CITY OF SHAKOPEE
�� M , ; , ,�<a
Memorandum � � �� � �
�.�, m �� � �" � �?�� �
.F
TO: Mayor& City Council
Mark McNeill, City Administrator
FROM: Jeff Weyandt, Assistant City Engineer
SUBJECT: Consider Awarding a Contract for the
Main Street Utility Improvements, Project No. 2012-5
DATE: May 15, 2012
INTRODUCTION:
Attached is Resolution No. 7198, which accepts the bids and awards a contract for the
Main Street Utility Improvements, Project No. 2012-5.
BACKGROUND:
On March 20, 2012, City Council adopted Resolution No. 7177, which approved the
plans and specifications and authorized staff to advertise for bids for the Main Street
Utility Improvements, Project No. 2012-5.
On May 9, 2012, a bid opening was held for the Main Street Utility�Improvements, in
which there were two bids opened for this improvement project. The bids are
summarized in the attached resolution. From the bid opening, the low bidder is Finnila
Excavating with a bid of$124,304.65. After the bid opening the low bidder realized he
made a mistake calculating his bid and has withdrawn his bid and has requested that his
bid bond be returned.
Staff believes it is in the best interest of all parties involved to return the bid bond to
Finnila Excavating Inc. and award a contract to Chard Tiling & Excavating, Inc. in the
amount of$153,835.31. Chard Tiling & Excavating Inc. has completed many successful
projects in the City and is currently working on the C.R. 69 Improvements. The
Engineer's estimate for this project was $150,000.00.
Capital Improvement Plan included a project cost estimate of$250,000.00. Adding a 5%
contingency to the actual low bid and 30% indirect costs, the projected project cost is
approximately $210,000.00, which is below the budgeted project cost.
If Council awards the contract, staff is also requesting a contingency amount equal to 5%
of the contract to cover minor change orders and quantity adjustments that may occur on
the project.
ALTERNATIVES:
1. Accept the bid of Chard Tiling & Excavating, Inc. and adopt Resolution No.
7198.
2. Reject all bids and rebid.
3. Approve a 5% contingency amount on this project for use by the City Engineer in
authorizing change orders or quantity adjustments on this project.
4. Table far additional information.
RECOMMENDATION:
Staff recommends Alternative No. 1 and No. 3 in order for this project to commence.
ACTION REQUESTED:
1. Offer Resolution No. 7198, A Resolution Accepting Bids on the Main Street
Utility Improvements, Project No. 2012-5 and move its adoption.
2. Approve a 5% contingency amount on this project for use by the City Engineer in
authorizing change orders or quantity adjustments on this project.
�
����
Jeff Weyandt, P.E.
Assistant City Engineer
E V GR?01'_-PROIECTS�20 L'-MAINSTREETUTILITYIMPR�W ORDiMBM7198-A W ARD-CONTRACT
RESOLUTION NO. 7198
A Resolution Accepting Bids For
For The Main Street Utility Improvements
Project No. 2012-5
WHEREAS, pursuant to an advertisement for bids far the Main Street Utility
Improvements, Project No. 2012-5, bids were received, opened on May 9, 2012, and tabulated
according to law, and the following bids were received complying with the advertisement:
Bidder Amount
Finnila Excavating $124,304.65
Chard Tiling& Excavating, Inc. $153,835.31
WHEREAS, Finnila Excavating has requested permission to withdraw their bid due to
error.
WHEREAS, it appears that Chard Tiling & Excavating, Inc., 26239 State Hwy 25, Belle
Plaine, MN 56011 is the lowest responsible bidder for the Main Street Utility Improvements
Proj ect.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
SHAKOPEE, MINNESOTA:
1. The appropriate City officials are hereby authorized and directed to enter into a
contract with Chard Tiling & Excavating, Inc. in the name of the City of Shakopee for the Main
Street Utility Improvements Project according to the plans and specifications therefore approved by
the City Council and on file in the office of the City Clerk.
2. The City Clerk is hereby authorized and directed to return forthwith to all bidders
the deposits made with their bids, except that the deposit of the successful bidder shall be retained
until a contract has been signed.
Adopted in session of the City Council of the City of Shakopee,
Minnesota, held this day of , 2012.
Mayor of the City of Shakopee
ATTEST:
City Clerk
ENGR�'_012-PROJECTS201'_I-MAINSTREE7C�IILITYIMPR W'ORD�RES7198-AWAR0.CONTRACT
City of Shakopee Capital Improvement Program 2012-2016
Project Manager: Project Type: Project Title: Total Project Cost:
Bruce Loney Street Construction Main Street Utility Replacement $250,000
A. Ex enditure Items: 2012 2013 2014 2015 2016
Land & ROW
Construction 200,000
Improvements
En ineerin /Admin. 50,000
Total 250,000 - - - -
B. Fundin Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants(specify)
Donations(specify) 150,000 (SPUC)
State Aid
Assessments
Sanitary Sewer Fund-Base 100,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Lev
Total 250,000 - - - -
����a� ���r��� ���moo.c �'<��.�. .,, � �@SCCIptl011:
� � �'� ����� ` ° �� � �� �.� �� �� Re lace the utilities and resurface Main Street north of H 101.
�� , a � . P
� �� � � wy.
� � k ��\��o�a,���� � � .�.
� w�r �� � �������` a �� �
..� ���.
»�'S��' .� ��V��\VA��p �4 '` � � "� � �.
�!M
�?�"M � \��� � �����\��F� \�\ \ , �� .. � '•�: f...
�,������ , � ���� ��;� ` q:��� � � Justification:
� ��,��er ,�, ��� �`��vd �>
��
,=J�,�;�� � ���,�'x,�„ � . � �� p � � ,��;�`�.�°` - ; �,.�,� � Aging infrastructure should be replaced and sanitary sewer should be rerouted
��� � ��;' �,,�+ a�� ����;�,. ��r��"� �" � �.���� to eliminate shallow lines.
4 �� ` ���� �,� " �4����" �:�y � k}�a��� .���r�.
» � W�"
� + � �p� �t� �y
'.�y'�a - , �� �� ' 9 ��� "� .^�{3 °"� � w �T y �
/ �,� @ h�" 1 .;; �ef..,� ,
x am�
yA+C
.. ,��;\, ��'� ,„�Y.p"�"�'+ �' ���a`��k� ,r�..�.~, K R+S'�w ���'��
�.,.:-,ir""" . , r �*'��� �� •�,� ��� ` � ��' �� � �,,;� Other Comments:
��� �� � � � � �-�;�
�.,�*� k � � C" _ `*F 4y�4�l�'.4 '�. Y�� 4.
� tp 1 9�3�l •r,. 9T✓y�«�' �"Y P . �ti� . a���" �'�Pg��" �, r 3�� ���:
i..�L� a��t� �`t*,.`�'� � ?w.;\�'��w+ �` F�"���R�^ � +�� ���*.�� '1P'\'=�A�r � »,„
t"` �(�" .-w — �,�' � '�V`���,az. ���u �� ��.;, ��� q`�" ,. �� �'
�.r + �1 '�Yy� �;i �`" ��, `� � �"'"�"„ � o�„a .��#'�"��,����
� � �q � a �� � evatd a 1r r� ,,.k
,
:,:, „, '' ������ e "��:t`�.���;�, r j„�"�e�• �a �"? "��4�� *�C°�'x "'�1r,., ".,}�.`.,,°'�^s�„
"�� �� �:��i4��� � �a a ���°*'�F� � ��-� ei�� G'S ��`��y,., �^``h"�..���� `
� � � ,:P�.ea'�'�� g� �. .� + m�9'� � � �' ��Yy`�•
'��' ���'�`r��"� P'�v,,"�3*� r��.�?�'��a�� �'�'���" `` . �� 'wp�.' ,�3' ��C,Y�S�y�``"
L � . �
F �� � � � . � � � � � � �"
.
. _
����� ���r& � ��'� ���� r����"����'�� � ���'�.��� ,� a� Operatina Costs:
�� ,, < a�"i
'°C�s,_.:� � :r...�� ,� . �"i`�°; � �, c .�+.-,� a�.�,.��`..� a ..��3
PROJECT LCICATION