HomeMy WebLinkAbout5.A.1. Extension Agreement with WSB & Associates for Upper Valley Drainage Ditch Wall Improvements by CSAH 17 5 7 Th f. •
CITY OF SHAKOPEE y
Memorandum
TO: Mayor & City Council
Mark McNeill, City Administrator
FROM: Bruce Loney, Public Works Director
SUBJECT: Extension Agreement with WSB & Associates, Inc. on Design Services for
Upper Valley Drainage Ditch Wall Improvements by CSAH 17
DATE: July 5, 2011
INTRODUCTION:
Attached is an extension agreement with WSB & Associates, Inc. for design services on the
Upper Valley Drainage Ditch Wall Improvements by CSAH 17.
BACKGROUND:
Earlier this year, staff presented a design for slope stabilization/retaining wall improvements in
the Upper Valley Drainage Ditch in Scenic Heights Park. Staff informed Council of other areas
that needed improvements and one in particular by CSAH 17 (Marschall Road).
Staff has received a proposal for design services to provide for retaining walls and stabilizing the
slopes. This project would eliminate the eroded riprap in the area by box culverts for drainage
and pedestrians.
Cost for this work would be from the Storm Drainage Fund.
ALTERNATIVES:
1. Authorize the appropriate City officials to execute an extension agreement with WSB &
Associates, Inc. for the design of the Upper Valley Drainage Ditch Wall Improvements
by CSAH 17.
2. Do not authorize the extension agreement with WSB & Associates, Inc.
3. Table for additional information.
RECOMMENDATION:
Staff recommends Alternative No. 1, to authorize WSB & Associates, Inc. for the design of the
wall improvements in the Upper Valley Drainage Ditch by CSAH 17.
ACTION REQUESTED:
Authorize the appropriate City officials to execute an extension agreement with WSB &
Associates, Inc. for the design of the Upper Valley Drainage Ditch Wall Improvements by
CSAH 17.
Loney, P. .
Public Works Director
ENGR/ 2011- PROJECT S //UPPER- VALLEY - DRAINAGE - DITCH -IMPRO VEMENTS/ W ORD/EXTENSION- AGREEMENT
WSB
�11 Engineering • Planning • Environmental • Construction 701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel: 763 - 541 -4800
Fax: 763- 541 -1700
June 28, 2011
Mr. Bruce Loney
City of Shakopee
129 S. Holmes Street
Shakopee, MN 55379
Re: Upper Valley Drainage Ditch Wall Improvements - CSAH 17 / Vierling Drive Location
Survey and Engineering Design
WSB Project No. 1811 -XX
Dear Mr. Loney,
Thank you for the opportunity to provide the City of Shakopee a professional services scope of
work to plans and complete survey work for the above listed project.
Project Scope / Understanding:
The scope of the project is to design and prepare construction plans, specifications and
quantities, bidding assistance and construction services to rehabilitate both entrance areas for the
CSAH 17 underpass along each side of the Upper Valley Drainage Ditch. The proposed walls
are located near the CSAH 17 / Vierling Drive intersection with existing slopes at 1:2 to 1:1
adjacent to a trail. The design of the walls is to eliminate erosion on the embankment, improve
trail sight lines (90° bend on trail), reduce / eliminate rip -rap (that is thrown on the trail by
juveniles), and improve aesthetics. See the pictures below for existing conditions.
tont
3
Minneapolis • St. Cloud
Equal Opportunity Employer
K: \Shakopee \17th - Vierling Wall Proposal\LTR Prop Loney 17 - Vierling Wall Proposal.doc
it
Bruce Loney
June 28, 2011
Page 2
Soils in the area are assumed to be 4" to 6" topsoil over gravelly and/or clay type soils with
shallow bedrock near the ditch bottom. The block walls would be the large block type with
dimensions around 48 "x28 "x28" with holes cast in the top of the block for a metal railing insert.
Metal railings or a chain link fence is included in our design, but may be installed by the City
Public Works. The work may also include some modifications to the adjacent storm sewer to
improve flow and reduce erosion within the ditch. No private utilities are anticipated to be in the
area and no modifications to any other surface features are assumed to necessary aside from
embankment construction and erosion control measures such as blanket and / or sod.
We anticipate the improvements will involve modifications of the box culvert end treatments to
tie the wall into the slopes more effectively. This may include removal of portions of the precast
end sections to better tie the wall into the underpass and adjoining drainage pipes to transition
slopes, thus reducing rip rap near the trail locations.
Permits:
We anticipate the following permits may be necessary to complete this project:
• MPCA NPDES erosion permit (includes SWPPP preparation)
• Scott County Excavating and /or Obstruction Permit
WSB will prepare, submit, and acquire these permits on behalf of the Owner. It is assumed any
permit fees will be paid for by the Owner. WSB has also included time for coordination with
Scott County so any improvements associated with this project will not interfere with any future
county improvements to CSAH 17.
Proposed Fee:
L Design Survey:
a. Research and review record drawings 2 hr @ $105 /hr = $210
c. Edit topo (shot) and enter record drawing info 2 hrs (a7 $105 /hr = $210
Subtotal $420
II. Design / Plans / Bidding 1 Construction:
a. Site / wall design 32 hrs @ $112/ = $3,584
b. Structural review 4 hrs @ $134/hr = $536
c. Hydraulic design 6 hrs @ $105 /hr = $630
d. Coordination with Scott County 4 hrs @ $134/hr = $536
e. Plan preparation 24 hrs @ $105/hr = $2,520
f. Permits (County & NPDES) 3 hrs @ $105 /hr = $315
g. Bidding & documents 4 hrs @ $112/hr = $448
h. Shop drawing review / comments / revisions 2 hrs @ $134/hr = $268
i. Construction admin 2 hrs @ $112/hr = $224
j. Construction staking 8 hrs (a7 $140/hr = $1,120
Subtotal $10,181
Grand total $10,601
The estimated cost to complete this work is not to exceed $10,601. We will commence work on
this project once we are authorized to proceed. The work will take three weeks to complete once
we are given the approval to begin.
K: \Shakopee \17th- Vierhng Wall Proposal\LTR Prop Loney 17- Vierling Wall Proposal. doe
Bruce Loney
June 28, 2011
Page 3
Thank you for the opportunity to again work with the City of Shakopee.
Sincerely,
WSB & Associates, Inc.
,0 ./tiE
Donald W. Sterna, P.E.
Vice President
I hereby authorize WSB & Associates, Inc. to proceed with the above - referenced Scope of Work
in accordance with the company's current fee schedule.
City of Shakopee Authorized Representative Date
City of Shakopee Mayor Date
City of Shakopee City Administrator Date
City of Shakopee City Clerk Date
K: \Shakopee \17th- Vierling Well Proposal\LTR Prop Loney 17- Vierling Well Proposal doe
,e, P. , may
F'
..i 11147 -
4 r . ,#
.f • ^^ ��,7 'fS 1 � s ue* AL r Ai '''. '',
•
ro
-
I
... � � , ,cif I 7 � . � �
Project Areas >y
■ , "11111116 .72. -til.'' - ' . ..t .. - , .
it
• • • 4 IP $.444 4. 4 ., 4,. 1,0 4 44 , .; .ti-•+:7 '7 ': s 1
- 7 ,
•M! 1 , -,_ - - ---__ . t - ,- -
c
s f 1 r. , . , i ,Y ca.
-,,, liar — _, — ,I p . : 1 .`e. $ i 1
x., i . ..
! t, 4
Retaining Wall Improvement Area 40 80 160
Feet