HomeMy WebLinkAbout5.B.2. Extension Agreement for Topographical Survey for Trail Extensions
6: (3.;t.
CITY OF SHAKOPEE
Memorandum
TO: Mayor & City Council CONSENT
Mark McNeill, City Administrator
FROM: Jeff Weyandt, Assistant City Engineer
SUBJECT: Ordering a Topographical Survey for the
Dean Lakes Trail Extension and the Southbridge Trail Extension
DATE: December 19, 2006
INTRODUCTION:
The Dean Lakes Trail Extension and Southbridge Trail Extension are included in the
City's 2007 Capital Improvement Program. In order to design these projects over the
winter staff is requesting authorization to enter into an extension agreement with WSB &
Associates, Inc. to perform a topographical survey. Attached to this memo is an
extension agreement from WSB & Associates, Inc. with a not-to-exceed amount of
$6,280.00.
ALTERNATIVES:
1. Authorize the appropriate City officials to execute an extension agreement with
WSB & Associates, Inc.
2. Do not authorize the appropriate City officials to execute an extension agreement
with WSB & Associates, Inc.
RECOMMENDATION:
Staff recommends Alternative No.1.
ACTION REQUESTED:
Authorize the appropriate City officials to execute an extension agreement with WSB &
Associates, Inc. to perform a topographical survey for the Dean Lakes Trail Extension
and Southbridge Trail Extension.
91tr
Jeff Weyandt
Assistant City Engineer
JW/pmp
ENGR/2007 projectsltrailsand bridgeIWSBEXTENSION
~
WSB
& Associates, Inc. Infrastructure I Engineering I Planning I Construction 701 Xenia Avenue South
Suite 300
December 4, 2006 Minneapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
Mr. Jeff Weyandt, P.E.
Assistant City Engineer
City of Shakopee
500 Gorman Street
Shakopee,~ 55379-1376
Re: Extension Agreement to Provide Topographic Surveying Services
Trail A and B
Dear Mr. Weyandt:
According to our Agreement for Professional Services within the City of Shako pee and Section I-C-2
(Major Projects), this extension agreement is written to provide topographic surveying services for the
above-referenced project.
It is our understanding, based on your request for proposal, that this project consists of approximately
2,400 linear feet of proposed trail along the south side ofT.H. No. 169, Trail A; and approximately 1,600
linear feet of proposed trial from Cambridge Road to just south of Whitehall Road, Trail B. This survey
would include all requirements as identified in your request for proposal.
WSB will provide the survey data as required for the design ofthis project on 1m hourly basis, as
necessary, in accordance with our current fee schedule, with a not-to-exceed fee of$6,280. Please review
the attached spreadsheet outlining specific task, hours, and costs.
We are available to start this work as soon as it is authorized and look forward to the opportunity to serve
you.
Thank you for considering WSB for your surveying services. We look forward to working with you and
greatly appreciate the opportunity to assist you and your staff in the completion of this project.
Ifthis agreement meets. with your approval, please sign below and return one copy to our office. If you
have any questions regarding this extension agreement, please contact me at 763-287-7181.
Sincerely,
WSB & Associates, Inc.
~y, U--
Steven V. Ische, RLS
Survey Group Manager
Authorized City Representative
Signature
Date
Minneapolis I St. Cloud
Equal Opportunity Employer P:\I..ET1'ER PH.oi='{)St~LS'.Sh.;l,hlpee'.Tr<lil A :,md B',t'2Oif%C:<llti'.d.'lC
.&.
WSB City of Shako pee - Trail A & B
Topographic Survey Services
& Associates. 'ile.
Set GPS Survey Control $624
Field Topographic Survey $4,368
Gopher One Coordination $234
Survey Existing Utilities $624
Survey Data Management $196
Project Management $234
Total Hours 4 36 2 42 $6,280
~... 1-'. :.- :~ ,-
Cit of Shako pee Capital Improvement Program 2007 - 2011
Project Type: Trail Project Title: Total Project Cost:
Trail Construction Dean Lake Trail System (North Segment) 230,475
Year Added to CIP: 2004
Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW
Construction 219,500
Improvements
Engineering! Admin. 10,975
Total 230,475 - - - -
B. Funding Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 230,475
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
--I Storm Drainage Fund-Trunk
I Tax Levy
w
01 Total 230,475 - - - -
Description
This project would construct a trail in the Dean Lake area to connect with trail being constructed as part of the
west Dean Lake developments.
Construction: $198,700 (Park Reserve)
Paved trail from Wakefield to the west side of Dean Lake. Trail would be bituminous with a bridge
to cross the outlet channel.
Trail Construction at $30/LF for 2800 feet=$84,OOO
Bridge 10' wide by 20'long+ bridge footings 20,000=$135,500
Engineering/Admin: Design and engineering, (5% of project cost) (Park Reserve).
Justification
Identified in Southbridge Master Plan. Trail through Dean Lakes Development is constructed and dead ends
at city property. This would provide trail connections to Southbridge.
other Comments
Work would be conducted after planned Dean Lake outlet channel control structure is installed.
QperatinQ Costs
Estimated costs: Labor $1,000
---_..".~.~.=
Cit of Shakopee Capital Improvement Program 2007 - 2011
Project Type: Project Title: Total Project Cost:
Park and Trail Development South bridge Area Park Development 1,430,310
Year Added to CIP: 2004
Expenditure Items: 2007 2008 2009 2010 2011
Land & ROW 368,000
Construction 846,200
Improvements 20,000
Engineering/Admin. 196,110 - - -
Total 1,410,310 20,000 - - -
B. Funding Source:
General Fund
Capital Improvement Funds
Park Reserve Fund 1,410,310 20,000 -
Grants (specify)
Donations (specify)
State Aid
.n~"_
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
....... Storm Drainage Fund-Trunk
I Tax Levy
w
w Total 1,410,310 20,000 - - -
DescriDtion
This project would develop several park areas in the Southbridge Development, including the MNDOT 75 parcel.
2007 . Parcel 75 Assessment for Southbridge Parkway
2007 - Trail from Cambridge Road to Whitehall Road along gas easement to connect to school trail, 2600LF @
$27/LF=70,200+10% (inflation per year), $77,200+5% Design/Admin, $3860, $81,060 (Park Reserve)
2007 - Park at Southbrldge Pkwy: Hockey/basketball w light 180,000, shade structure 30,000, Water fin & water service
15,000 and Plantings 20,000, concrete and trails, $20,000, earthwork, 30,000, site furniture 15,000, = $310,000 plus 25%
design and admin $77,500, total $387,500 (Park Reserve)
2007 - Construction: MNDOT 75 parcel 2 mi trail @ 27/LF=285,OOO, 1 small picnic shelter, $30,000, lights at kiosk 14,000
total site furn and interp signage 30,000, sod and plant resto $25,000, 25 space parking @$75,OOO= $459,OOO+plus 25%
design and admin, $114,750 = $573,750 (Park Reserve)
2008 - Improvements: Installation of fishing pier, $20,000 (DNR Fishing Pier Grant)
Justification
In 2001, the City worked with residents to prepare a master plan for the Southbridge area. The improvements identified in
this project are a portion of the overall master plan
Other Comments
Estimated cost for total development of the system based on the master plan is $3 million (2001).
ODeratinq Costs
Estimated costs: Labor $50,000 + Equip/Supplies $25,000 = $75,000 (when fully developed)