CITY OF SHAKOPEE
Memorandum
TO: Mayor & City Council
Mark McNeill, City Administrator
FROM: Bruce Loney, Public Works Director
SUBJECT: Consideration of Drainage Solutions for Valley Creek Crossing Block 3
DATE: October 16, 2012
ACTION SOUGHT:
For City Council to approve a drainage solution for Valley Creek Crossing Block 3 and approve
a cost participation between the City and the residents.
INTRODUCTION:
On August 21, 2012 residents from Valley Creek Crossing Block 3 approached the City Council
on a drainage issue in the neighborhood. Council directed staff to study the issue and bring
forward this item at a future meeting.
BACKGROUND:
Valley Creek Crossing is a recent subdivision located west of CR 17 and north of CR 78.
Residents along the south side of Evergreen Lane from Autumn Hill Park to Halli Road have
been experiencing high ground water table on their lots which affect their turf areas on their
properties and cause their sump pumps to run continuously. At the August 21 2012 City
Council meeting, homeowners dropped off information on their concern, pictures of the areas
with high ground water impacts, and with preliminary costs on a drain tile system to correct the
problem.
Staffs review of this area shows that there is an existing drain tile system with a storm sewer
catch basin along Evergreen Lane. To correct the high ground water table and intercept the
ground water into the storm sewer system extension of drain tile will be needed to intercept the
water in order to stabilize the ground and protect property. Staff also did investigate the area
around Autumn Hill Park and there is drainage problems associated in the park area similar to
what the residents are experiencing.
In discussing this issue with Tom Scott who resides at 1998 Evergreen Lane, the residents would
like to have their contractor perform the work which would include the installation of perforated
drain tile and all restoration. Staff has checked with our City Attorney on the city participating
with a private contractor that is hired by the residents and this is something that could be
allowed.
The concept of a drainage solution would be that staff would approve of a drainage plan, then
also allow a right -of -way permit for the connection of the drain tile system into the City's storm
sewer system at no cost and provide inspection of the drain system.
Staff also would recommend that the City would participate, due to the fact that we would
receive benefit to our Autumn Hill Park and to the fact that we have participated in other drain
tile installations to correct drainage issues that affect several residents.
Attached is a drawing showing the design of a drain tile system that would correct the problems
in this area. Curbside Landscape and Irrigation has done the design with staff input and the
estimated cost is $19,001.00. Staff would recommend that the City would participate at 100% of
Area A as this would correct drainage by the park and 50% of Area B. This funding would come
out of the Storm Drainage Fund and at a cost not to exceed $14,315.00.
Attached is an email from Steve Bloom in regards to the plan and city approach to this problem.
Also the residents will be present at the council meeting to discuss this item.
ALTERNATIVES:
1. Approve a motion approving a drainage solution concept proposed by staff and to
participate in the project at a cost not to exceed $14,315 from the Surface Drainage Fund.
2. Do not approve the drainage solution concept and do not participate in the project.
3. Table for additional information.
BUDGET IMPACT:
Participation in this drainage solution would come from the Surface Drainage Fund and there are
sufficient funds available.
RECOMMENDATION:
Staff would recommend Alternative No. 1., as this design would benefit the City by Autumn Hill
Park and would correct a drainage problem in this block of Valley Creek Crossing Block 3.
RELATIONSHIP TO VISIONING:
This supports Goal E: "Deliver effective and efficient public services by a staff of well- trained,
caring, and professional employees ".
ACTION REQUESTED:
Approve a motion approving a drainage solution concept proposed by staff and to participate in
the project at a cost not to exceed $14,315 from the Surface Drainage Fund.
ruse Loney, . .
Public Works Director
ENGRi2012PROJECTS/ COUNCIUConsiderationOtDrainageSolutionForV alleyCreekCrossingBlock3
Bruce Loney
From: Steven Bloom
Sent: Friday, October 12, 2012 9:22 AM
To: Bruce Loney
Subject: Evergreen Lane Drainage Proposal
Hello Bruce,
Per our discussion this morning I would like to move forward with your City of Shakopee Drainage Proposal on
Evergreen Lane.
I am also intent on attending a City Council meeting to further discuss the necessity of this project and the details to
facilitate the scope of work
I look forward to further discussions with you and your staff regarding our drainage issue. The project date has not
been finalized. As we discussed, a Spring time line may work best with our schedule and will allow for a better
growth period for new sod.
Best regards,
Steven Bloom
1980 Evergreen Lane
Shakopee, MN 55379
i
36 � N s . ` . , 1 # 1722 ';:
d
CV
_ 4 , 40 r,
M
I
«e` h , ++ •
. SS 922 ,. 110 # N.
i
fi x w
g a`
-T ,,
•
•
i
•
+ 1� l ` �� ' i�REIV S 24 + 0°P•
t
r ass' __. b = 4 „ ,°
vr
0; -:-. . t% , .
3p0' ;* 5926
; :-
Ti
S 0,., /
1956 q 1 I t s
7 1964 n
1572 (
4 •
.".° + } F 1922
4
•
„
.r g �. s:sr... 14. s
`fin r ;; .M , 1'
4 y
��
r t6,
tall- 1 zo7o zo6
v ..i 10 . 205
/
{
wog Y
vtN . ,
0,
-4
g ss9z :� ,sue ■L
e , 12450 Zinran Ave
.�� Savage, MN 55378
Cu ���� (952)403 -9012 Office J
(952)403-9282 Fax BBB
a n d s c a e& Irrigation r i a t i o n ► w�.w
p g www.curbsidelandscape.com : ye A ACCREDITED "� �11m i BUSINESS ,
9- Oct -12
City of Shakopee (Bruce Loney & Joe Swentek)
Tom Scott & Evergreen Lane Homeowners
Shakopee, MN
Evergreen Lane Drainage Proposal 3.0
AREA A per plan provided
Drainage System
Set up materials handling location (to be approved by the City of Shakopee)
Excavate trench for drainage system
Minimum trench dimensions:
24" wide
28" deep (or more to allow for proper pipe pitch)
Hand dig as needed around utilities and under sidewalk
50 cu yds Haul away and dispose of excavation
2160 sq ft Wrap trench with filter fabric
fabric to wrap bottom, sides and top of gravel
270 In ft Install drainage pipe
6" corrugated plastic drain tile, perforated
Install all necessary fittings
6" 90 degree elbows (2)
6" Tees (3)
Install area drains per plan
8" Round Grates, green (4)
Core drill to tap onto existing sewer catch basin
42 ton Install drainage rock around pipe
3/4" clear rock
24 "x24" along pipe
4 cu yds Install topsoil to fill trench to grade, 4" minimum
Equipment
Delivery of materials
Drainage System $8,935.00
Turf Repair
Install grass seed to repair damages from installation
Turf Repair $694.00
AREA A TOTAL $9,629.00
AREA B per plan provided
Drainage System
Set up materials handling location (to be approved by the City of Shakopee)
Excavate trench for drainage system
Minimum trench dimensions:
24" wide
28" deep (or more to allow for proper pipe pitch)
Hand dig as needed around utilities and under sidewalk
45 cu yds Haul away and dispose of excavation
2080 sq ft Wrap trench with filter fabric
fabric to wrap bottom, sides and top of gravel
260 ft Install drainage pipe
6" corrugated plastic drain tile, perforated
Install all necessary fittings
6" 90 degree elbows (2)
6" Tees (3)
Install area drains per plan
8" Round Grates, green (3)
Install fittings to tie into existing PVC drain tile
6 " -4" drain tile reducers (2)
Sewer and Drain Adaptors (2)
4" PVC Tees (2)
40 ton Install drainage rock around pipe
3/4" clear rock
24 "x24" along pipe
6 cu yds Install topsoil to fill trench to grade, 4" minimum
Equipment
Delivery of materials
Drainage System $8,697.00
Turf Repair
Install grass seed to repair damages from installation
Turf Repair $675.00
AREA B TOTAL $9,372.00
BID NOTES:
Bid assumes allowance for temporary on- street materials storage
Bid does not include any irrigation repairs
A
„„ c) 7 _ _ A y r ca.
�-- '”" -- 1 - 1'4 111 "' Area B
'd $(
L
. ,
NKr /1110AN ail
IBM
3/4" Clear Drainage Rock
," Drain Tile, Perforated
Topsoil, 4" minimum
Trech Wrapped in Filter ['picric