 5, 1984, as document 199712. EXECUTED IN WITNESS HEREOf as ofthe,_ day of - ' 2005. GRANTORS PRIOR LAKE-SPRING LAKE WATERSHED DISTRICT BY STEVEN D. MUT-IT"ENHARDT ITS PRESn)ENT - AND KATIILEEN V. MmrLENHARDT ITS SECRETARY ," CITY OF SHAKOPTIE BY -', ... - ITS MAYOR AND - -.- ITS CTIY ADMJNISTRt\TOR . 4 Jan. 26. 2005 4:10PM Prior Lake - Spring Lake Watersh No. 1612 P. 8 J STArn OF MINNESOTA) )ss. COVN1Y OF SCOTT ) The foregoing ins1rument was acknowledged before me this _ day of _ . J 2005, by STEVEN D. MUHLENHARDT and KATHLEEN V. MUHLENHARDT, husband and wife. Notary Public STATE OF MINNESOTA) )55. COUN1Y OF SCOTI' ) The foregoing ins1rumcnt WdS acknowledged before me this day of _, . . f005, by ~ ,~ and . -J the President and Secretary of the PR,IOR LAKE-SPRlNG LAKE W ATERSHBD DISTRICT,. a political subdivision under Minnesota law, on its behalf Notary Public STATE OF MINNESOTA) )ss: COUNTY OF SCOTT ) The foregoing instrument was acknowledged before me this. day of , 2005, by. ..and_. ---,the Mayor and City Acbninistratorofthe CITY OF SHAKOPEE, a municipal corporation under Minnesota law, on its behalf. - ~.. ..~.. - Notary Public This imirument was drafted by: HUEMOELLER, BATES & GONTAREKPLC 16670 Fnmklin Trdil Prior Lake, MN 55372 5 Jan,26, 2005 4: 10PM Prior lake - Spring lakeWatersh No. 1612 p, 9 EXHIBIT B [To Easement Improvement Agreement bctween Steven D. Muhlenhardt and Kathleen V. Muhlenhardt, Grantors, and Prior Lake-Spring Lake Watcrshed District and City of Shako pee, Grantces] PLANS .FOR CHANNEL IMPROVEMENTS (see attached pages 1 through 22) 1 Jan. 26. 2005 4: 10PM Prior lake - Spring lake Watersh No. 1612 P. 10 , CONSENT. AND SUBORDINATION OF MORTGAGEE TO AMENDED DEED OF DRAINAGE AND UTILITY EASEMENT The undersigned owners and holders of a mortgage, dated Novem~er 27, 197~, filed for record in the office of the Scott County Recorder on December 10, ] 975, as document 148066, hereby consent and subordinate their right,. title. and interest in the premises under the foregoing mortgage to the Amended Deed. of Drainage and Utility Easement, dated January 25, 2005, filed for record in the office of the' Scott County Recorder on , 2005, as document _ . EXECUTED IN WTTNESS HEREOF on the _ day of ._-' 2005. WILLIAM MUHLENHARDT MAGDELEN MUHLENHARDT 1 Jan. 26. 2005 4: 10PM Prior Lake - Spring Lake Watersh No. 1612 P. 11 STATE OF MINNESOTA) )ss COUNTY OF ) The foregoing instrument was acknowledged before me this _ day of ,2005. by WILLIAM MUHLENHARDT and MAGDELEN MUHLENHARDT, each single persons. . Notary Public This instrument was drafted by: HUEMOELLER, BATES & GONTAREKPLC 16670 Franklin Trail Prior .Lake, MN 55372 2 . CITY OF SHAKOPEE Memorandum TO: Bruce Loney, Public Works Director FROM: Joe Swentek, Project Engineer ~ J::~ SUBJECT: Prior Lake Outlet Channel Improvements/Rehabilitation DATE: January 25,2005 The Prior Lake-Spring Lake Watershed District applied for a grading permit to correct erosion issues along a segment of the Prior Lake Outlet Channel within the City of Shakopee. The proposed rehabilitation project begins at County Road 16 (Eagle Creek Boulevard) and continues 1,500-feet to the South. The total area proposed to be disturbed is approximately 1.15 acres. Since the applicant has addressed, or would be required to address prior to grading permit issuance, all items outlined by the City of Shakopee, a grading permit could be approved. However, if a grading permit were approved, I suggest the following supplemental conditions be attached to the permit: . The applicant shall contact the City of Shakopee engineering department twenty-four (24) hours in advance of all proposed land disturbing activity. . The applicant shall contact all adjacent property owners twenty-four (24) hours in advance of all proposed land disturbing activity. . All erosion control items shall be furnished and installed by the applicant and accepted by the City of Shakopee prior to construction. The applicant shall contact the City of Shakopee engineering department to arrange an inspection. . All erosion control measures shall be routinely inspected by the applicant and replaced as necessary or as directed by the City of Shakopee. . County Road 16 shall be kept free of any offsite sediment tracking. The installation of a rock construction entrance shall be required. . The applicant shall maintain dust control operations onsite for the haul/access roads throughout the grading permit process until final completion. . The applicant shall place six (6) inches of topsoil over all land disturbed. Exposed soil shall be seeded and mulched in accordance with NPDES Phase II requirements. . The applicant shall obtain all necessary Scott County permits prior to any land disturbing activity. . The grading permit shall be valid for one (1) year from the date of approval. Once this time period has expired, the applicant shall be required to apply for a new permit. . Should the applicant fail to comply with any of these conditions or any other conditions set forth by the City Code, the City of Shakopee's General Specifications and standard Detail Plates or the City of Shakopee's Design Criteria, it shall be cause for revocation of the grading permit. . The applicant shall provide a copy of the site's NPDES permit. H:\EMPLOYEE FOLDERSIISwentekIPermits (BP _ GP _ RW)\Grading.PermitsIPrior.Lake.Outlet.Channel.ImprovementslPL. Outlet.Channel.Improvemeuts.Memo. Conditions. doc Page 1 of! ~ Permit # GRADING PERMIT (f~rC''EA ~t{inpaT=:' "'Y;",' ~I" U 1'-',:;--' t:.~"i~ i r a Jl ..L~1.:..~...~ (XiMi\CJI\i1rf P'Lt12: Sl:t...1G l@k;i 1. OU__"_'_ --'-:'H';'~__''-"- ......~"'-- -::.:::=:::=:..-=-:......... - 2, 3. 4. Owner of Land DESCRIPTION: <I work including identification of obstructions to be placed and size and depth of excavation. 1 {lor ' Include earthwork calculations. Indicate quantity of material exported/or imported. S ,110 P J ~J,.., {.I..,Ji Work to start on or after:';; /,1 05 and shall be completed by: &/3D/O$ unless an extension granted to: 4. \" DATE by STAFF fo1 I =(':~'~ e~h1trr,,500 {(!O"k4"" /10 ~ -'!J1J) .- -c.L \" c ..)0 . , , . h' ( 5. Estimated cost of site grading and erosion control items $ rOOD (doc :v.~ I .\c:.Jwk l.:xM./cfc"r .f.x. ~!;C At, , \ Shall not include cost to purchase or haul borrow material (fX\J Ci ~ > ,., W', PHONE Q5.2 - '-ILl 7- - '-/ I &b ~~, h~e ''{J :=;S3'} z.. ''''1r CITY STATE ZIP NAME OF PARTY OR ORGANIZATION PERFORMING WORK .J-o be d df(J}uA.i,J hfhiJ GOPHER ONE-CALL REGISTRATION # E-MAIL ADDRESS CONTACT PERSON: EMERGENCY (24 Hr.) PHONE DAY PHONE FAX ADDRESS: STREET CITY STATE ZIP The undersigned herewith accepts the terms and conditions ofthis permit by the City of Shakopee as herein contained and agrees to fully comply therewith to the satisfaction of the City of Shakopee. The undersigned also declares that he/she has read, understands, and will comply with all relevant City Ordinances and all Grading Permit Regulations as stated in the following pages A Certificate of Insurance or Self Insurance verifying coverage has been provided to the City of Shako pee. (CITY OF SHAKOPEE TO BE N.AMEDAS;(JT~#LD) Title: AdfZUIU5~o..,Jvr Date: 12 -2/ -OL{ SIgned: S: ' /8 / AlIle1!.al requirements shown on attached pa1!.es to be complied with! The date when work is completed must be reported in writin1!. to the Public Works Director. FOR CITY USE ONLY AUTHORIZATION OF PERMIT Security: $ Security Type ($1,000.00 per acre disturbed) (Bond, Cash, Escrow Account or other method of providing security) Fee: $ Receipt No. (Up to and including $200,000.00: 5% of Estimated Cost for Site Grading and Erosion Control. Over $200,000.00: $10,000.00 plus 3% of Estimated Cost for Site Grading and Erosion Control.) In consideration of agreement to comply in all respects with the regulations and codes of the City of Shakopee covering such operations, and pursuant to authorization duly given by said City of Shakopee, permission is hereby granted for the work to be done as described in the above application with said work to be done in accordance with "GENERAL CONDITONS OF THE GRADING PERMIT" hereby attached: APPROVED BY: CITY ENGINEERING DEPT. BY: DATE: Page 1 of3 ~ Permit # ~,~J!p\ ~t<OIP1RF V~',,;! 'u, ,..D D COM1v;1Jf.Jif'! l2RIDE~ 1857 GENERAL CONDITIONS OF THE GRADING PERMIT FOR: ~~USR -1-) * iOfLctLe~"Z5:T-1~~ { {'tdYlJ1t.l I;prov'e#{(iLi- 1. Original copies (2) of the Contractor's certificate of insurance shall be received by the City of Shakopee prior to any grading ofthe site. 2. Applicant agrees to hold the City of Shakopee harmless for any claims arising out of the City approving the grading permit prior to Final Plat approval, Final Plat recording and Final Construction Plan approval. 3. The Applicant shall obtain a NPDES permit. The City of Shakopee shall receive this permit prior to any land disturbing activity. 4. All erosion control measures shall be furnished and installed by the Applicant and accepted by the City prior to any land disturbing activity. 5. All erosion control measures shall be routinely inspected by the Applicant and replaced as necessary or as directed by the City of Shakopee. 6. Erosion control maintenance shall be the responsibility of the Applicant throughout the life of the grading permit. 7. Adjacent streets shall be kept clean of any offsite sediment tracking. 8. Turf and permanent vegetation shall be established in accordance with the NPDES requirements. 9. Six (6) inches oftopsoil will be required over disturbed areas not part of building pads. Building pads not starting immediate construction require four (4) inches of topsoil. All areas not involving immediate building or construction shall have turf established in accordance with NPDES requirements. ' 10. Final Plans and Reports required upon completion: . An "as-built" grading plan shall be submitted to the City when the grading work has been completed. A statement shall be included from the Applicant's engineer that the grading work is in conformance to the "as-built" plan and specifications. Also, as a part of this plan, a statement shall be included from the Applicant's surveyor that the high water elevations around ponds and wetlands are within the existing and/or proposed drainage easements of the plat. No building permits will be issued until the City Engineer has approved this plan. Please refer to the City of Shakopee's Design Criteria for as-built grading plan requirements. . A report prepared by the soils engineer including locations and elevations of field density tests, summaries of field and laboratory test, other substantiating data and comments on any changes made during the grading and their effects on the recommendations in the soils report. Page 2 of3 ~ Permit # ~IHrAJKOfIBlH 6iI f , " 'lid CoM.MlJllJlI'l( P'RIDE SINCE 185'7 ...... .... ___GENERAL CONDITIONS OF THE GRADING PERMIT FOR: ----.- ---' ..- ... ..- -- ?k($e l, '1f;or kk. {},c .~/t: I f CktrHt I .:Iftlt,oVei1ftfi.-/f 11. All Topsoil (whether salvaged on site or brought in as import) to be used on site for turf establishment shall be identified, tested and approved by City of Shakopee Engineering Department prior to placement of said topsoil. Topsoil test results shall comply with MnDOT's "STANDARD SPECIFICATION FOR CONSTRUCTION" 2000 Edition, Specification 3877 for "SELECT TOPSOIL BORROW" (spec. 3877.2 B, Table 3877-2). 12. Grading shall be limited to the plat/property boundaries and as shown on the submitted grading plan. 13. County and State permits to be obtained are the responsibility of the Applicant. 14. See the following conditions from the Natural Resource Director and the Community DevelopmentIPlanning Department: Community Development/Planning: Park and Recreation Department: APPROVED BY: CITY COMMUNITY DEVELOPMENTIPLANNING DEPARTMENT. I BY: DATE: APPROVED BY: PARK AND RECREATION DEPARTMENT. BY: DATE: Page 3 of3 Phase I, Prior Lake Outlet & Channel Improvement Project City of Shako pee Grading Permit Application PROJECT LOCATION Phase I of the Prior Lake Outlet and Channel Improvement Project involves constructing Segment 1 and Segment 4B of the project, which are both located in Scott County, T1l5N, R22W. Segment 1 is located in the NE and SE ~'s of Section 27, in the City of Prior Lake. Segment 4 B is located in the SE ~ of Section 14, in the City of Shakopee. The 'fOllowing map identifies the Phase I sites. Prior Lake Outlet Channel Phase I Locations ) ", Note that there is no defined channel through Dean Lake, Pike Lake or Jeffers Ponds. The channel centerline through these water bodies is only provided for stationing purposes. ~ 1 .1 " , "n' ... i '. :l~h...., ....... .....;::;... " . , " Pubtic ',/'Jaters _I .. .. ..~ \ :.' :< . ... ...... ..' ". ; PLSlVVD Boun,jarf I .... ~ .- .~ ... r'1 ! Outlet Channel Segment If' ,..~.'. PlhH l"ke.$lllilllj l'll\e' . . L....-; ~ ..~~ W"telshitt! [listrict .. .... Q O!J 1 2 Mlis 1 I . . . I . . 1 Phase I, Prior Lake Outlet & Channel Improvement Project City of Shakopee Grading Permit Application DETAILED PROJECT DESCRIPTION Background Phase I of the Outlet and Channel Improvement Project includes about 1,500 feet of the channel just south of County Road 16 in the City of Shakopee~\Vhicl?-__i-~jdentified as Segment 4B. This channel segment is experiencing severe erosion due toJivestock encroachment. Cattle currently have unrestricted access to the channel, which has resulted in significant erosion ofthe channel banks as well as direct deposition of animal waste into the channel. There is also a need to stabilize the banks to prevent future erosion due to flow from the Prior Lake outlet and the watershed directly tributary to the channel. The proposed construction involves addressing erosion issues and stabilizing the banks of the channel using the following techniques: . Install boulders in select locations for grade contr.ol (rock cross veins) and toe protection, . Meander stream where possible to increase stability, . Stabilize banks using bioengineering techniques, including root wads, planting live stakes of willows and dogwoods, and seeding with deep-rooted native grasses, and e Install fencing and cattle crossing on Segment 4B. The wetland delineation completed for this segment found wetland conditions below the channel banks and also along the edge of the channel and County Road 16 on the north edge of the segment. The District is not planning to complete any work within the wetland at the nOlih edge of the site, other than to stabilize the site where the road drainage flows into the outlet channel. Details on the proposed construction activities for Segment 4B are provided in the paragraphs below. Construction Details The construction plans for this segment involve the strategic placement of boulders for toe protection and grade control along the channel and stabilization of the chamlel banks using bioengineering techniques. Some earthwork will be required to restore the channel at the south end of the project area, which has exhibited significant sediment accumulation over the last 20 years, and to re-slope point bars to a slope of 4: 1. Some minimal grading will also be necessary to install the rock veins, riffles and boulder toe protection identified on the project plans. Where needed, the restoration will use soil bioengineering techniques to stabilize severely eroded banks. Soil bioengineering uses dormant live cut branch material and live potted plants and seeds to establish a deep root mass to stabilize streambanks. All of the potted plants, seed and plant material will be native to Minnesota. The total quantities of stream bank restoration, rock and boulder placement, cattle crossing and excavation are as follows: 2 Phase I, Prior Lake Outlet & Channel Improvement Project City of Shakopee Grading Pennit Application Table 1:. Project quantities. Se2ment 4B Total Shoreline Stabilization (linear feet)* 659 In. ft. .'""'.....~ __""..", 4458 ft.2 Boulde~-Placement, Cattle crossi~g and Brush Grid (ft?) (0.10 acre) 3498 ft. 2 ExcavationlBank re-sloping (ft.2) (0.08 acre) *Seeding of deep-rooted native species will also occur along entire length of this stretch of the channel and is not included in the linear feet of shoreline stabilization above. An important component of the construction plans for this segment is the construction of a fence along both sides of the channel to exclude livestock. The landowner has agreed to the fencing provided that a dry crossing is constructed to allow him to move livestock and farm equipment from one side of the channel to another. The addition of the livestock exclusion fencing will improve both the bank stability and the water quality of the channel by preventing bank erosion caused by the livestock and by preventing the deposition of animal waste into the channel. In addition, the re-establishment of vegetation along the channel banks will provide a buffer to filter runoff from the adjacent pasture before it reaches the chamlel, thereby further protecting the quality of the channel and of downstream resources. Woodland Management/Tree Removal and Replacement There are three woodland areas on the proposed project site, as follows: 1. A row of box elder trees growing along the channel banks on the southern third of the project site (see Plan Sheet 1). 2. A clump of box elder along the channel where it turns to flow north (see Plan Sheet 2) 3. A stand of elm, buckthorn and ash on the northwest corner of the project site (see Plan Sheet 4). Some shade reduction/tree removal will be necessary to ensure that there is sufficient light penetration to allow the soil bioengineering techniques to thrive. Trees will be cut and removed or used as root wads or brush grid. The PLSL WD plans to remove the stand of box elders growing along the channel banks on the southern third of the site (Woodland Area 1), and the trees along the channel identified on Plan Sheet 2 (Woodland Area 2). This tree removal is necessary to help ensure the success of the bioengineering techniques. A total of35 trees of diameter six to 10 inches and five trees of diameter greater than 11 inches are proposed to be removed and re-used as either brush grid or root wads for the bank stabilization/restoration activities. The removed trees will be replaced with 1,900 native plant plugs along the edges of the coir fiber block, 860 native plant plugs in or next to the riffles, and seeding of a sun-tolerant native seed mix to the edge of the easement area, which is 35 feet centered on the channel. The following tables provide a species list for the planting and native seeding; this information was excerpted from the project specifications. Trees not designated for removal/herbiciding will be protected .., ,) Phase I, Prior Lake Outlet & Channel Improvement Project City of Shakopee Grading Permit Application with temporary fencing, to prevent the construction contractor from inadvertently removing or damaging those trees. Native Sun Seed Mix - Sun: for use in all areas of "Sun Seed Area" Forbs - 15 seeds per s.f. Scientific Name Common Name 0/0 of Mix Seeding Rate Seeding Rate (Number of (Number of Seeds per sf) Seeds per msf) Asclepias incarnata Marsh Milkweed 10 1.5 1500 Aster novae-angliae New England Aster 5 0.75 750 Boltonia asteroides Boltonia 5 0.75 750 Eupatorium maculatum Joe Pye Weed 10 1.5 1500 Eupatorium perfoliatum Boneset 10 1.5 1500 Helenium autumnale Sneezeweed 10 1.5 1500 Helianthus grossesseratus Sawtooth Sunflower 5 0.75 750 Lobelia siphilitica Blue Lobelia 5 0.75 750 Monarda fistulosa Beebalm 5 0.75 750 Rudbeckia laciniata Green Headed Coneflower 5 0.75 750 Silphium perfoliatum Cup Plant 5 0.75 750 Solidago graminifolia Grass Leaved Goldenrod 5 0.75 750 Verbena hastata Blue Vervain 10 1.5 1500 Zizia aurea Golden Alexander 10 1.5 1500 Total 100 15 15000 Grasses - 35 seeds per s.f. Scientific Name Common Name % of Mix Seeding Rate Seeding Rate (Number of (Number of Seeds per sf) Seeds per msf) Andropogon gerardii Big Bluestem 10 3.5 3500 Carex vulpinoidea F ox Sedge 10 3.5 3500 Elymus Canadensis Canada Wild Rye 10 3.5 3500 Panicum virgatum Switchgrass 25 8.75 8750 Scirpus americanus Three Square 10 3.5 3500 Scirpus cyperinus Wool Grass 10 3.5 3500 Spartina pectinata Cordgrass 25 8.75 8750 Total 100 35 35000 Cover Crop Scientific Name Common Name Avena sativa Oats 20 lbs. per acre 4 Phase I, Prior Lake Outlet & Channel ImprovementProject City of Shako pee Grading Pennit Application Plugs for "Coir Fiber Block" - all plants minimum 1.5" plugs, minimum 4" tall - Scientific Name Common Name % lNumber of Plugs composition . IAndropogon Big Bluestem 5 gerardii ,.:"-,---...- . -95 .'- Carex vulpinoidea Fox Sedge 10 191 Helenium Sneezeweed 5 autumnale 96 Monarda fistulosa Beebalm 5 96 Panicum virgatum Switchgrass 20 382 Scirpus cyperinus Woolgrass 8 152 Scirpus fluviatilis River Bulrush 8 152 Scirpus pungens Three Square 8 152 Silphium Cup Plant 6 perfoliatum . 114 Spartina pectinata Prairie Cord 20 Grass 382 Verbena hastata Blue Vervain 5 96 Total 100 1908 Plugs for "Riffles" - all plants minimum 1.5" plugs, minimum 4" tall- Scientific Name Common Name % Number of Notes composition Plants Calamagrostis Canada Bluejoint 10 Plant at Riffle Edge canadensis 86 Carex lacustris !Jake Sedge 15 130 Plant In Riffle Carex Pox Sedge 10 Plant In Riffle vulpinoidea 86 Panicum Switchgrass 10 Plant at Riffle Edge virgatum. 86 Scirpus Woolgrass 15 Plant In Riffle cyperinus 130 Scirpus River Bulrush 10 !Plant In Riffle fluviatilis 86 Scirpus pungens Three Square 15 130 Plant at Riffle Edge Spartina Prairie Cord 15 Plant at Riffle Edge pectinata Grass 130 . Total 100 864 5 ::ci ~~'<t ': 1'1 ...; ,0 0 .zoz 1'1 <..~t> """ PRIOR CREEK 5E6/'1ENT 4-D/ .. ~N lU 0 E~N 'e' - "'O.QJ-P-4 ~~oO~ ;; E,.g1tt~N ,.g !1uhlenhardf Properly AUA g en "DESIG":" .; t t .~_.<~ ." ~ ~~' ,... ilII t "::!~ ~ :;: DRAFT DESIGN PLANS \04 "; :7':'. ~ ~ '.' ,.' ,'.Q E< ~ I};I,QI ~ '" KDG PROJECT 04225 ~ ::.:tJ" "E ~ . ~,. 3HJ. ~ 8,u ~ u.~- ._l~ E'" Drawing Sheet Index j:l ""~. ~ ::: ::1< ~.~ ii:...l(5 0.. tl ~ 1::'8 ::i Q 't: ~ ~ ~ Plans and Profiles o -- tU 0\ .rl ~ a:!! - aft Page .;.; .-.;:: ob 6>' Vi .... ~~ N '=15;3::: Sheet Title Sheet Content Number(s) ~6bo~.-( 0\ ~~g~ =' ",~.s N '-51!~ Cover Sheet Context Map and Drawing Sheet Index 1 ~'ri) ~ 'l:l'S ~ 8....5. 00 ~~en ~ ~;;;~iI' Plan Plan Sheet 1 2 Uo ::s.::: 0 ..... 01>: ~ ts =: > ~ -a.; B Plan Plan Sheet 2 3 '8'--' ~ ~ -< 1.0 0 .!!l a ~ 3.g ~ Q: g ~ f5 ~ .~ .s Plan Plan Sheet 3 4 .... rJ} >;; i:l rl '" ";' .s.;!!.... Plan Sheet 4 '50 ~ <ll II) '" 00 i: 0 Plan 5 ....~ ~.. ~~N .?:8.~ Sections Sections 1 +00 to 6+48 6 g f}~ ~ g~.; iil 0 ~ l:: ::Q ~ lI"l ~e-s Sections Sections 6+63 to 10+82 7 _ ..d ::s 1.0 .... 0'1 .. ,- ~ ,. ._ I:: ..... M'- . "","0 11) II) Project Quantities Cut, Fill, Planting and Detail Quantities 8 ~~ ~~ ~;g~ ~~]~ ~ ~ U ..~ c:: !L~ . OJ ~j~ ~ $ lij] ~ 0 , p~ ~ Details ..s i '= ~~ Page tti ;. . ~ ~~ g .. 0 \. :'g~~~ Sheet Title Sheet Content Number(s) 1d ' < t:l..e - J:i, it ..._~ 0 Details I Erosion Control Blanket 9 ..... U '1. !: ti~g :z: u ~ t'l -a~gJ9~ Details 2 Root Wad 10 .. 0 !3 ~'<t .;!!.g1ll0": j ~ C 1'11'1 ~a1:irl Details 3a Vanes I 11 "5< ... '" "t "t .s a ..: .~ Q)'<t"'~ ~,,"';$ Details 3b Vanes II 12 ~~ l;!N!;;:"t'i!51!'S Details 3c Vanes III 13 ug .51 ~ ~ <"l 8 ~ * ~ i=l.. al 1.0 te >.'8'50", Details 4 Coir Fiber Block 14 Po... uk~.1 ~prino L..ko .......ISh.~ Disttlol e 0 o.t- ~iie".. ," '13 ".~(2' .. ;E~ ~ q ..= ~ .ll e ~~ ~ Details Sa Brush Grid I 15 ~ _ ~ ~ ~ _ =-'''0 Q . Il.2S D.S. o.1S' , -lit, Details5b Brush Grid II 16 Details 5c Brush Grid III 17 Prior Creek Context Map ~ Details 6 Riffle 18 ~ (I) Details 7 Boulder Toe 19 ~ ..1lC Details 8 Straw Logs 20 CU ...1_ Details 9 Cattle Crossing 21 ~ ~ ~-~ Details 10 Permanent Electric Fence 22 Board of Managers Project Prime: '" William Kallberg, President Wenck Associates, Inc. ~ ~ or: U; ~ p" c.-- William Schmokel, Vice President (763) 479-4208 e cnC Larry Mueller, Secretary Project Engineer: Edward Matthiesen, PE ~ i=l.. 1-0 \f\ ':(1) - Roger Wahl, Treasurer ~ "- --- '"""'-~:"".-... - 'i::;:;-~"- - ---~...;:::... cu..c Craig Gontarek, Manager Soil Bioengineering Consultant: ti ~ ...It/) a.. Abbreviations: The Kestrel Design Group, Inc. a.. (I) NJ.C.: Not in Contract \Ll~rn ,e 1\1 952 928-9600 0:3: L.A.: Landscape Architect Soil Bioengineering Prime, Landscape Architect: t5~~ NTS: Not to Scale Peter MacDonagh, RLA ~~~ C)...:l> ~150 ~;EU , . ::ci ~~..,. .: 1 root wad to be field located by L.A. .....; .00 N .zoz N . <( .. C:! 'is .... .. Exist ng Boulder Removal - ~E~.~ 0 .' . To 1e used as fill for Cattle .o'ON8 N .. "C4>....-I~ J:!~;)~~ ~ . Cr ssing f!"'-:d~N l! . : ,1% - 18~{BOulder Cross Vane (3) 000 ~ rn } . - op 9 Center Stone set at "DE'16M'" ~ t r ~\{ft_.,~~ s~..... .. ~ ----.-----~ 17~4'. See Detail 3. . !:I~.'~~ ls:c ',-,...~ .~; :~~ J 0 u ... ... ~ Deline,a ed Wetland Boundary ~ ;. ~""':;O s~ I!' : 'r:~. ~lf >. . . . ~. aH~'S" 1~ ~ .... 4"~12" Stone Rime (6) (.) ,~ - - .a ~CIl .~... .' TopiofCenter Stone - 775.5' ~ ~~. .... -,," . -.. ,~ ~ -r5 0.. tl ~ 1::] . . / :::s Q'~ 0\ Os 0-<>> M ~.r<l ~~~~'!:':~~~e~. / ~~~~ LEGEND H IS ~ 0\ ls!l' .;.:e,:) .~.~ ~ gb.V: E3 Wetland Delineation Line 8 C~ N'l:!os8 .= 61 Q ~.-l ~ ~~ ~~ Remove all trees within G:J PLSL WD Drainage Easement :;l ~.- 2 N .-s~~ ~ .~ Cl:l 'S ~ l'" . . - project area between E3 OQ) ~~rn ~ ::::q,o Temporary Construction Easement Uo .1'!'~ 0 ~.s"c;= Station13+27 and Station ~ ~ ~ ~ -< ~ ~~ J 3+12. Herbicide two ~s' Fiber Blocks .C........ ~ ~ \0 0 .- co en ,!!.?~/ i/~' Id'p ofCe~fie -775.9' 3~ iiCl..; 8~~ ~.~Jl prior to remov~~~ord' ~ Permanent Cnttle Fence .5 CIJ :.;;. ~ ~V\~ -5'~~ b() --.: gj "''''00 ~to if~ . ..,' ~2~one Rime (4) + .. .. .. s:l~ <l> s;; ll~N 'E8.~ ...+..... Brush Grid 8 €}~(I;S 0\ u5Is "./' op of Center Stone -776.1' ~ ""'~ Native Sun Seeding is Q) l.ll ~ <<l~ ;~Jl -E:l "\:j;:t \0 s:l0\ ".-t.. .- s::: ...... tf").- . ... '0 II) 2 root wads to be a:m Native Shade Seeding r55 ~~ :r;;gf ~~]~ . . .' field located by L.A. ~ ~ ~ . ..........'. ... /' Point Bar Excavation . .0 U h . .~A!';:;12" St9Jle'Rime (3) ~ Rip Rap Removal c: n ...-.....-...... .....,.......~enter Stone -776.4' ~!H. ~ ....." . ~ :'4"!~t(}n. e (2) Plan Scale r'~ ~ il a .Clp ofC~~.r..Stone - 776.7' c:) "u ~ root w~o be I I I I I I .E ... g'E~ ~ ... 'l:!" > fl 8.z 0 ~ ~~cated by L.A. 30' 15' 0' 15' 30' 60' v.i : [, $ ~~ ~ ..' ... Q) ."J ;~ ~~~ - ./oPLSL~Drainage Easement and Permanent Cattle Fence Location ~ J:l' 'I . . .... _.,- .. '.."." .~z ~ Context Map ''''; U ':'; il >>0 .... u ~ ~ ~~~srP 75 foot PLSLWD drainage easement, fence and planting (Add Alternate) ..0 '" ~"" ._~~o= E rn ~ .;; c: ~ Temporary Construction Easement $i r/) U N~ -OOll 11< ..O\'1.sls=.- "'''''O\~ ~,,~::o . c~ l;!NG='1 ._s '0 o (.) 0>< ii>>!l" / Excavate new 32" deep meander channel U ~ .- 0 ('f") M u.o In 3 ,"" ~ ~ :e ~ ~r~~.. ....~. between Cross Vanes (2) and (3). Install Coir E Q) ~ q.= ~ j e--3'~ ~ .. ;t~ Fiber Block as per Detail 4 at channel edge. _ c:Lt P-4 ~ _ p.,"t) 0 Q 4"-12" Stone Riffle (1) Meander channel fmal width between Coir ~ Top of Center Stone -777.0' Fiber Block to be 7'. Excavated Channel width . Delineated Wetland Boundary is to be 14' 8" prior to installation ofCoir Fiber 't- CJ .p/ Block at both sides of channel (see Detail Sheet \-..... ~ ~ ca "-24" Boulder Cross 4). Meander channel to be field located by ~ -1-- Project Landscape Architect. Plant plugs on ~.~ ne (2) - Top of Center both sides of channel per Detail Sheet 4. t: ~ .-- St set at 777.3'. See ~ .. ~l/) Sun Seed Area - see Excavate to 0.7% longitudinal slope for channel c. a..- Specifications 02955 detail for channel bed. ~ ct '10 ~ CJ"C Natural Areas ~ .:.:::cu GENERALN TES: (1) ca.t: Planting and t1 ] ..Jl/) 1. AIl areas on is plan sheet disturbed during construction shall be repaired per specifications section 02167, Disturbed ~ Seeding ~cu Areas Repair. ^' ~~rn .S! 'tiS '. a:s: 2. PLSL WD Buf r width is 17.5' on each side of stream centerline. , ~~.~ 3. Temporary Con truction Easement is 50' on each side of stream centerline with a ISO' radial construction easement in Vn~ place around the st am crossing area ~Q)ro ~,....... 4. Remove all tree ithin project area between Station 13+27 and Station 3+12. Use for root wads and brush grid material. aj~ 5. Channel and Poin Bar Excavation is to be constructed by tracked backhoe. Scrapers are not be be used within the stream ~.9 chalmel. ~~ ! .- Context Map /" . .. Excav~point bar to 4: 1 slope or / // I ;' . : . l~ Spread fill material smoothly in ., upland buffer area at LA discretion. . \ B~ Grid to be placed between bank . * ~~V~tt(i~~\;?~~ . . ~d channel. See Details 5 y ;it "'~ . 2 root wads to be field located by L.A. ' ~'\, ." '. i ,'~ ; 1.2" - ~"Boulder Cross vane (7)- " ~i,t *1 . : Top 0 Center Boulder set at 772.8'. ; l'fr'" ; -j i ~; .- See ~etaiI 3 . i: I . Pa e Breakline 5 eet 3 Above 12" - 18" Boulder Cross vane (6)- . Top of Center Boulder set at " . '" at 773.3'. See Detail 3 , . : .. Straw Log - To~ field located by L.A. , '. , ..... ~ Vane installed to dire:; water into chalU1el- .. : . / ~ / . Top of Center Stone (low - 773.6'. # "; .., ~}", / . Top ofC~nter Stone (high)\774.6'. , ",.!:':~ i . ; See Detall 3 . , ' i J , . r 9"-12" S\one Splash Pad . . f i . .: r- 75 foot PLSL WD drai~ge easement, , . . . fence and seeding (Add Alternate) ~ :. \ t _ ~ PLSLWD Drainage Easement t ; . \ . 1- 30' 15' 0 15' 30' i 60' ! '/ ; . Temporary ~ 75 foot PLSr draioage e""ement, ! 1, . Construction I , ;. fence and see mg (Add Alternate) . . Easement Proposed P SL WD Drainage Easement . I 42" Culvert - Botto~~?,fPipe - 774.3, 774.0'. ; . W Vane installed to dir7/ water into culverts - Culvert filled with gI:ayel! stone mix (50% gravyl! . Top of Center Stone (10 ) -774.0'. 50% stones 4"-8") 8"1yep across entire culvert ,; . Top of Center Stone (high) -775.0'. See Detail bottom. i~ . . . 3. Constuct raised di~der between center ofW Excavate CI'i~nel Margm for W Vane per . Vane and center of Culverts using >18" Field Verificat on. Use fill for crossing. . fieldstone boulder~ 42" - Bottom of Pipe ~73.3, 773.0'. Culvert . 4"-12" Stone Riffle (:7 LEGEND filled with stone! gravel ~x (50% gravel! ,~O% . stones 4"-8") 8".deep acro entire culvert b9ttom. . " \ Top of Center Stone E3 Weiland Delineation Line . ..., . 714.2' wb c:=J New Permanent C~ Fence .', : ~PLSL D PLSLWD Dminage Ensemcnl . ;, . . '. Dr.afuage E3 Temporary Construction Easement Existing Cattle Feuce . \ : fasement and ~ Fiber Blocks Sun Seed Area - see specifications 0295~atural, I \ . ermanent ~ Pennanent Coule Fence Areas Planting and Seeding "" \ . 1attle Fence m:3 ,. of- + ... . Brush Grid . .... ... ... + Remove all trees within project area between ~' . . . 4"- 2" Stone 1///'/1 Station13+27 and St~tion 3+12. HerbicicJe two ee~ . . Rif~e (8) Native Sun Seeding prior to removal aC90rding to specificatio~ Section 0294 . Top of Center IIEED Nalive Shade Seeding . ~ Use for root wads a~d brush grid as neede~ for p~jec~. . . Sto~ - 774.5' Point Bar Excavation ~ .. 2 roo wads to be ~ Rip Rap Removal GENERAL NOTES:'!' ,i/ \/i ~~,i! 1. field \Ocated by 1. All areas on this plan sheet flisturbed quring con~j;tuctio " ~a . L.A. repaired per specifications section 02167, Disturbed tea Rep~l. . 4"-12" Stone Riffle (7) 2. PLSL WD Buffer width is 1 tJ.5' on each side of stre m, enterlme. : Top ~ Center Stone - 774.9' 3. Temporary Constri!9tion Ea~ement is, 50' on ea.ch si:r ' ..... stlleam . Stra~ Log - To be field located by L.A. centerline with a 150"radial cqnstructio~ easement, in p a eat:~~:lld the ~~~:~~~s~~~~:~:a~i~hin project area ~'etween St~~io~ ~ +27.tln~-'-'-} 12' - 18" Boulder Cross Vane (5)- . T;T of Center Boulder set at Station 3+ 12. Use fOE. root wads and brush grid material_"",~, '-, l . 77 .1'. See Detail 3 5. ChalU1el and point,Bar Exca~ation is t6\be constructe by tracked, . . Brlder Toe - Along entire cutbank backhoe. iPers ~'not be "" nsed within the stream c re!::. \ . ' se tion (63 linear feet), See Detail 7 . ExcLate point bar to 4: 1 slope ~rl~s.' s~ ~11 ',_ ': ! 1 rooJ wad to be field located by L.A. . 1" - 18" Boulder Cross Vane (4) - Top of . ' . cruter Stone set at 775.2'. See Detail 3. material smoothlr,jn upland buffer are at LAs dl~cretil1' e Breakltne . . ..! ,eet 1 Bel~w Tempora?, Construc,pon Easement' ,I Piotto.' , I root wad to be field located by L.A. f Existing ~attle Fence . . Exist g Boulder Removal - PLSL WD frainage Elsement and . ToXe used as fill for Cattle Permane t Cattle Fence Location i~ . Cr ssing \ ' /' . . 1~' - 18':/Boulder Cross Vane (3) , . Remove a1 trees within pro~, ~ ... .. . . - .OP of Center Stone set at between StatiQ!!l.3~Stat' J. ad to .8. . .'7754{ S D '13 9 .. . ',7' ee etal . 3+ 12. Herbicid~ ~wee . ri?:Y ~~.tlfe~~ loc ',' , . ;~ Delmeated Wetland Boundary removal accoJ."' to ecrn.cat;.o /..~. '. . ... 'L 1 Secti~. e f9rroo ads ,/ ~/ ,"" ',,-": ,.,,", " '. . ./ ,.." . . .~ ~ ~ , ..41(tr Stone Riffle (6) a~ s . as n~fl ed, 0':- . ,'.... ""~, ,>' ' , . . ..... .. To' of Center Stone - 775.5' . .. ',..-,.-,.", ',' :.,;', ,'"., .': " , . ,. -----,..- " .~ PRIOR CREE,/( 5E6/1ENT 4-1? Prime Consultant: Soil Bioengineering Consultant: Drafted by: A.J.R. Wenck Associates, Inc. The Kestrel Design Group, Inc. Checked by: N.M.H. Prior Lake~ MN Landscape Architecture Ecological Design fll~eSTR.E.Ltt Date: 12/22/04 1800 Pioneer Creek Ctr. I ~ tJ"~ KDG Project No.: Plan Sheet 2 P.O. Box 249 _," .^ Natural Areas Planning Bioengineering ~ ~ . ~'b 04225 Ph. 763-479-4244 i"L.~Wencl< 5136 Hankerson Ave. Suite 1 Edina MN 55436 r<4""': ,~. Fax 763-479-4242m' 1 ,:.-.,:. .I/} l;!l '~:~ " :l1 /'" , Prepared For: 1 hereby certifY that this plan, specification or report was Ph. 952 928-9600, Fax 952928-1939 8(i 'O.P.Et. prepared by me or under my direct supervision and that I am a I hereby certifY that this plan. specification or report was prepare y me or duly registered PROFESSIONAL ENGINEER under the laws under my direct supervision and that I am a duly registered LANDSCAPE of the Stole ofMinnesoto, ARCHITECf under the laws of the Stale of Minnesota. Date: Reg. No, 16800 Date: Reg, No.41051 d~~ Sheet 3 of 22 ~~d'?--- ::ci < , ~:E;;d :!:i~z ~ .. ;::. t) f+.l ",-,<!~" _""""~ . ~~!:::!.~ .0 '. ""J;t~~""4" .::> 'C N e "t '~l;;"", "t",,%~j;j --", . ~CU-~ ~~~~fu". . ~~oO~ t) v':;"'-v, GENERAL NOTES: , . 5ed~~ Jl , ' ~ ~~",. 1. All areas on this plan sheet disturbed during construction shall be repaired per r/} ,,," . .. .. ... ". specifications section ~216?, Dis~bed Are~s Repair... . . ._ .. _.. v ~/D~1.~.~~~ J ~ t:.~:" . . . .'-"J..2.PLSLWDBufferW1d~h IS 175 on ~8:ch sIde of str~am centerhne~. ~-=-,;.. .:c:- ~ ~lff~\~~ .~ 0 .. -~_ 3. Temporary ConstructiOn Easement IS 50' on each sIde of stream centerhne WIth a ~ 'm'.;;:Q e ~ .. ISO' radial constructio.n ~asem~nt in place around th~ streatl} crossing area ,i/ : ~~~~!~ 4. Remove all trees wlthinproJect ~ea between Station 13,+27 and Station 3+12. Use i U ,~._3.HX~I~ h....:a for root wads and ?rush gnd mate~al.. , ':,/ ~~ So ;-j ~ 5. Channel and Pom~ B~ ExcavatIon IS to be constructed by tracked back.hoe. Scrapers p. .~ ~ ~ ~ -0 are not be be used wlthm the stream channel. ,,/ g ~.~ ~ ~.;i . . $-I 8~ ~ 6~ . :.:0 .~.~... oh s>.:n . c:: o~ N 0="352 / S51-"'- c-. !l"'o", .. - <::) 0 (L) t.C CIS fj . ::s <';'0__ N._ 0 . "'.- t>;j ll:\'~ '" II m ~ z . ".'r ./ 8 ~ ~ ~ ~ c-. ~=::. fl> J' - . Uo i!,5 oj ~ li,fJ'O'" " ~ ~ gp ~ ~ > ~.. P..-g ~ . wt'~ # . 'C 'f"""""'I .-::::.s -< \0 0 .!a fl:l ~ ~~"fi~ 8~~ ~.~41 < Delineated Wetland Boundary '61 r/} ~ ~ ~ ~ ~ .s 'E '0 "J./ ~~ ~~ ~Z~ ~U . ,., .- (,J ~ :i:::E N 8... u / ~ CD {l ~ '" o:l~ ~~d Sun Seed Area - see specifications 02955 Natural .:a t:: a ~ ~ ~..d i ! ~ M A Pl' dS <Ii r/} 0..1...... "'~"'"' _S,st:l reas antmg an ee ng . , Context Map 75 foot PLSL~ drainage easement,/\, /' (; a ~ ,.. .~. fence and seedmg (Add Alternate) " /' /~'. . c: II ~ ~ <.. . . ~--s Temporary Constrwmon Easemenl " ~,/'",./ / ci ~ Ii! .~ PLSLWD Dramage Easement / /'" /i .... . ./'../ .// I=l ,., .r~ ~ \A~ and New Permanent Cattle Fenc7 /. ...., ,4~'q2" Stone !liffle;(2)/' :~ :' ..' ~!ffi ~. ~ /" ..../. Top. of Cet:J,ter sze - ?71.0' ~ ., ..11 U ~ ::: EXistingCattleFen~z></ .. 1 t..'/d. ..~~ .fi Idl...'/~"'t LA" ~ExistingCattleFence .ffi (Jr:!ji ii~ ~ . ' rqo wa ...... ue Ie ... . oca y... / .,..- 0 il N ~ ~ ~ .!i ~ ....'/ . ..~-- . ," ..,~ .... .tJ 4> ~ ~ '--8w o~. / . . 4" 12' "Ri' 'm, (11) ./ .. a ~ ... N N -5 ",,- rJ Boulder Toe (113 liy.ear feet) . - one tUe /' /.,/ ~ < ~ 0\ 't 't. ~ ~ ~ ~ See Detail 5 \ /;' /. Top?f ~ntef Stone - ]71,.3V ~ ~ ~ (1; ~ ~ ~ E 'll '0 } :,.f .... . . 1 roo,~w~d t~ be fiel~aie'dbY L.A. E ' END ~ ~ ~ ~ ~ ~ i l~~ ~ Brush Grid to be place,d . . f ~(Ri (10).... '\ /'.. ~ W~"'Dcl_;oo"" ;f ~ ".:.,..: ".:j, ~ between bank.and bou~ er ...... o~"'Q~enterS~ ne: n1.7 .,/'" ~ PLSLWDDrainageEasement toe. See Detatl~ 5 anf,,8 ;. ..... Straw Lo.g; 'Fo be PLSLWD Drainage Easement E3 Temporary Construction Easement ~ . . .",. :'fiek!locatedbYL.~ /~., and Permanent Cattle Fence ~ Fiber Blocks ~ 12" - J &" t30ulder Cros vane 8 - .. .. \- 4 root wads to. be, T. f.' C B I:r~ ( ) , Temporary ConstructIon Easement ~ Permanent Cattle Fence -:;;. db tf . op 0 enter ~ <fer set at <.. i.: field locate y.. . 772.0'. ~Detail3 Brush Grid III ~ ",. . J8'foot PLSL WD drainage easement, Native Sun Seeding t: ~ . . /' fence and seeding (Add Alternate) Native Shade Seeding ~ 1 .. ExcavattPoint bar to ~:1 slope or . Point Bar Excavation ~ M lesySpread fill matenal smoothly m Rip Rap Removal ~ ~ ~pland buffer area at LA discretion. III ~ B91sh Grid to be placed between bank PI S 1 ~ z ~ aM channel. See Details 5 an ca e >o.l,(" :8 r:F1 . 2 root wads to be field located by L.A. l) CD~ ~ ./ . 12" - 1 II Boulder Cross vane (7) - 30' IS' 0' I '30' 60' ~ ~ ~ . . . Top of Center Boulder set at 772.8'. ~ ~ ~ /. : . See )jetail 3 \\( .8 . . ~.~ :i GENERAL NOTES: ~~~ci N 1. All areas on this plan sheet disturbed during construction shall be repaired per ""'lzo:z: N < .. ~ t) ..... specifications section 02167, Disturbed Areas Repair. ~E~ .g. 0 .o~Ne V"I 2. PLSL WD Buffer width is 17.5' on each side of stream centerline, "O"-ll< ~-l1a;~;q '0 3. Temporary Construction Easement is 50' on each side of stream centerline with a ISO' dG)-~N ., ......c d ~ ...c: radial construction easement in place around the stream crossing area ouo 0 CIl Stabilize Base of Existing Eroded Inlet Channel by others 4. Remove all trees within project area between Station 13+27 and Station 3+ 12. Use for "DESIGN'" .. M r root wads and brush grid material. Weiland Delineation Line ~Iftj_. '~~o: s ~ '" =~~~ a5 ".,-- --- 5. Channel and Point Bar Excavation is to be constructed by tracked backhoe. Scrapers PLSl WD Drainage Easement .. ....' 4,)~ --- are not be be used within the stream channel. ~.; J.j-~& i~ --- --- Temporary Construction Easement ~ ':i~:r.7 ] ~ $ --- . . BoUlder Tht0nstalled by others . ~. 31i~'" ..u. . . Fiber Blocks e.:> .:10 - - I~ e-lS --- ~ ~~. . --- --- . ~ ::: :g<-o - Pennanent Canle Fence " .~ ~,..J ...--, -- -- . " ''',,". 1- "Valle ~nstalled by others __ 0... ~~ 5] . Brush Grid ::s Q';:: 0\ e-~ ."- '. ..... "'" ~;%%1 81i~ ~~.~ ............... . . . . . ..."---.'. . ... ~ Native Sun Seeding +.it; .~.5 J; lS~.:;:; .. '_._._'-'~'~'~ db th . . . . . fa ~~ N '''''lS~ -.....;:"." , - ley 0 ers . Tree Protection Fence installed at Dripline of Tree Clump UJ-U] Native Shade Seeding ~5bo~~ 0\ ~~~.~ . ..." " '. . ................. . => <J._ 2 N .- ~ E ~ . .... . Sun Seed Area - see specifications ~ Point Bar Excavation ~.C;; ~ J:q.S ~ g _'- ell o Q) ~ O/JCIl ~ "t""~" ~ UQ ;:.5. !ii-So~ 02955 Natural Areas Planting and Rip Rap Removal b.O 't) :: ~ ~ "a-o.s .g ~ ~ a <r: 'D 0 .~ a b1 Seeding G) Cl) :.:::i:i:; s::"'o -Sg" .. ~::.~.>' -- ~~ ~ [g ~'<T~ "":!1i:= Tree Protection Fence installed at Dripline of Tree Clump '6iJ rn "'= III b ~ ob oS ~ ~ . s::~ III ~ ~~N t8.~ . . ~ '" .!=\, "'= 0\ a", . I !2 t:S-.. == N u....o;; . 4"-12J' St 'e Riffle 9) i:rlQ)~~ ~V"I~~oS ~ "l:i;: \0 0\ "'-13" ..... . ~ r.::= - ...... tt')..... . ...'"0 to) "'f~Qf, ntt!r Stone - .4' ~ ~~;;:::;Bf~S']~ ,."..,. '~""S~e ~iffle (~ ~ ~ U .... " ,op ofCente?~~.-76~' c: 0~~ ~m ~ . . J I . .'_, 71 . .,~ . . " ] , 0-" I~ 4"-12'" Stone ~e (17) - ",~ !;;1 .S ~_ . i, . . e goO <:> ~ Top ofCttnter St . -769.0' rn" i . $~~ ~ Q) , \ ~ (,)...J \0 . PLSL WD Drainage ~ ti':jl Ii',~ < ci and Pennanent Cattle ...... U ',jll {~~ Z e.:> .,.,. - Ei- ' ~ ~....~s ift .. 0 e ~~ ~.g~~~ . ~ 75 foot PLSLWD drain "E; rn .. rn U NM 1;l"O~ . \~nce and seeding (Add ernate) .::< ..O\'f'f -sag:. iil "'<TO\~ .c" ::s . \ g~ ~Nr--'t ,_5]'0 o><'f "Ii >-s " . \~~et Channel base stabilized U ~ ~ ~ ~ ~ ~~.Q~ 75 foot PLSLWD drainageeasemep.t, a Q) o . t' t' ~ fa eo.. '~ ~:~t.~~;f~.~,~~_" ~ M~6"-12" riffle stones. ~~ ~ q...; ~ .l! ~.g-:= ~ ;~~h:< fence and seeding (Add Alternate) .. ", · . \. Shade Seed ea - see _ ~ ~ ~ """ CI."'l:l 0 Q ,-, " .'" ~..~ -#'~[, ' DeIineated~~d BOomlaIY ~'" ~ . \ specifications 2955 Natural ~ : 1f,f:", Areas Planting nd Seeding \t- \.\~ Delineated We and Boundary a> ~(> ~ .:.:: .', <(, ('CS . ~ -1_ EXi:ting Cilttle Fence \ O').S::! ~ "0 C:... ~ .-- i..(h s:>.. Q.'- 30' . IS' / 10' 15' 60' e mO ll< I "l:S 4"-12" Stone ~iff1e (16~ ',.. ~. . I "~ ~=~~ ~~ . ,,/f ~,.__c s~,., ..... Top (}!~~e-::709.6~.,; ~ ~ - --.....1 (h -~~ Exca~~te point:bar to 4: 1 s~Je or less. ',. III (l) ... . ~~] ,. : /,1 ..; ... Spre.ad fill matpria1 SmZh1y in up1an --",-"o, h' G ^rFl ,.,~ buffer area at LA's dis reti h. .. ".~I ~<. ~ , , ! / ~~~ . J .' , ' . 4"-12I,'Stone Riffle~) ".~. ()~~ TO?bfCenter s~oh -770.0)(. -=;;'l-<~ ~.8 , ' / ' ~P-l l f . ' , .,,/ '.