Loading...
HomeMy WebLinkAbout14.D.Preliminary Plat of Riverside Bluffs-Res. No. 6243 '~ I~. D" CITY OF SHAKOPEE Memorandum CASE NO.: 05-030 TO: Honorable Mayor and City Council Mark McNeill, City Administrator FROM: Mark Noble, Planner I SUBJECT: Preliminary Plat of Riverside Bluffs MEETING DATE: May 17, 2005 REVIEW PERIOD: January 21,2005 - May 20,2005 INTRODUCTION: Ryland Homes has submitted an application for preliminary plat approval of Riverside Bluffs, proposed for property north of Eagle Creek Blvd. and west of Riverside Fields. The plat, as currently proposed, contemplates the construction of 101 single family homes on 57 acres. Access to this development is shown from Eagle Creek Blvd. and from Crossings Blvd. (from the East), with future connections proposed to tie in with the development to the west. DISCUSSION: There has been a substantial amount of discussion concerning park land and trails, the configuration of the Prior Lake Spring Lake Channel, compliance with the Shoreland Overlay Zone, access off Eagle Creek Blvd., the proposed greenway corridor, wetland mitigation and sanitary sewer service connection. Attached to this document is the report that was provided to the Planning Commission. Included in that report are summary statements from a number of the reviewing agencies as well as their complete memorandums/letters. Staff requested that this developer meet with the developers of the two adjacent developments to address a number ofthe issues and to consolidate their plans in an attempt to ensure there is some level of consistency in the elements that are common to their developments. Staff did meet recently with those developers to review their latest changes. It was noted that there has been some progress; however, there remain a significant number of details that still need to be addressed before staff is comfortable with determining the projects are ready to move forward. In addition to the report to the Planning Commission, staff have received a letter from Mark Themig, which addresses the status of the recommendations made by the Park and Recreation Advisory Board and the Environmental Advisory Committee, and a letter and updated plat drawing from the developer of this project. These documents are also included for the Council's information. FINDINGS: City Code Chapter 12, Subdivision Regulations, Section 12.08, Subd. 3.B. sets forth the factors that the Planning Commission and City Council are to take into account in making a decision on their ,. . recommendation regarding approval or denial of a preliminary plat. These factors are set forth below, along with proposed draft findings related to those factors. a. Whether the layout of streets, lots, utilities, and public improvements and their relation to the topography of the land, reflect good planning and development for the City; Finding A: It has been determined that there are significant issues that pertain to the layout of this development, as noted below: . The City's sewer plan contemplates that the Riverside Bluffs property would be served by sanitary sewer extended from the Prior Lake Interceptor to the west, through the former Eagle Creek Stables property, and then to the south to serve the areas on the south side of CR 16. The final design and installation of this sewer has not yet occurred; therefore, the developer would like to move forward with a temporary sewer service, which is not the preferred scenario as it could possibly lead to serious ramifications if it is installed incorrectly, and that it would create unnecessary utility congestion within Crossings Boulevard and would require additional congestion to abandon the temporary sanitary sewer at a later date. If approved, the city would require that the developer be responsible for all costs of installation, maintenance, escrows funds for the future abandonment of the temporary sewer line, and future removal of the connection, additional operation and maintenance costs associated with the diversion of sewage to the Southbridge lift station with the developer's agreement of Riverside Bluffs, and that there is a clear understanding that service to the south will only become available once the Prior Lake Interceptor connection is made. . The temporary sewer is shown connecting to the proposed Riverside Fields 4th Addition system at the intersection of Crossings Boulevard and Rye Court. Once the proposed trunk sanitary sewer from the Prior Lake Interceptor located to the West is . extended to the Riverside Bluffs plat boundary, the temporary system will be abandoned and rerouted. The applicant should be required to enter into an agreement with the Riverside Fields 4th Addition property owner for the installation of the temporary sanitary sewer. The applicant should also be required to enter into a reimbursement agreement with the City for the abandonment of the temporary sanitary sewer and be required to work with the City to develop an acceptable plan for this temporary service, its abandonment and its rerouting to a permanent system. . The applicant shall meet park dedication requirements by providing park land and the greenway corridor as generally shown on the preliminary plat. Final park land design/dedication calculations have not yet occurred. . CenterPoint Energy objects to the plans as proposed and will only remove their objection if the issues addressing the transmission pipeline easement are corrected. . The applicant shall modify all preliminary street profiles not in compliance with the City's minimum design speeds as designated. . Adequate drainage and utility easements shall be provided along the top and the bottom of all proposed retaining walls. Retaining walls shall not. be located within drainage and utility easements. . Approval of the proposed park area is contingent on additional work with the applicant, the Engineering Department, the Prior Lake-Spring Lake Watershed District, and the adjacent developer to determine the feasibility of relocating the channel, as well as the impact of leaving the channel as proposed in the drawing. . Approval of the proposed park area IS contingent on additional documentation related to wetlands and the channel water flow design. Wetlands or areas that would be flooded would not qualify for park dedication credit. . Requirements in the Shoreland Overlay Zone ordinance should be thoroughly researched and strictly enforced~ . Mitigation of sound and sightlines from future County Road 21 and a future expanded County Road 16 need to be part of the design considerations. . The city should research the feasibility of relocating the channel further to the south in order to help provide the contiguous park and greenway. b. Whether the subdivision preserves the site's important existing natural features; Finding B: A final determination has not been made regarding issues as they pertain to the significant natural features located on this property, which include wetlands, the Prior Lake Spring Lake outlet channel, woodlands and bluff land. The following are examples of outstanding issues: . A revised JP A between the City of Shakopee and Prior Lake-Spring Lake Watershed District for cost sharing of improved channel has not been finalized. . The final design and guidelines for the Greenway Corridor in this area have not been approved. . Site design, as it pertains to the planting plan and the woodland managementplan, is not consistent with the City's requirements. c. Whether the proposed plat will facilitate the use and future development of the adjoining lands; Finding C: There remain unresolved issues that concern the use and development of the adjoining lands,. as noted below: . The CSAH 21 EIS is still under review and may impact the development ofthis project. . The final design and relocation of the Prior Lake Spring Lake outlet channel has not been determined. . The applicant must meet the city's woodland management ordinance requirements. . In order for the greenway corridor to qualify for park dedication, the EAC concurred with the PRAB's thoughts that it must serve some recreational value, such as a trail corridor. . . The greenway corridor should be designed in such a way that it helps enhance a contiguous park area. . The applicant shall be required to construct the recreational trail shown on the plat. . Connecting sidewalks shall be provided throughout the development. d. Whether the subdivision can be economically served with streets, public services, and utilities; Finding D: There remain design issues that must be addressed, asfollows: . Minimum right-of-way dedication for County Road 16 shall be 75 feet from centerline, that the proposed road onto County Road 16 shall require left and right turn lanes to be constructed on County Road 16, and that the proposed pond along future CSAH 21 shall be designed and permitted consistent with the County's requirements. . The proposed extension of Crossings Boulevard to the western plat boundary does not align with previous submittals of the adjacent property owner to the West. Coordination of this alignment as it relates to the proposed alignment of the Prior Lake Outlet Channel resulting from the previously mentioned analysis will be required between the City of Shakopee, the applicant and properties to the West. . Any change in drainage entering the County right-of-way requires detailed stormwater calculations to be submitted to the County engineer for review and approval. . The proposed road onto CSAH 16 shall require left and right turn lanes to be constructed on CSAH 16 to County standards. . The development is proposing a pond in part of the County right-of-way for CSAH 21. The pond would also need to provide a stormwater benefit to CSAH 21 in order for it to be located in the right-of-way. A permit shall be required for the construction of the pond in the County right of way. . A revised plat shall be submitted that shows a connection to the land east of this development, which complies with the City Engineering design criteria. e. Whether all applicable provisions of the City Code are met; and Finding E: A number of performance and design guidelines remain unresolved, including the following: . A design identifying two independent water sources that are then looped together shall be provided, consistent with Shakopee Public Utilities Commission guidelines. . The city is working on a detailed proposal from its storm water consultant to develop a storm water model of the Prior Lake Outlet Channel from County Road 16 to Dean Lake in order to define the flood profile. The applicant previously indicated they would pay for this study to determine ,L._,. acceptable low floor/minimum building opening elevations - this issue remains unresolved. . The previously mentioned analysis is being performed to provide the level of detail necessary to define the design criteria for improvements to the Prior Lake Outlet Channel that would be required of properties proposing to develop downstream of County Road 16. The information resulting from the study will be utilized by the City, the County, the Prior Lake - Spring Lake Watershed District and future developing properties to specifically outline the proposed alignment of the channel, the future crossings of the channel and recommendations for low floor/minimum building opening elevations for these downstream properties. Results of this analysis could change the preliminary plat. . The applicant submitted a wetland delineation report dated November 22, 2004 to the City of Shakopee and to the Scott Soil and Water Conservation District. Review ofthe report resulted in a determination the delineation was performed outside of the accepted growing season, the delineation was not consistent with an approved delineation of the adjacent property to the East and no mitigation plan for proposed wetland impacts was submitted for review. As of this date, no additional information has been provided. Results of an updated delineation performed within the growing season could result in a change to the preliminary plat. . Scott Soil and Water Conservation District reviewed the submitted wetland delineation report, noting that there are a number of discrepancies and that new wetland delineation and supporting documentation are required in order to provide a determination prior to any proposed wetland drain, excavation or fill activities. . The applicant shall obtain the appropriate Wetland Conservation Act (WCA) permits and approvals for all proposed wetland impacts. . A storm water infiltration system, if required, providing pretreatment of storm water runoff prior to infiltration shall be submitted to the City for review and approval. . The applicant shall work with City staff to eliminate or minimize drainage over proposed retaining walls. f. Whether the subdivision is in conformance with any official map of the City and the Comprehensive Plan. Finding F: As submitted, the development is proposed as a single-family development, which is consistent with the approved comprehensive plan (Single Family guiding) and the zoning (R-1B, Urban Residential Zone). STAFF RECOMMENDATION: As detailed above and in the attached memorandums/letters, it is clear that a number of issues have not been completely resolved. The applicant and staff have had a number of meetings to address these is!:mes; 110wever, a final determination on a number of them remains unresolved. The review deadline for this preliminary plat application is May 20th. Without an extension from the applicant, the Council must act on this item at their May 17th Council meeting. Based on the number and/or significance of the unresolved issues, staff recommends that the Council deny the request. However; should the Council approve the request, they should provide direction to staff in the preparation of a resolution approving the plat application. PLANNING COMMISSION RECOMMENDATION: At its May 5,2005 meeting, the Planning Commission recommended (by a 7-0 vote) that the City Council deny the Preliminary Plat. The Commission had a very thorough and detailed discussion on this plat, spending a considerable amount of time discussing the number of significant and outstanding issues, noting that these issues should be resolved prior to any approval of the plat. A copy ofthe report to the Planning Commission has been attached for the Council's reference. ALTERNATIVES: 1. Approve Resolution No. 6243, a resolution denying the Preliminary Plat for Riverside Bluffs. 2. Approve Resolution No. 6243 with revised findings. 3. Approve the requested preliminary plat of Riverside Bluffs, and direct staff to prepare a resolution consistent with that action, and secure approval of an extension of the review period from the applicant in order to prepare the resolution for Council action. ACTION REQUESTED: Offer a motion to approve Resolution No. 6243, a resolution denying the Preliminary Plat for Riverside Bluffs, and move its adoption. g:\CC\2005\05-17\ppriverside bluffs.doc RESOLUTION NO. 6243 A RESOLUTION OF THE CITY OF SHAKOPEE, MINNESOTA DENYING THE PRELIMINARY PLAT OF RIVERSIDE BLUFFS WHEREAS, Ryland Homes, applicant, and Mark and Joel Liesener, property owners, have made application for preliminary plat approval of Riverside Bluffs; and WHEREAS, the subject property is legally described as: See Exhibit 1 (attached), and WHEREAS, the Shakopee Planning Commission conducted public hearings on the preliminary plat on March 7, April 7, and April 21, 2005; and WHEREAS, all required public notices regarding the public hearing were posted and sent; and WHEREAS, the Shakopee Planning Commission has recommended denial of the requested preliminary plat; and WHEREAS, the City Council reviewed the preliminary plat request at its meeting of May 17,2005. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKO PEE, MINNESOTA, that it adopts the following findings of fact relative to the requested preliminary plat: Finding A: It has been determined that there are significant. issues that pertain to the layout of lots, streets, utilities and public improvements in this development, as noted below: . The City's sewer plan contemplates that the Riverside Bluffs property would be served by sanitary sewer extended from the Prior Lake Interceptor to the west, through the former Eagle Creek Stables property, and then to the south to serve the areas on the south side of CR 16. The final design and installation of this sewer has not yet occurred; therefore, the developer would like to move forward with a temporary sewer service, which is not the preferred scenario as it could possibly lead to serious ramifications if it is installed incorrectly, and that it would create unnecessary utility congestion within Crossings Boulevard and would require additional congestion to abandon the temporary sanitary sewer at a later date. If approved, the city would require that the developer be responsible for all costs of installation, maintenance, escrows funds for the future abandonment of the temporary sewer line, and future removal of the connection, additional operation and maintenance costs associated with the diversion of sewage to the Southbridge lift station with the developer's agreement of Riverside Bluffs, and that there is a clear understanding that service to the south will only become available once the Prior Lake Interceptor connection is made. . The temporary sewer is shown connecting to the proposed Riverside Fields 4th Addition system at the intersection of Crossings Boulevard and Rye Court. Once the proposed trunk sanitary sewer from the Prior Lake Interceptor located to the West is extended to the Riverside Bluffs plat boundary, the temporary system will be abandoned and rerouted. The applicant should be required to enter into an agreement with the Riverside Fields 4th Addition property owner for the installation of the temporary sanitary sewer. The applicant should also be required to enter into a reimbursement agreement with the City for the abandonment of the temporary sanitary sewer and be required to work with the City to develop an acceptable plan for this temporary service, its abandonment and its rerouting to a permanent system. . The applicant shall meet park dedication requirements by providing park land and the greenway corridor as generally shown on the preliminary plat. Final park land design/dedication calculations have not yet occurred. . Center Point Energy objects to the plans as proposed and will only remove their objection if the issues addressing the transmission pipeline easement are corrected. . The applicant shall modify all preliminary street profiles not in compliance with the City's minimum design speeds as designated. . Adequate drainage and utility easements shall be provided along the top and the bottom of all proposed retaining walls. Retaining walls shall not be located within drainage and utility easements. . Approval of the proposed park area is contingent on additional work with the applicant, the Engineering Department, the Prior Lake-Spring Lake Watershed District, and the adjacent developer to determine thefeasibility of relocating the channel, as well as the impact of leaving the channel as proposed in the drawing. . Approval of the proposed park area IS contingent on additional documentation related to wetlands and the channel water flow design. Wetlands or areas that would be flooded would not qualify for park dedication credit. . Requirements in the Shoreland Overlay Zone ordinance should be thoroughly researched and strictly enforced. . Mitigation of sound and sightlines from future County Road 21 and a future expanded County Road 16 need to be part of the design considerations. . The city should research the feasibility of relocating the channel further to the south in order to help provide the contiguous park and greenway. Finding B: A final determination has not been made regarding issues as they pertain to the significant natural features located on this property, which include wetlands, the Prior Lake Spring Lake outlet channel, woodlands and bluff land. The following are examples of outstanding issues: . A revised JP A between the City of Shakopee and Prior Lake-Spring Lake Watershed District for cost sharing of improved channel has not been finalized. . The final design and guidelines for the Greenway Corridor in this area have not been approved. . Site design, as it pertains to the planting plan and the woodland management plan, is not consistent with the City's requirements. Finding C: There remain unresolved issues that concern the use and development of the adjoining lands, as noted below: . The CSAH 21 EIS is still under review and may impact the development of this project. . The final design and relocation of the Prior Lake Spring Lake outlet channel has not been determined. . The applicant must meet the city's woodland management ordinance requirements. . In order for the greenway corridor to qualify for park dedication, the EAC concurred with the PRAB's thoughts that it must serve some recreational value, such asa trail corridor. . The greenway corridor should be designed in such a way that it helps enhance a contiguous park area. . The applicant shall be required to construct the recreational trail shown on the plat. . Connecting sidewalks shall be provided throughout the development. Finding D: There remain design issues concerning streets, public services, and utilities that must be addressed, as follows: . Minimum right-of-way dedication for County Road 16 shall be 7S feet from centerline, that the proposed road onto County Road 16 shall require left and right turn lanes to be constructed on County Road 16, and that the proposed pond along future CSAH 21 shall. be designed and permitted consistent with the County's requirements. . The proposed extension of Crossings Boulevard to the western plat boundary does not align with previous submittals of the adjacent property owner to the West. Coordination of this alignment as it relates to the proposed alignment of the Prior Lake Outlet Channel resulting from the previously mentioned analysis will be required between the City of Shakopee, the applicant and properties to the West. . Any change in drainage entering the County right-of-way requires detailed stormwater calculations to be submitted to the County engineer for review and approval. . The proposed road onto CSAH 16 shall require left and right turn lanes to be constructed on CSAH 16 to County standards. . The development is proposing a pond in part of the County right-of-way for CSAH 21. The pond would also need to provide a stormwater benefit to CSAH 21 in order for it to be located in the right-of-way. A permit shall be required for the construction of the pond in the County right of way. . A revised plat shall be submitted that shows a connection to the land east of this development, which complies with the City Engineering design criteria. Finding E: A. number of performance and design guidelines of the City Code remain unresolved, including the following: . A design identifying two independent water sources that are then looped together shall be provided, consistent with Shakopee Public Utilities Commission guidelines. . The city is working on a detailed proposal from its storm water consultant to develop a storm water model of the Prior Lake Outlet Channel from County Road 16 to Dean Lake in order to define the flood profile. The applicant previously indicated they would pay for this study to determine acceptable low floor/minimum building opening elevations - this issue remains unresolved. . The previously mentioned analysis is being performed to provide the level of detail necessary to define the design criteria for improvements to the Prior Lake Outlet Channel that would be required of properties proposing to develop downstream of County Road 16. The information resulting from the study will be utilized by the City, the County, the Prior Lake - Spring Lake Watershed District and future developing properties to specifically outline the proposed alignment of the channel, the future crossings of the channel and recommendations for low floor/minimum building opening elevations for these downstream properties. Results of this analysis could change the preliminary plat. . The applicant submitted a wetland delineation report dated November 22, 2004 to the City of Shakopee and to the Scott Soil and Water Conservation District. Review of the report resulted in a determination the delineation was performed outside of the accepted growing season, the delineation was not consistent with an approved delineation of the adjacent property to the East and no mitigation plan for proposed wetland impacts was submitted for review. As of this date, no additional information has been provided. Results of an updated delineation performed within the growing season could result in a change to the preliminary plat. . Scott Soil and Water Conservation District reviewed the submitted wetland delineation report, noting that there are a number of discrepancies and that new wetland delineation and supporting documentation are required in order to provide a determination prior to any proposed wetland drain, excavation or fill activities. . The applicant shall obtain the appropriate Wetland Conservation Act (WCA) permits and approvals for all proposed wetland impacts. . . A storm water infiltration system, if required, providing pretreatment of storm water runoff prior to infiltration shall be submitted to the City for review and approval. . The applicant shall work with City staff to eliminate or minimize drainage over proposed retaining walls. Finding F: As submitted, the development is proposed as a single-family development, which is consistent with the approved comprehensive plan (Single Family guiding) and the zoning (R-1B, Urban Residential Zone). BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA, that Ryland Homes request for preliminary plat approval of Riverside Bluffs is hereby denied: Adopted in session of the City Council of the City of Shakopee, Minnesota, held this _ day of . 2005. Mayor of the City of Shakopee ATTEST: City Clerk .. ~)(+f \f)(I :L ~e:~k__.._~~\~ ------.. Parcell The Bast 250 feet ofth~ Sd1}.theast Quar~er of the Northeast Quarter of Section 14, .' Township 115, Range 22, Scott County, Minnesota, Parcel 2 '. The East 190 ~eet of that part of the' East Half of the Southeast Quarter of Secti~n 14, Township 115, Range 22, Scott County, Minnesota, lying northerly of the centerline of Scott County Hlghway No. 16. AND The West 60 feet of the Bast 250 feet that part of the East Half of the Southeast Quarter of Section 14, Township ,115, Range 22, Sco.tt County, Minnesota, Jying. . northerly of the centerlIne of Scott County Highway No, 16. ' . Pal'ce13 . , , , , . . . . - .' The West 341.75 feet of the East 591.75 feet of the Southeast Quarter of the Northeast Quarter of Section 14, Township .115, Range 22, Scott County, Minnesota', . Parcel 4 The West 341.75 feet of the Bast 591.75 feet of the East Half of the SontheB:st Quarter of Section 14, Township 115, Range 22, Scott County, Minnesota, lying northerly of the centerline of County Road No. 16, 'Except that part desoribed as follows: Commencing at the northeast comer of said East Half of the Southeast . Quarter; thence South along the east line of said East Half of the Southeast Quarter a distance of 1167 f 10 feet to the centerline of of Scott County Highway No, 16; thence deflecting to the right 101 degrees 25 minutes 30 seconds along said centerline a distance of255.05 feetto the intersection with the East 250 feet of the said East Half of the Southeast Quarter, being the point of beginning; thence continuing. westerly along said centerline a distance of200.0 'feet; thence North parallel with the east line of said East Half of the Southeast Q~arter a distat?-ce of. 444.40 feet; thence Easterly to a point in the west line of the East 250 feet of said East Half of the Southeast Quarter said point being 444.40 feet North of the point of beginning; thence South along the west line of the East 250.0 feet of said East Half of the Southeast Quarter a distance of 444.40 feet to the point of beginning, . " ~+l\1O\"" 1- o. Parcel 5 -- .. that part o{the East Half of thy Southeast Quarter of Section 14, Township 115, Range 22, Scott County, Minnesota, lying northerly of the centerline of Scott County Highway No. 16, Except the northerly 350.00 feet as measured at right angles and Except the easterly 591.75 feet as ll1easured at right angles. . Parcel 6 . The Northerly 350.00 feet, as measured at right angles, of the East Half of the Southeast Quarter of Section 14, Township 115, Range 22, Scott County, Minnesota, except the easterly 591.75 feet, as measured at right angles. . Parcel 7 That part of the East Half of the Southeast Quarter of Section 14, Township 115, Range 22, Scott County, MinnesQta,.described as follows:. " Commencing at the northeast corner of said East Half of the Southeast Quarter; thence South along the east line of said East Half of the Southeast Quarter a , distance of 1167.10 feet to"the centedineof of Scott County Highway No. 16; thence deflecting to the rightlOl degrees 2S minutes 30 seconds along said centerline a distance of255.05 feet to the intersection with the East 250 feet of the said East Half of the Southeast Quarter, being the point of beginning; thence continuing westerly along said centerline a distance of200.0 feet; thence North parallel with the east line of said East Half of the Southeast Quarter a distance of 444.40 feet; thence Easterly to a point in the west line of the East 250 feet of said' East Half of the Southeast Quarter said point being 444.40 feet North of the point ofbegimring; thence South along the west line of the East 250.0 feet of said East Half of the Southeast Quarter a distance of 444.40 feet to ~he' point of~eginning: , , CITY OF SHAKO PEE MEMORANDUM To: Mark Noble, Project Manager From: Mark Themig, Parks, Recreation, and Facilities Director Date: May 4, 2005 Subject: Riverside Bluffs Preliminary Plat Status INTRODUCTION I am writing to provide you with additional comments on the status of approval conditions for the Riverside Bluffs development. Unfortunately, I am not able to attend the Planning Commission due to a previously scheduled referendum pUblic information meeting. DISCUSSION The Park and Recreation Advisory Board's preliminary plat recommendations for the Riverside Bluffs development contained specific conditions that the approval was contingent on additional work related to the alignment of the channel and wetland documentation. In addition, there was consensus that the amount of active park land needed for the overall area (CR18 to Dean Lake) was 8-10 acres, which would require additional land from the adjoining development to the west (Noecker). City staff called a meeting with the two developers on April 5 to initiate dialog about the channel alignment and park area. During this meeting, we discussed several options for the channel alignment and size of the park. The direction that the developers were given was to relocate the channel to the west and provide 8-10 acres of park land that could be developed into an active park. Last week's submission of a preliminary plat application for the development to the west (Noecker) shows the channel being realigned. However, the Noecker alignment does not match the Riverside Bluff's alignment, nor does the proposed plat provide the amount of park land that is desired. (Mr. Noecker provided me a copy of a hand drawingafter the April 5 meeting that showed wetland/ponding areas in Riverside Bluffs' plat being used as park area to reach the 8-10 acres.) In addition to the channel alignment and park land issues, the recommended approval for Riverside Bluffs stated. that the applicant needed to provide additional documentation related to wetlands and the channel water flow design in order to calculate the actual amount of active park land that Riverside Bluffs is providing. As of today, we have not received this information. City staff initiated meetings with developers in the area and local agencies (Scott County, Prior Lake-Spring Lake Watershed District, Shakopee Public Utilities) as far back as December 2004 to encourage the developers to work together and bring forward a unified plan for the area. Although Mr. Sullivan has worked diligently to prepare plans that attempt to address park and greenway issues, the plan is not unified and significant unresolved questions remain. I should also note that the Environmental Advisory Committee made a recommendation to City Council that the city conduct an AUAR for approximately 2,000 acres south and east of Dean Lake, including the Riverside Bluffs development. That recommendation will be going to City Council at their May 17 meeting. J would concur with your recommendation that the application should be denied and the developer directed to go back and work with the other developers in the area to provide the city with a unified development plan. 05/12/2005 10:07 FAX 9522266024 RYLAND HOMES @002 RYLAND HOMES Memo To: City of Shakopee City Council Cc: City Staff Fmm: Brian Sullivan (;.S Date: 5/12/05 Re: Riverside Bluffs Preliminary Plat Submission Ryland Homes has been working diligently with City Staff and the developers of the property to the west of Riverside Bluffs to identify and coordinate issues that are common to all plats. In addition Ryland has resolved all issues that staff has indicated are pertinent to our plat. Prior Lake Channel: .. The Prior. Lake Spring Lake Watershed district (PLSLWD) along with the Environmental Advisory Committee has stated that their goals are to redesign the channel to create a natural stream. The redesign would include a more sinuous alignment and a stable stream banK to promote better water quality, wildlife habitat and aesthetic value. Ryland wholeheartedly agrees with this philosophy and has prepared a design that meets these goals. Ryland will undertake the grading and stabilization of the channel through our property. The channel's course has been designed as directed by City staff to tie into the Noecker development to the west. Ryland will continue to work with City staff and the PLSLWD on the final details. This allows the City Staff the most flexibility in the design of park and greenway throughout the area. It is understood that the PLS/..WD will not undertake the redesign of the channel until after the Preliminary Plat for Riverside Bluffs has been approved. II On April12lh Ryland met with City Staff. the City's consultant, WSB, and the PLSLWD. City staff has directed WSB to prepare a proposal to prepare a hydraulic model of the channel. The model will be used by Ryland to determine final grading and building elevations. Gas Line Easement . We have contacted Dale Sodahl with CenterPoint Energy to determine requirements for the gas line easement The pipeline must have 5' of clearance between the bottom of the stream channel and the gas pipeline. Stream crossings are pennitted with approval of the DNR. Ryland will adhere to the design requirements of CenterPoint. Attached are guidelines from CenterPoint on working within their easement Because the stream channel alignment has changed we will not be crossing the stream. e Page 1 05/12/2005 10:08 FAX 9522266024 RYLAND HOMES @O03 County Road 16 Tum Lanes: .. Ryland has provided Craig Jenson with Scott County Public Works Department revised drawings that address his initial comments. Craig has stated that the plan reVisions are adequate for Preliminary Plat purposes. Wetland Permit . Ryland has submitted the wetland delineation to the City and the Scott County Soil and Water Conservations District for their approval. Scott County is requesting that a ground water study be conducted in the area south ofthe proposed pond. To date Pioneer Engineering has not seen any indication of wetland hydrology. The wetland delineation performed by Pioneer Engineering was conservative and we expect Scott County to agree with our delineation. Additionally Ryland has purposely left that part of the site undeveloped in case the wetlands are larger than anticipated. In the unlikely event that the wetland delineation needs to be adjusted, Ryland will adjust the plat at Final. Plan stage. The final details ofthe Permit process will be finalized prior to Final Plat approval or grading occurs in the vicinity of the wetlands. Sewer Availability . The City Council approved Riverside Fields4lh Addition. Prior to Riverside Fields being platted as single family the property was zoned to arrow 600 residential units. Riverside Fields is approximately 200 homes and Riverside Bluffs is 100 homes. This is half the number of homes originally contemplated for Riverside Fields. There is adequate sewer availability in the short term if not the long term. As proposed the connection to the sewer in Riverside Fields will be a temporary condition until. sewer is available from the west Ryland will be responsible for all costs associated with the temporary sewer connection. Access to East Parcel . Ryland will adjust the location of the access road to the property east of Riverside Bluffs as directed by City staff at our meeting on May 101 2005. Per Craig Jenson with Scott County Transportation stated that parcel will be allowed access from CR 16. Project Timing . We believe it is unreasonable to delay the plat until the 2006 construction season as requested by staff. We have been meeting with staff and commission members since September of 2004. This is a single-family subdivision that is not requesting any variances. This is an area that has been identified by the City Council as suitable for immediate development We have worked in good faith with staff and the PRAB and EAC to provide a plan that addresses issues with parks and greenway corridors. . Page 2 E'~\~ j.. _~J,..~~~____.~~~fD~mmm__c - Parcel 1 The East 250 feet of the SOl;ltheast Quarter of the NortheastQuarter of Section 14, Township 115, Range 22, Scott County, Minnesota. Parcel 2 The East 190 feet of that part of the East Half of the Southeast Quarter of Section 14, Township 115, Range 22, Scott County, Minnesota, lying northerly of the centerline of Scott County Highway No. 16. AND The West 60 feet 'of the East 250 feet that part of the East Half of the Southeast Quarter of Section 14, Township 115, Range 22, Scott County, Minnesota, lying , northerly of the centerline of8eott County"Highway No. 16. . Parce13 I The West 341.75 feet of the East 591.75 feet of the Southeast Quarter of the Northeast Quarter of Section 14, Township 115, Range 22, 8cott County, Minnesota. Parcel 4 The West 341.75 feet of the East 591.75 feet of the East Half of the Southeast Quarter of Section 14, Township 115, Range 22, Scott County, Minnesota, lying northerly of the centerline of County Road No. 16, Except that part described as follows: Commencing at the northeast comer of said East Half of the Southeast . Quarter; thence South along the east line of said East Half of the Southeast Quarter a distance of 1167.10 feet to the centerline of of Scott County Highway No. 16; thence deflecting to the right 101 degrees 25 minutes 30 seconds along said centerline a distance of255.05 feet to the intersection with the East 250 feet of the said East Half of the Southeast Quarter, being the point of beginning; thence continuing westerly along said centerline a distance of 200.0 feet; thence North parallel with the east line of said East Half of the Southeast Quarter a distance of 444.40 feet; thence Easterly to a point in the west line of the East 250 feet of said East Half of the Southeast Quarter said point being 444.40 feet North of the point of beginning; thence South along the west line of the East 250.0 feet of said East Half of the Southeast Quarter a distance of 444.40 feet to the point of beginning. ~t4,.\r 1- Parcel 5 ......-.-.. ,- ':that part o(the East Half of th~ Southeast Quarter of Section 14, Township 115, Range 22, Scott County, Minnesota,lying northerly of the centerline of Scott County Highway No. 16, Except the northerly 350.00 feet as measured at right angles and Except the easterly 591.75 feet as l11easured at right angles. Parcel 6 ' The Northerly 350.00 feet, as measured at right angles, of the East Half of the Southeast Quarter of Section 14, Township 115, Range 22, Scott County, Minnesota, except the easterly 591. 75 feet, as measured at right angles. Parcel 7 That part of the East Half of the Southeast Quarter of Section 14, Township 115, Range 22, Scott County, Minnesota" described as follows:. Commencing at the northeast comer of said East Half of theSoutheast Quarter; thence South along the east line of said East Half of the Southeast Quarter a distance of 1167.10 feet to the centerline of of Scott County Highway No. 16; thence deflecting to the rightlOl degrees 25 minutes 30 seconds along said centerline a distance of255.05 feet to the intersection with the East 250 feet of the said East Half of the Southeast Quarter, being the point of beginning; thence continuing westerly along said centerline a distance of 200.0 feet; thence North parallel with the east line of said East Half of the Southeast Quarter a distance of 444.40 feet; thence Easterly to a point in the west line of the East 25 0 feet of said East Half of the Southeast Quarter said point being 444.40 feet North of the point of beginning; thence South along the west line of the East 250.0 feet of said East Half of the Southeast Quarter a distance of 444.40 feet to the' point of beginning. " ~fp " CITY OF SHAKOPEE Memorandum CASE NO.: 05-030 TO: Shakopee Planning Commission FROM: Mark Noble, Planner I SUBJECT: Preliminary Plat of Riverside Bluffs MEETING DATE: May 5,2005 REViEW PERIOD: January 21,2005 -May 20,2005 SITE INFORMATION Applicant: Ryland Homes Location: North of Eagle Creek Blvd., west of Riverside Fields Current Zoning: Agricultural Preservation (AG) Zone/Light Industry (I-I) Zone Proposed Zoning: Urban Residential (R-IB) Zone Adjacent Zoning: North: Urban Residential (R-IB) Zone (w/PUD Overlay) South: Rural Residential (RR)! Agricultural Preservation (AG) Zones East: Agricultural Preservation (AG) Zone! Planned Residential District (pRD) , West: Urban Residential (R-IB) Zone/ Light Industry (I-I) Zone Area: Approximately 57 Acres Compo Plan: Single Family Residential MUSA: This site is within the MUSA boundary Attachments: Exhibit A: Location/Zoning Map Exhibit B: Preliminary Plat Plans Exhibit C: Applicant Letter and Narrative Exhibit D: City Engineering Memorandum Exhibit E: Scott Soil and Water Conservation District Letter Exhibit F: Public Works Director Memorandum Exhibit G: Parks and Recreation Advisory Board Memorandum Exhibit H: Environmental Advisory Committee Memorandum Exhibit I: Parks & Landscape Designer Memorandum Exhibit J: CenterPoint Energy Letter Exhibit K: Scott County Public Works Letter INTRODUCTION: Ryland Homes has submitted an application for preliminary plat approval of Riverside Bluffs, proposed for property north of Eagle Creek Blvd. and west of Riverside Fields (Exhibit A). The plat, as currently proposed, contemplates the construction of 101 single family homes (Exhibit B). This item was continued from the March 7th and April 7th Planning Commission meetings. A request for MUSA and rezoning for a 14 acre portion of this property was approved by the City Council at their April 5th meeting. DISCUSSION: Access to this site is shown from Eagle Creek Blvd. and from Crossings Blvd. (from the East). There has been a substantial amount of discussion concerning park land and trails, the configuration ofthe Prior Lake Spring Lake Channel, compliance with the Shoreland Overlay Zone, access off Eagle Creek Blvd., and sanitary sewer service connection. The applicant has provided a letter and project narrative (Exhibit C) that address the project as well as several of these issues. Planning staff commented that the City's sewer plan contemplates that the Riverside Bluffs property would be served by sanitary sewer extended from the Prior Lake Interceptor to the west, through the former Eagle Creek Stables property, and then to the south to serve the areas on the south side ofCR 16. In the event that the Commission and Council choose to allow Riverside Bluffs to be served by a connection to Riverside Fields, it should be conditioned on 1) the developer being responsible for all costs of installation, maintenance, and future removal of the connection, and 2) a clear understanding that service to the south will only become available once the Prior Lake Interceptor connection is made. Joe Swentek, Project Engineer, provided a memorandum (Exhibit D) noting issues and concerns that City Engineering Department have regarding this project. Engineering has determined that the issues listed in the memorandum are significant and warrant a thorough review due to their potential to considerably affect the preliminary plat. Several of the key issues are listed below: 1. The City of Shakopee received a detailed proposal from its storm water consultant to develop a storm water model of the Prior Lake Outlet Channel from County Road 16 to Dean Lake in order to define the flood profile. The applicant previously indicated they would pay for this study to determine acceptable low floor/minimum building opening elevations. 2. The previously mentioned analysis is being performed to provide the level of detail necessary to define the design criteria for improvements to the Prior Lake Outlet Channel that would be required of properties proposing to develop downstream of County Road 16. The information resulting from the study will be utilized by the City, the County, the Prior Lake - Spring Lake Watershed District and future developing properties to specifically outline the proposed alignment of the channel, the future crossings of the channel and recommendations for low floor/minimum building opening elevations for these downstream properties. Results of this analysis could change the preliminary plat. 3. The applicant submitted a wetland delineation report dated November 22, 2004 to the City of Shakopee and to the Scott Soil and Water Conservation District. Review of the report resulted in a determination the delineation was performed outside of the accepted growing season, the delineation was not consistent with an approved delineation of the adjacent property to the East and no mitigation plan for proposed wetland impacts was submitted for review. Please see the attached memo from the Scott Soil and Water Conservation District dated January 9,2005 summarizing their concerns. As ofthis date, no additional information' has been provided. Results of an updated delineation performed within the growing season could result in a change to the preliminary plat. 4. The proposed extension of Crossings Boulevard to the western plat boundary does not align with previous submittal$ of the adjacent property owner to the West. Coordination of this alignment as it relates to the proposed alignment of the Prior Lake Outlet Channel " resulting from the previously mentioned analysis will be required between the City of Shakopee, the applicant and properties to the West. 5. The applicant is proposing a temporary sanitary sewer to serve the site. The temporary sewer is shown connecting to the proposed Riverside Fields 4th Addition system at the intersection of Crossings Boulevard and Rye Court. Once the proposed trunk sanitary sewer from the Prior Lake Interceptor located to the West is extended to the Riverside Bluffs plat boundary, the temporary system will be abandoned and rerouted. The applicant should be required to enter into an agreement with the Riverside Fields 4th Addition property owner for the installation of the temporary sanitary sewer. The applicant should also be required to enter into a reimbursement agreement with the City for the abandonment of the temporary sanitary sewer and be required to work with the City to' develop an acceptable plan for this temporary service, its abandonment and its rerouting to a permanent system. Additionally, Scott Soil and Water Conservation District provided a letter ofreview of the wetland delineation report (Exhibit E), noting that there are a number of discrepancies and that a new wetland delineation and supporting documentation is required in order to provide a determination prior to any proposed wetland 'drain, excavation or fill activities. Bruce Loney, Public Works Director, provided a memorandum (Exhibit F) that addresses the number of issues that need to be resolved prior to approval of the Riverside Bluffs plat, including but not limited to the following: . CSAH 21 EIS ." Relocation and design of Prior Lake outlet channel . Revised JPA between .the City of Shakopee and Prior Lake-Spring Lake WaterShed District for cost sharing of improved channel . Greenway corridor design in this area . CSAH 16 roadway improvements for access to plat . Revised wetland delineation in the spring of 2005 . Relocation of park from Riverside Fields With the number of issues associated with this plat and others nearby sites, he states that this plat should not be approved until 2006 construction season. If the Commission and Council were to approve the temporary sewer extension, it should be contingent on compliance with the conditions outlined in Mr. Loney's memorandum. Additionally, Mr. Loney commented that the wetland delineation plan has not been accepted and that ifthis plat is approved, a condition should be that the plat will not be reviewed by the Council until the property has been re- delineated. Mark Themig, Parks, Recreation and Facilities Director, has provided several memorandums (Exhibits G & H) that address the discussions and recommendations from the Parks and , ' Recreation Advisory Board (PRAB) and the Environmental Advisory Committee (EAC). It was noted that there are many issues that remain unresolved; however, if the Planning Commission recommends approval of this plat, conditions of approval should include the conditions noted in the memorandum. Andrea Weber, City Parks and Lands~ape Designer, provided comments and recommendations on the site design, planting plans and woodland management plan (Exhibit n. Shakopee Public Utilities provided a memorandum, noting that any proposed development of this property must be served with two independent water sources that are then looped together, along with standard SPUC requirements. They noted that there is one source in crossings Blvd. to the east, and a second source would be from the north across future CR 21 to the watermain around Red Oak Elementary School. CenterPoint Energy provided a letter (Exhibit J) that addressed the proposed preliminary plat of Riverside Bluffs, noting that they object to the plans as proposed and will only remove their objection if the issues addressing the transmission pipeline easement(s) are met. Scott County Public Works have provided a memorandum (Exhibit K) that addresses a number of their issues, including a requirement that a minimum right-of-waydedication for County Road 16 shall be 75 feet from centerline, that the proposed road onto County Road 16 shall require left and right turn lanes to be constructed on County Road 16, and that the proposed pond along future CSAH 21 shall be designed and pennitted consistent with the County's requirements. These comments have been incorporated into the draft resolution. STAFF RECOMMENDATION: As detailed above and in the attached memorandums/letters, it is clear that a number of issues have not been completely resolved. The applicant and staff have had a number of meetings to address these issues; however, a final determination on a number of them remains unresolved. The review deadline for this preliminary plat application is May 20th. Without an extension from the applicant, the Commission must forward a recommendation to the Council at this meeting to ensure the Council has an opportunity to act on this request at their May 17th Council meeting. Based on the number and/or significance of the unresolved issues, staff recommends that the Commission recommend denial of the request. However, should the Commission recommend to the City Council the approval of the request, staff suggest that the plat shall be approved subj ect to these following conditions: I. The following procedural actions must be completed prior to the City Council review of the Final Plat: A. The appli.cant shall provide plans that address CenterPoint Energy concerns regarding the transmission pipeline easement(s). B. The developer shall be responsible for all costs of installation, maintenance, and future removal of the sewer extension and escrows funds for the future abandonment of the temporary sewer line. C. That there be a clear understanding that service to the south will only become available once the Prior Lake Interceptor connection is made. D. The developer shall acknowledge that the extension of sewer from Riverside Fields 4th Addition does not constitute any approval of any kind to Riverside Bluffs. E. The developer shall enter into an agreement with the city for the additional operation and maintenance costs associated with the diversion of sewage to the Southbridge lift station with the developer's agreement of Riverside Bluff. F. The applicant shall obtain the appropriate Wetland Conservation Act (WCA) permits and approvals for all proposed wetland impacts. G. A storm water infiltration system, if required, providing pretreatment of storm water runoff prior to infiltration shall be submitted to the City for review and approval. H. The applicant shall work with City staff to eliminate or minimize drainage over proposed retaining walls. 1. The applicant shall modifY all preliminary street profiles not in compliance with the City's minimum design speeds as designated. J. Lots 1-19 of Block 1 should not be submitted for Final Plat review until permanent sanitary sewer is available from the West. This will eliminate urmecessary utility congestion within Crossings Boulevard and minimize the work required to abandon the temporary sanitary sewer. K. Minimum drainage and utility easements for sanitary sewer and storm sewer in non-paved areas shall be provided at a one to one ratio, depth versus width. The easements shall be centered along the utility alignment. L. Adequate drainage and utility easements shall be provided along the top and the bottom of all proposed retaining walls. Retaining walls shall not be located within drainage and utility easements. M. Address the comments provided by Andrea Weber, City Parks and Landscape Designer. N. The applicant shall meet park dedication requirements by providing park land and the greenway corridor as generally shown on the preliminary plat. Final park land dedication calculations shall be made prior to review of the final plat. O. Approval ofthe proposed park area is contingent on additional work with the applicant, the Engineering Department, the Prior Lake-Spring Lake Watershed District, and the adjacent developer to determine the feasibility of relocating the channel, as well as the impact of leaving the channel as proposed in the drawing. P. Approval of the proposed park area is contingent on additional documentation related to wetlands and the channel water flow design. Wetlands or areas that would be flooded would not qualify for park dedication credit. Q. Requirements in the Shoreland Overlay Zone ordinance should be thoroughly researched and strictly enforced. R. Mitigation of sound and sightlines from future County Road 21 and a future expanded County Road 16 need to be part of the design considerations. S. The city should research the feasibility of relocating the channel further to the south in order to help provide the contiguous park and greenway. T. Any change in drainage entering the County right-of-way requires detailed stormwater calculations to be submitted to the County engineer for review and approvaL U. The proposed road onto CSAH 16 shall require left and right turn lanes to be constructed on CSAH 16 to County standards. V. The minimum right-of-way dedication for CSAH 16 shall be 75 feet from centerline. W. The development is proposing a pond in part of the County right-of-way for CSAH 21. The pond would also need to provide a stonnwater benefit to CSAH 21 in order for it to be located in the right-of-way. A pennit shall be required for the construction of the pond in the County right of way. X. The applicant shall obtain the appropriate permits for all structures to be removed from the site and/or demolished. II. The following procedural actions must be completed prior to the recording of the Final Plat: A. Approval of title by the City Attorney. B. Execution of a Developers Agreement, which shall include provisions for security for public improvements within the Final Plat, as well as payment of engineering review fees, and any other fees as required by the City's adopted fee schedule. 1. Street lighting to be installed in accordance with the requirements of the Shakopee Public Utilities Commission. 2. Electrical system to be installed in accordance with the requirements of the Shakopee Public Utilities Commission. 3. Water system to be installed in accordance with the requirements of the.Shakopee Public Utilities Commission. This shall include a service with two independent water sources that are then looped together. 4. Installation of sanitary sewer and storm sewer systems, and construction of streets in accordance with the requirements of the Design Criteria and Standard Specifications of the City of Shakopee. 5. The developer shall be responsible for payment of Trunk Storm Water Charges, Trunk Storm Water Storage and Treatment Charges, and Trunk Sanitary Sewer Charges, as required by the most current City of Shakopee Fee Schedule. 6. No public improvements shall be constructed until the City Engineer and the Shakopee Public Utility Commission approve the Final Construction Plans and Specifications. 7. The applicant shall obtain an NPDESpennit prior to any land disturbing activity. A copy ofthis permit shall be provided to the City. 8. The applicant shall obtain the necessary Scott County permits/ approvals (access, right-of-way, drainage, etc.). 9. That the applicant meet park dedication requirement by providing cash in lieu of land dedication. 10. Sidewalks and trails shall be provided throughout the site as proposed. 11. All park dedication shall be calculated at time of final plat approval. 12. As provided in the park dedication ordinance, the exact cash contribution will be calculated at time of final plat approval. C. Street names and addresses shall be provided to the Shakopee Fire Inspector for review and approval. D. Temporary street signs shall be provided until such time that permanent street signs are installed. E. Provide electronic (AutoCAD) files ofthe Final Plat and all record drawings to the City Engineering Department. F. Easements must be shown on the Final Plat as approved by the City Engineer. ,. G. The survey data (length and bearings) shall be shown for each lot as well as the plat boundary and center line of streets. H. Simultaneous to the recording of the Final Plat, a deed restriction shall be recorded on all lots as designated by the City of Shakopee. The Deed Restriction shall appear as the following: This conveyance is made conditioned upon and subject to the following restriction. The Grantee, heirs, successors and assigns, are restricted from erecting any fence or other structure within the utility and drainage easements dedicated by plat over the above-described property, except with the prior written consent of the City of Shakopee., This restriction shall run in favor of and be enforceable by the City of Shakopee. III. Following approval and recording of the final plat, the following conditions shall apply: A. Building construction, sewer, water service, fire protection and access will be reviewed for code compliance at the time of building permit application(s). B. The applicant shall obtain the necessary right-of-way and/or easements to perform all proposed work offsite. C. Noise issues along the County roadways may arise as traffic levels increase in the area. The developer and/or their assigns shall be responsible for any required or desired noise mitigation measures. D. The developer and/or their assigns shall be responsible for the maintenance of all areas held in common ownership. E. The developer should implement the use of Best Management Practices for erosion control and stormwater management during construction. F. The applicant shall obtain the necessary CenterPoint Energy (Minnegasco) permits/approvals. G. Provide placement of at least one overstory/shade deciduous tree in the front yard. H. Provide sod placement in front yard and seed or sod placed in side and rear yards. 1. Provide placement of 6" of topsoil. The soil composition should be similar to the MnDOT topsoil borrow requirements. J. Provide rain sensors for any irrigation system. K. No landscaping, ponding; benning, or signage shall be permitted within the County right-of-way. L. Any change in drainage entering the County right-of-way requires detailed stormwater calculations to be submitted to the County Engineer for review and approval. M. Any work within the County right-of-way shall require a permit. N. The proposed trail in the County right-of-way shall require a permit. O. The existing field accesses and driveways to this property along CSAH 16 shall be completely removed from the County right-of-way and graded to match the existing ditch. P. The proposed road onto CSAH 16 shall require an access permit. Q. The applicant must meet the city's woodland management ordinance requirements. R. In order for the greenway corridor to qualify for park dedication, the EAC concurred with the PRAB's thoughts that it must serve some recreational value, such as a trail corridor. S. The greenway corridor should be designed in such a way that it helps enhance a contiguous park area. T. The applicant shall be required to construct the recreational trail shown on the plat. U. Connecting sidewalks shall be provided throughout the development. V. In the park area, the developer shall: 1) Fine grade the site, picking rocks and dirt clumps %" and greater in size 2) Provide a finished grade that is approved by the city as suitable for park use. 3) Apply a grass seed mixture "Pro Turf Lawn Mix" at a rate of60 pounds per acre that meets the following criteria: Item % of Mix Minimum Purity , Germination Alene Kentucky 30 90 95 Bluearass Denim Kentucky 30 90 95 Bluearass Secretariat 20 90 99 Perennial Rye Mardigras 20 90 99 Perennial Rye ALTERNATIVES: 1. Offer a motion to recommend to the City Cotlllcil the approval of the Preliminary Plat, subject to the conditions as presented by staff. 2. Offer a motion to recommend to the City Cotlllcil the approval of the Preliminary Plat, subject to revised conditions. 3. Offer a motion to recommend to the City Cotlllcil the denial of the Preliminary Plat. ACTION REQUESTED: Offer a motion consistent with the Commission's wishes, and ~ _ ark oble Planner g: \boaa-pc\2005\O 5-05\ppriverside bluffs.doc - €" ',(\-1 \s. ,,- t::.c \~ ".~ ." 11 RIB ,PRD '''--- AG AG - AJG 'AG ~ N _ Subject Property W.E SHAKOPEE .......... ShaKopeeBoundary COMMUNrlYPRIDllSlNClll8S7 s c=I Zoning Boundary CJ Parcel Boundary Preliminary Plat of Riverside Bluffs 6c+( \&\1 C , . Riverside Bluffs Project Narrative Description of Property After thoughtful consideration and study, Ryland Homes along with the property owner Joel and Mark Liesener have prepared preliminary plans for residential development of the Liesener property. The property is located north of Eagle Creek Boulevard and is approximately 57 acres in size. The property is currently utilized for agricultural purposes and large lot single"family homes. On the property are three residential structures and associated outbuildings. Historically the property has been used for agricultural production. Residential uses and a The property consists of several parcels which are under ownership or under contract by the Liesener's. The site is irregularly shaped and is bounded by Eagle Creek Boulevard to the south, agricultural uses to the west, future County Road 21 and the South Bridge Development to the south, and agricultural, park and the Riverside Grove residential development to the east. Site Features- The site topography is varied with the northern half of the property at a lower elevation and relatively flat. The southern half of the propelty is at a higher elevation with a more varied topography. Dividing the north and south portions of the property is a bluff line or slope of variable grade. The Prior Lake Channel is located in a 70' wide drainage easement on the property and bisects the southern portion of the property and then follows the west property line before turning west. The Channel had been reaIlgned and straightened to increase water flow. A 70 'wide drainage and utility easement is located over the Channel. The Watershed District and the City have indicated that there are plans to improve.the channel to control erosion and create a more naturalistic stream. Also located in the center of the property is a 60' wide Cenerpointe Energy pipeline easement. The easement contains an 8" gas line and traverses the site on a north/south axis. Vegetation includes several stands of trees, wetlands pasture, lawn and fallow land. The tree stands are associated with the Prior Lake Channel. sloped areas, fencerows, and structures located on the property. Typical tree species include elm boxelder and maple. In the center of the property a stock pond has been dug. Associated with the pond is a degraded wetland complex and drainage. system that outlets water to the Prior Lake Channel. The predominate species in the wetland areas and areas adjacent to them is Reed Canary Grass. Site Proposal Riverside Bluffs is designed as single-family home community. There are 101 lots contemplated in the proposal. Many of the home sites will offer walkout and lookout basements in the home. In the design of the subdivision attention was paid to circulation protection of existing site features, traffic circulation, and parkland dedication. Circulation: _ u . . Etc.\o,,,a,-r C~ The circulation contemplates extending Crossing Boulevard through the northern portion of the site and constructing a nortb/south road that connects Crossings Boulevard with Eagle Creek Boulevard (County Road 18). To ensure connectivity between adjoining tract of land we are proposing street connections to the undeveloped parcels to the east andwest. Road'crossings of the Prior Lake Channel were limited to one to minimize any environmental impacts and prevent the chopping up of the greenway into smaller segments. Parks: The proposal for parks is to provide land to meet our parkland dedication requirements. When developing site plans for the property is became apparent that an innovative solution would be required to give the City an adequately sized park that is usable. In addition the project is located within the greenway corridor that the City is currently developing. The Greenway would follow the Prior Lake Chrome! providing wildlife habitat and oppOltunities for a trail system. To the east park and trail was dedicated to the City as part of the Riverside Fields development. When developing the site plan it became apparent that he best way to maximize parkland dedication to the City would be by combining the existing parkland with the Greenway Corridor that is proposed along the Prior Lake Channel. Combining all these elements in one location provides the City with the most useable parldand. Retaining the existing park in Riverside Fields creates a disjointed park system. The site plan contemplates combining the park remnarits into one large park. The existing gas line easement and wetlrolds are located within the park but are not counted toward the park requirements. There is also the option of using the gas line easement for a trail cOllilection to Eagle Creek Boulevard. In addition we have expanded the width of the greenway corridor to help preserve trees along the Prior Lake Channel. The storm water ponds are located adjacent to the corridor and trail system in Riverside Fields to provide additional habitat and visual quality. The proposal parkland dedication is summarized below. Park Requirements Park Proposed Riverside Fields Park Swap: 4.1 Ac Park and Greenway: 8.2Ac. Park Required for 101 Homes: 4.0 Ac Pipeline Easemel1t~orTrail Total Required; 8.1 Ac and Greenway: 1.8 Ac. Existing Wetland in Park: O.SAc Total Park Proposed: 10.5 Ac. Conclusion: The landowners, Joel and Mark Liesener, and Ryland Homes have worked to prepare a plan that provides for the creation of a greenway corridor along the Prior Lake Channel. This plan also provides the City with parkland that is of a usable size in a central location that is accessible to the existing residents of Riverside Fields, Riverside Bluffs and the other undeveloped parcels to the east and west. Circulations patterns have been developed that allow connectivity between adjoining parcels and provide easy access to the local network of roads. The design of the subdivision and the topography allow for the creation of walkout and !ook qut homes in a significant portion of the development. We would like to elicit the support and suggestions from members of the City Council, E~~\~(\ C. 3 Commissions and Staffin developing what will become a truly unique housing neighborhood in the City of Shakopee. ~ E)(~'(Q\~ c1' RYlAND The Ryland Groupl 'nc. March 1, 2005 7600 Executive Drive Eden Prairie, MN 55344 Contractor', LIe # 20035443 . - ..-.- .. .. . ....-.... ......... ......... ,. .-..---.._- ,-- ....---. . - www.rylond.com Mayor and City Council Shakopee City Hall 129 South Holmes Street Shakopee, MN 55379 Re: Riverside Fields 4th Addition, conditions of Final Plat Honorable Mayor and City Council members: Riverside Fields 4th Addition Final Plat approval is before you this eyening for your approval. As part of the City Engineering staff comments on the plan, they have asked that the sewer connection from this property, in Crossings Blvd. to property further west be eliminated. W e re~ectfully request that the sewer connection be left in the approved plans for Riverside 4th Addition for the following reasons: 1) The original City Resolution for Riverside Fields and the current Resolution approving Riverside Fields 3rd Addition, require the connection. ' 2) Ryland Homes has an agreement with Mark Liesner, the property owner of the 46 acres west and adjacent to Riverside Fields; to develop the property as single family. a. Together with the property owner, we have been working with the City staff since last September in preparation of plans for a single-family . neighborhood, in reliance upon this connection. b. Plior to the fIrst of the year the City Engineering staff indicated that if there was sewer capacity for the Liesner property to be served temporarily to the east, it could be done. However, more recently, City staffhas indicated the City Council would make the determination whether the Liesner property could be served temporw:i1y through Riverside Fields. 3) We have met with Centex Homes, and they have no objection to leaving the connection in their plans. 4) The temporary connection supports the orderly and sequential single:.family development of this area of the City, also supported by the logical extension of: Crossings Blvd.; water mains; storm-water systems; park, trail, and open-space. 5)' The Liesner property is in an area of the City identified by the CitY Council as appropriate for current development. 6) The Liesners and Ryland Homes has been working with the PRAC and the EAC and designed a preliminary plat that: a. Confopns to ail City Ordinances. ~+l \e\ '\'" c.~ b. Proposes a single-family neighborhood of high-value homes consistent with City land-use wishes. c. Provides park and trail systems consistent with City standards. i. Ryland will dedicate additional developable easement area usable for parks and trails as a part of the approved plat. d. Completes a connection from existing Crossings Blvd. to County'Road 16. , , "-' -- Ryland Homes has appeared before the EAC twice and the PRAB and will be at the March 3 Planning Commission. We believe we have resolved all questions from the EAC and the PRAB and we hope to be to the City Council in March or early April. We ask that you leave the sewer connection in the Riverside Fields 4th Addition Final Plat , approval and allow the temporary service of the Liesner property through Riverside 4th Addition., IS Enger Mark Liesner Land Resources Manager Joel Liesner Ryland Homes Twin Cities Division Eagle Creek Blvd. Shakopee,A1N' " E'\t~,~\, .D \ City of Shakopee Memorandum TO: Mark Noble, Planner I ~~~ ' ' , . FROM: Joe Swentek, Project Engineer SUBJECT: Preliminary Plat - Riverside Bluffs Addition , PID NO.: 27-914005-0,27-914005-1,27-914006-0, 27-914007-0, 27-914009-:0, 27-914011-0 CASE NO.: 05030 DATE: April 28, 2005 The application indicates a request for Preliminary Plat approval of a single-family (R1-B) , residential development located to the South and to the West of the Riverside Fields Addition. This review should be considered preliminary, as more comments are to follow with additional submittals. However, I offer the following comments at this time for the applicant and for the planning department: General Comments 1. The City of Shakopee received a detailed proposal from its storm water consultant to develop a storm water model of the Prior Lake Outlet Channel from County Road 16 to Dean Lake in order to define the flood profile. The applicant previously indicated they would pay for this study to determine acceptable low floor/minimum building opening , elevations. 2. The previously mentioned analysis is being performed to provide the level of detail necessary to define the design criteria for improvements to the Prior Lake Outlet Channel that would be required of properties proposing to develop downstream of County Road 16. The information resulting from the study will be utilized by the City, the County, the Prior Lake - Spring Lake Watershed District and future developing properties to specifically outline the proposed alignment of the channel, the future crossings of the channel and recommendations for low floor/minimum building opening elevations for these downstream properties. Results of this analysis could change the preliminary plat. 3. The applicant submitted a wetland delineation report dated November 22, 2004 to the City of Shakopee and to the Scott Soil and Water Conservation District. Review of the report resulted in a determination the delineation was performed outside of the accepted growing season, the delineation was not consistent with an approved delineation of the adjacent property to the East and no mitigation plan for proposed wetland impacts was submitted for review. Please see the attached memo from the Scott Soil and Water H:\EMPLOYEE FOLDERS\JSwentek\PlatRevielVs\Riverside BluffslPrelim.PlatRevielV.Riverside.B luffs#2,doc Page I of3 ~ "'~,~,.,.. '01- Conservation District dated January 9,2005 summarizing their concerns. As of this date, no additional information has been provided. Results of an updated delineation performed within the growing season could result in a change to the preliminary plat. 4. The proposed extension of Crossings Boulevard to the western plat boundary does not align with previous subinittals ofthe adjacent property owner to the West. Coordination of this alignment as it relates to the proposed alignment of the Prior Lake Outlet Charmel resulting from the previously mentioned analysis will be required between the. City of Shakopee, the applicant and properties to the West. 5. The applicant is proposing a temporary sanitary sewer to serve the. site. The temporary sewer is shown connecting to the proposed Riverside Fields 4th Addition system at the intersection of Crossings Boulevard and Rye Court. Once the proposed trunk sanitary sewer from the Prior Lake Interceptor located to the West is extended to the Riverside Bluffs plat boundary, the temporary system will be abandoned and rerouted., The applicant should be required to enter into an agreement with the Riverside Fields 4th Addition property owner for the installation of the temporary sanitary sewer. The applicant should also be required to enter into a reimbursement agreement with the City for the abandonment of the temporary sanitary sewer and be required t,o work with the City to develop an acceptable plan for this temporary service, its abandonment and its rerouting to a permanent system. Preliminary Plat 1. Execution of a Developer's Agreement, which shall include provisions for security for public improvements within the Final Plat and the engineering review fees. 2. Payment of Trunk Sanitary Sewer Charges shall be made, as required by the most current City of Shakopee Fee Schedule. 3. Payment of Trunk Storm Water Charges and Trunk Storm Water Storage and Treatment Charges shall be made, as required by the most current City of Shakopee Fee Schedule. 4. No public improvements shall be constructed until the City Engineer and the Shakopee Public Utilities Commission (SPUC) approves the Final Construction Plans and Specifications. 5. The applicant shall obtain the necessary right-of-way andior easements to perform all proposed work offsite. 6. The applicant shall obtain the necessary Scott County permits/approvals (access, right-of- way, drainage, etc.). 7. The app,licant shall obtain the necessary Centerpointe Energy (Minnegasco) permits/approvals. H:\EMPLOYEE FOLDERS\JSwentek\PlatReviews\Riverside Bluffs\Prelim.Plat.Review.Riverside.Bluffs#2,doc Page 2 of3 ;oK+('~ IT 1)~ 8. The applicant shall obtain the appropriate Wetland Conservation Act (WCA) permits and approvals for all proposed wetland impacts. 9. A stonn water infiltration system, if required, providing pretreatment of storm water runoff prior to infiltration shall be submitted to the City for review and approval. 10. The applicant shall work with City staff to eliminate or minimize drainage over proposed retaining walls. 11. The applicant shall modifY all preliminary street profiles not in compliance with the City's minimum design speeds as designated. 12. Lots 1-19 of Block 1 should not be submitted for Final Plat review until permanent sanitary sewer is available from the West. This will eliminate unnecessary utility congestion within Crossings Boulevard and minimize the work required to abandon the temporary sanitary sewer. 13. The applicant shall obtain the appropriate permits for all structures to be removed from the site and/or demolished. 14. The applicant shall obtain a NPDES permit prior to any land disturbing activity. A copy of this permit shall be provid~d to the City. 15. Easements shall be shown as approved by the City Engineer. 16. Minimum drainage and utility easements for sanitary sewer and storm sewer in non-paved areas shall be provided at a one to one ratio, depth versus width. The easements shall be centered along the utility alignment. 17. Adequate drainage and utility easements shall be provided along the top and the bottom of all proposed retaining walls. Retaining walls shall not be located within drainage and utility easements. 18. Simultaneous to the recording of the Final Plat, a deed restriction shall be recorded on all lots as designated by the City of Shakopee. 19. Provide electronic (AutoCAD) files of the Final Plat and all record drawings to the engineering department. Conclusion The engineering department has completed its review of the preliminary plat application for Riverside Bluffs Addition. It has determined the issues listed above are significant and warrant a thorough review due to their potential to considerably affect the preliminary plat. H:\EMPLOYEE FOLDERS\JSwentekIPlatReviews\Riverside B luffslPrelim.Plat Review.Riverside.Bluffs#2 .doc Page 3 of3 EXH\fb\, E- \ SCOTT SOIL AND WATER CONSERVATION DISTRICT 7151 West 190th Street, Suite 125 * Jordan, MN 55352.2103 Phone: (952) 492.5425 ---.......;;, ~ Fax: (952) 492-5422 January 9,2005 To: Ken Arndt, Wetland Specialist Pioneer Engineering From: Peter J. Beckius, District Manager Scott Soil and Water Conservation District . Re: Review of the Wetland Delineation Report for the Riverside Bluffs Site A review of the Wetland Delineation Report for the Riverside Bluffs site has been completed by the Scott Soil and Water Conservation District (SWCD). The area reviewed is located in the E 1/2 of the SE 1/4 ofthe NE 1/4 and the N 3/4 of the NE 1/4 ofthe SE 1/4 of Section 14. T1l5N. R22W. City of Shakopee. Scott County Minnesota. Pioneer Engineering prepared the November 22, 2004 wetland delineation report. The following comments and/or suggestions are submitted for your consideration: ' . The "Introduction" ofthe delineation report describes the location of the subject property in the 'NW 1/4 of the NW 1/4 of Section 14". This property description is inconsistent with the , property boundaries shown on the exhibits contained in the delineation report. The property reviewed by the SWCD, described above (underlined), more accurately reflects the legal description of the exhibits contained in the delineation report. We used the exhibit labeled "Existing Wetlands" for the site boundaries and the focus of our site investigation. . In the future, consider numbering exhibits to correspond to the delineation narrative. . Page 4, 5 and 6 ofthe delineation report refer to an "Eagle Creek ditch" and uses the term "east of Eagle Creek". There is an Eagle Creek in Scott County but not in the location of the subject property. The ditch on the subject property is locally referred to as the Prior Lake Outlet Channel. The ditch is a DNR protected watercourse. . In the summary on page 7 of the report, there is reference to an area that has one Protected Water or Wetland. The wetland number "(249)", identified the report, refers to a wetland that is not on the subject property and should not be confused with the DNR protected watercourse that is within the subject property. . Page 4 of the report indicates a need to be "consistent with approved wetland delineations conducted on the abutting parcels to the east and west". The wetland delineation on the subject property does not match up to the wetland delineation submitted for the property to the east. . While we agree that the use of hydrologic information available from delineation reports submitted on adjacent properties could and should be looked at as contextual reference, the subject property will need to provide supporting documentation, specific to the site, for the conclusion of existence or l1on~existence ofthe hydrology parameter. EQUAL OPPORTUNITY EMPLOYER Vic::lt II~ on thA web at: www,scottswcd.ore' ()(+\,~ ,,.. E2,... . The wetland delineation was performed outside the growing season. The Army Corp of Engineers (COE) generally does not accept wetland delineations performed outside the growing season. . The Scott SWCD will review wetland delineations performed outside the growing season if nonnal conditions exist at the time of the delineation. Tn addition, the delineated wetland boundary must be staked high enough on the landscape to insure aU questionable areas ar,e included. The field review and off-siteaerial photograph review of the subject property does not provide enough information for the SWCD to support the delineated wetland boundary. Based on information submitted to date, we assume the wetland delineation line will ultimately be based on the hydrology parameter. We recommend a detailed hydrologic investigation be . completed to determine the hydrology parameter dUring parts of the growing season, particularly early growing season, when wetland hydrology would be expected. We will review the delineation and provide concurrence once the additional data is provided. . A preliminary plat plan was not provided at the time of the office and field review of the wetland. The delineated watercourse and wetlands will need to be surveyed and located on the plat plan. Drainage and utility easements and buffer strip setbacks (if required) will need to be identified around the perimeter of the all wetlands and along all watercourses. . Ifno wetland impacts are proposed, an application for "Certificate of No Loss or Exemption" should be submitted to the LGU for review and approval. If drain, excavate or fill activities are considered, the Minnesota Local/State/Federal Application Forms for Water/Wetland Projects (Wetland Replacement Plan) needs to be submitted to 1) the appropriate Local Government Unit (LGU), 2) the Minnesota Department of Natural Resources (DNR), and 3) the U.S. Army Corp of Engineers (COE) for authorization of any proposed water/wetland project affecting lakes, rivers~ streams or wetlands that may fall within the jurisdiction of any (or all) of these three agencIes. . A Grading Permit should not be issued until proper approvals have been received from the LGU for any proposed wetland drain, excavate or fill activities. The LGU is the City of Shakopee. c: Christina Carballal, US Anny COE Les Lemm, BWSR Joe Swentek, City of Shako pee Dawn Tracy, Scott County Natural Resources Patrick Lynch, Area Hydrologist EQUAL OPPORTUNITY EMPLOYER Visit us on the web at: www.scottswcd.or~ ~\13 \T" F\ CITY OF SHAKO PEE Memorandum TO: Mark Noble, Planner I FROM: Bruce Loney, Public Works Director SUBJECT: Approval of Riverside Fields 4th Addition Final Plat DATE: March 11, 2005 This memorandum is in regards to the extension of temporary sanitary sewer from Riverside Fields 4th Addition to the proposed Riverside Bluffs plat. A request has been made by Ryland Homes to extend sanitary sewer to Riverside Bluff proposed plat to serve this site until the permanent sewer from the west can be installed. Attached is a map showing the sanitary sewer service districts in this area. Engineering staff has recommended that the extension of temporary sewer be denied since the permanent sewer may be available in a year or two. A temporary sewer extension can be provided with several conditions as follows: . Developer of Riverside Bluffs pays for the sewer extension and escrows funds for , the future abandonment ofllie temporary sewer line. . Developer acknowledges that the extension of sewer from Riverside Fields 4th Addition does not constitute any approval of any kind to Riverside Bluffs. . Developer enters into an agreement with the city for the additional operation and maintenance costs associated with the diversion of sewage to the Southbrldge lift station with the developers agreement of Riverside Bluff. . Developer agrees that a connection to the temporary sewer line cannot be done until the spring of2006 assuming a preliminary plat approval of Riverside Bluffs. In my view, the proposed plat of Riverside Bluffs has several issues that need to be resolved before approval. These issues include the following: . CSAH 21 EIS . Relocation and design of Prior Lake outlet channel . Revised JP A between the City of Sbakopee and Prior Lake-Spring Lake Watershed District for cost sbaring of improved channel . Greenway corridor design in this area . CSAH 16 roadway improvements for access to plat . Revised wetland delineation in the spring of 2005 . Relocation of park from Riverside Fields E)(f4 \ !:>,,- F ~ With the number of issues associated with this plat and others l1earby sites, in my opinion, this plat should not be approved until 2006 construction season. Also with the amount of work in progress such as Countryside development and the new Public Works building project and lots in inventory already, it would be difficult for staff to properly review and inspect this development in 2005. In summary, staff did not recommend the temporary sanitary sewer line to Riverside Bluffs proposed plat for orderly extension of utilities and for growth management. If council wants to approve the temporary sanitary sewer line connection, it should be done with conditions outlined in this memo. ~nf7l Public Works DIrector BL/pmp Riverside 4th addition ~)Gt1l~''- 't \ CITY OF SHAKOPEE MEMORANDUM To: , Mark Noble, Project Manager From: Mark Themig, Parks, Recreation and Facilities Director Date: March 30.2005 Subject: Parks and Recreation Advisory Board Review of the Preliminary Plat for Riverside Bluffs, Ryland Homes INTRODUCTION I am writing to provide you park related comments for the Riverside Bluff's development, and the Parks and Recreation Advisory Board's recommendation. DISCUSSION The Parks and Recreation Advisory Board (PRAB) reviewed the proposed Riverside Bluff's preliminary plat at their February 28 meeting, but tabled action to get further input from the Environmental Advisory Committee (EAC) on the proposed greenway corridor. The PRAB resumed discussion on the application at their March 28 meeting. As with the EAC. the PRAB struggled with the proposed application since this is a single development in a large area with more prominent natural resources than more recent developments. In addition, there are likely to be other development proposals in the area, and an overall master plan for the area would be desirable. However, Mr. Sullivan worked diligently with staff. the EAC, and the PRAB to prepare a plan that attempts to reach compromise with the most significant issues. Specific items that the PRAB discussed included the following: 1. Whether or not credit should be given for park dedication for the proposed greenway corridor. The application requested park dedication credit in exchange for providing a greenway corridor along the outlet channel. If the applicant was not given credit, they would eliminate the proposed greenway corridor. The PRAB came to consensus that if the greenway corridor served a recreational use, then park dedication credit is appropriate. In this case, the applicant was able to demonstrate that the greenway corridor could accommodate a trail, which was noted by the PRAB as the number one priority for residents in our 2003 Parks and Recreation survey, and therefore would be eligible for credit. However, the PRAB noted that they would review credit for greenways on a case-by-case basis. The applicant also agreed to pay for the costs .of constructing the trail. 2. The applicant's request to relocate the park from the Riverside Fields development to the Riverside Bluffs development. When Riverside Fields was approved, the intent with the park dedication was to add additional land to the west so the park would serve as a larger facility for the entire Ex ~'h 0 ,,- ""Z- area. The applicant is proposing to relocate the park apparently due to roadway design issues that would restrict the amount of land that could be added to the existing Riverside Fields park. The PRAB.was generally agreeable to relocating the park from Riverside Fields to Riverside Bluffs" but noted that the applicant has a responsibility to notify homeowners in the Riverside Fields development of this change, and handle any questions from those homeowners. 3. Whether the city should accept the area within the gas line easement as park land and greenway corridor. ' The applicant is proposing to dedicate the gas line easement to the city. However, there is no park dedication credit for this easement. The PRAB was generally In favor of accepting the gas line easement, except that portion covered in Outlot I. 4. The/ocation and size of the park. By relocating the park further west, there appears to be an opportunity to add additional land as this area develops. The applicant is proposing about 4-5 acres of contiguous usable park land. Additional park land could be acquired through dedication when development occurs to the west, for an 8-10 acre park that would serve the entire area. However, expanding the park area would require evaluating the location of the outJet channel. If the channel stayed in its current location, an expanded park would be segmented by the channel and likely cost more to develop due to the need to construct bridges over the channel. The applicant noted that it appears feasible to relocate the channel south, but that would require working with the adjacent developer. The PRAB was generally agreeable to the proposed park size and location, but noted that the channe/location needs to be evaluated further with Engineering, the Prior Lake-Spring Lake Watershed District, and the adjacent developer. This will likely take some time. PARKS AND RECREATION ADVISORY BOARD PARK DEDICATION RECOMMENDATION The Parks and Recreation Advisory Board recommended approval (6-0) of the proposed preliminary plat dated February 28, with the following conditions: a. The applicant shall meet park dedication requirements by providing park land and the greenway corridor as generally shown on the preliminary plat. Final park land dedication calculations shall be made prior to review of the final plat. b. Recommendation of approval of the proposed park area is contingent on additional work with the applicant, the Engineering Department, the Prior Lake-Spring Lake Watershed District, and the adjacent developer to determine the feasibility of relocating the channel, as well as the impact of leaving the channel as proposed in the drawing. c. RecQmmendation of approval of the proposed park area is contingent on additional documentation related to wetlands and the channel water flow design. Wetlands or areas that would be flooded would not qualify for park dedication credit. d. The applic?nt shall be requir~d to construct the recreational trail shown on the plat. F'>c+Ha tT ~3 STAFF COMMENTS AND RECOMMENDATIONS There are still many issues yet to be resolved with this plat. The most pressing appear to be the amount of wetlands in the areas identified as park land, the design of the channel , going west into the adjacent development, and the channel water flow design. If the Planning Commission recommends approval, conditions of approval should include the items. stated above, with the understanding that significant work is still needed. Finally, I would note the fOllowing additional tequirements should be added as conditions of approval for the preliminary plat: e. Connecting sidewalks shall be provided throughout the development. f. In the park area, the developer shall: 1) Fine grade the site, picking rocks and dirt clumps %" and greater in size 2) Provide a finished grade that is approved by the city as suitable for park use. 3) Ensure a minimum of 6" of topsoil. 4) Apply a grass seed mixture "Pro Turf Lawn Mix" at a rate of 60 pounds per acre that meets the followina criteria: Item % of Mix Minimum Purity Germination Alene Kentucky 30 90 95 BfueQrass Denim Kentucky 30 90 95 Bluegrass Secretariat 20 90 99 Perennial Rve Mardlgras 20 90 99 Perennial Rye Please let me know if you have any questions. ~ . ". .. ..... 'PAR:K RJ;QUiREMijNTS"'~ .. ' Existin~iPark,:~a,:~p' 4~tAc. Par~:.E~eqUire.d' lot 101.ijomes 4~O, Ac. ---; 'TCtr~,PARK,REQt1IRED' . r 8.1 Ac. , ~I ~/ PARK PROPOS eli' ' ~ ;Pa~'and GreenWay 8.3 Ae. ,I i 9,i"'line ESm, fofPark 2..4 Ac. ancf ~~ay . To~ Park.~R;)posed i ; " v , jl \ .....,.. " " '. Future Park'Traihsnc.l Realign Stream ' . P~opbSQd:1!a~1 Channel l' Greenway / ' ,Expand.ed Gr~ ~ ....-r.;l!cJiII~:~'~~ ....._M_.......lIlit~ ..;;;~~. ~.....~~~~. ~iI~~' s:F~.i:tfaw...... ~~.,.JllillflltJilJff!!e.. ' - ~. . II "';;..,..." . . . -.- et~ t1I.' , ,"....l""-;t'~;.c- ' " c '~''''';o!..~ ' ~~.-: X ~$.w '"~'lif-' - :t. ........ ."l:l!P.> -:'.;2"" , '.IIlZ:L 1llIIIl. ~--'- @, ' -' '.'~~"~U1 !i!/Iii.~~ ,. _", .- .~~~ ~~:',. -w- ~"- ..".a I:",: .~.. =-. .~ lli'. ,'"", ~<T' iR' ,~tyj Ji"'~_. _.' ._..: ~f -'. . ~;,..~ :e:.o.:~ ~'::"':~~':'~:; ....Jj, ,'.'." ~ ;,~~l.r 12..~~~~ ,.j' . .' .' - .., -... . ...- , .., ..I!\i!Il'4 ... .___'. _.... ..~.~ . '-)if _ .. ... "~4 ~ ..... -.- -..... -,. .... .. '. ~ . ....-. .. n. ._. - --. .-~- .. . --. ._*... .~-_. -- .. ... ...-.. .. - .- ~.-. .-.. .... .. , u . ~i.1'.Ni5'j ~r...-sA.. ......~ . P..'. .~.. ,.".;~.u "'. u, 3641 RIVERS~DE. BLUFFS liE SHEET , 2/26/90 , ,X/XX/XX ~ ..3$41 ' . , E>< +-' Uo \,..... "e. CITY OF SHAKOPEE MEMORANDUM To: Parks and Recreation Advisory Board From: Mark Themig, Parks, Recreation, and Facilities Director Meeting Date: March 28, 2005 Subject: Preliminary Plat Review of Riverside Bluffs, Ryland Development, Continued from February 28 Meeting INTRODUCTION The Advisory Board considered the proposed Riverside Bluff's preliminary plat at your February 28 meeting, but tabled action following further discussion from the Environmental Advisory Committee, which also tabled action at their February meeting. The Advisory Board is asked to remove this item from the table and continue discussion. DISCUSSION Environmental Advisory Committee Recommendation The Environmental Advisory Committee continued discussion on the proposed preliminary plat at their March meeting. They had considerable discussion about the original plat and a revised plat that provided some additional protection for wooded areas, as well as what was the best area to incorporate into the greenway system. The applicant also presented drawings that showed how a trail could be incorporated into the greenway corridor running south toward CR 16. The Committee ultimately recommended approval of the original proposed preliminary plat, with the following conditions: 1. The developer should implement the use of B~st Management Practices for erosion control and stormwater management during construction. 2. The applicant must meet the city's woodland management ordinance requirements. 3. Placement of at least one overstorylshade deciduous tree in the front yard. 4. Sod placement in front yard and seed or sod placed in side and rear yards. 5. Placement of 6" of topsoil. The soil composition should be similar to the MnDOT topsoil borrow requirements. (This is now city ordinance.) 6. Rain sensors for any irrigation system. 7. Requirements in the Shoreland Overlay Zone ordinance should be thoroughly researched and strictly enforced. 8. Mitigation of sound and sightlines from future County Road 21 and a future expanded County Road 16 need to be part of the design considerations. , 9. In order to for the greenway corridor to qualify for park dedication, the EAC concurred with the PRAB's thoughts that it must serve some recreational value, such as a trail corridor.* 10. The greenway corridor should be designed in such a way that it helps enhance a contiguous park area. * 11. The city should research the feasibility of relocating the channel further to the south in order to help provide the contiguous park and greenway.* E",K~ ,~" ~" Park Dedication Considerations Please refer to the attached February 28 staff memo for detailed information on park dedication considerations. At this time, it is difficult for me to give you good suggestions on the proposed plat, because so much depends on what occurs on the Noecker development to the west. One option is to continue the park area into the Noecker development. However, that would likely require relocating the channel in order to ensure a contiguous park area. I will have a drawing at the meeting that shows a revised plat for the Noecker development. Some considerations include the following: . Do you support relocating the park from Riverside Fields? . Does the proposed plan provide adequate active park areas? . Do you support using park dedication toward greenways? Also, the status of the city actually moving forward on Riverside Bluffs is still in question. As we discussed at the February meeting, Riverside Bluffs' approval is contingent on City Council granting temporary sewer service from the east. If Council does not grant that service, this development can not move forward. I will review all of the issues in detail at your meeting on Monday. REQUESTED ACTION The Advisory Board should discuss the proposed plat, and if so inclined, make a recommendation on park dedication to the Planning Commission and City Council. E)<~ \C() rr '=\ -"\ . CITY OF SHAKOPEE MEMORANDUM To: Parks and Recreation Advisory Board From: Mark Themig Meeting Date: February 28, 2005 Subject: Preliminary Plat Review of Riverside Bluffs, Ryland Development INTRODUCTION The Parks and Recreation Advisory Board is asked to conduct a review of the Riverside Bluffs development. BACKGROUND Brian Sullivan from Ryland Homes will be in attendance at your meeting to present the Riverside Bluffs development. This is a +/- 57 acre development located north of County Road 16 and south of the Southbridge development. Ryland is proposing 101 lots on the property, with 70' widths. Home costs are anticipated to be approximately $325,00- $450,000. , The land is currently a mix of woodlands, bluff line, and open areas. The Prior Lake outlet channel rUns through the property. I have attached the project narrative, the Environmental and Park Plan Review, and plat drawings from Ryland. DISCUSSION , This development is the first submittal for an area that wifllikely see significant development in the near future. It is also an important component of the city's developing greenway system, which is discussed in more detail below. Finally, land associated with this application was identified for adding to the park land that was dedicated in the Riverside Fields development to the east, in order to serve the overall area. As you will see, this application proposes moving that park and rededicating new land for parks. Staff met individually with Ryland Homes on several occasions, as well as jointly with other developers in the area to try to facilitate discussion among the different developers so we have a more unified development approach. Ryland has been receptive to working with the city to meet the varied goals for the area. However, there are several ,considerations that the Board will want to discuss with the applicant. Park Dedication Requirements Park Dedication Criteria for Residential The City's park dedication requirements set a standard in residential plats of a minimum of one acre of parkland per 75 people. Thus, one acre of land shall be conveyed to the City as an outlot warranty for every 75 people the platted land could house. In this case the development is single-family units, so the ordinance establishes: 3.0 persons/lot X1 01 lots /75 = 4.04 acres of park land rK+t .0t, q'f The City's park dedication ordinance also allows the City to accept cash in lieu of land, or a combination of land and cash. Cash dedication based on the adopted 2005 Fee Schedule would be: 101 single-family units X $4,632/unit = $467,832 Considerations Greenwav Corridors For those of you that may not be aware, development of a greenway system is an initiative that the Environmental Advisory Committee has been working on for several years. As part of the city's acceptance of the Natural Resource Inventory, City Council directed staff to use the Natural Resource Inventory to identify significant natural resources that could be included in an overall greenway plan. The term "greenway" is a general term for an infrastructure that can do several things: . Protect significant natural resources such as wetlands, bluff lines, woodlands, etc. . Provide wildlife movement corridors. . Connect elements within the area by providing trail or recreational connections. The Advisory Board hasn't heard much about greenways up to this point for two reasons: (1) we haven't had much development occur in areas that have been identified for potential greenways; and (2) the city doesn't have specific criteria for greenway corridors developed yet. In 2004, the city received a planning grant from the Minnesota DNR to help facilitate the greenway planning process. We currently have a planning firm, CR Planning, who is developing refined greenway maps and actual design criteria for greenway corridors. Since we don't have specific greenway design criteria in place, it has been' somewhat difficult for staff to provide specific direction to Ryland on the greenway design. Ryland's proposal attempts to incorporate elements of the greenway concept along the outlet channel and gas line easements. Their proposed corridor varies in size from large open park spaces to as small as a 70' in one segment. Trails are planned for portions of the corridor. However, as the corridor goes south toward CR 16, the trail diverts to the gas line easement in order to meet ADA requirements. The applicant is requesting park dedication credits for the greenway corridor, including the outlet channel easement areas. Channel Restoration Work The Prior Lake-Spring Lake Watershed District has long-term plans to reconstruct the channel through this area. However, there is no funding at this time; Ryland's plans include re-routing the channel in portions of the property, which would entail some reconstruction. However, it doesn't appear that Ryland would provide the same level of restoration that the Watershed District is using in restoring other areas of the channel. Funding the remaining work would be the responsibility of the Watershed District and the City, since we have shared responsibility for this channel. Sanitarv Sewer Service The city's sanitary sewer plan requires that service come from the west in order to meet the needs of future development to the south. However, the applicant is requesting temporary service to the east until a connection can be made to the west. The city's engineering department is still reviewing this request. 5'>,~ lib rr ,,~- Trail Construction At our last discussion, the applicant has indicated that they would not construct the trails shown on the plan as part of this development, and there is no city funding identified for the trail construction cost at this time. Adiacent Developments This development will likely set certain design considerations for adjacent developments. Specifically, Crossings Boulevard would continue west with this proposal, potentially creating larger green space area along the channel. Woodlands The applicant is proposing to remove 90% of the woodland (936 trees 6" or greater DBH) and preserving 98 trees. The quality of the woodland, ranges from low to medium quality, with some unknown quality. Species included box elder, elm, black cherry, silver maple, and willow. Applicant Proposal Park and Open Space As part of their proposal, the applicant is requesting that the park that was provided in Riverside Fields (east of this development) be moved to this development and incorporated into the greenway corridor. This would provide a more central park for the overall area. Although the land was dedicated to the city in Riverside Fields, legally it can be rededicated in other areas. If this were to happen, the original park land would revert to the previous owner, Ryland Homes. The applicant's proposal includes 10.5 acres of area they are calling park land. This is designated as follows: Required Park Land Park Land Prooosed Riverside Fields: 4.1 acre Park and Greenway Corridor: 8.2 acres Riverside Bluffs: 4.0 acres Total 8.1 acres 8.2 acres The applicant is showing a total of 10.5 acres of park, greenway, gas line easements, and wetlands that would all be dedicated to the city. Although the city may accept dedication of the gasline easements and wetlands in order to serve park, trail and open space purposes, the developer is not eligible for park dedication credit for these areas. As you can see, the applicant is requesting park dedication for segments of the greenway corridor. Providing park dedication credit for greenways is a new concept for the Parks and Recreation Advisory Board, and may warrant a joint discussion with the Committee and the Parks and Recreation advisory Board. Finally, the size of the more active park area that is being proposed may not be adequate to serve the needs of the overall area. Environmental Advisory Committee Comments The Environmental Advisory Committee reviewed the proposed development at their February meeting, but tabled any action due to unresolved questions about the greenway corridor. They are having a work session on March 2 to try to clarify the i:X~'~T ~,~ greenway corridor in this area. The Advisory Board is welcome and encouraged to attend that meeting in order to gain a better understanding of the greenway concept. The meeting will be held at 6:30 p.m. in the Council Chambers. REQUESTED ACTION The Advisory Board is asked to review this proposed development with the applicant. However, I am recommending that you table action pending further input from the Environmental Advisory Committee on greenways. i:)e~ua rr t-l, CITY OF SHAKOPEE MEMORANDUM To: Mark Noble, Project Manager From: Mark Themig, Parks, Recreation and Facilities Director Date: March 30, 2005 Subject: Environmental Advisory Committee Review of the Preliminary Plat for Riverside Bluffs, Ryland Homes INTRODUCTION I am writing to provide you natural resource related comments for the Riverside Bluff's development, and the Environmental Advisory Committee's recommendation. DISCUSSION The Environmental Advisory Committee (EAC) reviewed the proposed Riverside Bluff's preliminary plat at their February 29 meeting, but tabled action to have further discussion on greenway corridor criteria and design. The EAC resumed discussion on the application at their March 9 meeting. As with the Parks and Recreation Advisory Board (PRAB), the EAC struggled with the proposed application since this Is a single development in a large area with more prominent natural resources than more recent developments. In addition, there are likely to be other development proposals in the area, and an overall master plan for the area would be desirable. However, Mr. Sullivan worked diligently with staff, the EAC, and the PRAB to prepare a plan that attempts to reach compromise with the most significant issues. Specific items that the EAC discussed included the following: 1. The proposed greenway corridor location. The applicant initially proposed the greenway corridor along the outlet channel. as part of their park dedication requirements. If the applicant was not given credit, they would eliminate the proposed greenway corridor. The EAC had considerable discussion about the intent of the greenway corridor. For example, the corridor could provide a recreational amenity, wildlife movement, or protect a significant natural resource. The primary discussion revolved around whether the channel or the woodlands should be the corridor. The EAC held a special work session to discuss greenway corridor criteria and design. Ultimately, the EAC came to consensus that the planas presented best , demonstrates the greenway corridor. Although the woodlands on the property are a worthwhile natural resource, the are not "old growth" woods, and therefore have less ecological value. The EAC did recommend that we evaluate the alignment of the channel as it moves west. E)C'~ '0 \'T"" \0-\.'2.- 2. Shorefand Overfay Zone Portions of this development are within the Shoreland Overlay Zone. As a result of discussion at the EAC, the applicant adjusted their plans to meet certain standards required in the Shoreland Overlay Zone. The EAC recommended that the city thoroughly research requirements in the Shoreland Overlay Zone and strictly enforce its compliance. 3, Impacts of County Roads This development will be between two major county roads. Future CR 21 is likely to be built on the north, and CR16 will someday be expanded to four lanes. The EAC recommended that the development provide adequate buffer from the future noise and sightline issues from these roadways. ENVIRONMENTAL ADVISORY COMMITTEE RECOMMENDATION The Environmental Advisory Committee recommended approval (6-0) of the proposed preliminary plat dated February 28, with the following conditions: a. The developer should implement the use of Best Management Practices for erosion control and stormwater management during construction. b. The applicant must meet the city's woodland management ordinance requirements. c. Placement of at least one overstorylshade deciduous tree in the front yard. d. Sod placement in front yard and seed or sod placed in side and rear yards. e. Placement of 6" of topsoil. The soil composition should be similar to the MnDOT topsoil borrow requirements. (This is now city ordinance.) f. "Rain sensors for any irrigation system. g. Requirements in the Shoreland Overlay Zone ordinance should be thoroughly researched and strictly enforced. h. Mitigation of sound and sightlines from future County Road 21 and a future expanded County Road 16 need to be part of the design considerations. i. In order to for the greenway corridor to qualify for park dedication, the EAC concurred with the PRAB's thoughts that it must serve some recreational value, such as a trail corridor. j. The greenway corridor should be designed in such a way that it helps enhance a contiguous park area. k. The city should research the feasibility' of relocating the channel further to the south in order to help provide the contiguous park and greenway. STAFF COMMENTS AND RECOMMENDATIONS As noted in the park dedication memo, there are still many issues yet to be resolved with this plat. If the Planning Commission recommends approval, conditions of approval should include the items stated above, with the understanding that significant work is still needed. Please let me know if you have any questions. ~)(-H \ ())\-r- '" , CITY OF SHAKOPEE MEMORANDUM To: Environmental Advisory Committee From: Mark Themig Meeting Date: March 9, 2005 Subject: Continued Preliminary Plat Review of Riverside Bluffs, Ryland Development INTRODUCTION The Environmental Advisory Committee tabled action on the Riverside Bluffs development at the February 9 meeting. The Committee is asked to continue discussion on the proposed development. BACKGROUND The Environmental Advisory Committee considered the proposed Riverside Sluffs development on February 9. At that meeting, action was tabled primarily due to unresolved questions about the greenway corridor. With the help of a grant from the Minnesota DNR, the Committee is leading a natural resources planning process that, will result in a detailed greenway map with greenway design criteria and implementation options. This project is expected to be completed sometime this summer. However, the city is required by law to review and act on a development application within 120 days, unless the applicant agrees to an extension. Therefore, the city must review this application and either approve or deny it before the greenway planning process is completed. The Committee held a work session on March 2 to discuss criteria to be used in prioritizing greenway corridor options. CR Planning prepared a summary of that meeting, which is attached. DISCUSSION Greenway Corridor/Park Land Dedication The Committee had considerable discussion on February 9 about the location of the greenway corridor. There were questions about whether the wood line or the channel was more important to try to protect in the greenway. One option discussed would involve moving the channel along the wood line. The Prior Lake-Spring Lake Watershed District is receptive to discussions about moving the channel, although it would ultimately require working with the Noecker Development to the west, not Ryland Homes. Based on comments from the February 9 meeting, Ryland Homes has sub'mitted a revised concept that would provide some protection forthe woodland (see attached maps). They've also shown the potential for moving the stream. In both of the concepts, Ryland Homes is proposing to use park dedication for the greenway corridor. The Parks and Recreation Advisory Board discussed using park E~.(\err 4-\A dedication for greenways. Although they did not take an actual vote, there seemed to be consensus that if the corridor serves a recreational purpose, some park dedication might be appropriate. Ryland Homes has also showed how a trail could be incorporated into the proposed greenway corridor to the south and still meet ADA compliance. The Parks and Recreation Advisory Board also tabled action on this plat to get further feedback from the Environmental Advisory Committee regarding greenways. I do want to note that the Advisory Board expressed concern about the amount of active park land being provided. As I mentioned previously, the concept for parks in this area involved adding to the park land that was dedicated in the Riverside Fields to provide a larger, centrally located active park forup to 400 single~family homes that will be constructed in the area. In my opinion, both concepts being presented do not achieve this goal. Shoreland Overlay Zone Portions of the development are within the shoreland overlay zone, which extends 300' from the center line of the channel. Requirements of the shoreland overlay zone include the following: . Lots must be at least 75' wide. . 25' buffer along the channel. . 50' structure setback from the ordinary high water level. . Slopes less than 18% within the overlay zone are not considered bluffs. The updated concept drawings have been revised to reflect the requirements for 75' lots in the shoreland overlay zone, and it appears the applicant is meeting the other requirements of the overlay zone. The overlay zone text does state that "lots created through subdivision must be suitable in its natural state for the proposed use with minimal alteration" (Subd. 7.). However, the specific criteria that defines "minimal alteration" are not as clear. I should have more interpretation on this text for the meeting. REQUESTED ACTION The Advisory Committee is asked to review the proposed development and make a recommendation to the Planning Commission and City Council regarding environmental issues. You have options of recommending approval as presented, recommending approval with modifications, orrecommending denial based on specified criteria that can be supported in the city's existing ordinance. As submitted, the proposal appears to meet the city's ordinance requirement. The only question would be whether or not the proposed development exceeds the minimal alteration discussed in the shoreland overlay zone. Standard conditions for approval include the following: 1. The developer should implement the use of Best Management Practices for erosion control and stormwater management during construction. 2. The applicant must meet the city's woodland management ordinance requirements. 3. Placement of at least one overstorylshade deciduous tree in the front yard. 4. Sod placement in front yard and seed or s,od placed in side and rear yards. 5. Placement of 6" of topsoil. The soil composition should be similar to the MnDOT topsoil borrow requirements. (This is now city ordinance.) 6. Rain sensors for any irrigation system. The Committee maywant to add additional conditions as you deem appropriate. E)(+\, o\r +\-; CITY OF SHAKO PEE MEMORANDUM To: Environmental Advisory Committee From: Mark Themig Meeting Date: February 9, 2005 Subject: Preliminary Plat Review of Riverside Bluffs, Ryland Development INTRODUCTION The Environmental Advisory Committee is asked to conduct a review of the Riverside Bluffs development. BACKGROUND Brian Sullivan from Ryland Homes will be in attendance at your meeting on February 9 to present the Riverside Bluffs development. This is a +/- 57 acre development located north of County Road 16 and south of the South bridge development. Ryland is proposing 101 lots on the property, with 70 widths. Home costs are anticipated to be approximately $325,00-$450,000. The land is currently a mix of woodlands, bluff line, and open areas. The Prior Lake outlet channel runs through the property. I have attached the project narrative, the Environmental and Park Plan Review, and plat drawings from'Ryland. ' DISCUSSION This development is the first submittal for an area that will likely see significant development in the near future, and it is an important component of the city's developing greenway system. As a result, staff has met individually with Ryland, as well as jointly with other developers in the area to try to coordinate developments. Ryland has been receptive to working with the city to meet the varied goals for the area. However, there are several considerations that the Committee will want to discuss with the applicant. Greenway Corridor Since we don't have specific criteria for the greenway corridor developed yet, it has been somewhat difficult for staff to provide specific direction to Ryland on the greenway design. Ryland's proposal attempts to incorporate elements of the greenway concept along the outlet channel and gas line easements. The proposed corridor varies in size from large open park spaces to as small as a 70' in one segment. Trails are planned for portions of the corridor. However, as the corridor goes south toward CR16, the trail diverts to the gas line easement in order to meet ADA requirements. The applicant is requesting park dedication credits for some of the greenway corridor, including the outlet channel easement areas. Park and Open Space As part of their proposal, the applicant is requesting that the park that was provided in Riverside Fields (east of this development) be moved to this development and Ex\-( '~\T'" .\-\~ incorporated into the greenway corridor. This would provide a more central park for the overall area. They are also requesting park dedication for segments of the greenway corridor. As proposed, the applicant is showing 10.5 acres of park, greenway, gas line easement, and wetlands. This would be a new concept for the Parks and Recreation Advisory Soard, and may warrant a joint discussion with the Committee and the Parks and Recreation advisory Board. Channel Restoration Work The Prior Lake-Spring Lake Watershed District has long-term plans to reconstruct the channel through this area. However, there are no funding at this time. Ryland's plans include re-routing the channel in portions of the property, which would entail some reconstruction. However, it doesn't appear that Ryland would provide the same level of design that you reviewed in the most recent channel reconstruction project. Sanitary Sewer Service Sanitary sewer service would normally come from the west to serve this development. However, the applicant is requesting temporary service to the east until a connection can be made to the west. Although this is feasible, the Committee may want to discuss any environmental considerations that this has. Trail Construction The applicant has not indicated yet whether or not they would construct the trails as part of this development. There is no city-funding identified for the trail construction cost at this time. Adjacent Developments This development will likely set certain design considerations for adjacent developments. Specifically, Cro,ssings Boulevard would continue west with this proposal, potentially creating larger green space area along the channel. Woodlands The applicant is proposing to remove 90% of the woodland (936 trees 6" or greater DSH) and preserving 98 trees. The quality of the woodland ranges from low to medium quality, with some unknown quality. Species included box elder, elm, black cherry, silver maple, and willow. I did not have a reduced size woodland management plan, but will get that and forward it to you electronically on Monday. Park and Landscape Designer Comments Andrea Weber, the city's Park and Landscape Designer, will be providing additional comments. (They were not complete at the time of delivering packets.) I will forward those to you on Monday. , REQUESTED ACTION The Advisory Committee is asked to review this proposed development and make a recommendation to the Planning Commission and City Council regarding environmental issues. 1:)(+\\(0,'" "I. , CITY OF SHAKOPEE Memorandum To: Mark Noble, Project Manager From: Andrea Weber, R.L.A., Parks and Recreation Landscape Design Subject: Riverside Bluffs Date: FebrnalY 4, 2005 INTRODUCTION The following is a list of staff review comments and recommendations for the Riverside Bluffs Residential Development. Comments regarding site design, planting plans and woodland replacement are included. STAFF REVIEW COMMENTS The following comments are listed referencing sheet pages of the CUI Tent drawing set submitted dated JanualY 20,2005. 1.) Cover Sheet (Overall Site Plan) . Sidewalks: There is a trail connection on the N side of Crossings Blvd. toward Riverside Fields but there is no trail shown in Riverside Fields on the adjoining lot. This trail would serve as a connection to the trail up Rye Ct. in Riverside Fields to cross future Co Rd 21. If there is no actual trail connection in Riverside Fields for this lot, I think the developer of Riverside Bluffs should work with this homeowner and the Riverside Fields Developer to install this important trail connection. . Though they may not be required, sidewalks along at least one side of all. three cul-de-sacs proposed would be beneficial to this development due to the long length of the cul-de-sacs and the topography ofthe site, in order to help protect the safety of pedestrians and to encourage walking for health and sustainability. . Aligning the proposed street stub to the east property line and the cul-de-sac, Street E, would reduce home sites with headlights flashing onto them due to being located at the endof 'T' intersections and would reduce the number of intersections, which could improve safety. . Removing lots along the park site would allow for a more desirabe shape and better functioning park space, especially lots 1-5. . A trail connection built by the developer along the drainage channel would be desirable (see below) 2.) Sheet 5. Preliminary Grading. E)t''tt,r:r,,... J 'Z- . The average slope (though the slope is not continuous) along the drainage channel is less than 0.5% (using a grade change of 4.2' and a distance of 840'). This would easily allow an ADA accessible trail along the east side of the channel. I think a trail along the channel which will be reconstructed as an amenity, is much preferable to a trail along the gas line easement. Though it may require the removal ofa few additional trees, I think the overall benefit is worthwhile. . There are a lot of retaining walls shown in the residential areas. I would recommend a uniform material for these and would encourage natural boulder walls for durability, aesthetic quality, and sustainability. They are approximately the same price as concrete unit walls. . Further grading comments are located in number 4, below. 3.) Sheet LS 1, Preliminary Planting Plan. . The Landscape notes and Tree Planting Detail should show a dimension of 6' -8' wood mulch ring for canopy trees (as in current International Society of Arboriculture details). . Plant List substitution of Red Oaks is required. Red Oaks are the most susceptible to Oak Wilt, which is documented in nearby areas. In addition, acoms droppping onto roads and sidewalks is not desirable for maintenance and safety reasons. Bur Oak or Swamp White Oak may be substituted in the park site if they are moved to 50' min. o.c. from the curb line to minimize acom drop on the road and sidewalk surface. For residential road sections, Red Oak may be substituted with , Hackbeny (Celtis occidentalis) or Ironwood (Ostrya virginiana). . Screening: most lots along Eagle Creek Blvd. have adequate evergreen screening from traffic view and noise except Lots 2-4 on Street D and Lots2, 3 on Street E, which should have screening added unless a solid wall is proposed and shown on plans. . The existing tree line and existing trees to be preserved should be shown on the Landscape Plan. 4.) Sheet TR 1 Preliminary Tree Preservation. 0 The tree replacement calculations are based on all woodlands on site being low quality. This is incorrect. There are 4 woodland areas defined on the site; one is "unknown", 2 areas are medium quality, the last is a low quality woodland. The "unknown" quality area will require further review by staff to determine a replacement rate. The medium quality areas require two trees replaced for every , three removed. Low quality is as stated on the plan. The different quality areas will need to be separated on the tree inventory and recalculated according to the appropriate rates. The developer should contact me for further information on the location ofthe woodland areas, if needed. A copy of the woodland areas is attached. . The proposed amount of trees being removed (90%) shows little attempt to preserve woodlands except where it causes no challenge for construction. Taking the Grading Plan, Sheet 5, into account there is the potential for small clumps of woodland to be preserved along the west side of Street A, in back of houses on r,)('+4\G" T . -~ the east side of street A , between Street E and the gas easement, in back of houses along Street B. All of these preservation areas would require little or no change to proposed grading. . There is a significant amount of grading shown in this site in order to achieve walk*out and view-out home sites as evidenced by all of the retaining walls shown along the backs oflots. Ifa more sensitive grading approach were taken, it would be possible to save more trees. Some areas where less grading could allow more tree preservation would be: along the west side of the channel near Street D cul-de-sac, Lot 10 of Street D, and around the Street E cul-de-sac. In these cases, the economic value between a "partially wooded" lot and a walk out could be reviewed. . Another factor to consider is that the developer is only proposing to plant the same number of trees as their (incorrect) mitigation requires. Preserving more trees may help offset the recalculated value of replacement and thus be of benefit to the developer and the woodlands . Tree preservation fence should be labeled on the plan. - ~)G,",\bT" ..l\ . r::r:;Ofnt. 700 West Linden Avenue PO Box 1165 Minneapolis. MN 55440-1165 February 1, 2005 Mark Noble Planner 129 South Holmes' Shakopee, MN. 55379 RE: Proposed plat of Riverside Bluffs Dear Mr. Noble: With reference to the preliminary plat of Riverside Bluffs, Cent~rPojnt Energy does have an existing high-pressure natural gas transmission pipeline within this proposed plat. CenterPoint Energy strongly objects to plans as prepared. I was contacted. about this property recently and forwarded a detailed letter to Chad Baker at fax #952.223.4240 as he requested. The letter dated January 6, 2005 explained the details of this natural gas transmission pipeline and the process required to develop this parcel. Copy enclosed. rhe information prepared by Pioneer Engineering is incorrect and with many flaws. They are listed as follows: 1. The transmission pipeline easement recorded as document number A631418 is not on any part of this property but for the property immediately to the west. 2. The transmission p,ipeline easement in the Southeast quarter of Section 14 was reduced to a 1 DO-foot strip according to Modification and Amendment of Easement Grant, recorded as document number 117360. 3. The transmission line easement in the Northeast Quarter is an existing blanket easement filed with the Scott County Recorder on November 25, 1939 in Book of Easements on page 97. CenterPoint Energy will release the existing easements over the above referenced property upon receipt of a new easement defining an SO-foot wide strip on the south end where the grade is steep, and a 66-foot easement over the remainder of the property to the north. CenterPoint Energy must be contacted as soon as possible before this objection will be removed. My telephone number is 612.321.5381. Respectfully, CENTERPOINT ENERGY ~ t{!l~ Steven Von Bargen Right-of-Way Acjministrator P.O. Box 1165 Mpls., MN. 55440-1165 pc: Brian Sullivan, Ryland Homes .\ E')(\-\\ ~\\ ~2- ' ' : ' . CenterPointTM 700 West Linden Avenue P.O. Box 1165 Energy Minneapolis, MN 55440-1165 Minnegasco January 6, 2005 Chad Baker by fax #952.223.4240 RE: CenterPoint Energy easement #887-1-24 & 887-1-23 East half of Section 14, Township 115, Range 22 Dear Mr. Baker: In response to your request, CenterPoint Energy currently has two easements over the parcel number 7 you faxed recently. That part of the parcel located in the Southeast quarter of Section 14 was reduced to a 1 DO-foot strip according to Modification and Amendment of Easement Grant, recorded as document number 117360. Copy to follow. As to that part of the parcel in the Northeast Quarter, CenterPoint Energy will release the existing easement over the above referenced property upon receipt of a new easement defining a 1 DO-foot wide strip, 50 feet on each side, centered over the high- pressure natural gas transmission line presently located on the property. The existing easement was executed on October 24, 1939 and filed with the, Scott County Recorderon November 25, 1939 in Book of Easements on page 97. It was subseque'ntly assigned to Minnegasco according to Quit Claim Deed recorded May 18, 1987 as document number 234148. Copies to follow. CenterPoint Energy's pipelines are operated and maintained in accordance with the Code of Federal Regulations, Part 192, Title 49, "Transportation of Natural and Other Gasses by Pipeline: Minimum Federal Safety Standards. The first s~ep in this process will consist of CenterPoint Energy personnel locating the existing transmission line and marking it with yellow stakes or yellow paint. The next step is to tie down the natural gas transmission line to a current survey of the property. This survey must be completed by a Registered Land Surveyor and define a centerline located over the transmission line to use as a legal description for the new easement to be executed by the current owners of the property. The current owners or any party other than CenterPoint Energy will pay all costs for this survey. Please provide: 1. The legal description and survey as referenced above. 2. The names of the current owners. If a corporation or partnership a copy of how the signature block should look. 3. If the property is Registered Torrens or abstract. If Torrens, the certificate of title number. 4. A copy of the development plans for the area. We must have a copy to review and approve to insure all safe conditions are met in the development. E\t"" \~ ,\ ~ .. SCOTT COUNTY PUBLIC WORKS DIVISION ' HIGHW A Y DEPARTMENT' 600 COUNTRY TRAIL EAST ,JORDAN, MN 55352- 9339 (952) 496-8346 . Fax: (952) 496-8365 'www.co.scott.mn.us LEZLlE A. VERMILLION PUBLIC WORKS DIRECTOR April 14, 2005 Mark Noble City of Shakopee 129 South Holmes Street Shakopee, MN 55379 RE: Preliminary Plat, Riverside Bluffs CSAH 16 and Foothill Trail Dear Mark: We have reviewed the request for a preliminary plat and offer the following comments: . The proposed road onto CS~ 16 shall require an access permit. . The proposed road onto CSAH 16 shall require left and right turn lanes to be constructed on CSAH 16 to County standards. . The minimum right-of-way dedication for CSAH 16 shall be 75 feet from centerline. . The existing field accesses and driveways to this property along CSAH 16 shall be completely removed from the County right-of-way and graded to match the existing ditch. . The development is proposing a pond in part of the County right-of-way for CSAH 21. The pond would also need to provide a stormwater benefit to CSAH 21 in order for it to be located in the right-of-way. A permit shall be required for the construction of the pond in the County right of way. . Noise issues along the County roadways may arise as traffic levels increase in the area. Noise attenuation is the responsibility of the developer and City. Has there been any noise study perfonned and mitigation proposed? . The proposed trail in the County right-of-way shall require a pennit. . No landscaping, ponding, benning, or signage shall be permitted within the County right-of- way. &t.h~l'" j~ .' Chad Baker January 6, 2005 page 2 No more than 1-foot' of cut or fill will be allowed within 10-feet of the pipeline. According to paragraph one of Exhibit A of the easement "A level area of not less than 6 feet on each side of the pipeline shall be maintained at all times. Slope beyond 6 feet from the pipeline shall not be steeper than 4 to 1, unless otherwise agreed. Any amount of cut or fill, within the 4 to 1 slope area, shall increase the width of the level area on each side of the pipeline, by that same footage of cut or fill." When you provide all of the about information, I will then draft a new easement and a release of the existing blanket easement. Two copies of the new easement will be sent to you for execution by the current owners. I will also include an . unexecuted copy of the release for your reference. When both copies of the easement are executed, return them to me and I will have the new easement and the release of the existing easement executed by a Senior Vice President of CenterPoint Energy. The new easement will be filed immediately subsequent to the release. Please contactme at 1.800.234.5800; extension 5381, or 612.321.5381 to have the , gas main located .when you are ready to have the area surveyed. The transmission line .will be located within a week after you call me. The survey must be completed within days of having the line located so these markings will not be disturbed. Respectfully, CENTERPOINT ENERGY 5PtLllr- Steven Van Bargen Right-of-Way Administrator P.O. Box 1165 Mpls., MN. 55440-1165 Steven. VonBaroen @CenterPointEnergy.com t)t:i-\,~ ,\ ~ t.- Riverside Bluffs Page 2 . Any change in drainage entering the County right-of-way requires detailed stonnwater calculations to be submitted to the County engineer for review and approval. . Any work within the County right-of-way shall require a permit. Thank you for the opportunity to comment. If you have any questions, please feel free to contact me. Sincerely, ~ Craig Jenson Transportation Planner <:( ....2'1 ~~: ;:) .e:.~ 0 - I --- I I . tt). ~ ...,1 ('.II 1 1 ~I 1 COI r--i col ....1 ('.II ....2 ('.1ft ...,! , ...,1 ~J a()! I ! ! :I ....~ !, ! ! ! I ! e . . ~ 9 co- JlG'aC..._ -JIO'Dl._ _JlIllllL__ .All1ll.._ _.JI:I'Dt..... .l1ll... .. _..JVL.. ...JIl~ ..AD'Qt._ __.JlG'K.__ . ~ Ii ! I ---6"'IIi--- --11"'&- . "'-- _.ATII<.. -'1AI'G!'"- -'lGtlt"'" -,.,...- a() I J . col 101 ,....1 ''''-., -tInII- --fJcn:ID-- --6"Q,-- -fi ....8 ....5 en ,/ ,"""'"', \. ! . ...,! ('.I! . :l " " ... . ('.Ii I ""I ({, },-........ ) I <0 I ---- ....2' P ~ 8 . ! '. ~ ~ ~Ild , '---' / ~\ 5 '~'J ~ :l I ~B ' . --- '-.. _/ I _.It) --- ;:) ....... .... . ~ ~ ~ -_~,1- ------- 0 --- I 1I I OUlLOT C II l.1fllllaWlo . I ___~- OUlLOT 0 -- ..;en..... .11------ -- -- -- -- - 101 t . I ....1 ~""i I :l 10)1 I ,. I ; . ...,1 ---Single Family Setback Check Ust--- I 5 . - Nole ...... NA lIIl... Infonnatlon nol oppIlcobI_' Pfo;.ctRMflS2DE BWf'fS 0l1lnl:R'l'LAND HOUts ... f. U/I/D< Pr.~ Uora~DtAN A Dcdc: 12/1/04 I ...... Corote' 'lliUMotIM to A-g...W -30" Hause fo&Inctollan to R-o--W _3Q" . Carove '~UOl'. I. CVl'tl _HA Gar.,. fClWldallM to cvrIl poriIlftt ba~_NA HouICt fouNkrtIan tD curti _Nit . SleW ~'9'" ,,~;oa to am. .0Iklnt ... _flA co! Aecw-3D lu.dInQi 10 BulldlII9.%ff ! Spfdrc ..tbGcb: Pka\ bcuNSor\u _:Ii 'Petlft *"CIl")' Rne(s.); __.lla'K.__ -.JlalU..... _..~__ R-o-w ~...., 'hen \)p1a!II _30' CD. ,,1M' -,tdlf 1-0-1'1'(.): Wetlands. , HMo dhOtiott ., ..... SttMdl "4lITI HM. -30" HYl\. ..W1t1an ., ~ $c,1tock From HMo -30" NWI. cMllon _ , Lake HYl\. ., K~ NYalion -t "''''- I I:cteI'I'lMlAr\;.. ...It CWcdlMt ., ...... ,~ :;z:: ~ &J~O::IIH1tS llllowed h ..Ibocks: ~ I ~~~~=_:"=-':'-..::'::' [(~~t "r~'[~~ '.,~~lr;:' ~~'(r ':a BB ~/~ ~ """,'- ---------- r.....(l)/.]lold.(1)I.] [""mI.] t to a{!JI. loa 50 0 loa .....:~~~~~.:.._-_. r'""Cll I ~ ramI 'j rGlI ~ f to i1GlI ~ ...... -.------------ ..... Y I' old. Y I' ,,.. Y 1M. ,. . Y I . I , . I 3... SeoIGft pClrth.. ----- hnt 't I ~d, ... Ie ,.cr Y /.N B to B Y I N .pollett: -------------- fr..,I'" I Nt tllde T I Nt n1cr Y I ~ B 10 B Y I t_-_____ _Cll/M ,"'(l)/' _@ . .'..Gl/M] Scala In Foal -('I'''' pitt ...-...--------- (hnl. 'V I N] older I N) tHf' Y r'N] B to 8 't I H) . EleCKS, PAtIOS. ECRtSS PItS-MilCH fXCttD l' 1M ~ S\U.U. BE AU.DWt:D lO 8[ LDCATtD ui a.OStR 10 RW PROP. UNE' TWAN IS RtOlJRED 8'1' I>ESl'.N STANDARnS Cf' 1HE 20NNC b151mCT IN 'MilCH lHE DtCK IS l~1ED. DOUBL! FRONT,," L015 (LOYS Mnt FRDHTAct ON 2 PARAU.D. S1RttTS). $MALL BE EXCllJOEO rR()l.4 1HfS PRD,*,SION DUt 1'0 tHE AtH)I1JON DE:P1If IU:OUtRED Df' 'THEse LOll PROJECT NAME : SHEET nTLE : NOTES : RE'IISED : ENe. REVISED : 3641 RIVERSIDE BLUFFS TIE SHEET 5/12/05 XX/XX/XX 3641 PROJECT If: 104290 DRAWING: 104290101,DWG . . RIVERSIDE BLUFFS' PRELIMINARY SITE, GRADING AND UT~ITY PLANS SHEET INDEX' ,SHAKOPEE, MINNESOTA ,~ ~:~~~SITEPLAN ~\ I ~ f') ~ t~ ~ T F D 3. EXISTING cONDIDONS . , . ~f'<># ~""f ,,~;l;,l II r 4. PRELIMINARY PLAT \ ~~~~t I ~...L_+-l, ! ! i I' I I I 1 1. i " _ I Y ,'l' ~ ,,~ ~ ,~~.. ' . 5. PRELIMlNARYGRADJNGPLAN \ - _ r \ . . ---r-J , R1VER~lDE F1E/LD 2N~ ADDl~ON \ ' I UTILITY &:,' ,)1 \ I 'f' I T-"-r--~--I-- I I i I \ ,/ 'f!'ll 2 o~ ",i'l"" ,6. PRELIMINARY UTIT1TYPLAN \ ~,' I ,., I I ~' , I ","Ill! h '.) 7 PRELIMINARYPRO:CTT l:l~ " ~I' \ I I I ' , , I I /~ ,~ '. ~,..... ,-,,". . r~ \ " \ I : I ! I i I / ~ 2 _",/ J' ' , 8.PRELIMINARYPROFILES IOOSIlNG PllOPOSfIl DESCRlPllON \ ,fI--- "r:::t, R1~StOE FlrjLD 4TH AqDl11CJt1 [J 2 --' : J 'i'C\NE'';R 9. PRELIMINARY PROFILES if f( ImlRAIIl(S) ,I: -.... I;' ""', \ I f I I J, " r ! .I t. \ 1><1 M GAlEVAL~S) \\' 'I f(. \.,,-,----1 I I ! I ~ O/f:'-10 J I ( ~"'i(-'Ir..t:E':::r'il,I(' pf. LS-1.PRELlMIN, ARYLANDSCAPEPLAN I> . REDUCER(S) \\ I: -\'~. -- ~. I I ~ e:f\j,'I~L. .'\,.\<..:3, ..\. TR-ITREEINVENTORY , _ _ -1-.-- EXiS11IIG WAlERMAln \' ). ~ _-' R'IE COURT ' I . _1- I'ROPOSED'ilAlER\.WN \ 'f. ~- \),., ' 'I 0 TR 2 TREE INVENTORY _ _ _1_ --'- FUlIJRt WA'IERllAllf , \). ~' ...- / 0U1l0T B ! - . o . SANITARY MAH/lOLE(S) \ \ "'F I I! I I I ., _ - - < - - - EXISlING SAIllTARY SE'toER \ \ I' I I' I, I I'!I I ' \, I'OND ' ' .-<___ PROPOSED sANITARY ~ J , " I, t I . , 1 - - ... < - -- FUTURE SAIIlTARY SEIlER '" \ \. ~. \ ;' I I , I I 1 1 'I Q:t:J ", I ' ~ [J . CATCH BASIN a \. , , l I I , I ,I ' o . I.lANHOlJ; i\\ ~ '" ! I jl I' I I' I' '. "I' 1/ /I I \ 1>" FlAAEllEND 9. \ --- " ' f , a " ' IIA /I e 8 BEEIt1\IE ~ ~ ~-_' I I , - - -<< - -- EXlS1lna S1IlRlI 5F/.ER ~ ____--- - -- @ · "" I -,.... 1-' -- -- GJ D) / 1.# 'I / / ----<+_ PROPOSED STORM SEIlER ~ ' , I I , 13 f:\ ,/ _ _ _ << ..: __ FUTURE STORll 5F/.ER '12. \,' 9 ' ......... 2 ~ I -:- =:~ \\\ r<~01[JEJ~_D'!I' . 0<dQ' -~ O[JqpDq'~ DDEJp c=J i CJ / I L/ ~ IGjW~ 'f!"ll ' ,2 I SlREEl' A -,. "l'" f) - r&:~i%j:~ CONCRETE SURf'ACE \ I 7 / / ' OUl1.OT C I'/::'\. . ! ~ .7 FOOT Hll1lY o fiELD UlCAWlIlANlTARY OR STORId MANHOU:' '/' J, rl ". ~ I ""'I. ' ... fiELD LOCAWl Hl'DRANT . r:l 18 I ~~. '\ I ,- - I Q 0 [] - If FlELD UlCAWl SERVICE \. m .9 I 18 17 , 0 ~ .'" ~, , , I 8, ,I I ~ fIElD UlCAWl LAIlN SPRInKlER VALVE II " · J 2 I .. FlELD I.OCAWl LAIlN SPRIIIKLER HEAD I . Iii - --- I, ~l.~~ I",~ i- '-\cl[J Q I, ~ EJ ' ,0 I .,.. FlEUl LQCATEIl WAlER'IIEU. ,_ el' -'" ~ ~,.t.!I.i "" 2 · 102 C]f 5 ======.. FlELD I.OCAlED CULVERT I 8 ~~G W!;. . ""'?I'JI I 11 .! I 8 I Ilil FiELD UlCAml CATCH BASlII 9:::---' ./ I ... :!h I _1--- AI. fIElD LOCAWl FLARED END SEcnON ' -...., 1& '", ,I --- -- ~ FlELD LOCAlED 'lREE UNE I ' , ~ ~..... I D r;l I, r-;-l ~~--~ -" - -::!:_-==-=-= e fIElD UlCAlED lWOR lREE " -_ -, ., L.:-1 f L-LJ-- \--. I - I I j-- -oh-oh- FlELD LOCAlED OVERHEAD unUTY UNES ~ '.... I ' ----- -tv- tv- FIELD LOCAlED UNDERGROUND lELE\IISlON UNE V~O' ~ 014 t-._~--, ' ~. . ~ ENERGY~) \\ 9 \" -, 9 -= .!L:: 9 -I -1- -/ -teI-tel- FJall UlCAlED UNDERGROUND 1EW'IIonr; UljE VI 0" ... ---- JJ 9 9 9 \ \: '1..."- r--------- -to-to- fIElD LOCAlED FIBER OP'lIC une: ,II '-', I g' 9 . _ue_U._ FIEUl I.OCAWl EU:C'I1UC'UlIE 1 1~ - 9 9 - 9 - g~ fIElD LOCAlED UNDERGROUND GAS UNE CD I ~T' 10 , \> >:./ - t Ai'" ~-' ) l\~ ..... ,l <) ~ 4 SIb........... /. [J W I -,-x-x- FIELD I.OCAlED FENCE une: ' CJ 4~) JT~ ~~p 1\ ....:, ,'~ '" I 1 . fIElD LllCAWl EU:C'I1UC BOX '.~ /' V AT , / ~_,~.D" %. \~\' · ~ ~ '\ '\-.: I o FIELD UlCAlED ELECllllC BOX , t;;t' ./ - - , *':11II: FlELD UlCAlED UONIlllRlnGIIEll. Y "'" --- - -.- _ ", 7 ) 7 a FlELD UlCATEIl lELEPHONE sox ' ,,.-' /' WI ,~- l'-~ - )} c-l j- - 'J - - - - - IJ FlELD LOCAlED 1ELE'ASION BOX ./- ,/ '.' ~ ',-_ ~ -, a fJ........~i *' ==;:~I'~ __/~~' /~1I,/'/ f-ElCIS1IHGalEEKCEN'lEIlIJHE III' .,$- --0- ""N." ~~ -~ 1[]/ I 0.......... if ,j 1& fIElD UlCAlED lEST HOLE ;,' cP ... ~ ,," , I ~ 1 I -- ..... ' ''<l - , 8 [] 3' ":>- ;:; CI FlELD LOCAlED MAIlBOX /~~ // 'I () I ~--_ 0\1!>~...._ ( 4 ,/. .."... AaD LOCATED SIGN ",,' , t{j\V'"~,,, ,,-' I . "" ...... Q;: I .... / ROAD~~~~BJ1UMIIIOUSPAlH'_'"""'~~'t ,/" / r;-], Iii []2 II', Oci ',,- ,<<~ -', I //' V IMPRO.~,~ .' .".,. " ,LJ m ,"])-, '- Cl?; - I I ' :,....--CURB UIIE ,/.., ,/~ ,.-." , I I '',Ol"{) ',- '- ~..,~ _ "'---'~~"'" / ./ " I 0 I ; , ,,< - ' COU~~ Y!"~ ,-' .".,.' ,,", . I 8 [] I ' 'l Q;;~ -"-- ____ "......,_ ~ / ..' I 3 I' , " (;)'-01''''' --_ ,,.- i 11\ I,' ... -. =----RIGIlT-or-WAY unE /' _,." I I f'(lIO ,/I, 13 '----.. ~ ,. _'..' ,_'''. ,.~.,"' _'".0, ' , , ' " ~SETaACKUNE ..," ~ b" J_~..,ti.frA. ri!t~!t~$:i,t""";I:i!:r~g~~tr~.' ' '. , I ' ~ ' ~'~f ~i;i':~~",~!;~~1i.~I:'r' io: .' ",,' ,,,,:< ' I [J r:I I, I II [;j::-'::: - '....~-_ "-" .... I '.:(; ;~',-{;'::-:/',,>, >i;<~ ''f''':~.!}tf~ ;<J:;':~o,)~'f' . ",0 '1'iitf< ': LJ, : i '\ "" -, I '~J, ,i,':,,.", ,~.",fJ,o/i ,,~,~~ i;;t:!arJ.,;d~1~, ;;:0., ;,f;a;;;.~,;,'i,*" '0: 11 '" ~.-:.. <; . V'.;.,.~. . 7-......h. ....;.\"':t.t ....T ;,,~. ~,:""'~"':'v.r'ti""",'1 ~ · ., ...~ . __~~It ~1'~.;'!{~~~ PRBPAREDBYPIONEERBNGINEERING.P.A. ~ ~- I L f.( 0/ (( -'t-_ I ,(]l*j!t:~:!i\f~.~f~i~B~~~'~~.;.. :-;:~~l!'~~~~ ' ~ ----. '..' 11 ~ 0 - 0 / Sq1w.;'tJ'if,!~jfjif':, -,. ';1;'~\('ir.'fll.lifJ,f' ;"~'~"{.:'~'f$~~;ijf.;4; DEANM.ROBBlNS ,r-;l I ~ ~_ 1 _ ' 1, , ~~;~~'t~.~ ';,I' ,.' ~ i).;'~'I~l~1<I'.?~:t.... ~.s:,'" .. ; > r. ;>~ ..,':\.~. .:.~~'!},:;.. ~ r ~ --"-- - I . The ",tormatlon ond/or ,""",ring, end mop. conloln'" hem. ..<11 o. ofT..l .:,'.?,,";ii'~"J~' o,,:,~, :,< ' ,,,,,,'!.>!'1,?':;:l!.-:::M1\t~J,1.j.~ ~~~~ PROJBCTCIVILBNGINEER. [J OJ [J [] fGJ------- [Jj::-i-J and' lot Joc=Uon. dlmen5lons. cree.. kmdsCdpfng and cunenittes. ant of the ',:bfi-;i.?:.,..t :c;..:~t;':1.k'1...... 1",;..y:!.~~f.jt1~ffL;l.i;:1~!_'0.1~~i ;'. . ;. ... ...-..... . .. . lOle purpoM of d~C\ln9atJG poutbta "Rlyot lMto p....,uu" ... d ..~t"'bJe.t ::;-Sl.:~~.:~~~;'~;~;"1."?- """.f;if.i~<!;:;;;!ii;"Il'li~;t~~\-i'l',&;:'i.~~fti':rh DBANM.ROBBlNS ,8. 9 I I. ,2' I loch Itonoreprcsent onorwarron GS Jott..'Y' 0........,...._. ';'.......?f,.I~"!~'f1il1:j~~"".M...'\.:~:"ii".'l.~.:'I"._.-.;..:i.i"::~"'.II"l;~.jIfJ:I;,;rt: .,~;~~.'....~;~..., .... . .wn~orlondu.eof..",proporll"lebelngrnocle,endBU)'0'8'hoUld t1""~~':':~"i'~~~'f'.~i'i"""'>-'I,,~I~~;.-~-~~~nr'-":i;"l~tlO~ REGISTERED PROPESSIONAL qvIL ENGINEER G \ I . "~ ) '--:..;../ I "o~ and 'Hal not rol'J Q!\ the. InfocmuUan fltd/af" renderings and maps or ~?\';:<~ .~Ui ~~f.:':-::4;'.s"tp;';,?~~"" ,'l~~~"I ~"t1~r~i'iJlf!~"';1C: ~.'~-':""'1'."" ..... \~ , If: . fl (;j ~ ~ vSows' contained herein in d&eldlng to purchase any ~ert~ It=- ;N..!I!tJ.~~-;1~'tJ ?i:~'j~1:2~~:f~.t~%~:'l'~ ..:~f'~;*~!~~~; .r!~ :Ji;;J !.~~ t1.:-':~~~" ~ 3 ....... . 3 Pion.... El\gIM<rirog. 1'.... moke no _lie. or r.proo...tatJon. 01 any kind :lt1iNig:~r.i,;'~~~~1{~@1,.,tl{},~.:!,' '>-" _,~;g~j.\i\m(~.~'" ; , f,~\~' :" REGISTRATION NUMBER ~ "," ~!. "- or chGt'a~U'. e~reuled or ImpU&d. wIth respeGt to th. matters depfcted or ::1~'t3....t~.:::'P.~'.'~"1I 1'~~~"t;.::v;;"" ~..,~..:r:' .;:/..L.; . ......:... 1"'1._ n'f"~ '- ~ L-J ffi hJ4 S1REE1 D . '....... II -- - - cownd by the tendetfng. mwlng" and ether InfonnoUon hereil). :,:t';:f~J!'~'''.'' ;;' :':~~'::=f~.'&f.f./l~'L(~~1.;~\'1!~' ;;J(.:'1!. . ~-I; .:t:.. ~' I~"~~ ~...,~... --- - . "'7*;' <:'..~ .~ f.;:t/.-~.':"',~,"i->>..'.fi:;j;l~.t;.... '~-':l. ~~;~~~~#'!r'/~-~. ~:j~~~; '. ~.. ........ for detaDs of exlaUng developed areOf, refor to ih. recorded fined plat. tiJ.~~i' .{" ~~1.?lr~:1{.fv-*F.~~';~~ '~;"'"iil;;\~i~~~ ,,~. i" ,","~..;;r~~ ,~:~ DEVELOPER . ,. J f 4. '" '... .... :;z: .. Tn. owners or the property shown end thelr successors end assIgns reMM ..Y'Pj{? ~ .J.'\'::t~~s"-;~'i~~~~?t: ~":~..;.::~:.:...;;:.~~...... .'....~-::'.:: ~ :~ ~}~ ;.2 . . . I . ~....-_..------_._~ .'"~""""'."".~1I'1t """'~",,r.(,,,..,.~:,_~~ RYLAND HOMES D [:J tJ DO EJ. 00~ I, ""y port(,) 01 the propertle.., ,Ai'i.i~g)?l4r,,1~,;:Mr~l' ,;lW~'f.~'~~~:,~~ 7600 EXECUI1VBDRIVE 10 9 · 7 8. · ~c.?{ I f G? Ii T The d......operr_.....lJ1. right to <I1l1119' tile pion, wfthout f1!rfJler noUc.. " .' ",1".*, ''1-'.':.'''' "", "v.;~ ',,'~''''''~,;<,,'ifr1i''''''''''''"<',.'. ." .".,"" BDEN PRAIRlE.MNSS344 D ~ , CONTACl':BRIANSUUJVAN. '. , '- Subject to City end all Gowrnm."l opPlOvaI.. LOCATION MAP LAND RESOURCBSCOORDlNATOR h---. --- ---4 ---\1 LJ I GlllIPffiC SCALE IN FEET PICNEERengineering '. PHONE: (952)229-$16 /'"...- , "S- - - , 'O<290-PIl&C/l< CMI."""'- .............. """,1lJO"""" ....OSCUIAlIClOl2<1I lboRby....u)<"'" ""'.......I"l"""t>y a..u.... "'" ,,2ll<lS RYLAND HOMES ~~D<I.;.SSl2D MendotiHeighlSOfficc ~~.tJ.~'Mir~ :,~~~~' """.....-, tlroI DMR COVER SHEET 7600BXECl11'IVllDRIVI! RIVERSIDE BLUFFS 1 01' 9 (6JI)6aJ.l9,a:;.o:~&1~HI (763)7B3.1880PD:78J..1883 lWicrlhe:I&""arIh8S&ll&ot~ Re#-No. ~ DIla~ Om.." JM.PC EOENPltAlRIB,MINNESOTAS5344 SBAKOPEe.MINNESOTA ...- - - -._- . , t> ~~\~'~I-r= ~~~ ., 1, 'I \-\{;j ~ . ~ ~ 0 O~h~~ ~~ / . . ~ __~-.. __. L4~C: ~ A/l . .' ~ J g FII tLJ)S\ ~4' ,~ -- ::">/ ? ~ J I , . E:~I:'! rI~. I ~ ~ & '/.." '.h. '5ti '~I --= :J "~ ,n 7 "'=- J ~- \SA . ~ ~ ~~ ~ ~ "'~r= . -~ - I ~ ~~. . "H' 7~ ".,i ' ' J. ' , \\ \.,.. '~,. .1. t .I~I' · +: Ii +'1/;8 Qffh~ow"J~" ~~ 4EZ ~ . . au=." ,P '- /......' Ii ~ ~oo <100 ~ I t ~ 'C: .. · I 4~':: ~ : 0: ~:""J II Q'h 'f'l1E; Q .[;1 GRAPmc SCALE m FEET ! B /::' \,. =..,_\\1 ~ . I' , 0 ~ I .. \,,' 'II , PREPARED BY PIONEER ENGINEERING, P A. ,0 11 12......,;"j --- m, ~ I cP "//j'fiQI ~ =, B 1 DEAN M. ROBBINS I I 1 --=, 7 · 7, ....-::1 . 1---' I- f--- " @' PROJBcr CIVIL ENGINEER . <,~ -t/.. 1 ['.., · . 3 , DEAN M. ROBBINS ~p --- '-'. ' REGISTERED PROFESSIONAL CIVIL ENGINEER 4]968 ,,/ REGISTRATION NUMBER V I / "--:--U' ~ V N EKOER RTY I ~ · II 'I 1\ . DEVELOPER I~OSED D PMElL I ~ · .j. .N) .. . RYLAND HOMES 1600 EXECUTIV:Il DRIVE EDBNPRAlRIE, MN 55344 II ~ I' · COlfI'Acr: BRIAN SULLrv AN, LAND RESOURCES COORDINATOR =- I ~ I :... '/'/1 · · \@ PHONE: (952) 229-6046 I I I I 1- I J '1= I I ~ r I' F ' - I I I I I I ~ i 1. . Irq, . PlaNEERengineering 100290.PBp;.stm QW.1iHOttDll!R! LUl:)~ WlttJUllVJlTClllS UNl':lSCAJ'SAIaimlC1'I .-....,ry.......""""..._br Rcvblaac RYLAND HOMES ~:~~~SSl2'l MendoraHeighlSOfl1ce ~'t$~~33 :'dw";""u::i'...:=e.~' IJoo4M.R.b"'" PRELIMlNARY SITE PLAN 7600EXECunvEDRlVE RIVERSIDE BLUFFS 2 OF 9 {~1l681.1914P.IX:68t.f48J (1631'lB.1.1RalJF='lB3-US3 tzn4ulMIlZ\lIlor&h4SWaor~ Rcj!.Ho. ~ ~~ 1!DEN PAAlRIE. MINNIlSOTA SS344 SHAKOPEE. MJNNllSOTA " .--..-- " , ,""): PROPO~ n'r-At D~ON ~ PRFtIUIHARV PlAT PURPtl<:R mrL'" 1ft.. Eoat S9t.75 t.et or the Sou'lboast Cllarter .,til_ NorUleost Ouorter or SecUon '" Township 115. Ranis 22. S~tt County, UlMesotc. Taglth<< with: CD :'~:!':1 ~~ =ty ~~a~N~i~ Cuorler or SaoUon ,... Towhaftlp 115. Ronv- 22. . Sc:ott Count)', lAlnas" l)fng northerty of the ,., ~ <0 Together with: .. AU that port. 0' CU60t C. AIVERSoE. FIELDS 'ST ADDmON, oec:ordlng to the ~lId plat 'ttaereof. S=tt County. "'w.notcJ. ~ ~ '. F- ,., PREPARED BY PIONEER ENGINEERING. PA. ~ :'" I ~ JOHN C. LARSON z ~ REGISTERED PROFESSIONAL LAND SURVEYOR' j 19828 \ 500'09' 42"e: 366.M ... REG."NO: CD z , ~ (- ,,~, r - - - '- ~ r- -.. \.JJ " ,::I - a::: ~ -'- ~- :) I ~ 0 \ ltl ,t'",.. ~ ~ t':~:;.:r':::'~~:-,:i- CONCRe:n;; @) - CAST IRON MONUMENT \ . _ aEC'lIllO BOX Z1 ~ o _ FENCE CORNER r::::::::::::~::::::::::~::::::I- 81'Ml'NOUS h.- flARED END 5EC11D/1 ~=====_CUL\1;RT o .. lUG POLE ~ _ lREE UNt Woo GAlE VALVE _)>__ STORl.I SE\\a1UNE T1'= H'lllRANT _ > -_ SANITARY SE1lEli unE . - FOUND IROM PIPE ----d: :;;;z::: ~ _I -- WATER UN!: 0.. IlANHOlt O'lHER '!HAN SANITARY OR STORIl r 80 120 240 ... -oh-- OVEllHEAD U11UTY UNES -+- _ unUlY POlE , f I -tel-- UNDERGROUND 1EI.EPHDNE UNE 0.. SANITARY al STOIlM IlANHOLE GRAPHIC SCALE m FEET _ g -_ UNDERGROUND GAS UIIE III " TElD'HONE BOX < ~ ,... f 895:86''''':'' e - TEST HOLE . ; \ .," a -X-- FENCE I ,/'....., ,"" ; \\ -.","---_.1 e - CATai BASIN Ii - 1'EIE'lSlDN BOX e - CATCH BASIN BEEHIVE """. WA'reR 1\W. -,.\ ~"'\\ , , PI CNEERengineenng 1 '. \ ", ~ ' ClV1.~ J,Nml'lAHNlDU 1..\."(DM'IE\'CIlS I.AHQlc:A1'llAltCllmClS' '- Oll< XXX RYLAND HOMES ""'''-''''''' MendOla Heights Office 201 1Stb,^"r:0J4N.W. Dod xxx EXISTING CONDITlONS RIVERSIDE BLUFFS Mc:udota Hcla,hu. MN 55120 c-, "pldo.loIN 55411 (651)681..1914 Pax:6Bl-94tlS (163)183-1880 Pa:70-1883 "'... """ SHAKOPEE. MINNI!SOTA , . I, UAlCH LINE. ~ ~ tll ~ - CD \ \ I I RIVERSIDE f ; ! \ ' 2ND 1.0011'1 ... \ \ I , m \ \ I o~ CO~~~:! ~~ \ I ~ \.. C "( ~'1"'" . 0 \ ,~ fZ I I \ R ' " E ::'l C , " .... I~:C , r- I 1"\ ~ ,., \ .... IV K.;:J,vc ~~ ICL......:, '" / / 'C'.... .. CO"" ~ 5 .,.. , 1"'\ ~ I WATCH UN!' tU _-;. eJ \ · ..J I CJ ro ' I V .- 'b . II _ _ 1'~~ .1168 .,; I 0 iO 15 ~_ \ -14_ I l'" - _2. --, ,1-"- .12. .1!.. .12. -"- 13" 10 I _ 1 1 I I 8 ~ i! ~ (,? 4~ g \ \ ~ 3 !2 !i 1 : ~ 1 !2 .31 4 !5 :: 6It..?...!i-.!i 9 10 "'11 _r'40 .'/ t;:fJ .c. r.t:: Ul>>1f ',IDll. lUoO. UCd. ..... ".., ,'.f!JO" UOlISl' ..",;lO1, 3 - ..." ~ I,IDI" ::__sr f2 is I,d " 10 .. .. I I, I I 1;; 12 i 0 1 L:J C:l \ tU \ '70 70 10 70 70 70 70 10 0:5 6S tLI\lI,.. ". a.m.,. ..I." <C ~- 31.. L \-_ ...~ <43 97 122 III :J - - ~ ~~ .... 0 Q 10 ~ 140 153 g FOOTHILL _ \ \ I 'S> .. OJ TR'. IJ_ Q 3 &l 4 r 1- :5 .. 7 I. 7lI ,.. '~ - !l18 ! 17 ! 16 !i """r Q ""'... I IQ ",... i '" 5 0 r . L'l \ l.,) e.m.. ... 1Z.Ic.. - t~ 1S:z I ~ 1:UP" .. ;: " "'( __ ____ .. N 5 I '40 4 :: ~~ _: 0 10 .. ~:I 2:g i! ........ lli!7..3.. 0 ........ i! 2 !! 1 <:> I L:! r:l :n \ ct: ... OUTLOT C 11,;:.r 116" : "'1 : :;..2... II 5~: [L: "Ii c.j (t) 7Aa514 1 f1.IOfrl' I I~ .fClMSl' .: ---- :=-. - ~ =-=.IHD~ l! tI\II7. = ilL 161 ih 10 '70 3.1 (.) O#alNrr~ 1(0 1!2 :51~ ------ '- ~- -.. ..~ _) III lilt W () Q (~ () . 86 ea l) ~""'ACCAHOttIUtY .... Iii .....""... .. '-" 1310 ,.. ~ ~~~ 10 ~ 19.. i! 0 ---1":-:'\ ~- I ". ~ -.. ", :) I " ....... C) 9 C ' If) -..... ., 2 1" 0 1<40 ,... UllO" I '" 01 B 0 ,.. '" I ....... ., 3 1" "J,l '40 .. "":''' I 01 7 ill ~ 4 I "lOll. ... ClI ~ ~ TOTA~ AREA S1.9972 AC t ... ~ :l .~. r ~!i Z ' TOTAL R.O,W. AREA 10.5953 AC. Ii 0 0 .1.. I' ~ 0 80 120 24<1 I:'RnPMmI~I':J.f ~lPnnNFonPRF1M"hAVPl..TPlmPMrnnN[Y I tU :!: 5. 8~ , I r f TOTAL LOT AREA 27.7104 ...0. ,.... 177 'Tho Eost 591.75 fat 01 th. Sex.tthlCld OuGttar of tbf, NorthilOft 0\Jc::rleI' tit SectIan 14. TllwnahIp 115, Rcttge 22. Scott Coun~ UfMeaota. 5 105 ~ 70 TOTAL OUTLOT AREA 19.6914 AC. T....... wi"" l! ........ l! GRAPlnC SCALE IN FEET 'so 0 6 NUMBER OF OU1LOlS 5 AU that ~ of bra Eoil Half of tho Southeost Cuarter of $1Ic&n ,.., Township 115. ReinS. Z2. Scott Counl1o NmHato, J)Vig northcrl)' llf th. 4 0 7 Cl 8 c:ent<<lilo of bit Counly ~.O)' No. UL 0 1UI0.;; 1J,4a" ~ UD:If' .t:uoo. NUMBER OF LOTS 101 Tll90thlt with: . 1at .,. ;\ All that part or Oullot C. RMRSIDE I=lElDS 1ST AOOmDH. according to the reeorded plot thereor. Scott Count)4 Uinnesota. -z as 70 70 lARGEST ~OT "4.633 SF. " DRAINAGE AND UllUTY SMALlEST LOT ;'.427 SF. 'in" ;:: EASEMENTS ARE SHOWN lHUS: ,- om .~. F. ~.. .... : : t GROSS DENSITY (EXCWOES OUTLOili) 2.6356 ~Oili/AC. 11. ~ 10 !i 9 '" '" I Iii! ~ 5 .', 5 PREPARED BY PIONEER ENGINEERING. PA. ., 1 a ............. -~.. -2J.1 r,.~.. - ,......, I NET DENSITY (EXCLUDES O~TLOlS k R/Wl 3.6#8 ~OlS/AC. ~ ""'F . __ ___ _-' l___ . 2 l-s CO JOHN C. LARSON '80 :.. =. 7." ". II ,I .J L' ,-,., ZONING _~Aa!~ - -.- - -'- - - U1lUllES AVAltASLE REGISiEREO PROFESSIONAL LAND SURVEYOR """'........ I I - - - 19B2B BEING'S FEET IN WiDTH, AND ADJOINING LOT REG. NO, / I UNES UNLESS OTHERMSE INDICATED. AND 10 FEET IN WlDlli AND ADJOINING STReET UNES AND REAR ~OT UNES UNLESS OTHERMSE I J INDICATED ON lHE PLAT. PlaNEERengineering I I c:MLBfllllHIMll lAJatl'VJlKl1U: UHDSUlV&YClIU 1J.Hl)fC.VDAJ,c:mm:rs "",",,,_I)rioc '. ""RS,,^_II.W. ~'::'=:bl II.... - D.. xxx. RYLAND HOMES _H......MNSS'2tI MendoraHetghlllOffic. Cnma......MII..431 ...duJyu......,.,.,.......,&ol= JCXX xxx PRELIMINARY PLAT 2l13CUl'1'DDlUVE RIVERSIDE BLUFFS 4 9 (6SJl6S1-J914 f'u:6114'81 (763)183-1180 p."..,a:M883 1lhfa1hctaw. aidle 8D.l11ofMInntd& lttr.Na. xxx Dla~ OnWll xxx EAGAN, MlNNESarA5S122 SHAKOP.EE. MINNBSarA OF . t C , :::J I ([f ~~ ~ ,. J \ ~.:.. Of''-W "11N-//~ . 7!(/JJij rnll~~ll I ur 11'1Tl III I rrrl!S I" I' :' -u ! 'PRBPARBDBYPIONEERBNOINEER1NG.P.A. . I It :!::i" _\.:: -~...._- ~1-.I7r:ni TT il 'I III I UN ~ '=:.CJ., J ' JH llr /TI': )lIt ~ \ ~ ~ ,},. -/. ~ -~~t;; Ii j' \.~:/ 1\ ~ }~/ /L,U~/lIl ' DEAN M. ROBBINS \- \\), /:n, -/- : TIll. ,1,'" --,,,:'i:--- -,- /..../ =-- -- ~,p,.// PltOmcrClvILENGINBER . 'I ~ t,., ::L-T-~- S\\lTCHGRASs...LANE __-K / n. . . \\ '~.V....'Wt.,7/J 'p:} fltt1ffi I I ,t" rf rm-t -- ~-, - - -- ._->19" A(c " DEAN M. ROBBINS .'\ ~/ ~ I~,><.IU 1J.+ \tr::::;;; "\'~ REGISTBREDPROFBSSlONALCMLBNGINEER - '~'L.J-!t~ ~ _/11 ll~J1 \1 UW I LJ,J /11,1 "/-j/,I' . ~ . ..--=~' \(~....::::='"' -=-I~~~ ' ,""0 _ ' " . ,- "RBGISTRATIONNUMBBR ~ y~ e _ n 1/ ___i'-. Ii" '/ I' , . :Q ..; I ~ ~ ~\ "~~ '.. _ ' ~ I DBVBLQPBlt ~. IL 2 ~~ RYLAND HOMES , , \ g., 1';:~ ~ ~ U ' ~(f\. ~ Y-i . Y-.. ~ -~~ ~ 1600EXECUTIVBDRlVE ~ . t. ~= y-;...L.,:~ ~ ~ /~ 1\11"';:': . EDBNPRAIRlE,MNSS344 ~ ' N - ;;:g; I '-- '-.. '" IIM-.,7 II ElOSllNG LANDRllSOURCESCOOllD!NATOR \1 \~ II ~ .'::' of' of' / RYE COURT ~ -.::::----. '" ~ ~ I(A II/)#. I WEIlAND, PHONE: (952):229-6046 \ ~,,~1 ~ { __ _ _ _ ~O% """'- "" ~ / ~ "" (t I t I ,if J' ~U I ( \' I L ~! 1 {_" . . ,I '0-;: ...~ .1. uU1LO~)1 I / 11 :l ~::l " '\ 'r 'J~..r " ~'~I ""-[,..r,, =,1, 11'1EJ)' ~!l~~'~ ~ 'POND' I I J I (1IId() 11\\\\\ ( (1, , I !.l~i/ \\W) \v- n rt rL, 1L,l-J ~ ' .. IlJ II ' ~, ,J) I fEROSlOl C~lROL I ( 1// I' /l } (,/ I \ \\ \ \\ ' IrI ;'71 i \~ ~ ~ s I \ I I"" 0 .9 fJ'J "-. . ~ ".. :a ' (' 1 I' (I I f ( J ') ,\ \ \ " /I, tV I . -\:~\ _ \'~.......) ~ ,'" /-_,.... lIP , ~6 ~7' ,/" ~ -' I f / I I I, J I I [ ", I [, \ \ \, I ,) .....-m--.________ ~--__ {,' I /" J7 I . 1 t I ~ 77 no. '" " "-"." . l_ 1 1 j -.~,~~. \ ' , II -_ ...~- 1>, ~ ~.:;;>- _::::--a:I .-:::> III L! J It2 ""'M ~ . ,''/\ .~ ,~ 1'- ~. , ~ ___ ..... ......~..i-m. c. r ~ k'. J~ ..~ ~ I.. t- - - ~ i "r-#/-/ -, 4 ... If I ) ~I -m. ~ " M:~ ~'i:::..." II ~ J.;;;., "'ot," -- ", '.r. "d"., "," ~l~ I ...:::: , N /__ ~ "0). ~. :"..~,. f--'- ," \ ~ "'; :I"'f li J " ~ l ~;~ '.1 L~Hll.. '"!,.~n f.\ II\) I~~ r'?"'/) I 4 'S' . ~ ~~., - __"......-' ~ ~J ~ f i'," if . ",~,~ \ ~' ~'O 11 f-:' ~ ~ . Ifll ~"I IJJ,t",. j 11 ,,~J. ~. .... .u....) ~;~ , 0 "',,) '''''''-. 'r .. ..l b:u...:l 0 .' .'~':" I ,1 0 ~ijt. I~t I , \ ' 1'.: _:-;t;;-''SlllEET ~~" .,~ I ( "0' ~.. -.,;J "....". ~ ,. ,"0. . ,,'" ," ' , ~ ..lJ "J ~, I 'J:"J:"'T' . I .I' 'W/7':"'~""'~~-~--riJj 1 J ')~ '''', - .0.. .... ._~EET"r. '=, , -, ," ~":,', ~" '<!l!JH, -j ,~IJ',' ,In I I '\ " _ t, _ I" f 1 2 ~ --.. ~ .... \ ..7' ~ , '!"J' : :. 'l~ ~ ,'. .', '" _ 'l " ,. mm; u. L.- \ EXISllNG PROPOSfD DESi:mPnoN \ ,. "7'f;! f"./-. _ _.....3: , I OltU.OT C ~ r AI J 1M ~ i I\.. ~,~;" 1'- ----".' " ',,' '... ,00:0:\1 .. Ii: ~~ "''''l P,fj~"~,,~"';,~ '!~. if * H'lDRANT(S) j' ""'" -of I .t r~" 0 . W;' 11~ I. I / ~.- '" IT. "'ill \ I 11 'IP . '(J \ I ~ .., 'l Iv. \. ",' 'lI. ~ ." J' ": rr; . M H CAlE VAL\E(S) . = ~ It,~ I - -u ;,r 11\ i! I"l - f- -1-(, - - - - -..;:z: i'-. 1/1. '.. ,,'\: . j;( I "'~,' . .:.~, 1. I.l: C . II ~ J ,'." fl I I I> ~ REDUCER(s) I i ,.-" II~, 1 ' ~/.-\1' . ~ti " ':lI .. ..' ",,'. 1 .. _ _ _I _ _ _ EXlS'llNG WATERMAlIoI . \ J a,~ 19_ ,-'1:8'"" 17 16 ~~l I \ "<<:::1' ,0-0 \ I' 1,' · L~rJ ~ ~)! '" i. ~ .'''-' ., -. .11 ~ II If _1_ PROPOSa> WAlmIAIIoI . \ 0 l!:I ~ - _ 1--'-_ .. "J : ~ (."j If' .\-- I' ~ l!if ..':---.. " B ; " " l:fn " } / I I I . -0-1-;- ~~~=:cS) >' ~ = h-. /~~\\-,c::::::::I J, / " POND 4: / ~ ,~'l . If I /! "'5 I I ~;)12'-.i 'I' ';1 >~ ~ 5'1j~' '" l.. Il~U"mJIIII,.. - - - < - -- EXlS1llolC SANITARY SEYlER, ,a[' .. f)ill '- . l :,. i '" ~ ,~ I. , I } I' '\ _<_ PROPOSED SANlTARYSEWE/l . . ~o\.' )~~\ _. ll~1I: i! -'''',' _J'\, \ _ '" I ~ J 1 ~ I il-. b:- \..." \ _ , :!I {<,m I ;' ') '\ ___<___ f1l1URESANlTARYSEWER I '\ .B('in'ii; . 1 r I J'" \ ~ . J \ . I....! "'>U \ \ "''\> R..... 'I " '/1 [J . CATai BASIN J. -.. ,,",, ''''''Y'~';;; _ i doll ~ ~ lllr J' . I \ I'i -, II '" 6 I' 1 "'\ l' ' I ""11e ---=t--==-= o . IL\NHOLE ~ '7,...., _J ~ ~ ~ ENreRLIIlE PQOPOSED . ' 1 \. . _ .. . ' 1/ ~ J :: :; =_ / "' X>> ~.'-'~~.....{ Ii' )) I I=-~ _ ~ :-1 11 ~ - ""'" ,\~\ ~ .,,~ < ~~ '- ;/: :,.'tfLr--- ___<<___ EXlS1llolGSTORI.lSEWER . __,' ,', ' _ ~.~, ~i iJC) ( I} I; ;,'I.~ ,,9 ... '- "'(~ .'- -j 8""s:reit.G~14A1 ,i '" :;;;..r r-A :l'~___~\_____ -----<~ PROPOSa> STORU SEWER 0- 17\ . ~ . fti' .~/ '. -" 1 POINT EN (MINNEG 0 . . , "II.' l\......... , , . _ J I ',II I , _ _ _<< _ __ FU1URE STORM SEWER ~ '..:.:J:J.T O#? '\; / f---" 9. ...-, ,'./ '- \ '\ .'~ I.....:on I I /, , _ _ _ _ _ PHASE ImE ", , . ::..--'-:::;;;> ::.~ t) 1,__"8" 51FfI: GAS MAlIoI __ ~ -lreljg '\ I I~!" \ G~ '\ ~ ,'\ \ . ':!' h' ffi I "", ~ _~~ ~ ~ \ ,~~/ ~ _~) / ~_ _ B - _ _ -"., ~_ 1 ~~. ~,y \. '!'>-~~~' blJt:1~ -... Im~1\-......<, \ ... _ '=' = . Ei!: \'\"_ -". ~>~1 "', '"1('''--''' ."..,.."......."" ' - .. , - ~"" 'HI ,'1\ \" r . fJK.. r:t 'I, I /. -... !:.;.:,:.;,:.;,:,:-:-::,:.:.:,:,,;,:':i,1 Ill1UUIIoIOUS SURFACE I J11!! I / '" l:r,( -'-;;:- J j,r:;- / 7" ,,,,-~,\ _:a . 7f"~ -''':,\' "".::;,.., '\\"--"'__ ..., I I I f I ~/~""-::;i\..-"--' ,,> ....."'" ,/ " . ' II) / '''' '" "V< 7/.!,'''-. /'-~._~'1. l Ii' ~---:-. ~~~~1f~!i.ft;~ COHCllElE SU~'ACE jER aSlON C~lROl. 1,lf\1 ..-,)<,-~ y.~;~G~::;'''- /,," /' \ 1Ft EXl SllNG ~-~NE INFlLTRNhON \ \ "t'.. ~ ,~~., '~ ')I..v-/ .,(' ~AJ ). ." I'\..~ , . , I _, AY ~~ -' " I n I -... POND! / ........ rt" ~,:-;(' "f'" \ / I . o flELDLOCA'!EllSAIoI1TARYORSTCRLlt.fAllHOLE I / ,'I _~_-.~~~Go{_,7-'" ,," ,,, 'J I I l oJ....~ -I v;!!, '~, .>>~ <U.\'I"'~' 1'; -""J,,!' I H fiElD LOCA'!Ell GAlE: VAL\>E . I \ I ;'--~' 1\ ; ~ ....... 'I I NOEC/{l':.t ROPERTY I I I I -" "" -t"... s ~ :\ I I .l. ~ '~/, t {.. I ." fiELD LllCA'!Ell H'tORANT I '- r-'!...' o.~ _-- \, I I I I Iii' ~\ ' ~ If I I, I if fiElD LOCA'!Ell SERVICE \ "''X'''j ...-,- ".....---' \ \ / I illf...- ~, '" ~ " '" I ,I i ( 'ff FIELD LOCAml ....\\tl SPRlNWR VALVE I _..-...- /",-~,-r..... ".. I I I!) 1'\ I' I ru .IL !-.:t~ 4' ~ ~ :lri~" ~~-..l ""\" --' ~~ lUll" 'I' FIELD LllCA'!Ell ....\\tl SPRINWR HEAD ~_- /' ...- I / / / \ '. /' 'U: ",:'ll;0'li. ~::! :lil ~,-....,,-.co'~ - '. I il i'ti ~ FlELDLOCAml WATER v.aL __....- ,.... _-.... . , II I I 11l'~"")C " ~ ~ "" ' (~J '" c= ====" f1aD LllCAml ClJt.VEIlT /'" ....... 'I I, Vi : ,I-V I I 'JI!-" ijt I ~-" l!..: ;,;.; - '1 \ '-, '\ \ J,iI IliI fiELD LllCAml CATai BASIIl ,_-- t II III I I ) -, ~ I l'IV ',..,. '. I \ / ' . A FlELDLOCAmlflAREDEIIOSEcnON ./ _....- ' I I{\I I '/ 1./ I -"10. ....\".0 Ii! ~ FIELD LllCAml 1REE UNE /-- ' , f . .,....-...;~-. , \ ~" III FIELD LllCAml L1AJOR 1m: ,_- ~ I ( ) I I ... I., r I '~-i-'~ -s:..:: ~ '.4':' /1 ", . I _.-2...- fiELD lllCAml OVERHEAO UlIUTY ImES ~ 1, 11,1 Q.l~~~ rm - ,"' 'I' . 14 1/ / I ~ ~ _ ~~. J I 1 'III.' VIii -t.-tv- fiELD LOCAml UNDERGROUND 1ELEo1S'ON lINE " I I .\ ~ .- i '..;:a:, " ," ~A II "~I I PI . -lel-:-- lel- fiELD LOCAml UNDERGROUND 'JELEPHOHE ImE ' '\ I,'^ 1111,1' m I :.. " ~ I ~1 I!f ~... ~ ~, ,,'>: '!'~ OW, ''''/J/~ -fo,-Io- fiELD LOCA'!Ell FIBER opnc UNE ' , Ii I111 I .~~ .! ~ . ,;.,I 'Sl ~ ~..J:ij r' ~ ~u.-u.- AElDLOCA'!EllEtEClRICUNE '. lle 111\ I '" 11,- ~~ ~ JOe V ~A \1"','1< ""-~;:s~ ;.' 'EROSlONCONlROl. _1_1_ AElD LOCA'!Ell UNDERGROUHD GAS UIoIE , I Il'h "II 'II . lit! .ii ~v.. ~ Jill ~~ l r,~rll.' I -x-x- FIELD lOCAml FENCE UNE I II~, .l~ IIII ~. ~ ""I ... 1"'f-"r.. ~ "VI,' I "4 ~ ' III . FIELD LOCAml EtEClRIC BOX 'II 1" n .T" " , '~Il/ fin/! II' ' I D FIELD lOCAml ELECTRIC BOX " { JII'I ~ ;;T~l IL. I 5 ,r;iI~!1 ~/I.. I' II "<f; . ~ "'Q1:Wl~ '1-'1 ~.Jl, i ' ~IL *':llf FIELD LllCAml L10lollTORING \\W. 'VI" 1111/,., ~ "'W. j; 0 ~-- "" 'Z ',' IV;'" 10 ~ FIELD LOCAml 'JELEPHOHE BOll , ' I 1,\\ lJI1 (' . .. v-. _ r.-W .s: . ", J!;/j' $ :' liJ/"/~/i$- Ii fiELD LOCAml TElEVISION BOX I I, I I 11 I .AI''', . , 't- lit, I / /" /' '; I 'lIt' _ flELDLOCA'IElUl1IJlYPOLE' 1,\1/111111I1 If~, . ~r-~ . I '!CY '~"~ -, Ih, f'l.//t/~~'/r :$: FIELD LOCAml UGHT POLE II I M Ii ; , . ~., r., . .' " . """'., \~ " / /?;'/;/II 0' AELD LOCAml 'lEST HOLE \ I If UI) 1 !; . ,.' ...' ~"/ ' 'It {;f,h r-'li'i" III/I' I !:l fiElD LllCA'IEl L1AIlBOX . \ \\ ~lt ~IIII1~" I/rJll\ ~ :':':,~\.\ '.EO ~ ~ ~~l. ,!:7J)J. \SJi '., ':'/Ifll \ . -.- fiELD LllCA'!Ell SlGIl . } , \ ~I/ 00)/ I I ' i( . '\ ,'l:l.O /-... ~ ,..... _~ ~ ' I r J ~ fi ; '}1 .,~, ~ I, "-':" lW>1t'o~Em /SIMIIIoICUS PAlH \ \ \j I I~ I.~ "" 735 . , >( 1/ " 11;,rj(~T"7 _ . .:.--CURS UNE \ \ \ / \\ \il f i!l1~. A ~, \ r,,-.., .. ' '- "~ ,,,&;pl> ~', ' "/:".~: Ifll/ {i ( ( , I I I 1\ 111 '1.1 I OJ lb. .". "". it' ,," :x-..: ~ I;~ / I , T il _CDNCRElE WAIJ( \ I 1 I ~ c.:. '" \1I \ lJ 1I '\.' 1''\1. I ~.J'-, /,'~ IjJ , / / J I V I ~ 1 - 1-.0"- ~...... 6 ' ;, f I / ~, _ ) J : : I \\i.~ ~ i'lIltj '"';;''' ~, r -y(.~/ 141i~/ /) I SETBACK UIoIE . I I / I 'n'~ Wlil~,{1 m :J-.- ~ --"'"~, ,..... ~ "1:-.:g~lll I / //1 .: ::z: - , ( 'Ir ""', d,,~.d,f{1 (I . ... '\,\\I.f/IJ/l' J I /'i! ~&.." ","," "." ...,_." ~''''\''''..,''! 1,"'""1 -r 50 100 2.. . . '\ \ \ ,~ J // /I / I j r NOECKER PROPERTY 1" I 7 > I ~ ), I '-,.. " I \, "(I,'!t':N//IjI".. 1/ .i \', . I j If!..'!: f)/ / ir 1 \ \ll~/~";" ,/ --;;) ... I ,." I I PI:NEERPJ1O'ineering '. l { W(l~.%"J/"./ 1'--~_700--""~-""-""'./~lt \ \ ~"'--j / ,hi'/ / GRAPIDC SCALE IN FEET , w~. i 111,/1/,1 / ~ '" ,,~,"''';',~~'t,,:,,:\;~,;':';'''.''__'''''''l.~ \' I ij,~,lIr " / / OY1I.i!2'IOlHSDl.S u.HDJU,NQgU lAHUSUAMc.3~.uc:Hm!CI'S. It~lc:en:1f1tJlUthlsPWlWMpn:p:ualby RcvidGo'tl ID= ).2.0.05 -.- ........ ~ . ,-", 104290-PJtE.Gft 24:2 Eo",....Dd.. u.ndotaHeighlSOITice ~~~"!~1~"'!;~:.. ....._..'dI....""""""""""".<I """...R_ '"_.,;;'" D'~ -\ PRELIMlNARY GRADING & RYLAND HOMES RIVERSIDEBLTTlXlS J MtndoQHdg'nu.MN55120 1\'lC WUUIIft&"....._~~.J a:madW,l..5c:c1lScdProtealcwJ&pu:cr . ...... /O'U\, , rur.' (651l6Hl,1914P""6SI"'SS /763)1B!,IBSDFa:11l3-1KR3 _ohol<wtol~,S"'oIMI(l"'Olt Ro;.N..~ o...~ ,ID.... DMM 1 EROSIONCONTROLPLAN IIDIlN~J~5344 SIlAKOPEE,MlNNJlSOTA 5 or 9 - .-. (', ." . RIVERSIDE BLUFFS PRELIMINARY LANDSCAPE PLAN I, SHAKOPEE, MINNESOTA '~_ .' " --^ ..../'-- ~~' I '. ' \ I 171L" _-= ,~i ' DECIDUOUS TREE PLANTING DETAIL \ " I ( ~ 1~.J, tz: ~~~ ~ : '~(:.~~::~ ,\" ,\" " " I v ~~'~":~)7~PJ.W ~ . .. (~~~' \ ,.;( I' '\ ~,,/ ......." , I~'l ~..l '\ "'l --; / / ,,, , . ~.~; ,,! ~/" ....;:! \,/ "- '\" </;;."/ <"-, --;........ I ~ II~ ~ ~~ 1# UTLqlfl '! I " ' .. "" r ,~ \ 1. . "\ I I 1""" 1-..]i. c.... f ~ r . I , . ' ~ ~~ . \\d j'Y ~ "~\~]'\) II / <7;;) \)1 L) ~~~ ~ ~~ '~, 'I I ' /1 / ( J /1 i I ) (/ / ) \ \ \ \ I ' ~~~ A ~ ~~ \-\\ """-'\\,.,..--,)\ l ($ /!-.-,~ r':::-h 4 I ~1;J.~ ~/ /J (~~ I (I I ({' { J f II (.,,1 / \ \) ) 1 /'---------:_ (---..... \ If =:t""':f.f'~~ l;.!f=~ -_ ...~~~" "..._ r:::::::::,'~ I / >l/A.' ~" , ' l I . I "~r ~.\ 111 -~g-. Mbrh\:J'.!!3I /..., \ '\.. \: '= --::- _ ~ ~I "''''l, I ..,L- Z ../.-) }r ..L.r. ......:.\" 7f FiT. ... 'J'I --"""" ...iiito;:,;r' ~ \', r-:-:r-;; ~ y~ I ~ i=l -- I. I'" /" 2 m~c:.l'/~ ~::tr li\, J////-.>-c ~ -. ~ )/ .~~ - ''I>''-'''~_ l-&'-~-"'\9\1~ ,,~:' ,1 f.,' ~ ~I t \. !LL- roo A / I ~)(;n."" ~I I J l I L?- <: "',~, \ I II "'iZ a I {I / _ 8. \ J <~ -- ~ , ,,--'~ I Gl // / ,._~ ~)(/5("""~ ~ I ~ ~ ~ ~ :- ~ - / j V 1 'fI I I ....-.... ~ ~ \ .0 _____" I ~ " ,,"~'K ~J < r ~: ')~ :;: 'J / 1/ . ~ ==.::::: ~ , .." /'"... ", '" .-.JjI {/ ~~~ I ::... ~ A }. \ \ '( ~ ~ C. r~1 (~ _w \ -1Y.:l!I, ~ J (f....1~ ~ 1""-.L~Fo--< -"I ,!...l~!lil F'l J. ,f'J! I '.L.S ~.. '::- I ~...... "d 1 l.!! \ ~\~.;, IlJ \ li -.- ~" - - -,- IT, T;I __ _-..1- .}. "1.-' Ib./ _ _ \ 'l'l -L-1-____ ~ .-/ ~ I ..." ' , 'I'll< ;:::". '\ \.. ~"<: ^ I ~- 1 /1 /1~ _/ \ 1<; ~ III P \ y;J-g .18 17 ~ ~ (( .."'-.'----. ",( ~>7 r ~ ;. r" ~4-1"",~ f>., ~~)t '...' ,~~. N \, 1'1. 'f. :t'" w.- -tl/ / I): ~ -- ,~ t I I ~ i I '~ tl!'. 'I '~LfJ IS:-l; I' \ iJ I 4 CONIFER 7REE PLANllNG DETAIL . J ...... ~~.::;:::. -~- --. /"J ~ 1 ~' I 1 5.... :--9....~hJKj ~.'" ~.'" \ ,1\ --=- .~;;,:;;j 1~II,Jtl11/( .' _~ 'I\..l\, '//:::; '-_" OUTLOT C, ,J. I 1/ \ ~ vr ,S->>oJ../ N. , \I'\"L" ~ '., 1'-./ ,I I I II ' , - DId - -- 'J~ \ ,/ <:-;; l t ' .--''\ I / I , ... J ..1 '. ~ ~, 'I--:""S I I -'I , . dollllI__ > 'I't ''\ ~ ~ ~ ... _J. {, , / \;]~? J 1 \" V ~1 6 1 \ ~f'. '^ ,2;:' l-. './-1.-1"/11- -, I .... .x;~ ~ /, I , f i ~ /'" ,........",1 \ ',",\\' l/!l:L I ra~~ . ,~r / ~ ~ ~~'~~ l ~_ (~-t -:J/ ;/ ---f-- \-- I ~ :::-. h ceJmIlPOINTflER 9, ~)'~ ~ 1, ~ ~~~f\~I\""~"~111~-'~' ~~ a.:.'P" "-., ...1." t-L:H ~7n;o;,,\ ~'v:; ~ 1--9} ; / 9- 9~,_..J \ '-- \ ~ ~~\ 1. \ ... \~' I" II I ~ "\ ,c:t' ~........-: >~:\ J:::::" I ~~:.- -=- ----c:=::= \ ~ ' ~"" \~~~ \. 1t'1-11', ..-' J /il,\ . . /- I -I... ~ ~ - ~ 0 j~, / _~ ,_ ~, .....,~ ~ v~~f"l ;p- \) ~.~' r--..J'... I I)L~-:: . , ~ ~- - ,,",,'\~ ~,~ ~K ~, ..fi. ,\,Llt\ "r/'", 'I I_ .' ) I I I /" /,.../ .oJ'" "fJ i '- - / r' if" ;; v /.. '"" ,~ ,~ _ \.......... 'J. 1J ~\\:"\ _'4 ] t, .::::: , "" I ) If,! ,/" l\ ,-;':::--- ..../ ,..y'" \ ;(1 ...-...-...... '!~ '.....'Q...../ ~~~.~ ~~ ~ L I vi ,/'-' ~ _w =-:.=.:: I \ ,I ',"J... ,-" ,I I I))' I / I 0 ~ .Q ? lr j A ' "- I I. "t ~ " I I' I I.... ~ -.1 I llf' ~ '\ I ,,,-,,r'l. .,.-' ,,----.../ , II ' r ^ h 1"'1' , \. \ '/><-'h/. ,-r" .......... I , . IJ/\ I J 1/ Z-Ir I '" -\. \ " Xl tl ill I //' /lfJ:.,'/ ,,) \ I " --' ....-'"11''' ~.. ~ ' . -r ,& fr'\ I III I , . '-, ( II IY I .~ I __ \ '" " ill! 'l. :-""" '""":f""" \, \ \....- I' /A LANDSCAPE NOlES I' I h 'I 'IJI_ ~ 1\ /' I ? ~-:d:n Oi/j 1J. /' ~""l,~~~~ \ \ \ \ i . ~ \ ~ ~'~ ','" \ )'1' .'!he c.n_",.. th. ",joct_ I. I' ...,1 I " _ - '" ~""'''''''''''~', tll I =."Rklio- wftIIlho ~ ~ pM' to , !' I 1/}' ~ I I !fP~l&L n ,~ ~ _, _~ :,"<;<"C:~~, 'Ii .'!he~Con_"'''VI!ff7''uIDlIIeo... I .i. '.i-. ,I I "\ ~~ ~ ~ ~ "r Ill. pnl)oct ol\O prior II> -..-.a -- ' M ROOT N PALe ONS I ~t, I~ - " I , !I ) ~tlL DI' '\ '~'~~ii7 ~'~fr l!J( 'N1~ond_~lob.p_b1olh_' I Iltt/fl I ~. 1\' 1}f$JM ~ ,~ ~~ 'l/tiJ .NoP!C'>t..-oIlclbor_onlD"",,"oond AP AUSllllAH - IflUS ~ I !i'il 1111 ..J I" J rI'!J't") I I I! '7/fY. :- ~ I " ~'-:: ~ r! 6lf/ ,~boo - -plotod it tho -- BS lIUCl( IlUS CUllCA 1lEIISA't If NB lIS I ;r \ I ,!. II" ~ \ L " \ " / "/'r-:;.(JJj, KI'f , .N1Pl<w1t___lho__.." 'I I,~ iil~ IW/1!1..\ r...... , :.it, '1,t~ , ~.:;tjf(}1/'l/;-1; I/~l :~41:i~~--Am- M AUlIUl A9I _'#U1UWIIl'IKII'lf: U" ' \ 111IH~~~ I I "'I d' ../,_ ~ ~ \ ~ ,'":''' '\ ",<~lfl1CJ1A:I"J MI ,/1' -..... AS -1lI..QE ~x_ zsll6ll 2+ II i II J" --:--" . f: ~~ , .~"=-ofm~ \:"~Ij.Ill;"'tlog ... _ ~ sanR"t l..oEH AWEIllCNIIo ZS IIIIB :la 111'IVI'~ '1" \ -I ~ """ '" _ ~II }I /'/~~//."" .B:-'~d:L~of~~"'~~-='~ :]i 'MlOOS AQR 1RACNllHOS_ ,:<.0:: ~ ll'\l((tll\! I 11'/ '~~'~~ It1 ffi~ 'T"}~> r;tl- .. ~~/"LIj./",,"?z~l: to · om -- - -JlO REIl ONe llOOlClJS IlUlIIA BOll 22 I l' \j I I I~ I J ' .J \ \.l. '-!r ~ ~ J~/lIf. - 'fJ f. ! r?/Ir'/f'1 '~~C;:lr =~~:~ . \ 1111)1 ~I : i I I,,~; -. :r2C ~ > \ , r \(J I /f{~1t( '~::-oIl~~ml:~~~.rc:i... 312"ffiEESREQUIREDFORMrnGAnON-SEElREEINVENTORYSHEETS"ffi1AND"ffi2 111~ '~Ll),lil,l{ t.,~y::.. ,\.\ \':" '-l>a..c\..... ~" I \~, Y/dl'lL.. t~l~.__ontheplcln 312 MlTIGAnON"ffiEES PROPOSED INCLUDING 1 1REE PER LOT AS PER ORDINANCE I ~ ~,' Ii I W I fY'f" "J~\ \ r, SJRmI'..D' ~ 'I' },l / / )')") . NId!od I \., V 'I ~..., . V II {___ ~ .~$l:k"T:'~::l..b. , '\ li{II\!frl< VoJ.\1Jf. \ t ~ 2" II / I J. (r' , '=~IAIdd1*:=c.~"'.rit=:~ ) \ '1 1\\)\\\ J ) ~,~ 'A-i -&- '"'-" - \\"",- ~ tI IJ / f f t E~ =r~ =...~ t..~d ~ ' \ ~ / rvh r;; 1:1<, ~ r-!L ~ '1, ''is- ..\-"" __v ~_ < --f I J I ) U~_~~_ ~ Z ~ ) P \ I \\/1, I ,TIV~ )'T = [t '. ~ . " J ~/ I / , .i:"~~~~~~~ / h,,' l:_~1 , ~ .....!c.:' ,~, - I iJ , II" I w.tti.......;;;w.- J I:" 71... -1'l"'':.- --- - - -', ~ '7 ! f,' / , r ~ 110 i " "f',\< l~))I') I ) /1 ~",- r'--~ <---7 '--'> ~ ~"} 1-;- -r,,;'-- , '~ I \ \M~~j~~1 /'/'~-'.r'" . r\.- \ '...... / / J II/If I PI8NEERtmoineering GIUPIDC SCALE IN FEET :' " M?k~~~/ (" .;-~" ....-, J \ \. "..-----1 / ill 1// / j.... U''b" " I~l c:mr.~ 1J\HDfl"UQIDJ lAJItJlVaVl<<CltS u.HD!CoUX.w:HP'8:.'fI 111""",=11,,,,,,,,,",,,,,,,",,,,,,,,,, lbwW... I"", Ifl/!IO$ I RYLAND HOMES I -'- ~~d~,=:'M~lSSl2II MendOIaHeigbtsOffice ~~.l~MN~~ :.'d~:'==--":"" 'Doal.... llJ/ , PRELIMINARY LANDSCAPE PLAN 7600EX1!ClITlVBDlUVB . RIVERSIDE BLUFFS LSloF 1 (65I)6SI,1914 Fad>8I094B8 (763)1S3-'BRDFoC1S3-'1lD ..""Ib./.."r""s.....r"'"'-' Rc~Ha. - ""'- ""~ JU/ , EDEN PRAlIUB.MINNESOTA SS344 SHAKOPEE.MlNNESOTA -,- ".,>, . .. PRESERVAllON TREE TOTALS . CITY OF SHAKOPEE TREE REPLACEMENT CAblfER /lREE PRESERVA1l0N NOlES HAZAR!) 'lllEE STA1alENT # IN ES :; , _ .EtORe lAND a.EAR1Ho ....... CDNlI!AClOR SHOUlD IdEE! _ 1HE . HA%ARD lIlEE EVAWA""" lIA$Ell ON : ="" " ( ) C<>ISULT.INT ClII "'" TO _EW .... """" PROCEllURE!, =ess RMES. TREE UST CONllNUED UAUTY WOODLAND REPLACE ONE on<,.. FOR SA VE 98 940 9.5% .,,,,.1lt AIltAS, AND lIlEE P/lOlEC11<IN IoIEAS1JllES, . HAZARD 1llW 'Nl EASY 10 USE REID ....... ' LOW Q EVERY lHREE TREES REMOVED REMOVE 936 9437" (90.5%). . -lREE PR01tC1lON FalCE IS TO.E P1ACaI OlmllDE OF lHE__ OF . BVEIl HAtts, ",".tsorA DNR. ,... TMf1il2E 1REEfS1EIlS Sl'AlUS AU.. SJGHlFlCANT 1REES TO Bi SAVED. FElICE 10 REWJN umL AlL TOTAL 1034 10377" (100.0%) S11twllRl(ISCOllPlmD. FalCESHllULDNOTBEW....."'.ELDCAtED 'HAZ.\RlltllEE-ANYDEFEl:11W:1IIEE..nUTARGEL 100 15B R TOTAL TREES REMOVED: 936 REPLACEMENT TREES= ..,,(C,ur....... '" WlllTIDl c""""",,,,""" %1m '\lIE CllIlSUlTAllT. . TAACU _ NIV ..... ..- PEOPLE wow: "'ROUCIl. UNem, !IUS 12 110 IR 936/3=< 312 TREES TREES USlEO AS DEAD OR HAZARD ARE NOT ~-NOflLLSllOlJLO.EPUCED.....sr1HEmuHl<,OH""'llOOT'CR"'" casr... RlCLUOES"FAClUlIESNlOPE!lSONALPIlOl'EllTl': w, liB IR , INCLUDED IN lHE OVERALL TREE TOTALS, '" "'''''' Ilflf DRIP LlHE AREA OF ANY 1llEES '1lfAT ARE 'lll1lE SA"'" .,..... USlEIl AS H..... ..... NOT lIE 1r/CWllEll IN '\HE 1051I ll... 2 R MlllGA'TlON TREES USED AS LANDSCAPE TREES I I - · - CARl! IIUST BE r...... TO - """'" .. "'" .... amastRv OIJE: 0YEllAU. tIlEE TOT""" 8051 '4 ... I IR , I 'lD CONCHm WASHOUT #.NO t.EA!CM!. OR SPlUJ.tZ or 'nWIc: WA1aUALS REFER TO LANDSCAPE PLAN FOR MIl1GAll0N TREE LOCATIONS /..-/'- ~ SUCIlASPAlNlSORRIELS. ' 15m 3 ~, . - AIL COHSIilt/C1lOH EOIJlPNDlT. _ClE 1IW'flC ANO STCRAoo: AREAS 16 elIl R ~/- r UUST SE lOCAlEtI OUlSlJE U MY 'TREE flRD"IEC'nCtl AIlEIt. . 13 Un I m f:::::::.-.'\~, #~ 1 .-.....N.","""'11lEESWSTNOTT_PLACE"'OIl.....'.TO....Y1. ,lIoln R '. I 1 ~ ~ ~ --=-~ 7-lF""......."'OAKmmOCClJR.ANOH-TOlOC.....,..ESSl.OllUsr 14.m \ "J\J ~ ~: .E - _laY, (EXCAVA'lllRS WST HAVE A NCN-1D"'C lRE I05B I5loln R ~ ~ '/ """"" DRESSlIIO "'''' "'Ell ON O€'.aOPIlENT Sl1ES. . m 9 S \ I II --.J ~"'~~>> I m 7 R \~ "'\ ~..,..:"../ /"~' '1 ~~... IJA/, T!-OT( : ~ 6 : , k '-/ ./ ~-.....-<- "- ~ ~ .t/~1/ 'f )1 I05B 6 R , I ) ( "\,, ~--",,--- I !! ~ ~~~/'/.~il/I 1, 1IOl!4 1 '.J ~.......~ \. \ '\ J "I ~l ~ il · I !iI65 1 '..1 ~ .. , I' ~C~ ~.. I . ' , \' .~ r I05B 1 R , ~) \ I <,;;)) I ~/ ~ ~ .. ! / I 0 II i I ( , 1 \ \ \ \" \ / (It ~ 10d R ) ~ ~ ~ \,' },J /~.,.-.-f.. ,L...,_ ,r M/.lftJ-/~ ~,~ ' ,I) I ~J ~l.( ~ ok ' _ /--: _ ,:<~--"- \f/~ I ::: : ~ -\ ~~~')\" ~~t~~ . _::::::==;~ 'Ii ~./ A ~ ~ ~ ~ ~'-J rJ: -~ ~ -- - " - ~ ~ ':11f~ j 8l11: : ,/ ~ r'~" ~;;~~ ~ 8:,\.v' /~ J I 4"''\.~\'''' t::;~~'~ J ,.~ I-l--- ~ ..I ') 7 \ 9\ 1- '0"= f-' ~~ )r~- 'rR I rIA I 4 : ::01 : ~ \ ~;I j ~.) / I I ~~~ I-~~ ~ r-'" ~:t& J '" \ d I 1\ v. ~l -f 1~i1 / 'T 61115 a R' ~\ . I 'x:::,r. "... " \. '" v // / ':::-....~'~ J. \ ~ I ~ ~ ~.:J. ~, 'j 'II 111 ~ I fl "'" 21>lbr lSUn R '" J '>i. .r,~ ~\ ~ /' r--... '::::xJrO .'))L~~"'" . , ~~ ~ 1.- I IJ san Uta . 1\:1 ./-/. ~~ 0\~~~,,- ~~ t , (I "" "{ ~ ~~i~'--' ~ \ ,,_,.. ,_IT, --';.J~' I ljJ :: :M: 2 R \ - J \. "" I/f I \, rll, Fe IIIl!Il l311! rl // ~ '\ '/1 1 ~ ' ;;'1. ~ I . !IlIl1 15 ..." W \ ' ~J. I-j 7 I r~,\ In iT L I ""- ...L"_---....~ r b - ~,p.~J,.. I x ~ ~. /I!fJ'l 1!11112 14 I R ,,- \ 11.9 18' ~17 1\1;6\ 11 -( It ,- - ~ lt~~^. " 9 t ",4- 'I.' ., ~ . '" 'Ii "I r:rdl ~I ~ flhl'l :::: 2 R , / i,V' ~ >'1 I' 1: \ ' ~ -.;;;;] 71" ~ - .j... E' Ad}, Ii2j ! l!.!..f' ~ "I 1/ / !1165 Be ' R \ '- -;/'::/X';,.-< cAY \ " ~ - id -H~b~ f\. . ~A, -, ~ ~ ~l ""~;; /lV/!f :, ':~ R !. i\-.Y\. 1'L v \ I'. 5, '- \ \ ':"'~ ~ t<: I I IJJ68 1 R " \:l..~-((n r" 1 . '---., ou TLO!-,C ~ .\.' ~I ,(} ,: ~\ M" '&~ I 1t,J: ::: : : 1\ ~'. . v -,,~ J / \ ~./"" \ 1\ t r1 6 : I ~ 1 L I \ J J>: 'I j ~ III9l 13 ) ~~ '\. ./J-('~ ~.-i II " ! I ~ ~ I'V = , a'f", JV1J I Iii... Dba WI5111 I\IZ 1 V I -- ,..~ ~ " I I I!., ~\ I \\ .. ii:~\ lri IlI92 to '/ ' V'-/, I ~~ ~ v / J _ /:"'_~TI___'L--- ----,-- "':::::-: . CEH1BlI'0INT9 9. \'-- \--'( ~-f' .., '\ \. """-.;:;:-iJlAm- - 1433 llll! 2'..... ~ lffi '\ I?OI~......\ .....y/ I l"r-.. " ll' r!. T - 9-:. z- :) ......... \'~' :~ ~ / 1/ ( 14311 7110 IMMilml""" R l~, tj3 Et ~ -* ~ ~I L _~ ' 9 -:..- ~ - ~ ---Ej- \\ ~ \~ ~ " \ ~ ,'I)Jf-- 1,f/l R~: :itdec "". _/~ ~\\ ' '--./-j -.., to<" \~ - ~"S, / _ ~"~ !\ ~f0.~~\ '/- :1-.,.""-l;,' ~~7 'HL_ C ~- ~ ,- , ~~ 7 , m 7- ~ ~ ...,~;=: ~ ~~~'\." ~23 ~ _ l~ '..fJ I~\""- E ' R I J I' I L ",,"'- , _/.,..."..#' hVfJ ~ Ii P /1" --;:::=::2 r:ii:::~~... ~ ~..l 'fi$ I J., - !h'IJ fIt:: ~": R I I J ,/ _ i'I /", /' ' \ I I ---__ \\ c' l- ^ _ ~ i>. ,I IJ \ ~I ~ 'I / I:" R J ( /' ()_<;.;r~ / ~ VI I I,} ro: ~ Iv ii= '- ",~;:;7:1. ~ It;;. , , , 'fJ/ ~ VI IJ 13"" "P'Jl'I I I ( I:'~ Gt f:!I"'>/ 1 \ /,' I / I f c-...~ ~ <...;::: r: 1 I/~ V ! \' \...,><,..r'~ ~~>/ ,,__1 (II I I I ,'I.!< /..... ""~ '~.'-~ . ,~~. JI{ TREE SPECIES KEY \ \.. I ,,-,;j....,iJf ....1'" /" \ yl\ I": ,,:r n ~ z-~... " .........- ... ....":~ ..........'" -, \'C .:!x f'" /1 aAL fIR aA1.SAll fiR ~ ,'- '/J~ , \ I ... !-.I r,,~ " li ~~" L ............. L.;'_~ ". 1<>Il I [ . Be BlACK CHERRY ~,/' / PROTECTED ROOT ZONE / Ill' ~ 'jli i'\. , ~ ,,2S '~ ~'~'" cJi \~< X~k- n , :s :~a<~SPRUCE , I ~ 1 I' I .1 /! .....,rrz- l;~1 .aT " ---.~ 'kx;)1"\" >I q ao aUROAK , ( --) J J '\. 1/ I ni #/.. h'!/'" Ii lT1l1Uh:. '( / ~ .. ~~ ~~ awAl. aLAa< WALNUT , . · , II, i1il\\;I!l': lk4 ,- Ii : h I ~SPR ~:~~SPRUCE \1 II /7 II I V. .' ",7 cw COTTONWOOO' '~f \/1 I..r:q I I I' >' ~- _ ' f 11 lli).SIB ~~~ I ~ 1/1 ' ,,.I ,.( I t:J::j {J' I lit 1 GA GflEEN ASH , I I . ~ ~ He HACI(BERRY lREE PROlECTlON FENCE I ~I ~ l'UIE ., ]~ I ~ I ' ~ IIlI[" 'I'; =.. vl ;j;,,~ HON l.OO HONEY LOCIJST I 1m I 11 II [I' ~ IJIIJ:. . 'I! I f!I NOR lIAP NORWAV MAPLE HE.\VY IlUTI"'T RHCE: USED 1-1II00T JSllS ~ ' I' fJ I'll U' >- L II '.iI HI P alll PAPER BIRCH l'llI1lEFllOlEC1Il>>lRHCE: r.r......... .<<.1'1' - ~.' I I~d, I , ll"~ ~ / 11 ~~ :rEDAKI~~a1 , --<-- : ~ .... ';:IT ;r>R1PllNE ) \l1~~~J~ b~ I(l t. . 1',- ~ \ ,.~ '.J__ f'i-'I!l'lit ~ :g~~ :: =~... ..J . I I I ~I" Ii! Illl ~ i-J ~ .. r.Jf I ~ lilt .//O,//- RUS ouv RUSSIAN ouve: :.:- m;,~":: ... .:--- 1;;;01' I I if 11 l,;. A 'or -,.,. ""__ , ~ ar. - '1/ Iii //'l/~% SlIMA 5I\.'IElI MAPLE ............. ,r' "'.... JWj. ; tn" 1t' ';,I" 1.11 '" ,'. " II II '"I / n SUOIIA SUGAR MAPLE I "/: :$:;....;:=:S.':;.::";,,'" ~ROTECTED ROOT ZONE I {11\,~1 111"1 I ~ - \ L~~= ~ 1.2.~- '~.J . ''lb. 'II ~ UJr')4~a,(ffIIJ1I ~~ :l~=w ] / :---..-_...~- NO SCALE ' I I I I s' \" -..; 1-' I{ fll/lt '/{ YIP ....'rePlNE i ~::..."':::.::.:= H-."'...........lll.................,..___ \ 1/1, ~II n'l )(" i:: I .'. '=_..Y L' ~ I -1"7 ~ I( /~df/~/ r ~ ~ ::=::-:...::. 1\ I' II s\. .---;~ ~..[J..p, / /J1, lREE UST KEY lIE '..<:m:Cml ROOT 2llNE NO'l1!S: I · ..... IcI' .'-' -..... ~:;,... ~ l.L /" \', .. -~ ,',:' ."........""'" """""""."""" """',..""... ".... II #1 Ii . I ;1, , ...... - r II))" SA"'. 'IIlE Tll.ESA\IEIl 100 200 ~ ...v ~ "'Jo..~'" .sastlA'rIlEESROCn'smtu.~.lltIH"'nwol.OI"YJeSCrt.. I \l \ -w . ~..- I 1 ".~. REUDW-lRE1DBERalCWD 01 6.0 I I ~-':'" ~, ::::'~'jl ._""".... ""_.,. ""'..."......."""""-w.""'" \ )'\ VI . _.i~...' ".,:"1 ~v; ~~... ,..... h"ll/flf 1 so - ,.EEA1FEC1EIltNSlC1lIdD>>AAOE....1S . . .... ... UJ:~:,,;,,; ROaIJ'DW'I'!JtCOOtfl'llWIIUlNw.3IftNGfIIJIlQaUPI'Nl! \ . ~ 1 I g RSUCTEDI<SAPERCEKTAGE'rFOAWAcmCROYoN ':.:::'.:,' :::,::':' ~ .....".,...............1ll"""""''''''''''''''''''''''''''''''' I I I ...'==- ~ 5" ~\'\:"S<'/' . -,1 II I 111 - tIlEEH..IlSTOP........"'''''SlORll''''''''.. ..' '., .. . "':., 2 KeD NC IXl:Il:EIoIW' mtmlVE 'm INt MOl' ~ I ~_ -, II . J SPUT _ 'mEE HAS SPUT an FRQI,( IHCUJOEJ) 8ARK eft STORLC DAMAGE GRAPffiCSCALElNFEET ........'=::.,:,::p", .', ."""CO...................."""""""...._........... 'I III / )PII: 9 -a-- 1--./. "'t! -<\ ~ 4 iJ I, / DE4Il.1llEEISDE.tllI'RC#NAltJR>>.C1JJSE5 .......;::::::,/'''.'/ .:: ---~ ....-...""""'.........""......-......"""" l' I J I I ~ 1"- -. I'. 0-- ~~, .-1. f f I :QE>Jl . PmCENTAGECFlllEED<.AOfIlDMNA11JIW.CAlJSES =='...-=-~ :=::;:---=-- .~~=:::lSlOIlEI'lJmJOlftSUU ,) \ II ~Ie . ~ ~ ',~-- IT 1,1( J ~II/ IHt,DEC,"1R'EEHASDBVlOOSSlCNSQF'lNlERNAJ.DEC\V .. -- '" I i,li' ~ '. - - ," .l/I II il / / 0'" 0 .ASt . WAJOR a...... Tll c.wa,uv tAtER .T .ASE tF TREE / II;. ~t '- -- .::<<J "-'-, ';I j' / ( CAV 0 BAS!:. lIlEE H.<S A...'" 01'," a...,Tt AT.ASE Ol" 1llEE I" I ( (.1; II I I I - 1 . 7 I . INC SAAI( . 'tREE IS SlRIJC1\IRIU.Y COl<PR""'SED aIlE 1D "aJ>llED . , i \\)\~JJJ))J) I / "\.. r <-;p---. '--..., II, A"1 I ....ATIlAJDRBR...ClfIlNlD/'DRAT.4StOF1llEE PI5NEER . . '. !\ I if)(//~//,,..I (/ ~\ \ " J / III 1//1 ! .. engmeenng , 101,290 TR1.DWG ""......""" .....,....,.."., ....--- ......CAIII""""'""" Ihctob'''''"''......"p''''wu~1ty H_ 2<0"'"", PRELIMINARY RYLAND HOMES RIVERSIDE BLUFFS 2''''_NIJri.. MendoraHeightsOffice i:"~'1:"':~~ ............,.-..,....""''''''..... IOlNAllNI7T TREE PRESERVATION PLAN 7600 EXECUTIVE DRIVE TRloF 2 =.~t"I'ttL~f.J.'J'.. 17(~)'a3-''''F'''''JI3.''82 ......U_"-..omlC=illlolMods<. ....N.. ~ -_ EDEN PRAIRIE. MINNESOTA 5S344 SHAKOPEE.MlNNESOTA