HomeMy WebLinkAbout13.D.2. Extension Agreement for Design of a Bluff Avenue Storm Sewer 13.0.- CITY OF SHAKOPEE Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director SUBJECT: Authorize Extension Agreement for Design of a Bluff Avenue Storm Sewer DATE: May 17, 2011 INTRODUCTION: Attached is an extension agreement from WSB & Associates, Inc. for designing of a storm sewer system from Bluff Avenue to the Minnesota River flood plain for Council consideration. BACKGROUND: With the C.R. 101 Project, Bluff Avenue will be getting a new bituminous pavement for the local detour route. Portions of Bluff Avenue are currently gravel with no storm sewer drainage system. Prairie Street to Dakota Street on Bluff Avenue is gravel and the street grades are very flat. The current drainage system is an overland system that goes down a ravine on property owned by Jim Stocker. The City does not have an easement for this drainage and the ravine is showing signs of erosion. Staff is recommending a design and construction of a storm sewer system to preseve the life of the new bituminous pavement and would correct the erosion of property. Funding of this work would be out of the Storm Drainage Fund which has sufficient funds. The extension agreement from WSB & Associates, Inc. is to survey and design a storm sewer system and provide easement documents at a cost not to exceed of $9,750.00. Staff has contacted Schulz Ornamental Iron and Jim Stocker about this potential project and both property owners indicated their support. Also, following previous Council direction, staff will be obtaining cost estimates to pave Prairie Street, Dakota Street and Minnesota Street, from 1 St Avenue to Bluff Avenue. In order to do the work with Northwest Asphalt, a change order can be entered into with the C.R. 101 contract and this work could be done in September of the year. In review of these streets, the existing pavement or bituminous millings would need to be reclaimed to provide for a suitable surface to place bituminous pavement. Staff is proceeding on obtaining a cost estimate for fixing these streets with reclaiming existing pavement and millings. Current policy would suggest assessing bituminous pavement reclamation projects. Staff is viewing this project like a bituminous overlay with preparation of the base before placing the bituminous layers. If this is not the case, Council should provide direction to staff on their desires. ALTERNATIVES: 1. Authorize the appropriate City officials to execute the extension agreement with WSB & Associates, Inc. for the design of a storm sewer system for Bluff Avenue by Prairie Street and Dakota Street. 2. Do not approve the extension agreement. 3. Provide staff direction on obtaining estimates for bituminous pavement work on Prairie Street, Dakota Street, Minnesota Street, from 1S Avenue to Bluff Avenue. 4. Table for additional information. RECOMMENDATION: Staff would recommend Alternative No. 1 and No. 3 to design a storm sewer system for Bluff Avenue by Prairie Street and Dakota Street and provide direction on obtaining cost estimates for paving Prairie Street, Dakota Street, Minnesota Street, from lst Avenue to Bluff Avenue. ACTION REOUESTED: 1. Authorize the appropriate City officials to execute the extension agreement with WSB & Associates, Inc. for the design of a storm sewer system for Bluff Avenue. by Prairie Street and Dakota Street at a cost not to exceed of $9,750.00. 2. Provide staff direction on obtaining estimates for bituminous pavement work on Prairie Street, Dakota Street, Minnesota Street, from 1 St Avenue to Bluff Avenue. / Aru Lone , E. Public Wor s Director ENGR / 2011 - PROJECTS /C.R.101/WORD/BLUFF-AVENUE-STORM-SEWER A WSB � Assoc Engineering ■ Planning ■ Environmental ■ Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 -541 -4800 Fax: 763- 541 -1700 May 12, 2011 Mr. Bruce Loney City of Shakopee 129 S. Holmes Street Shakopee, MN 55379 Re: Scope of Work Associated with the Bluff Avenue Improvement Project Hydraulic Report and Storm Sewer Design WSB Project No. 1811 -16 Dear Mr. Loney, Thank you for the opportunity to provide the City of Shakopee a professional services scope of work to prepare a Hydraulic Report and Storm Sewer Design for the Bluff Avenue Improvement Project. The Hydraulic Report will include recommendations for catch basin location, design flows, draft storm sewer design, drainage area mapping, and a storm sewer plan. The limits of the project area are Bluff Avenue right -of -way from east side of Dakota Avenue to the west side of Prairie Street and from Bluff Avenue north. The following tasks have been outlined for the Bluff Avenue Hydraulic Report and Storm Sewer Design: Task 1: Gather Background Information ................... ............................... ...........................$450 Background information related to the project will be obtained from various sources. These sources include: City staff, City's water resources plan and library, GIS database, record drawings, and other background information that may be made available as the project develops. Information regarding property boundaries and existing easements that are dedicated over the area will also be collected. Task 2: Complete Review and Analysis of Background Information ..... ...........................$450 Background information collected will be reviewed and analyzed to develop the design for the road drainage and storm sewer. The existing road drainage patterns will be evaluated to determine the system flow capacity and discharge rates from the road right -of -way. Minneapolis ■ St. Cloud Equal Opportunity Employer CADocuments and Setnngs\BLoney \Local Settings \Temporaryluremet Files\ ContentOut look\9B21JK6PF\LTRProp Loney 0501111 =DOC Bruce Loney May 12, 2011 Page 2 Task3: Complete Topographic Survey ..................... ............................... .........................$1,200 The topographic survey of Bluff Avenue from Dakota Avenue on the west to Naumkeag Street on the east will be completed. The proposed storm sewer alignment between 831 Bluff Avenue and 931 Bluff Avenue will be completed. The City will be responsible for obtaining the right of entry on the properties to complete the survey. The data collected will be used to develop the project plans. Task 4: Develop Catch Basin Location Recommendations and Design . ...........................$750 Utilizing the information collected and the hydrologic analysis of stormwater flows, WSB & Associates, Inc. (WSB) will prepare a catch basin location plan for areas west of Prairie Street to east of Dakota Avenue. We will review the recommended locations and number of catch basins with City staff. T ask 5: Develop Storm Sewer Design ......................... ............................... ...........................$850 The storm sewer layout will be developed based on the catch basin spacing design and the existing storm sewer systems and ditches serving the project area. The storm sewer layout and design will be provided to the City. This task will include storm sewer construction plan preparation, storm sewer tabulations, and storm sewer profiles. It is our understanding that the City will prepare any construction plans, tabulations, and profiles involving any other utilities. The storm sewer construction plans will not include any adjustments to watermain, sanitary sewer, and residential services. It is anticipated that any plans to modify these utilities will be completed by the City. Task6: Easement Preparation ................................... ............................... .........................$2,150 The preparation of three easement descriptions and exhibits for the storm sewer will be prepared. The negotiations with property owners to acquire the easements will be the responsibility of the City. This additional service can be added to the proposed scope at the request of the City. The filing of the easements with the county recorder will be the responsibility of the City. Task 7: Soil Borings The collection of two soil borings will be performed in the project corridor to determine the bedrock elevations. The cost to perform the soil borings and develop the boring report will be solicited from two firms prior to proceeding with this work. The cost to complete the borings is not included in this scope. Task8: Construction Plans and Specifications ......... ............................... .........................$3,060 WSB will prepare the construction plans for the Bluff Avenue Storm Sewer Improvements. These improvements are anticipated to include new storm sewer on Bluff Avenue from Dakota Avenue to Prairie Street and north along the property boundary between 831 and 931 Bluff Avenue. CAD000mema and SWmgs\BLoney\i.oW Settings\Tempoxnry Imeme[ FIles \Conter&QMook \9B2UKOMTR Prop Loney 0501111 1PALDOC Bruce Loney May 12, 2011 Page 3 Task9: Construction Staking ...................................... ............................... ...........................$840 WSB will provide survey stakes necessary for the installation of the catch basins, manholes, and storm sewer pipe. The staking of the Bluff Avenue road centerline or pavement section has not been included in this task. These services can be added if necessary. The estimated cost to complete this work is not to exceed $9,750. We will commence work on this project once we are authorized to proceed. The work will take three weeks to complete once we are given the approval to begin. Thank you for the opportunity to again work with the City of Shakopee. Sincerely, WSB & Associates, Inc. Donald W. Sterna, P.E. Vice President I hereby authorize WSB & Associates, Inc. to proceed with the above - referenced Scope of Work in accordance with the company's current fee schedule. City of Shakopee Authorized Representative Date sm C:Mocom uand SeWnp\BLoncy\Loc9 Set inpUempormy Imemet FiteeACont=tOutIwk\9B2UK6PFU.TR Prop Loney 0501111_3ERDOC f ' I r . . t ......._,.:_ 804+ ✓�...._...._ c - ^^ , T STREE. WIDT H 2" OVERLAY (AFTER DETOUR) `•.�. 2C' WIDE iLEVEIING'AND'OVERL',AY iFOR DETOUR PREP? -- ^ "STREET �W IOTH:.: 2' & (AF TER DETOURr - -. 7} r� , 3 !_� _' ` . S 'L SEE.INSETU_� , i 1 (, BLUFF AVE k I .__.. STROVE WID }{le 1 R AY X AF TEN DETOUR) I r r i I� — w .._ �. I� {fir _ 4: I� i cl If F� r — 1 i a J DETOUR PREPARATION DETOU R NOTES: (DAKOTA ST TO NAUMKEAG ST) (MARKET ST TO DAKOTA ST) 1. ALL PATCHING NECESSARY TO PREPARE SURFACE FOR DETOUR IS INCLUDED IN (NAUMKEAG ST TO MARSCHALL RD) _ — TRAFFIC CONTROL (LUMP SUM1 PAY ITEM. E °° 2. ADJUST WATER MAIN GATE VALVES TO BRING TO FINISHED GRADE. TO BE PAID FOR AS ITEMS ADJUST CATE VALVE BOX (EACH). 3. ENGINEER SHALL MAKE FINAL DETERMINATION OF EXTENT AND TYPE OF RESTORATION APPROPRIATE TO RESTORE DETOUR ROUTE STREET SURFACES TO PRE - DETOUR CONDITION. 4. REFER TO SPECIAL PROVISIONS FOR FURTHER INFORMATION. ° c 2" TYPE SP 12.5 WEARING COURSE 2" TYPE SP 12.5 WEARING COURSE F MIXTURE (3.B) - SPEC 2360 - (SPWEB34081 MI %TURE (3,81 - SPEC 2360 - (SPWEB34OB) ° BITUMINOUS TALK COAT -SPEC 2357 0 N (INCIDENTAL) o ° I' TYPE SP 12,5 WEARING COURSE (LEVELING) MIXTURE (3.B) - SPEC 2360 - (SPWE83408) SUBGRAOE PREPARATION (INCIDENTAL) rW: CH IF, HE T YN' wFAV`i�tiSTRNV I 'T 4 LI[FxseiD oEMd¢o SHEET _ ¢ 1.0 zoo 0 0. Ps BOLTON $ MEN I 70-701-07 CT YG, NC. S.A.P. ..B.. C.P. 101 -07 SCALE �JPS CONSULTING ENGINEERS & SURVEY ORS C.S.A.H. 101 RECONSTRUCTION 5 O ®Bd:m 6 Nm cw 2010. en n, ��� Cx.91 WHEN .0 OH unm MANSATO. MN FWMOHT, MN SLEEPY EYE. NH H OF a,. :It -- zcslz 1e --leM csa � euw+ S.E. MN DETOUR PLAN 5.17 S. � 1 �. • I '*�p ' iFn M 1: 44 .. F 1 1 \- r ui ^ ' -S "+fie. _ ' e •Q� I y e ! Y , I� J 'A' ,. l4'�.{ . { /'� � F dati�r. .r�� xr .� 1� .ys � .w"� Mme, A�. S- . �� -1 �� " � , \ y � P - " I. t , , �i• r ,t A�r �...,vy�yyr.'� R <H' Y� � y�-1, ��•$SL r,' yk . ..r �• ��..�.1 i R \�f