HomeMy WebLinkAbout13.D.3. CR 101 Street Lighting Change Order a CITY OF SHAKOPEE Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director SUBJECT: Consider Approval of C.R. 101 Street Lighting Change Order DATE: May 17, 2011 INTRODUCTION: Attached is a cost to add five (5) lights west of Fillmore Street along the C.R. 101 corridor. This agenda item is to consider approving a change order for this work to C.R. 101 Project. BACKGROUND: During the design phase of the C.R. 101 Improvement Project, staff has recommended replacing the nine existing "Corten" steel lights west of Fillmore Street to the signal at Sommerville Street. The attached replacement design would be for (5) lights similar to the lights from Fillmore Street to the Mill Pond Bridge. The original estimate for this work was $72,000.00 or $14,400.00 per light, thus it was recommended to delete this work . Any lighting system work west of Fillmore Street is 100% cost to the city and with Local funding. The bids received were much better than expected and staff has requested a cost estimate for this work. Reasons for reconsideration are as follows: 1. The existing lights are located in sidewalk areas with difficulty in maintaining the sidewalk area. 2. Several of the light poles are showing excessive deterioration. 3. Lighting system would be consistent from Sommerville Street to the Mill Pond Bridge. The cost estimate received from Northwest Asphalt, Inc. is $50,000.00 plus any rock excavation. Based on the reasons listed above and the fact that replacing the lighting system is $22,000.00 lower than estimated, staff would recommend approving this change order work. Staff would need one easement from Holiday Stores to locate a pole behind the 5 -foot sidewalk. Staff has discussed this with two managers and they have indicated this would be a benefit to their site and would recommend approval. Attached also is a recommendation from Ken Taillon of SEH stating that the proposal is very thorough and the new lighting system and pole style is a logical point of transition at the Sommerville Street signal. The budget impact of this change order would bring the tax levy project total to $180,000.00 as compared to previous estimates at $325,000.00. The favorable bid received has resulted in a much lower anticipated cost to the tax levy portion of the project which is scheduled to be bonded. ALTERNATIVES: 1. Approve a motion authorizing additional street lighting work west of Fillmore Street at a cost of $50,000.00. 2. Do not approve a motion approving additional street lighting work west of Fillmore Street. 3. Table for additional information. RECOMMENDATION: Staff would recommend Alternative No. 1 with funding to be from the C.R 101 Project. ACTION REOUESTED: Approve a motion authorizing additional street lighting work west of Fillmore Street at a cost of $50,000.00. A one , E o Director ENGR/2011- PROJECTSIC.R 101/WORD /CHANGE- ORDER - STREET- LIGHTING , - .----- - - - - -- I I I I I I ;' 11/4" NMC I I - - - - --I I I i /4" NMC 1 /Ca4 1 1/4" NMC 3 -1/C >4 3 /Ca4 CSAH 101 I 1 I /4" NMC 1 -1 /Ca4 INS. GR, i 1-1 /Ca4 INS, OR. I I I -I /Ca4 INS. OR. 3 -1 /Ca4 ��•' � 1 /Ca4 INS ✓ 63 a r___ A /O �`'• \4 �'�� I 62 61 A I; I I 5B I 5 I I 56 I I I 5 - -- ! Lo w I 1 I 60 I 5 I I I I I I I I o 54 - - - ---115 - -- - - - - ]10 N i w 1 I I t o I a v AA I i 1 -� 6 r a 64 I I I I ` A v- I I I /I�� 2 1 2 A � A A A W 00 65 I� I_ I 3 I I 4 5 I 7 a 1 1/4" NMC LLU11 3 -1 /Ca4 i° I� y : t -1 /Ca-0 INS. CR. 0 LEGEND 'A 1 1/9" NMC 1 1/4" NMC -� LIGHTING UNIT TYPE SPECIAL l - 3 -1 /Ca4 I '`� 1 1/4" NMC 3 -1 /Ca4 W 1 -1 /Ca4 INS. GR. p 3 -1 /C-4 1 -I /Ca4 INS. OR. U 1-1 /Ca4 INS. OR. .�{.. - Z LIGHTING UNIT TYPE SPECIAL 2 0. NOTES: a N 1. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE CONNECTION - INPLACE LIGHTING UNIT TYPE 3 OF THE POWER FOR THE LIGHTING SYSTEM WITH SHAKOPEE PUBLIC UTILITIES. LIGHTING STANDARDS AND BASES 2 THIS PLAN SPECIFIES CONDUIT SIZE, TYPE AND GENERAL LOCATIONS, INPLACE TUNNEL LIGHTING UNIT NO. STATION OFFSET LOCATION TYPE LUMINAIRE THE EXACT LOCATION WILL DETERMINED IN THE FIELD. n ^ TYPE 4 64A 08-85.6610.97 ftT SIDEWALK 1 120 LED v c 65A 108 +85.66 142.91 RT SI EWALK I 1 1 0 LEO 3. ALL CONDUIT SHALL BE NMC - SCHEDULE 80 AND SHALL CARRY 1 /C-4 IA 2A 110 +65. 7 4Z.96 RT RE .WALL 120 LEO GREEN INSULATED GROUNDING CONDUCTOR AS SHOWN IN THE PLAN. s 3A 11 +75.43 38. RT SI EWALK 120 LEO E3 INPLACE HANDHOLE n 4A 114 +55.43 38.49 FIT SID EWALK 1 120 LED 4. SEE SPECIAL PROVISIONS FOR LIGHTING UNIT 5 C F CAT DNS. o 5A 116 + 38.50 T SIDEWALK I 1 0 LED 5, IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO UTILIZE THE A. 7A 118+20.65, 38.50 RT SIDEWALK 2 120 LED 1♦ EQUIPMENT PAD /SERVICE CABINET 63A 10 +85.13 43.13 LT SI EWALK - t 0 LEO GOPHER ONE CALL EXCAVATION NOTICE SYSTEM FOR ALL UTILITY N a 62A 107+79. 3 40.16 LT SI EWALK 1 120 LEO LOCATIONS. fi A 10 +65.80 38.50 LT SI EWALK 120 LED 6, ROCK EXCAVATION FOR THE LIGHTING BASES IS EXPECTED AND - -•---- FURNISH AND INSTALL CONDUIT c o 59A 6 A III +45.80 38.5D LT SIDEWALK 2 120 LED SHALL BE INCIDENTAL TO THE LIGHTING SYSTEM. - ° " , 5 A ll 29.7] 38.51 LT SIDEWALK 120 LED °. "SYSTEM A' 57A Il +23.90 38.50 LT SIDEWALK 1 l20 LED 7- ROCK EXCAVATION MAY BE REQUIRED AND SHALL BE INCIDENTAL TO - - - ---- INPLACE CONDUIT A II +91.4 38.50 LT SI EWALK WALK 1120 LED THE LIGHTING SYSTEM. 54A 55A 119 +17. 738.50 -LT .SIDE 2 120 LEO SOURCE OF POWER (BY OTHERSI a oR "w" - wenvisw" I F TK ITI "1 � m BOLTON � MENK. IhC. S. A.P. 70- 701 -07 C.T.B., C.P. 101 -07 5 N�* _ 0 50 100 • >ROFE E,&1 uiaEx rxE - IF TxE sTAi[ uINNt's � JBW ^1y 7�lt.xA CONSULTING ENGINEERS & SURVEYORS L.S.A.H. 101 RECONSTRUCTION 16.03 C N SCALE FEET / `iR��A//_f/ gR T, NEy STN �"� ^�- -�- MA.ATO. MN FAIR4ANT. MN SLEEPY EVE. MN WRLNAR. MN aF n ' L".. a ...N. IM..... A.-'a R,.a.,. =e 11//��JJ�lld tS'v 4! oz -m -zou auRNSVx,LE. uN cxnsm.NN Ra 1,ua uAr�.EW000. w+ A.S. �A LIGHTING PLAN 16.08 Y SHAKOPEE ` .4 � �L , i re { s dr Olt it 1 R - MiNp1�8' m .iY. r , c F i .691 r C � 111 e 0 • 1 4. FLRS � �. y •t 1 3 \ " tt (y �l� � , � , Y� •(� QCONCRETE POLE •�'� .e`. .y t..�... 9 11F� ''3• a{ !! ' 1 it 1 r `y _ Qea:r&+r •rooa W ®- CONn : \V F.N 1 �,ir - r 1 :� . J � A ' , prn lc e c vmY -e o (� �' ��� ` i � � _ T ��� •. QWWOiOLE 00. CE T �,�� jam` F Z 3 ¢' '� � ^ ° � • MISSMG it swu r. x it V7 1 I' M > ° t• ail .e7}sJS" '� �•� .µ , Y +' .} r Vr� f. NN )e 3SS9$ r NM 1 F 9 � A KA 1 Northwest Asphalt, Inc 1451 Stagecoach Road Shakopee, MN 55379 phone 952- 445 -1003 fax 952 -445 -1056 To; Scott County Price Request Len laxen 1 Date of Quote 1 5/12/2011 NWA# 1706 Job Description: County Road 101 City; Shakopee Item Approx Qty Unii of Description Unit Price Bid Amount measurement 1 LS Lighting roposal per attached sheet $44,000.00 $44,000.00 1 LS Remove and Replace Walk /Ped Ram /Bases $6,000.00 $6,000.00 Please issue a Change Crderforthe. Total Due Total $50,000.00 I Sincerely, Total Due $50,000.00 Jeremy Gylland Ind ustria ILLM�� 5141 Crystal, Co 56429 ELI mmer Underground • M � �f IG Tph Fax: �SSj (763)424 May 10, 2011 Jeremy Gylland Northwest Asphalt, Inc. 1451 Stagecoach Road Shakopee, MN 55379 RE: Scott County CP 101 -07, SAP 70- 701 -07 CSAH 101 in Shakopee Additional Lighting West of Fillmore I Dear Jeremy, As requested, Killmer Electric is pleased to provide this revised proposal for the additional lighting on CSAH 101 west of Fillmore Street. South. Scope of work is as follows. Furnish and install five lighting units from approximate Station 106 to approximate Station 111 on CSAH 101 per the attached drawings. Included are five - Type Special 1 (Alternate 2) pole & fixture, concrete foundations, wire and connections per the attached drawing. This proposal is based upon utilizing the existing conduit system, provided It is in a usable condition. To utilize the existing conduit scope includes intercepting conduit at existing lighting units, "splice-in" a conduit to make the existing conduit continuous, intercept existing conduit at new light unit locations and extend to new base. This will require the removal and replacement of existing concrete sidewalk, which we exclude from our proposal. This proposal does not Include any rock excavation for the installation of the concrete light bases, salvaging of existing lighting poles (contract unit price), removal of existing wire (contract unit price) and removal of existing concrete light base (by others). We will salvage the lighting fixture to the City Utility and dispose of the pole. Price to complete is $40,000.00 Lump Sum. Pricing does not include any markup that Northwest Asphalt may be entitled to. You will need to add for costs for the sidewalk and concrete base removal. I have included a copy of my estimate as supporting documentation to my proposal, which is confidential in nature. Please submit to the Project Engineer for consideration. Feel free to call me at (763) 425 -2525 if you have any questions. Sincerely, �6 Daniel E. Balls g Project Mang r Killmer Electri Co., Inc. An Equal Opportunity Employer . f • ®• �o� KILLMER ELECTRIC CO., INC. LIGHTING ON CSAH 101 WEST of FILMORE F &I FIVE LIGHTING UNITS w /CONDUIT & CIRCUITS May 10, 2011 CONFIDENTIAL ADDITIONAL LIGHTING UNITS EQ =1 LS WEST OF FILMORE ST. S. MATERIAL MATERIAL LABOR LABOR DESCRIPTION QTY PRICE PER EXTENDED UNIT PER EXTENDED 1 Design E Base Mod Equip & Labor 5 35.00 1 175.00 6.00 1 30.00 2 24" Dia. Sono Tube 30 4.40 1 132.00 1 0.00 3 Reinforcing Steel (16.1 # /ea) 80 0.65 1 52.00 1 0.00 4 1.25" PVC Ell w /Cpgls 24 1.59 1 38.16 1 0.00 5 1.25" PVC Bell Ends 12 1.66 1 20.16 1 0.00 6 Concrete (1 CY /Ea) 5 140.00 1 700.00 1 0.00 7 5/8" x 10' Ground Rod & Clamp 5 22.60 1 112.60 0.75 1 3.75 8 Wlrehoider 5 6.50 1 32.50 1 0.00 9 Holophane Decorative Pole (Special 1) 5 3000.00 1 15,000.00 2.50 1 12.50 10 Holophane Decorative Fixture (Special 1) 6 750.00 1 3,760.00 0.75 1 3.75 11 12 -2 OF Pole Wire 80 396.00 1000 31.68 8.00 1000 0.64 12 Terminal /Splice Blocks 20 9.00 1 180.00 0.30 1 6.00 13 Tape & Misc 5 4.50 1 22.50 1 0.00 14 Fuse Holder w /Fuse (Brkwy) 5 32.00 1 160.00 0.30 1 1.50 15 1 0.00 1 0.00 16 Expose /Intercept Existing Conduit 10 0.00 1 0.00 1.50 1 15.00 17 1.25" PVC Conduit, Schd 80 80 54.10 100 43.28 3.00 100 2.40 18 1.25" PVC Couplings 20 0.25 1 5.00 1 0.00 19 Trench & Backflll 40 60.00 100 20.00 12.00 100 4.80 20 PVC Glue (Qls) ., 1 18.00 1 18.00 1 0.00 21 1 0.00 1 0.00 22 Expose/Intercept Existing Conduit 6 0.00 1 0.00 1.50 1 9.00 23 1.25" PVC Ell w /Cpgls 10 1.59 1 15.90 1 0.00 24 1.25" PVC Conduit, Schd 80 110 64.10 100 59.51 3.00 100 3.30 25 Trench & Back6ii 60 60.00 100 30.00 12.00 100 7.20 26 PVC Glue (Qts) 1 18.00 1 18.00 1 0.00 27 1 0.00 1 0.00 28 #4 THHN Cu Wire 4460 851.24 1000 3,788.02 6.00 1000 26.70 29 Electrical Permit (Additional Lights) 1 25.00 1 25.00 1 0.00 30 1 0.00 1 0.00 31 1 0.00 1 0.00 32 END 1 0.00 1 0.00 TOTALS 24,429.21 Hrs. 126.54 SALES TAX 6 $w�6q, $1,679.51 TOTAL MATERIALS W/TAX $26,108.72 MARKUP ON MATERIAL 1;1 b%: $3,916.31 TOTAL MATERIALS $30,025.03 EQUIPMENT (Hrs x Rate) Hrs, Rate Pickup Truck 24.00 $11.00 $264.00 Equipment #2 $0.00 Equipment #3 $0.00 Equipment #4 $0.00 Directional Boring - Subcontract $0.00 Page 1 of 2 KILLMER ELECTRIC CO., INC. LIGHTING ON CSAH 101 WEST of FILMORE F &I FIVE LIGHTING UNITS W /CONDUIT & CIRCUITS May 10, 2011 CONFIDENTIAL LABOR , t `$74}/Hr. $9,773.95 TOTAL MATERIAL, LABOR & EQUIP. $40,082.98 NUMBER OF UNITS 1 PRICE PER UNIT $40,062.98 Labor. Taxable Mkp Fringes Hriy Wages 62% Rate Foreman (Local 292) $42.72 $26.49 $21.64 $90.85 Journeyman (Local 160) $34.82 $21.59 $15.11 $71.52 Operator (Local 49) $33.38 $20.70 $15.25 $69.33 $0.00 $9.09 $0.00 $0.09 TOTAL CREW RATE $231.70 Crew Size 3 AVERAGE HOURLY RATE $77.24 Page 2 of 2 LEGEND L Iti E ST MATC -.304 5 . REMOVE EITUMIN4G3AYEM .P,ENT xX LF 6AWI!{Q tONtI}ETE �IA�K '• QV .. � .- - AdPROX IMATE CONSTR11CT10b L115�is : �. %X I:F SAWENP i�IYUf,1CNQUS PT}VEIAENT [/U 'Q) RE♦.iPVE..CORCRETE WALK {PAYJ:NEtii ,,; .. - �� '` �# \, t IlIl4 BITU6iIN0Ui' PlVENNT tI 9' °i XX CF S E PAVEb 6L{]FF AVE 't S4VA Q ttCHT INQ'VM T 0E . ". ,: : ,. REMOVE'CONCRETE CGRB R E 0 E.1.61 I BASH MM ry0 ✓ RE40VE COND M10 MW �1RN�� BEYNEEN, REM�XEO LIO`NTCNO GNCT i ! t ' 10,W.RIW U RO 05 U 7ER . (� f '�,. tt '@ r I 6`,LF � 9 Lk ] .] 1(„) _,•] �.. 1,�. � IS L: LF A 1 B 2 i I J- m? I 5LF � . is :.. ....... ...� ... .... .... .. ... d.^ x� x. F RE Q At - : :.. �. .. 1 ..,:._.. � � � �' � ,' : 6 -.LF :' 9 LF I 5 l "F� 3 F t � •.,.,K .',, F l t �.: °• ` bR: 7jL o TTYYTTIORK :... ..... '• {•. :I 6 u .� m: I 1 cfEd?:'�/RA ryXOE'z $ 4(Ai�.� !AN sAN ARY P4A I7N5f .. hhtpN.WIM CS...;.CC1 . ,. I '.L S10 ..,Q:. di Cr- {C(577430 u f w t� Tp SCi�U it" , 1I{ 4NSillUGtlbf{ L1HtYY5 -' .F4R AdYi10A Ii1FOR14CON� .l{ , 4n p '] � bitY8 3 N4TEg f(i3TE0 es�V..I ¢ REFRf YO EX lSTTt•IQ t4} 1ES AfIOR ,•FNE RI01�T - Qf WAY TQ Q $ bTH Ti � !� 9R bTNEk 4F,�MTTK4 AEMbYAL�# SIyyU11CNfjU PAVEMEC77 GONEi�ETE PAYEAfENT tJCNQRETE BALK A D cpNCHiE cU179 1's iN�LQDEQ - Q .'v Ia 3TM0 2105,,01 Cgx�FOy.:(7ffiAVAYgys`, REp €R T9:S,41L & CQt♦STRIICrQN �FpTE; o A S A. 5T0F',Kt I4E RE S 'OR NARKET,$f EY SYOR,M ;$ VER C YRU�TYON SNA4L NdT WSTRQCT ACCE55 TO — A4JACENT P OP RYES COIYJRA4TOR 40 GOORQNATE W {TH:;ENCINEER QN rALI.QIV9R 5iQCKPiL$ STpl AREA$' StlDRN ON $NEEY3 B O1 .ANI1 0 05 IN :TNE PLAN ARE Ap.PRTl1fFMATE: . o„ so loo �"" .. N�rz Fwa�E swx if�GEY1 i u_ ..QN E�C'at — 'TChI $• hllE�iV Y� IhIG +^' " A P 70'7.1 A7 C TB C P ]OS'67 sNEEt'. G4Nt§%TING ENGMEERS & $URVEY(Nt5 : .N. 101 REG{1NSTRUCTION 8 1 L SCALE " 'FEET j ' .. TWB 4UU 0. EPA;HdlT kl FPY ETE Mt 11r�.4. . !; !! , /'C6F„fCl, u :.zsssz .. m.so-hmi o � '. amxSJUE Rw <xas!u.sd o xs puiEMootl wr abcs,a� S• ARMOV/tl, PLAN. 8.,05 X i 1 • I I I {( aOI PR t l/A NMO : to ' �~ ,`,,.. :' I� .fd �I ! i A• . • •I � w° ^"� I �- .....+ I t t I 5R I i 5 A + I 6 � I I � ffUUll m .. ) .. _ 1 �..,- I.� --+a II __ fr I y�3 i -, tf Q 4 • I L 1. 1 A /A �N�r�: _ Al YNS DR : LE�rFND '� ,.y �,. 1 }j4u NRC -': ,• :� - �w -. � 3 1�CA4'NNC ' PE �SPECIAL:1 ' •� 'CIC�eV�A� ! .� 3 -d lC 4 .. - - :l .:( /4 INMG 1 lC 4 YNS G ' tNS. W TYPE SPECk l.7GriTIND uNFr S . 4IGNr[d'u UNtF Arz RAT R. JS.kESDbNSiBLE':OR.CRDIAA� - - !� Q,.THE CONNEtr ON" kNPLACE LIO iI TYPE n Y oX¢:I T C T OP T d -NC a.: - .? ...: : -;..•� ".. F TNE:POPIER FtlJIiNE FSCNTlNC I SIS EM WIN NAkOPEE 'PUBLIC �. - ;, , X121 rINGST NDA by y( (J ..[ :.: - ,:.. ' 2 I`NISsPI:AN 5PECIF kES bDND "UIY:1572E 4YpE +AND G� E(jAL_1;0¢AT IVNS -.. NPL��.[: ...E4k 14NTlNA UNIT I - fY!'�.�^.'` �SY!. ':: -S,�` : ". .:; .NO :,,: TAiION.�.. =OPF C..:•. A:,O Y77 L M RE .. pN jj TV E #ACi LbCATSAN`WtLL D €T'Et�3MJN��! jN THE f)E4Ai�! 7YR A 1 �•.i '. .:... ,. �: _: .. .i C ..� :�`. -.— A..:.- .e � x.+ 3 AR4lI ALL:UHUIlir.5Hi1�1.4.BE .RMC- S�ryEbII4E DQ . A:y�HAC'L P /EbA . N NDINI. CANPUFibR AS(lOwN TN THE - P�'AN . _ _ _ . _ PCAGE NAI�ONOEE -. ?:.* -'. •'.. �, .,: .'. ''.'.. ;.' :.: .. - 1 .- ED � 4 SyE 5pEG�At PRDVS�ION FDQ 4,IbI4rINP UNLT �,PEL'�F ICA7lONS CI N r T SW.L'L BE. N tbNARA DTI L'fCON,` $VS T I E JS FO �AHL SLTE['7YE EDQ(PI PAD /S RVJff CABN I - B T f+� �} FURNiSN AND Ik5TA4L ctlNDUIT gg GOPHER; pp 4 R V AN N E M R L 6 $XALL TOEYHEAEI6xTINdSSYSYEME %PEC . a TEA ANq Bo B L .¢ z6r o- c o INPLACE OOUO ill Ir - u.Ki ��SY$UM A" 7A 6 i. ROCR E% YVATIDN.:TAM PE REQUIRED AND pigA BE INC[OENTAL TD - - - •':: - - - THE LTG 1NG ¢YS E r 50URCk OF POWE6 IBY tlTHERif x Ir e(a mCL.'I CIV M, NK IhIC S AaP ld 70 D7 4'B 4.P.101=07 s«Etr o A. 50 .: -rdp ro7 'iw.wU<p+ wok T•x Y*4F'A k o<ypuNSO 3B �t . - s �' �'^".. , .:- 1-•—.. p R1eh CbN5U471NG ENGINEERS S IIRV�YOR$ 1Q1 RECON$rRRC ION..'. 16,Q3 € °�: _ .'.S M.e :._. J:7 /( /�� / o " uiwlLratw tLNNavi ra air "r ert,w *u+uA�?+s.0 LIGHTIN�i N.LAN BUmttri [ ax cld I.ier N.�i$c w+ Wrtif do0. W +�Y.[. .4 - I Bruce Loney From: Ken Taillon [ktaillon @sehinc.com] Sent: Thursday, May 12, 20114:01 PM To: Bruce Loney Subject: Re: FW: Lighting Bruce, I reviewed the proposal of services prepared by Killmer Electric for the addition of five new light poles to the CSAH 101 project. The proposal is very thorough. I found nothing out of the ordinary in the pricing associated with their proposal. The work outlined in this proposal will install the same style of poles that are to be installed immediately east of their location. This installation will extend the new lighting system and pole style to a logical stopping point at the signalized intersection. This will provide a point of transition to a new style of pole that may be associated with future projects. Let me know if you have any questions. Thank you. Ken Taillon ( Associate Project Manager, Outdoor Lighting Services SEH 3535 Vadnais Center Drive Saint Paul, MN 55110 -5196 651.765.2980 651.490.2150 fax ktaillonosehinc.com www.sehinc.com Bruce Loney <BLoney @ci.shakop ee.mn.us> To Ken Taillon < ktaillon(asehinc.com > 05/12/2011 02:36 cc PM Subject FW: Lighting fyi - - - -- Original Message---- - From: Jeremy Gylland rmailto :JGVlland(@nwasphalt.net1 Sent: Thursday, May 12, 2011 2:18 PM To: Bruce Loney i Subject: Lighting Please note the following proposal excludes traffic control, rock excavation and is based on the attached proposal from Killmer Electric. Please consider the environment before printing this email [attachment "20110512141947005.pdf" deleted by Ken Taillon /seh] 2