Loading...
HomeMy WebLinkAbout13.D.1. Approve Plans and Order Advertisement for Bids for the 2011 Bituminous Overlay Project No. 2011-2-Res. No. 7090CITY OF SHAKOPEE Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Jeff Weyandt, Assistant City Engineer SUBJECT: Consider Approving Plans and Ordering Advertisement for Bids for the 2011 Bituminous Overlay, Project No. 2011 -2 DATE: March 15, 2011 INTRODUCTION: Attached is Resolution No. 7090, which approves the plans and specifications and authorizes staff to advertise for bids for the 2011 Bituminous Overlay, Project No. 2011- 2. BACKGROUND: On January 18, 2011, Council adopted Resolution No. 7077, a resolution ordering the improvements and the preparation of plans and specifications for this project. Staff has completed the plans for the bituminous overlay and would request that City Council approve the plans and authorize advertisement for bids, with the intent to have the bids be considered at the May 2, 2011 Council meeting for the work to be done yet this summer. The total estimated construction cost including a 5% contingency is $775,000.00. Currently there are excessive pavement markings in the downtown area. The current plans will eliminate the two on- street handicap stalls located on 1 Avenue and the one on- street handicap stall located on Lewis Street north of 3 Avenue. The businesses adjacent to these stalls have parking lots with ADA compliant handicap stalls. The current stalls in the street are not compliant with ADA standards. To make the stalls compliant the stalls will need to be wider resulting in a loss of parking stalls and pedestrian ramps will need to be added near each stall. The estimated cost per pedestrian ramp is $1,800.00. The current plans will also eliminate all crosswalks not located at intersections with 1 Avenue and all parallel parking striping. The parallel parking striping is unnecessary and does not result in additional stalls. Eliminating the excess pavement markings will save the City an estimated $11,000.00 in construction costs and roughly $2,200.00 a year in restriping costs. ALTERNATIVES: 1. Adopt Resolution No. 7090, A Resolution Approving Plans and Specifications and Ordering Advertisement for Bids for the 2011 Bituminous Overlay, Project No. 2011 -2. 2. Deny Resolution No. 7090. 3. Table for additional information. RECOMMENDATION: Offer Resolution No. 7090, A Resolution Approving Plans and Specifications and Ordering Advertisement for Bids for the 2011 Bituminous Overlay, Project No. 2011 -2, and move its adoption. ACTION REQUESTED: Offer Resolution No. 7090, A Resolution Approving Plans and Specifications and Ordering Advertisement for Bids for the 2011 Bituminous Overlay, Project No. 2011 -2, and move its adoption. ENGR/2011- PROJECTS/ 2011 - OVERLAY/ WORD/MEM7090 /APPROVING- PLANS -ORDER -BIDS wzttJoIc2 Jeff Weyandt, P.E. Assistant City Engineer ATTEST: City Clerk RESOLUTION NO. 7090 A Resolution Approving Plans And Specifications And Ordering Advertisement For Bids For The 2011 Bituminous Overlay Project No. 2011 -2 WHEREAS, pursuant to Resolution No. 7077 adopted by City Council on January 18, 2011, Bruce Loney, Public Works Director has prepared plans and specifications for improvements for the 2011 Bituminous Overlay Project, by bituminous overlay and any appurtenant work, and has presented such plans and specifications to the Council for approval. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA: 1. Such plans and specifications, a copy of which is on file and of record in the Office of the City Engineer, are hereby approved. 2. The City Clerk shall prepare and cause to be inserted in the official paper and in the Construction Bulletin an advertisement for bids upon the making of such improvement under such approved plans and specifications. The Advertisement for Bids shall be published as required by law. Adopted in session of the City Council of the City of Shakopee, Minnesota, held this day of , 2011. ENGR/2011- PRO]ECT/2011- OVERLAY /WORD/RES7090 /APPROVE-PLANS -ORDER BIDS Mayor of the City of Shakopee APPLEBLOSSUM, II. N 7 &i:Fyl�i PPLEWOOD A FIRESIDE CT i gES 17TH AVE E AREA "A" ] \C tC Proposed Downtown p Improvements L., z 17 N II l of 10TH AVE WEST I EAST DONGOLA POTTOK IKISO� 1 TH AVE ST 111H AVE ACM RI ISSFI I SAGE CT LILAC AVANAU AREA "B" Proposed Improvements In TIMOTHY T E VIERLING D DOWNING FRENCH TRACE A ON AVE AUSTIN ST LUFF A JURA WAY HA►y1}1NE ST FRANCIS z N GROVELAND MOOERS A FARIBAUI CT RAILROAD 4 Y ALYSHE CT EFFERY 1I �� s l _ate innnnnn 0234 VI SHAKo CYQIIfIPmf»fe' 2011 BITUMINOUS OVERLAY AREAA &B PROJECT LOCATION MAP DATE MARCH 2011 DRAWN BY: JTE SHAKOPEE ENGINEERING DEPARTMENT 0 750 1500 - - -- - — DRAWING No. A