HomeMy WebLinkAbout13.F.1. Ordering Plans & Specifications for Community Center Roof ReplacementCity of Shakopee
MEMORANDUM
TO: Mayor and City Council
Mark McNeill, City Administrator
FROM: Kris Wilson, Assistant City Administrator
SUBJECT: Ordering Plans & Specifications for Community Center Roof Replacement
UPDATED
DATE: August 15, 2011
Introduction
i3. P. I.
u pda , k,d
The Council is asked to order plans and specifications for a new roof for the Community Center and
authorize the hiring of a consultant to prepare these items and assist with the bidding process.
Background
Staff has met with and received proposals from three roofing consultants interested in assisting us with
the design, bidding and installation of a new roof at the Shakopee Community Center. The three
options are as follows:
1. Tremco. Tremco is a manufacturer of roofing products and also has a service division that is
currently under contract with the City to respond to and repair leaks at the Community Center.
They would design, assist with bidding and provide construction inspection services at no direct
cost to the City. In return, the City would commit to purchasing Tremco roofing materials for
the project directly off of a purchasing contract (like the State Purchasing Contract). Under this
scenario, the portion of the project that would be competitively bid would be the labor and
Tremco would provide an inspector to ensure that the Tremco products are properly installed
and then warranty the new roof.
2. Inspec. Inspec is an independent engineering / architectural firm focusing on roofs, walls,
pavements and waterproofing systems. The architecture firm of BKV introduced us to them a
few years ago while trying to solve some water leakage problems at the Library. They have
quoted us a design and bidding price of $15,200 to $17,200, depending on the costs associated
with a structural engineer needed to design the new roof access. While the roof is being
installed, they would provide on -site inspection three times a week for three hours pervisit for a
cost of $9,500.
3. Skyline Building Envelope Consultants. This firm comes to us highly recommended by
Shakopee Public Schools who has worked with them numerous times on various school building
projects. Skyline will provide design and bidding services for $16,000 and project management,
including a full -time onsite inspector during the roof installation, for an additional $12,000.
Budget
Funding for these design and engineering services would be taken from the City's Building IS Fund as
part of the overall project cost. Using a conservative estimate of $400,000 for the cost of a new roof,
these services would total approximately 7 percent of the construction cost.
Recommendation
Staff recommends that the City hire one of the independent consultants, rather than automatically tying
the City to Tremco products. Based on our meetings with the two independent consultants, their
proposals and the recommendation from the school district, staff recommends that the City accept the
proposal from Skyline Building Consultants for design and project management services not to exceed
$28,000.
Relationship to Vision:
This is a housekeeping item (F).
Requested Action:
If the Council concurs, it is asked to order plans and specifications for a new roof for the Shakopee
Community Center and to accept the proposal from Skyline Building Envelope Consultants for design
and project management services not to exceed $28,000.
SKYLINE BUILDING ENVELOPE
CONSULTANTS
ADVANCED CONSULTING & PROJECT MANAGEMENT SERVICES FOR FACILITIES MANAGEMENT WHICH INCLUDE:
ALL TYPES OF ROOFING & WATERPROOFING, BUILDING ENVELOPE & FACADE EVALUATIONS & RESTORATION,
PARKING GARAGE EVALUATIONS & RESTORATION, FORENSIC EVALUATIONS.
August 12, 2011
Ms. Kris Lyndon Wilson
Assistant City Administrator
City of Shakopee, MN.
129 Holmes St. South
Shakopee, MN. 55379
Mr. Duane Toenyan
Facility Operations Supervisor
City of Shakopee, MN
129 Holmes St. South
Shakopee, MN. 55379
Reference: Proposal for Design & Project Management of the Roof Replacement on
eight (8) roof levels (approximately 58,188 sq. ft.) of your Civic Center Facility within
the City of Shakopee.
Dear Kris and Duane,
Skyline Building Envelope Consultants' fees for the Reroofing Design & Project Management
(which means Skyline BEC will have a Full Time Inspector on site during the entire project until
completion), for complete project at the Civic Center facility, our fees would include:
-All preliminary meetings with City of Shakopee Administrators and Building Manager to
discuss overall project, various options for all aspects of this project, etc..
- Preparation of the Advertisement for newspapers and Builder's Exchange.
- Includes the preparation of all Specification Documents, Drawings, Details and Bid
Submittal Form for the reroofing of the Civic Center facility (Reroofing, Mechanical,
Electrical, Structural for exterior & interior roof access ladders or ships ladders, etc.).
SPECIAL. NOTE: Preparation of the Bid Documents, will spell out "Good, Better, Best
Reroofing Options — at least three different roofing systems for City Administrators
and the City Council to choose from.
- Revisions to the Scope of Work by way of Addendum # 1 & 2 (if necessary),
- Conducting jobwalk with contractors.
- Review of the Contractors Bids as submitted, with City Administrators.
-Type all AIA Contract Documents for the City of Shakopee with successful bidding
contractor.
- Project site visits to verify compliance with Specs & Drawings by Skyline BEC's Rod
Schalesky.
-Full Time Inspection by Skyline BEC's project inspector, which includes weekly Reports
with progress photos.
1
-All project site photos to be given to City of Shakopee in the form of CDs.
- Conduct either weekly or biweekly project progress meetings to be held with all parties
involved.
-The generation of all punchlists for all contractors involved on the project.
-The final inspection with City Administrators, Facility Manager and contractors to verify
that all items for each firm has been completed per specifications.
Summary of above Fees are as follows:
Reroofing Design Fees = $16,000
Project Management Fees = $12,000
We at Skyline Building Envelope Consultants continue to look forward to building a
strong business relationship with you your City by helping to solve your roofing and
waterproofing problems, by combining knowledge and experience with excellent
services, along with guidance on specifying the best products and systems available in the
market place. Please, continue to consider Skyline Building Envelope Consultants to be
a part of your management team.
Respectfully Submitted,
�ac, l 'ye
1 �0 74 se'4alesle
Rodney A. Schalesky
Civil Engineer / Project Manager
Skyline Building Envelope Consultants
ACCEPTED BY:
PURCHASE ORDER #:
DATE OF AUTHORIZATION:
15050 CEDAR AVE. S/ SUITE 116-333/ APPLE VALLEY, MN. 55124
OFFICE: 952 - 303 -4824 OFFICE FAX: 952- 405 -6060 MOBILE: 952/210 -7803
WWW.SKYLINEBEC.COM SKYLINE1221(),MSN.COM OR