HomeMy WebLinkAbout5.A.1. Market Street Storm Sewer ReplacementTO: Mayor & City Council
Mark McNeill, City Administrator
FROM: Bruce Loney, Public Works Director
SUBJECT: Approve of Market Street Storm Sewer Replacement
DATE: February 15, 2011
INTRODUCTION:
CITY OF SHAKOPEE
Memorandum
This memo is to confirm the preferred storm sewer replacement route for the Market
Street trunk storm sewer from 1 Avenue to the Minnesota River.
BACKGROUND:
On the January 18, 2011 Council meeting, staff did present additional storm drainage
improvements for the C.R. 101 project for Council consideration. The main storm sewer
improvement is to replace the Market Street trunk storm sewer, from 1 Avenue to the
Minnesota River.
At that meeting staff did present two options, the 1 option is to replace the existing pipe
on Market Street, from 1 Avenue to the Minnesota River and the 2nd option would be to
provide a new storm sewer on Minnesota Street, from 1 Avenue to Bluff Avenue and
then a new storm sewer on Bluff Avenue from Minnesota Street to Market Street and
then replace the existing storm sewer from Bluff Avenue to the Minnesota River on
Market Street. Attached to this memo is an e -mail from Chris Chromy, Project Manager
with Bolton & Menk, Inc. on the cost to the City for each option. These costs were
determined after discussion with Mn/DOT on what turnback funds would pay for on both
options.
Option 2, which is the replacement of the Market Street storm sewer from 1 Avenue to
the Minnesota River is a lower cost and would involve some rock excavation in an
existing trench. The other option called Option 3, is Minnesota Street to Bluff Avenue
and then to Market Street to the Minnesota River, would involve new rock excavation on
Minnesota Street and Bluff Avenue and would be very near some existing homes on
Bluff Avenue.
Based on Option 2 being a lower cost and replacing a pipe in an existing rock trench,
staff would recommend that Option 2 be the route to include in the C.R. 101 plans.
5,I9I
C
ALTERNATIVES:
1. Approve a motion to improve the Market Street storm sewer system, from 1St
Avenue to the Minnesota River, with local share funding out of the City's Storm
Drainage Fund.
2. Approve a motion to replace the Market Street storm sewer with a storm sewer
along Minnesota Street, from 1 Avenue to Bluff Avenue and along Bluff Avenue
from Minnesota Street to Market Street with local share funding out of the City's
Storm Drainage Fund.
3. Table for additional information.
RECOMMENDATION:
Staff recommends Alternative No. 1, for the reasons previously stated in the memo.
ACTION REOUESTED:
Approve a motion to improve the Market Street storm sewer system, from 1 Avenue to
the Minnesota River, with local share funding out of the City's Storm Drainage Fund.
nice Lo
Public W
ENGR/2009- PROJECTS /C.R. 101 - RECONSTRUCTION(WORD /MARKET- STREET -STORM -SEWER
P.E.
s Director
Bruce Loney
From: Chris Chromy [chrisch @bolton- menk.com]
Sent: Tuesday, February 01, 2011 3:57 PM
To: Bruce Loney
Cc: Rasmussen, Mitch
Subject: Market Street Storm Outlet
Attachments: Cost Est_Market Storm Sewer Opt 2.pdf; Cost Est_Market Storm Sewer Option 3
2011- 01- 11.pdf
Bruce — Attached are the updated cost estimates that reflect the CTB participation as follows:
Market Street (Opt 2) — 28%
Local Cost - $292,500
Minnesota /Bluff Street (Opt 3) — 45% CH 101 to Market /Bluff; 29% Bluff to MN River
Local Cost - $311,000
As we discussed, Opt 3 likely takes on greater risk dealing with virgin rock excavation.
Please call if you wish to discuss further.
Thanks! - Chris
Christopher S. Chromy, P.E., P.T.O.E.
Senior Transportation Engineer
Bolton & Menk, Inc.
Consulting Engineers & Surveyors
12224 Nicollet Avenue
Burnsville, MN 55337 -1649
P: (952) 890.0509 ext. 2428
M: (612) 756.1236
www. bolton- menk.com
DESIGNING FOR A BETTER TOMORROW
CSAH 101 Reconstruction
Scott County, City of Shakopee
Engineer's Construction Cost Estimate
January 12, 2011
Market Street Trunk Storm Replacement Plan Estimate
ESTIMATED CTB SHARE (28 %)
ENGINEERING COSTS
ESTIMATED LOCAL COSTS
H: \SCCO \T42100851\Excel\Cost Est_Market Storm Sewer 12 -3 -10 (2).xls
101,946.6
30,300.00
$292,448
g
}
• I MAA
: y ��
3..�,FE ��
- EM' DESCRIPTION
, = N
TTY .d
COST s
CeOST�
2021.501
MOBILIZATION
LUMP SUM
1
$15,000.00
$15,000.00
2101.502
CLEARING
TREE
40
$125.00
$5,000.00
2101.507
GRUBBING
TREE
40
$30.00
$1,200.00
2104.501
REMOVE SEWER PIPE (STORM)
LIN FT
1,095
$8.00
$8,760.00
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
2,385
$3.00
$7,155.00
2104.509
REMOVE CASTING (STORM)
EACH
8
$50.00
$400.00
2104.509
REMOVE DRAINAGE STRUCTURE
EACH
8
$350.00
$2,800.00
2104.513
SAWING BIT PAVEMENT (FULL DEPTH)
LIN FT
80
$3.00
$240.00
2211.503
AGGREGATE BASE (CV) CLASS 5
CU YD
670
$20.00
$13,400.00
2350.501
TYPE MV3 WEARING COURSE MIXTURE (C)
TON
290
$50.00
$14,500.00
2350.502
TYPE MV3 NON WEARING COURSE MIXTURE (B)
TON
430
$45.00
$19,350.00
2451.601
ROCK EXCAVATION IN TRENCH
CU YD
1,950
$35.00
$68,250.00
2451.601
GRANULAR FOUNDATION AND /OR BEDDING
CU YD
1,450
$16.00
$23,200.00
2503.515
15" RC PIPE APRON
EACH
1
$1,500.00
$1,500.00
2503.515
36" RC PIPE APRON
EACH
1
$2,000.00
$2,000.00
2503.515
60" RC PIPE APRON
EACH
1
$2,500.00
$2,500.00
2503.541
15" RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
72
$28.00
$2,016.00
2503.541
36" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
92
$67.00
$6,164.00
2503.541
60" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
940
$120.00
$112,800.00
2503.602
CONNECT TO EXISTING STORM SEWER
EACH
1
$1,000.00
$1,000.00
2503.602
CONNECT INTO EXISTING DRAINAGE STRUCTURE
EACH
1
$1,600.00
$1,600.00
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN C OR G
LIN FT
4.0
$230.00
$920.00
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020
LIN FT
10.0
$300.00
$3,000.00
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 96 -4020
LIN FT
28.0
$640.00
$17,920.00
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 108 -4020
LIN FT
26.0
$720.00
$18,720.00
2506.516
CASTING ASSEMBLY (MANHOLE)
EACH
6
$500.00
$3,000.00
2511.501
RANDON RIPRAP CLASS IV
CU YD
50
$70.00
$3,500.00
$1,000.00
2506.516
GEOTEXTILE FILTER TYPE IV
SQ YD
100
$10.00
2563.601
TRAFFIC CONTROL
LUMP SUM
1
$800.00
$800.00
2564.552
HAZARD MARKER X4 -2
EACH
6
$100.00
$600.00
2573.502
SILT FENCE, TYPE HEAVY DUTY
LIN FT
300
$2.00
$600.00
2573.530
STORM DRAIN INLET PROTECTION
EACH
4
$150.00
$600.00
2575.501
SEEDING
ACRE
1
$1,500.00
$1,500.00
2575.505
FLOATATION SILT CURTAIN TYPE MOVING WATER
LIN FT
100
$25.00
$2,500.00
2575.505
SODDING TYPE LAWN
SQ YD
100
$3.00
$300.00
2575.553
EROSION CONTROL BLANKET CATEGORY 3
SQ YD
200
$1.50
$300.00
TOTAL ESTIMATED CONSTRUCTION COST
$364,095
CSAH 101 Reconstruction
Scott County, City of Shakopee
Engineer's Construction Cost Estimate
January 12, 2011
Market Street Trunk Storm Replacement Plan Estimate
ESTIMATED CTB SHARE (28 %)
ENGINEERING COSTS
ESTIMATED LOCAL COSTS
H: \SCCO \T42100851\Excel\Cost Est_Market Storm Sewer 12 -3 -10 (2).xls
101,946.6
30,300.00
$292,448
CSAH 101 Reconstruction
Scott County, City of Shakopee
Engineer's Construction Cost Estimate
Janaury 12, 2011
Market Street Trunk Storm Replacement Plan Estimate - OPTION 3 Minnesota St. to Bluff Ave.
STIMATED CTB SHARE (29%) No of Bluff
ESTIMAGED CTB SHARE (45 %) Minnesota/Bluff
ENGINEERING COSTS
ESTIMATED LOCAL COSTS
63,148.7
91,356.8
H: \SCCO \T42100851\Excel\Market Street Storm Outlet\Cost Est_Market Storm Sewer Option 3 2011 01 11.xlsCost Est_Market Storm Sewer Option 3 2011 01 11.xls
$ 44,600.0
$310,864
TIM
ITEM DESCR IO _, r ' :ro ° 1'
, -*_31.14
GOS . _ OST
REPLACE TRUNK LINE FROM BLUFF AVE. TO MINNESOTA RIVER
2021.501
MOBILIZATION
LUMP SUM
1
$15,000.00
$15,000.00
2101.502
CLEARING
TREE
40
$125.00
$5,000.00
2101.507
GRUBBING
TREE
40
$30.00
$1,200.00
2104.501
REMOVE SEWER PIPE (STORM)
LIN FT
600
$8.00
$4,800.00
2104.509
REMOVE CASTING (STORM)
EACH
4
$50.00
$200.00
2104.509
REMOVE DRAINAGE STRUCTURE
EACH
4
$350.00
$1,400.00
2451.601
ROCK EXCAVATION IN TRENCH
CU YD
1,250
$35.00
$43,750.00
2451.601
GRANULAR FOUNDATION AND /OR BEDDING
CU YD
925
$16.00
$14,800.00
2503.515
36" RC PIPE APRON
EACH
1
$2,000.00
$2,000.00
2503.515
60" RC PIPE APRON
EACH
1
$2,500.00
$2,500.00
2503.541
36" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
92
$67.00
$6,164.00
2503.541
60" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
600
$120.00
$72,000.00
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 96 -4020
LIN FT
28.0
$640.00
$17,920.00
2508.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 108 -4020
LIN FT
26.0
$720.00
$18,720.00
2506.516
CASTING ASSEMBLY (MANHOLE)
EACH
4
$500.00
$2,000.00
2511.501
RANDON RIPRAP CLASS IV
CU YD
50
$70.00
$3,500.00
2506.516
GEOTEXTILE FILTER TYPE IV
SQ YO
100
$10.00
$1,000.00
2573.502
SILT FENCE, TYPE HEAVY DUTY
LIN FT
300
$2.00
$600.00
2573.530
STORM DRAIN INLET PROTECTION
EACH
4
$150.00
$600.00
2575.501
SEEDING
ACRE
1
$1,500.00
$1,500.00
2575.505
FLOATATION SILT CURTAIN TYPE MOVING WATER
LIN FT
100
$25.00
$2,500.00
2575.505
SODDING TYPE LAWN
SQ YD
100
$3.00
$300.00
2575.553
EROSION CONTROL BLANKET CATEGORY 3
SQ YD
200
$1.50
$300.00
SUBTOTAL
$217,754
PROPOSED TRUNK LINE FROM MINNESOTA ST. TO BLUFF AVE. TO MARKET ST.
2104.505
REMOVE BITUMINOUS PAVEMENT
SQ YD
1,420
$3.00
$4,260.00
2211.503
AGGREGATE BASE (CV) CLASS 5
CU YD
100
$20.00
$2,000.00
2350.501
TYPE MV3 WEARING COURSE MIXTURE (C)
TON
225
$50.00
$11,250.00
2350.502
TYPE MV3 NON WEARING COURSE MIXTURE (B)
TON
225
$45.00
$10,125.00
2451.601
ROCK EXCAVATION IN TRENCH
CU YE)
1,510
$35.00
$52,850.00
2451.601
GRANULAR FOUNDATION AND /OR BEDDING
CU YD
1,120
$16.00
$17,920.00
2503.541
48" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
725
$100.00
$72,500.00
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 72 -4020
LIN FT
36.0
$380.00
$13,680.00
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 96 -4020
UN FT
12.0
$640.00
$7,680.00
2506.516
CASTING ASSEMBLY (MANHOLE)
EACH
4
$500.00
$2,000.00
ADDRESS UTILITY CONFLICTS
LUMP
SUM
1
$25,000.00
$25,000.00
UPSIZE CSAH 101 MAINLINE FROM MAIN ST. TO MARKET ST.
LUMP
SUM
1
$3,750.00
$3,750.00
DOWNSIZE CSAH 101 MAINLINE FROM MARKET ST. TO MINNESOTA ST.
LUMP
SUM
1
($20,000.00)
- $20,000.00
SUBTOTAL
_
$203,015
TOTAL ESTIMATED CONSTRUCTION COST $420,769
CSAH 101 Reconstruction
Scott County, City of Shakopee
Engineer's Construction Cost Estimate
Janaury 12, 2011
Market Street Trunk Storm Replacement Plan Estimate - OPTION 3 Minnesota St. to Bluff Ave.
STIMATED CTB SHARE (29%) No of Bluff
ESTIMAGED CTB SHARE (45 %) Minnesota/Bluff
ENGINEERING COSTS
ESTIMATED LOCAL COSTS
63,148.7
91,356.8
H: \SCCO \T42100851\Excel\Market Street Storm Outlet\Cost Est_Market Storm Sewer Option 3 2011 01 11.xlsCost Est_Market Storm Sewer Option 3 2011 01 11.xls
$ 44,600.0
$310,864
OPTION 1 - USE EXISTING OUTLET.
DO NOTHING.
OPTION 3 -A - USE EXISTING PIPE
FROM CSAH 101 TO BLUFF AVENUE.
INSTALL SEPARATE PIPE ON MINNESOTA & BLUFF
NO INTERCONNECTION AT MARKET ST. & CSAH 101.
OPTION 2 - REPLACE EXISTING PIPE
IN MARKET STREET TO THE RIVER.
OPTION 38 - SAME AS 3A WI H
INTERCONNECTION AT MARKET Sr. E CSAH 101
TO MEET THE 10-YEAR EVENT CAPACITY FOR THE
ENTIRE DRAINAGE AREA.
MINNESOTA RIVER
OPTION 2 - REPLACE Exi TINE PIPE
FROM CSAH 101 IN MARKET ST.
TO THE RIVER.
OPTION - - HO I NTERCONNECT I OI .
OF STC:r'' FP rrrnl THE SOUTH.
1,7 - EI -)JF ' CD. RD. 101
OPTION 3A 8 38 - REPL. - SYSTEM TO P:
tlr BLUFF AVENUE
OPTION 3B - INTERCONNECTION
OF STORM SEWER FROM THE SOUTH.
'OPTION 3A U 38
MINNESOTA STREET -BLUFF
-STORM SEWER OUTLET TO F'
100 200
SCALE IN FEET .
aHAKOPEE
100851 Market Ontinns- TFH.dan 1/13/2011 10:24.27 AM
CSAH 101 RECONSTRUCTION
S.P. 70- 701 -07 C.T.B.& C.P. 101 -07
MARKET STREET STORM SEWER
IMPROVEMENTS TO MINNESOTA RIVER
SHAKOPEE,MINNESOTA
Scott