Loading...
HomeMy WebLinkAbout15.B.2. Final Plat of Riverside Fields 4th Addition-Res. No. 6187 CITY OF SHAKOPEE IS.G. ~. Memorandum CASELOG NO.: 05-022 COi~SENT I TO: Honorable Mayor and City Council Mark McNeill, City Administrator FROM: Mark Noble, Planner I SUBJECT: Final Plat of Riverside Fields 4th Addition MEETING DATE: April 19, 2005 REVIEW PERIOD: December 24, 2004 to Apri122, 2005 INTRODUCTION: Centex Homes has submitted an application for final plat of Riverside Fields 4th Addition, located north of Crossings Boulevard, and west ofthe 3rd Addition and future commercial development along CSAH 18. This property is presently legally described as Outlot C, Riverside Fields 3rd Addition, and has an area of 15.17 acres, and would consist ofthree (3) streets with 74 single-family residential lots. This item was tabled most recently at the March 15,2005 meeting to allow staff and the applicant additional time to review design issues. CONSIDERATIONS: Since Council's last review of this project, the applicant has resubmitted plans that are generally consistent with the approved preliminary plat. They have proposed Switchgrass Circle to be constructed as a cul-de-sac (750 foot max. length, consistent with City Code requirements), rather than as a street that loops back to Crossings Boulevard along the commercial development proposed adjacent to County Road 18. At the February 3,2005 Planning Commission meeting, the Commission reviewed a PUD Concept Plan for that commercial development, recommending that the commercial and residential projects develop without a street connection (they did support constructing an emergency access connection between the developments). Tom Pitschneider, City Fire Inspector, has commented that Riverside Fields 4th will still need to provide a temporary emergency vehicle access road for the entire Riverside Fields development. Conditions of approval are as follows: 1) provide an emergency fire apparatus access road from Switchgrass Circle to Southbridge Parkway; 2) the access shall be constructed with a Class 5 surface with a minimum driving width of 12 feet; 3) the access road shall include the installation of barricade devices that are approved by the City of Shakopee; and 4) appropriate easement agreements shall be recorded prior to recording the final plat. He has also noted that if the plat is approved, the design, installation, maintenance and easement agreements of this emergency access road shall be reviewed and approved by the Fire Inspector. The developer has submitted a plan which shows the design and specifications of the proposed access road. Mr. Pitschneider also commented that a maximum of 100 units in this development may be constructed without an approved second access for emergency use. Joe Swentek, Project Engineer, has provided a memorandum.recommending approval ofthe final plat, noting a number of conditions that shall be addressed prior to recording and construction. The recommended conditions have been incorporated into the draft resolution. Planning staff commented that the City's sewer plan contemplates that the adjacent "Riverside Bluffs" area (the property just west of Riverside Fields 4th Addition) would be served by sanitary sewer extended from the Prior Lake Interceptor to the west, through the former Eagle Creek Stables property, and then to the south to serve the areas on the south side of CR 16. In the event that the Council chooses to allow Riverside Bluffs to be served by a connection to Riverside Fields, it should be conditioned on 1) the developer being responsible for all costs of installation, maintenance, and future removal of the connection, and 2) a clear understanding that service to the south will only become available once the Prior Lake Interceptor connection is made. Bruce Loney, Public Works Director, provided a memorandum'that addresses the sanitary sewer issue, noting that Engineering staffis recommending that the extension of temporary sewer be denied since the permanent sewer may be available in a year or two. Mr. Loney noted in his memorandum the number ofissues that need to be resolved prior to approval ofthe Riverside Bluffs plat. lfthe Council were to approve the temporary sewer extension, it should be contingent on compliance with the conditions outlined in Mr. Loney's memorandum. Planning staff notes that the applicant ispresently discussing the sanitary sewer service connection issue with the proposed developer of Riverside Bluffs. There currently is not a provision for this connection to occur in Riverside Fields, and at this time there is not a final resolution to this issue between the developers; however, staff has determined that this is not a reason to deny the Riverside Fields 4th Addition Final Plat request. Chris Enger, Ryland Homes, has submitted a letter addressing the proposed sewer connection, requesting that the sewer connection be left in the approved plans for Riverside Fields 4th Addition, with several reasons supporting the request. Mark Themig, Parks, Recreation, and Facilities Director, provided a memorandum that addresses an incorrect statement in Mr. Enger's letter. Additionally, it should be noted that the Planning Commission did review the Riverside Bluffs Preliminary Plat at their March 3rd and April 7th meetings, but that they continued the public hearing to the April 21, 2005 meeting, citing the need for comments to be received from City Engineering, Scott County Public Works, and other reviewing agencies. The Building Official commented that temporary street signs are required prior to construction. Shakopee Public Utilities Commission provided a memorandum noting that water, underground electric and street lighting installation is available subject to their standard terms and conditions. The applicant must pay the associated fees, and contact them regarding installation/construction policies. Additionally, they noted that Rye Court and Switchgrass Court watermains will have to be connected for looping purposes, and that Switchgrass Circle's watermain will have to be extended through Outlot B (commercial area) of Riverside Fields 3rd Addition to County Road I8's watermain also for looping purposes. The landscape plan approved with the preliminary plat proposed the planting of 468 trees for the Riverside Fields development, with 306 required for mitigation. The submitted landscape plan identifies the planting of288 trees north of Crossings Boulevard, and appears to be generally consistent with the plan previously approved. Parks and Recreation recommended approval of the plat, conditioned on the applicant modifying the tree replacement plan for the Red Oak trees planned along Rye Court. Two (2) options were offered that the applicant should explore to ensure compliance with this requirement. ALTERNATIVES: 1. Approve Resolution No. 6187, a resolution approving the final plat of Riverside Fields 4th Addition, subject to the conditions as proposed. 2. Approve Resolution No. 6187, a resolution approving the final plat of Riverside Fields 4th Addition, subject to revised conditions. 3. Deny the final plat of Riverside Fields 4th Addition. 4. Table a decision in order to allow time for the applicant and/or staffto provide additional information. ACTION REQUESTED: Offer a motion to approve Resolution No. 6187, a resolution approving the final plat of Riverside Fields 4th Addition, subject to the conditions as proposed. k ~ / Planner I RESOLUTION NO. 6187 A RESOLUTION OF THE CITY OF SHAKOPEE, MINNESOTA APPROVING THE FINAL PLAT OF RIVERSIDE FIELDS FOURTH ADDITION WHEREAS, Centex Homes, applicant and property owner, has made application for Final Plat approval ofRNERSIDE FIELDS FOURTH ADDITION; and WHEREAS, the subject property is legally described as follows: Outlot C, RIVERSIDE FIELDS THIRD ADDITION; WHEREAS, the Shakopee Planning Commission reviewed and recommended approval of the Preliminary Plat on August 7,2003; and WHEREAS, all required public notices regarding the public hearing were duly sent and posted and all persons appearing at the hearing have been given an opportunity to be heard; and WHEREAS, the City Council of the City of Shakopee reviewed and approved the Preliminary Plat of Riverside Fields on August 19,2003; and WHEREAS, the City Council of the City of Shakopee reviewed the Final Plat of Riverside Fields Fourth Addition on April 19, 2005; and NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA, as follows: That the Final Plat ofRNERSIDE FIELDS FOURTH ADDITION is approved subject to the following conditions: I. The following procedural actions must be completed prior to the recording of the final plat: A. Approval of title by the City Attorney. B. Execution of a Developers Agreement which shall include provisions for security for public improvements within the Final Plat, payment of engineering review fees, and any other fees as required by the City's most current fee schedule. 1. Street lighting to be installed in accordance with the requirements of the Shakopee Public Utilities Commission. 2. Electrical system to be installed in accordance with the requirements of the Shakopee Public Utilities Commission. 3. Water system to be installed in accordance with the requirements of the Shakopee Public Utilities Commission. 4. No public improvements shall be constructed until the City Engineer and the Shakopee Public Utility Commission (SPUC) approve the Final Construction Plans and Specifications. 5. Payment of Trunk Sanitary Sewer Charges shall be made as required by the most current City of Shakopee Fee Schedule. 6. Payment of Trunk Storm Water Charges and Trunk Storm Water Storage and Treatment Charges shall be made as required by the most current City of Shakopee Fee Schedule. 7. The extension of sanitary sewer to temporarily serve the property generally located to the West of Riverside Fields shall require City Council approval. C. Easements shall be shown on the Final Plat as approved by the City Engineer. They shall include, but not be limited to, the following: 1. Provide a total of seventeen (17) feet of drainage and utility easement in the rear of Lot 5 of Block 1. 2. Simultaneous to the recording of the plat, a deed restriction shall be recorded on lots as designated by the City. The Deed Restriction shall appear as the following: This conveyance is made conditioned upon and subject to the following restriction. The Grantee, heirs, successors and assigns, are restricted from erecting any fence or other structure within the utility and drainage easements dedicated by plat over the above-described property, except with the prior written consent of the City of Shakopee. This restriction shall run in favor of and be enforceable by the City of Shako pee. D. The following variations are granted from the zoning code provisions: 1. 15 foot structure separations are approved for all lots, with no side yard setback being less than 5 feet. 2. 50 foot lot width minimum requirement for all lots. E. The applicant shall implement the use of Best Management Practices for erosion control and stormwater management during construction. F. The applicant shall verify that all items set forth by Todd Hubmer ofWSB & Associates, Inc. in his letter dated September 16,2004 (Exhibit 1) have been adequately addressed. II. Following approval and recording of the final plat, the following conditions shall apply: A. This development shall comply with City Code Section 10.60, concerning noise elimination and noise prevention. Responsibility for other noise mitigation measures that may be required in the future shall rest with the developer and/or its assigns. B. Building construction, sewer, water service, fire protection and access will be reviewed for code compliance at the time of building permit application(s). C. The applicant shall design and provide an emergency fire apparatus access road (including installation, maintenance and easement agreements) from the end of Switch grass Circle to Southbridge Parkway. D. The access shall be constructed with a Class 5 surface with a minimum driving width of 12 feet. E. The access road shall include the installation of barricade devices that are approved by the City of Shakopee. F. Appropriate easement agreements shall be recorded prior to recording the final plat. G. Provide a second remote access (including easements) in accordance with International Fire Code Appendix D when the total count of lots accessing Crossings Boulevard west of County Road 18 exceeds 100 units. H. Watermains to be installed in this development shall provide the necessary looping connections, as required by Shakopee Public Utilities Commission. 1. All existing easements are retained. J. Final grading, utility connections and access to city streets will need approval by the Engineering Department. K. All outstanding fees will apply. L. Temporary street signs are required prior to construction. M. Landscaping shall be cansistent with the submitted landscape plan, except that the applicant shall madify the tree replacement plan far the Red Oak trees planned alang Rye Caurt, either by staggering the species alang the cul-de-sac to' avoid having adjacent Red Oaks or by replacing the Red Oaks with anather species such as Iranwaod, Blue Beech, Black Ash, Burr Oak ar Swamp White Oak. N. The applicant shau1d transplant healthy yaung trees an site whenever passible. O. The developer shall install rain sensars far the irrigatian system, and that all sprinklers awned and aperated by the Hameawner's Associatian shall have rain sensars cansistent with State Law requirements. P. The applicant shall canstruct houses using canstructian materials and methads far indaar naise mitigatian. Q. The applicant shall include 6 inches af tapsail, meeting MNDOT specificatians, an the entire site. R. Property addresses will not be released until the approved final plat is recorded with Scott County Land Recards. S. Pravide e1ectranic AutoCAD files af the Final Plat to' the Engineering Department. T. Submit two' (2) capies afthe final plat (11" x 17"), and an electranic capy, to' the Cammunity Develapment Department, as fallaws: a. The final plat capies shall be labeled 'final' and include the Council hearing approval date. b. Submit paper copies to': Cammunity Develapment Department, 129 Holmes Street South,Shakapee,1f.N 55379. c. Send electronic capy (.dwg ar .shp) to' RecordedPlat@ci.shakopee.mn.us. THEREFORE, BE IT FURTHER RESOLVED, that appraval afthe Final Plat of RIVERSIDE FIELDS FOURTH ADDITION daes not constitute a representatian or guarantee by the City af Shakapee as to' the amount, sufficiency ar level af water service that will be available to' lats within the plat as they are develaped. Adopted in session of the City Council of the City of Shakopee, Minnesota, held the _ day of , 2005. Mayor of the City of Shakopee ATTEST: . . =-== _.j.~(~L- ~~~ / ~ , . ~ . g [_Nml~ ' -mq -: 'I '/ \ ~I1f _ ~ UI ,:. ~ -; b>J R1B' RHt&1i'11 I I - - gf~~.;;. = 'I ~E8f!gJ= ~- U-l! /.1,- ~~~ ". 8i ' I ~.=:IJ..I1. 11 ~.' . . , .71: _ ODl'J'tl.., ~ !]"ld: I ~ ~"" ~1Wj 'TITI~"^ - I, ~ - II"~ 1(;(1\ jl D";~ ~Or" Y!:~~'-~' A ~s..~ ,t (.. 'Y,\W) ~- 'e,..,p. '. ~.t}j... : "" :;" - ~ t K ~~\[~~w~;rit\~$':' r~ .:i ~1 I1 :c'~ ~ <>.~~ ~,~. Il"- 11 . ~ _~ rIA ~ 1\~1 }.:!:"-. 11 1[1 1(11 ". ~Be \~L >-. G......... O$lM '11 '0.--..... - "~~ ,.. J, l _ .~: ~ /i[::, --- 1. 'tH- ... p~ I. · """ ,'Ip. r- .,L~ ~ 1 L RIB i(G /.'1l1TI'.,i7\'-" '" y "~,' -I. t{t!:J~' . ~--~ ~a I . ''\~ ~~( - ... l' I iRR InT,-VJ._ :.ii j '- I J:U: ,.~.. -- .)- AG ;:... l[J:~~fJ~{V::::-= ~ - - r ~ ~ =1~'I:l JarJ , ~m~/ ~ f~ PV" . '" -..-. ~v .- . " ' .G' ot-- .. - AG . ' ~- -@ ~\ D~,,;. .fc;; '<<s.'4~ AG .: j: I-?~~~I l/li 1\ / I /~rt ~ ,Jb.. ~ Subject Property SHAKOPEE \V~WE .....,. ShakopeeBoundaf)' CCM""UNlTYt'RlDaSlNCU11~7 S U Zoning Boundary , D Parcel Boundary Final Plat Riverside Fields 4th Addition City of Shako pee Memorandum TO: Mark Noble, Planner I FROM: Joe Swentek, Project Engineer SUBJECT: Final Plat - Riverside Fields 4th Addition PID NO.: 27-366066-1 CASE NO.: 05022 DATE: April 13, 2005 The application indicates a Final Plat request for a single-family residential development to be located in Outlot C of the Riverside Fields 3rd Addition. After reviewing the above referenced application, we have the following comments for the applicant and the planning department: General 1. Execution of a Developer's Agreement, which shall include provisions for security for public improvements within the Final Plat and the engineering review fees. 2. Payment of Trunk Sanitary Sewer Charges shall be made, as required by the most current City of Shakopee Fee Schedule. 3. Payment of Trunk Storm Water Charges and Trunk Storm Water Storage and Treatment Charges shall be made, as required by the most current City of Shakopee Fee Schedule. 4. The extension of sanitary sewer to temporarily serve the property generally located to the West of Riverside Fields shall require City Council approval. 5. No public improvements shall be constructed until the City Engineer and the Shakopee Public Utility Commission (SPUC) approve the Final Construction Plans and Specifications. 6. Provide electronic (Auto CAD) files ofthe Final Plat to the engineering department. C:\Docurnents and Settings\MNoble\Local Settings\Ternporary Internet Files\OLK9\Final.Plat.Review.Riverside.FieldsAth.#2 - Revised CDS,doc Page 1 of2 Final Plat 1. The applicant shall work with City staff to provide emergency access from the end of D\; (e Circle to Outlot B of Riverside Fields 3rd Addition. "$Wlich:t"'s'S 2. Easements shall be shown on the Final Plat as approved by the City Engineer. They shall include, but not be limited to, the following: . Provide a total of seventeen (17) feet of drainage and utility easement in the rear of Lot 5 of Block 1. 3. Simultaneous to the recording of the plat, a deed restriction shall be recorded on lots as designated by the City. The Deed Restriction shall appear as the following: This conveyance is made conditioned upon and subject to the following restriction. The Grantee, heirs, successors and assigns, are restricted from erecting any fence or other structure within the utility and drainage easements dedicated by plat over the above- described property, except with the prior written consent of the City of Shakopee. This restriction shall run in favor of and be enforceable by the City of Shakopee. Storm Water Mana2:ement Plan The applicant shall verify all items set forth by Todd Hubmer (WSB & Associates, Inc.) in his letter dated September 16,2004 have been adequately addressed. Recommendation Engineering staff recommends approval subject to the comments listed above being addressed by the applicant prior to recording ofthe Final Plat. C:\Docurnents and Settings\MNoble\Local Settings\Ternporary Internet Files\OLK9\FinaI.Plat.Review.Riverside.FieldsAth,#2 - Revised CDS.doc Page 2 of2 .. t\G-W \ ~\T i w..SB ~ & Associates, Illc. September 16, 2004 Mr. Joe Swentek City of Shakopee 129 Holmes Street S. Shakopee,MN 55379 Re: Riverside Fields 3rd Addition Review of Grading Plan and Storm Sewer System WSB Project No. 1281-76 Dear Mr. Swentek: We have reviewed the construction drawings and grading plan for the above-referenced project. In particular, we have reviewed the following plans related to this particular request: . Grading Construction Plans for Riverside Fields 3rd Addition development - dated 08/20/04, received 08/24/04. . Stormwater Management Plan, Riverside Fields 3rd Addition - dated 08/20/04, received 08/24/04. Based on our review of the final plans and calculations, we offer the following detailed comments related to this application: 1. Extend catch basin south on Rye Court to Station 3+50 to capture additional drainage discharging from the south. 2. The site appears to discharge into a flood prone area as identified in the City stonnwater management plan. Please reduce discharge from site to 0.1 cfs per acre for the 100-year 24-hour event. The hydrologic modeling infonnation for the project indicates that under proposed conditions, 24 acres will discharge into proposed north pond and off site to the northeast. 3. It is not clear from the information provided if wetlands are located on site. Please identify any delineated wetlands on grading plan. 4. Confinn invert elevation of 24-inch RCP located in northwest portion of site. Previous development plans in the vicinity identify invert elevation at 748.69. Please also confirm that the ultimate outlet for this development will be incorporated into the Blue 4150 Olson Lake watershed stoml sewer trunk system discharging to the west. Memorial Highway 5. Verify exfiltration rate used in hydrologic calculations for north pond. Suite 300 Minneapolis 6. Identify conveyanceway direction, capacity and ponding location for areas draining to Minnesota the south in the southeast comer of the proposed development. 55422 763.541.4800 7f'ii,541,1700 FAX Minneapolis' St. Cloud ' Equal Opportunity Employer F: \ WPWlNi I 281-76',09 / 504-bl,doc Mr. Joe Swentek September 16, 2004 Page 2 7. Widen emergency overflow located between Lots 33 and 34, Block 1, to 30 feet in width to allow 1: 1.5 sideslopes on spillway into north pond. 8. Identify hydraulic parameters for emergency overflow overtopping Crossings Boulevard at Station 18+50 and ultimately discharging into Proposed North Pond through drainage swale located between Rye Court and Switchgrass Court. 9. Confirm cumulative off site area discharging to catch basins 404 and 501/503. The detailed Micro drainage area map does not clearly identify all areas discharging to these structures. If you have any questions or items you wish to discuss, please contact me at (763) 287-7128. Sincerely, WSB & Associates, lltc. ~~ Todd Hubmer, P.E. /.<8- Water Resource Engineer cc: Bruce Loney, City of Shakopee Doug Stah1- Pioneer Engineering Jeff Weyandt, Pioneer Engineering Phil Belfiori - WSB & Associates, Inc. F:I WPW/NI/28/-76\09/504.bl.doc - CITY OF SHAKOPEE Memorandum TO: Mark Noble, Planner I FROM: Bruce Loney, Public Works Director SUBJECT: Approval of Riverside Fields 4th Addition Final Plat DATE: March 11, 2005 This memorandum is in regards to the extension of temporary sanitary sewer .from Riverside Fields 4th Addition to the proposed Riverside Bluffs plat. A request has been made by Ryland Homes to extend sanitary sewer to Riverside Bluff proposed plat to serve this site until the permanent sewer from the west can be installed. Attached is a map showing the sanitary sewer service districts in this area. Engineering staff has recommended that the extension of temporary sewer be denied since the permanent sewer may be available in a year or two. A temporary sewer extension can be provided with several conditions as follows: . Developer of Riverside Bluffs pays for the sewer extension and escrows funds for the future abandonment of the temporary sewer line. . Developer acknowledges that the extension of sewer from Riverside Fields 4~h Addition does not constitute any approval of any kind to Riverside Bluffs. . Developer enters into an agreement with the city for the additional operation and maintenance costs associated with the diversion of sewage to the Southbridge lift station with the developers agreement of Riverside Bluff. . Developer agrees that a connection. to the temporary sewer line cannot be done until the spring of 2006 assuming a preliminary plat approval of Riverside Bluffs. In my view, the proposed plat of Riverside Bluffs has several issues that need to be resolved before approval. These issues include the following: . CSAH 21 EIS . Relocation and design of Prior Lake outlet channel . Revised JP A between the City of Shakopee and Prior Lake-Spring Lake Watershed District for cost sharing of improved channel . Greenway corridor design in this area . CSAH 16 roadway improvements for access to plat . Revised wetland delineation in the spring of 2005 . Relocation of park from Riverside Fields With the number of issues associated with this plat and others nearby sites, in my opinion, this plat should not be approved until 2006 construction season. Also with the amotmt of work in progress such as Countryside development and the new Public Works building project and lots in inventory already, it would be difficult for staff to properly review and inspect this development in 2005. ill summary, staff did not recommend the temporary sanitary sewer line to Riverside Bluffs proposed plat for orderly extension of utilities and for growth management. If council wants to approve the temporary sanitary sewer line connection, it should be done with conditions outlined in this memo. ~?tI Public Works Drrector BL/pmp Riverside 4th addition RYLAND the Ryland Group, Inc. March 1,2005 7600 Executive Drive Eden Prairie, MN 55344 Controctor', Lie # 20035443 www.ryland.com Mayor and City Council Shakopee City Hall 129 South Holmes Street Shakopee, MN 55379 Re: Riverside Fields 4th Addition, conditions of Final Plat Honorable Mayor and City Council members: Riverside Fields 4th Addition Final Plat approval is before you this eyening for your approval. As part of the City Engineering staff comments on the plan, they have asked that the sewer cOIll1ection from this property, in Crossings Blvd. to property further west be eliminated. We respectfully request that the sewer connection be left in the approved plans for Riverside 4th Addition for the following reasons: 1) The original City Resolution for Riverside Fields and the current Resolution approving Riverside Fields 3rd Addition, require the connection. 2) Ryland Homes has an agreement with Mark Liesner,the property owner of the 46 acres west and adjacent to Riverside Fields, to develop the property as single family. a. Together with the property owner, we have been working with the City staff since last September in preparation of plans for a single-family neighborhood, in reliance upon this connection. b. Prior to the first of the year the City Engineering staff indicated that if there was sewer capacity for the Liesner property to be served temporarily to the east, it could be done. However, more recently, City staffhas indicated the City Council would make the determination whether the Liesner property could be served temporarily through Riverside Fields. 3) We have met withCentex Homes, and they have no objection to leaving the cOIll1ection in their plans. 4) The temporary connection supports the orderly and sequential single;.family development oftbis area of the City, also supported by the logical extension of: Crossings Blvd.; water mains; storm-water systems; park, trail, and open-space. S) The Liesner property is in an area of the City identified by the City Council as appropriate for current development. 6) The Liesners and Ryland Homes has been working with the PRAC and the EAC and designed a preliminary plat that: a. Conforms to all City Ordinances. b. Proposes a single:-family neighborhood of high-value homes comistent with City land-use wishes. c. Provides park and trail systems consistent with City standards. i. Ryland will dedicate additional developable easement area usable for parks and trails as a part of the approved plat. d. Completes a connection from existing Crossings Blvd. to County Road 16. Ryland Homes has appeared before the EAC twice and the PRAB and will be at the March 3 Planning Commission. We believe we have resolved all questions from the EAC and the PRAB and we hope to be to the City Council in March or early April. We ask that you leave the sewer connection in the Riverside Fields 4th Addition Final Plat approval and allow the temporary service of the Liesner property through Riverside 4th Addition. sEnger Mark Liesner Land Resources Manager Joel Liesner Ryland Homes Twin Cities Division Eagle Creek Blvd. Shakopee, MN CITY OF SHAKO PEE MEMORANDUM To: Mark Noble, Planning From: Mark Themig, Parks, Recreation, and Facilities Director Date: March 7,2005 Subject: Clarification on Letter from Chris Enger, Ryland Homes on Riverside Fields 4th Addition ' I wanted to comment on the letter that Chris Enger from Ryland Homes distributed at the March 1 City Council meeting, and correct one of his statements. In the second to last paragraph, Mr. Enger references the proposed Riverside Bluff development and states that: "Ryland Homes has appeared before the EAC and PRAB and will be at the March 3 Planning Commission meeting. We believe we have resolved all questions from the EAC and the PRAB and we hope to be to the City Council in March or early April." Ryland Homes presented their preliminary plat for Riverside Bluffs to the Environmental Advisory Committee on February 9. The EAC tabled action due to unresolved questions regarding the location of proposed greenway corridor. The EAC set a special workshop to discuss greenway corridor criteria for March 2, at which time they developed various considerations in identifying greenway corridors. The Parks and Recreation Advisory Board reviewed the Riverside Bluffs preliminary plat at their February 28 meeting and also tabled action on the plat, pending additional input from the EAC on potential greenway corridors, and how those corridors relate to park needs. Mr. Enger's statementthat all questions have been resolved is not true. The EAC is scheduled to continue the discussion on March 9, and the PRAB will continue discussion on March 28. Depending on the outcome of these meetings, there may be a recommendation for the Planning Commission in time for their April 7 meeting. Please let me know if you have any questions. · .R E eEl \I E D APR 0 7 2005 k RIVE R SID E FIE L D S 4 TH ADD I TI 0 N KNOW ALL PERSONS BY THESE PRESENTS: That Cent.. Hom... a Nevada general portnenhlp. ~i ~.Fl,.. - - T - - - - -l ~:::r.. ~~ ~ following described property lIluoted In tho County 01 Scott. Slot. of I I CluUot e. RMRSIOE RELDS 3RD AOOlnON. oc:ccrdlng to the recorded plot thereof. Scott County. .,~ .\ , ~ Minnesota. ...e. I,..t I I Has causod tho sarno to be .......~ ...d plotted as RIVERSIDE RELDS 4TH ADDlnQN and _ Ym' "1" A I I hereby dedicote to the public fot pubnc use farever the Court. and C!rcIeo ond also dedicot.. the r~r-~::~\~-+----- --1 easements 01 shown on thr. plot for drctlnCJO'l ond utmty purpog.es on)~ : : : In witness whereof aold CenteK Homes. a Nevada general partnership. hoa caused these presents I '"'UI ,,' A I ....r;:"'..,.. I to be.ttlgned by Cent.. Real Estate CorporoUon. a Nevada corparatton, Its manoglng general :::.. I ,..t ~'- I,..t portner this _ da)' of 20_ : : : BY: Cenlex RooI Estoto Corponrtlon L _ _ _ _ _ -L _ _ _ _ _ .J _ Its: Managing Gooorol Portn... r~ I B~ SECll0N 13, '!\\P. 115, RGE. 22 I ::-:: I f"\ Scott J. Rlcht.... OMolon ~t ~OO~ ~ I U NO SCAlE _ STAlE OF ....) COUNTY OF 'The foregoing instrument WOI acknowledged before me this _ do)' of 2D~ by Scott J. Rlcht.... OMolon ProoIdont, on behalf 01 Cent.. RooI E&loto Corporation. a Newdo corporation. Its managing general portn.. of Centex Hames" 0 Nevada gen...oI partnership. Notary Public County, My Cornmlnlon Explroa 63 I hereby certify thot I how surve~ ...d plotted tho property described on this plot os RI\'EIlSlOE RELDS 4TH ADDInON, thot thl. plot Is a _ repr.....tation 01 th. _ !hot - - - - - - - - - all distances ore correctly shown on the plat In feet and hundreclth. of 0 foot: that all S89,?,OWE ;.:'=~ ::est;;:t=-~e:r ~:C::~th::~ :::,.~ c:.'::yb:es= ~o;:. In plot; and that there ore no wetlands os defined In "'innesoto Statutes. Section 505.04 Subd. 1. or public hlghwo,. to be designated other than al shown. 64 John C. Lorson, Prol_oI lAnd Surw)'Ol' "'lmesota Ucense No. 19828 STAlE OF lIINNESOTA COUNTY OF Th, foregoing SuMyor.. CertIficate was odcnowtedged before me thls _ day of 20 ~ by John C. Larson. Professlonaf Land Surveyor. MInnesota Ucen.. No. 19828 Notary PubIlc County, Minnesota My Comm_ Explroa o ~ CITY A TlORNEY. CITY OF SHAKOPEE. MINNESOTA I hereby cortIIy thot I how """",lned this plot 01 RIVERSIDE FIELDS 4TH ADDInQN ond do hereby recommend this plat for approval os to form thIs _ day of 2D~ 8 CIty Attorney. Shokopee. Minnesota "*' g ~ CITY COUNCIL. CITY OF SHAKOPEE. MINNESOTA DO 10 this plot of RIVERSIDE FInDS 47H ADDfllON w.. opproYed and accepted by the City Councl V of tho CIty of Shakopee. Minnesota. ot Q regular m"tlng thereof held this _ day of 20__ ond pursuont to ....5.A. 505.03. sub. 2. we ore In conformance. 2 ~ ~ ~ SCOtT COUNTY SURVEYOR I ~ I Pursuont to ......nesoto Statutes. Olapter .389.09. SUbd. t. os amended,. thls plat hot been ... 17 r I r S89'50'37"W ._ed and _owd this day 01 2D ~ ~ Ii! I 4 I~ 81D r\ By: ~ 0 I llil V' ' ~ ~ on l!l~~'~~ _1~,~ J :..1... ~ Scott County Surveyor ;o!'l r I ~/~:;: SCOtT COUNTY AUDlTOR/TREASURER ~ g: 8 I 3 18 !2':::~ I hereby cortIIy that the current ond delinquent tox.. on tho lands deso1bed within .... paid and ~ b g I Ig , ~/J: the transfer Is entered thfa _ doy of 20_ ~ ~ 1!!81.'5.!!:3.rt.. _ g,0:!!,0 J.:..L. - _ _ I ~ _ - I 60 30 D 60 SIgned by Deputy ,r I rS89'50'37"W _ ~ I ',_ l:! I 2 Iii! 8/ 22 ,/ SCOtT COUNTY RECORDER ~ lil I llil ' 476B ,-f I Scale in Feet 1!!81.'5.!!:JIIL _ g,O:!!'OJ 6-01'59'28"<-4 I I hereby certlfy that this plat ... filed In this olllce this _ dor 01 -J\ ~ 20 ~ at _ o.dock _ ... os Document No. r I r S89'50';srW 11974--" t26.78 I "I 8 I 1 r-'8 30 30 I ' L~ S89'50';srW 128,4t '''0 I ."1 I '...) I lil ... ....,.. Scott County Recorder lli tri.1 30 I 30 46 ql;t; 30 30 r ~71 \00 I ~I I Inl... I g L_______J L_______~ z 120,90 30,00 30,00 119,33 30, 0 30,00 125,21 30,00 30,00 _ _ BEARINGS ARE BASED ON M:ST LINE OF THE NORTHM:ST I N89"50'37-E 91526 OUARlER OF SEC, 13, nw>, 115. RGE, 22 WHICH IS ASSUMED I . TO HAVE A BEARING OF SOO'09'23'E. ~ I '" " i:> ^ _ _ , " " ~ ^ ,., I ,..." ^ -) '"' '" DRAINAGE AND UTILITY ...:" J '" v I \ v.::.:: I " " ~ D v U L. C. v n r\ U '" EASEMENTS ARE SHOWN THUS: 0 DENOTES 'Ill INCH BY '4 INCH IRON MONUMENT ~~""'S.. I I SET AND ARKED BY LICENSE NUMBER 19828, "g F- - - - - - - - - - - - 5-1 . DENOlES FOUNO IRON MONUMENT, z I Wl/4COR,SECI3 T j 60 I j 60 I II I TWP, 115, RGE.:22 . NO MONUMENT SYMBOl SHOWN AT ANY STATUlE , J,. ,- (FHO SCOTT CO, C,I.M,) . (() (() e I 1--51 e REOUIRED LOCAnON, INDICAlES A PLAT \ ,/' (,') (,') L J MONUMENT THAT Will. BE SET ACCORDING TO <( <( _____ ___..J L_____ ___ MINNESOTA STATUTES AND WHICH SHAll. BE IN " I C)I\ lr-e)~II""'\. .1.1 1""'\::-", I I ~ I'" PLACE WITHIN ONE. YEAR OF THE FJUNG or THE I I I \1 V '-I \...)ll.Ic.. .- IL...L.U""'" eH\ IC""C:>C::II""'\C"" 9~ hd C"IC"I r"'\~ ')1\'1""\ I IL ~d I ^ ......"ITIA...I PLAT. SAID MONUMENTS SHALL BE 1/2 INCH X ~ J I \1 V LI '_ItJL ....'" 4~ I IL-L.LI..,) "-I ~LI C) c::~ "LILli I lvl... . 14 INCH IRON MONUMENTS MARKED BY UCENSE :;;~"S... ~ST ADDIT:G~~ :::: <( :::: <( BEING 5 FEET IN W1DlH, AND ADJOINING SIDE NUMBER 19828, gill r () --' () --' LOT LINES UNLESS OlHERWlSE INDICATED. AND l!lg . I I t: I I ~- I 10 FEET IN W1DlH AND ADJOINING SlREET lJ) : :: : > LINES AND REAR LOT LINES UNLESS OlHERWlSE \~__"~:~~.S~&'b e;) e:l INDICATED ON lHE PLAT. r!.!~~~~~~2! ~ ; RIVERSIDE FIELDS 4TH ADDITION HErEI WED APR o '( 2aos - - - AREA SKETCH AREA SUMMARY TOTAL LOT AREA = 12.4337 acres TOTAL RIGHT-OF-WAY AREA = 2.7335 acres TOTAL AREA = 15.1672 acres 61 12,413 sq.fL 64 13.740 aq,fL 36 7.518 sq.fL 13 10.009 oq.fL I- ~ 0 14 () 7 9.112 sq.fL l8 6.244 sq.fL ~ 6 13 6.059 aq,fL 15 is 7.686 sq.fL f;;;;. ~ CI) 5 16 6,045 sq.fL 7.192 sq.fL 4 I- 17 6,045 aq,fL 0:: ::::> 0 6.681 aq,ft. U 3 ~ 48 72 6.045 aq,ft. 18 6.036 aq.ft. 0:: 6.173 aq,fL 6.506 sq.ft. 2 19 22 44 73 6.045 aq,fL 47 6.366 aq,ft. 5,967 aq,ft. 6.486 sq.ft. 6.552 oq,fL 6.717 oq.ft. 1 20 21 45 46 74 7.859 aq,fL 7.222 aq.ft. 7.683 sq.fL 7.458 sq.fL 7.404 sq.ft. 8.008 sq.ft. PIaNEERengineering CMLENGINEERS LANDPl.ANNER$. LANOSURVEYORS UNDSCAPEAACHrmCTS