SUBJECT: Extension Agreement with WSB & Associates, Inc. for Design Services
on Valley View Road
DATE: May 1, 2012
INTRODUCTION:
Attached is an extension agreement from WSB & Associates, Inc. to provide design and
survey services for the Valley View Road Improvements project from Evergreen Lane to
Sarazin Street.
ALTERNATIVES:
1. Approve the extension ageement with WSB & Associates, Inc. to provide design
and survey services for the Valley View Road Improvements Project, Project
2012-7.
2. Do not approve the extension agreement with WSB & Associates, Inc. to provide
design and survey services for the Valley View Road Improvements Project,
Project 2012-7.
3. Table for additional information.
RECOMMENDATION:
Staff recommends Alternative No. 1, as it is essential to establish the easement limits
west of CSAH 17 as soon as possible.
ACTION REQUESTED:
Approve the extension ageement from WSB & Associates, Inc. to provide design and
survey services for the Valley View Road Improvements Project, Project No. 2012-7
from Evergreen Lane to Sarazin Street.
Jeff Weyandt, P.E.
Assistant City Engineer
ENGR'_01'_-PROJECT VVRD WORD�EXTENSION-AGREBMENT-WSB
Engineering Planning Environmental Construction 701 Xenia Avenue South
Suite 300
Minneapolis,MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
April 25, 2012
Mr. Jeff Weyandt, PE
Assistant City En�ineer
City of Shakopee
129 Holmes Street South
Shakopee, MN 55379-I376
Re: Valley View Road Extension
Proposal for Final Design and Survey Services
City of Shakopee, MN
Dear Mr. Weyandt:
WSB & Associates, Inc. (WSB) is pleased to submit the following proposal for the final design
and survey services for the above-listed project. Please see the attached figure for a layout of the
project area.
As you have requested, we have developed the attached Exhibit A- Scope of Services for the
final design and topobraphic (topo) surveying and constniction staking for the constniction of
Valley View Road west of CSAH 17 to Evergreen Lane. It is our understanding that this work
will be either incorporated into the Scott County Plans for CSAH 17 or a separate standalone
plan and will be designed meeting Federal State Aid Standards. This work will also include the
tabulation of quantities and coordination with Scott County.
We have also provided an optional services estimate for the design and constniction staking
survey services for Valley View Road east of CSAH 17 to Sarazin Street
Payment for services would be completed as listed below and according to our agreement
for professional services with the City of Shakopee and Section I-G2 (major projects). Olir
final design is a cost not to exceed $25,500 which includes the design, plan, specification, and
preparation for the west side of Valley View Road. Topographic survey of the areas on Valley
View road weserly side and east side (not previously shot) as indentified on the attached figure
will also be completed. For the Valley View Road west section, the constniction survey staking
service is estimated to be $8,300 which is an estimate due to the variability of construction
schedules and contractor selection. This construction staking will be for any City improvements
sho�vn on the City plans that will not be sutveyed by the County for the CSAH 17 constniction.
It is assumed the County will be staking the storm sewer, pond areas, and rough grading in this
area.
Mr.Jeff W'eyandt, PE
April ?5,2012
Page 2
We have also included additional optional service tasks for the final design services and
constniction staking for Valley View Road east which would only be used if authorized by
the City. This final design is an estimated cost not to exceed $29,500 and constnlction survey
staking service is estimated to be $13,900.
Please see Exhibit A - for more inforniation on these tasks.
We will commence work on this project once we are authorized to proceed. The �vork�vill take
five �veeks to complete once we are given the approval to begin. This letter proposal represents
our understanding of the project scope.
The City of Shakopee agrees to reimburse WSB & Associates, Inc. for these services in
accordance with Section IV of the Agreement for Professional Services. If this agreement meets
with your approval, please sign below and return one copy to our office.
Thank you for your consideration
Sincerely,
WSB 8c Associates, Inc.
����� U� �
Donald W. Sterna, PE
Vice President City Administratar
Attachments
Mayor
Date : May 1, 2012
r.si,��:�,�„,ui�vv iz,i r���i„�,.�i�i ie vv ku rkor uaz;e.d�<
�VSB & ASSOCIATES, INC.
EXHIBIT A - SCOPE OF WORK
VALLEY VIEW ROAD EXTENSION
PROJECT UNDERST�NDING
WSB & Associates, Inc. (WSB) proposes to provide professional design and survey services for the above-
listed project that will involve the following work:
Constniction of the west half of Valley View Road from CSAH 17 to Evergreen Lane as sho�vn on
the attached figure
Storm Sewer and ponding design is essentially complete from the CSAH 17 project
Final casting elevations will be provided for storm sewer stntctures
Drain tile locations and other special storm sewer considerations will be designed as necessary
Includes the design of sanitary sewer and water main from alignments provided by the City and
SPUC
Assume B-618 curb and gutter will be installed
8-foot trail on north side of the roadway
No sidewalk on the south side of the roadway
Plans beriveen this and the County CSAH 17 projects will be coordinated and bid together
Improvements may be assessed per City policy
SCOPE OF SERVICES
The tasks to be completed are shown below:
Task 1 —Project Nlanagement
This task will consist of management and administration of the project team, as well as project coordination
and communication with Scott County, MnDOT, Shakopee Public Utilities(SPUC), and the City of
Shakopee on the project.
WSB will coordinate meetings with Scott County, MnDOT, SPUC, and the City of Shakopee to discuss and
review the project. The meeting will serve to review the project's elements and identify any outstanding
issues that may be remaining that will be incorporated into the final design of the project. WSB will form
a Project Management Team(PMT) as needed to discuss project issues with representatives from Scott
County, SPUC, and the City of Shakopee.
Task 2—Base Mapping,Data Collection
Any additional record drawings not already collected from the CSAH 17 project will be obtained from both
the City and the County of the existing facilities and right-of-way limits. WSB will complete the remaining
survey on the west leg of Valley View Road, as well as the proposed St. Francis Hospital entrance driveway.
WSB will investigate the existing private utilities(including irrigation system,well(s) and septic drain field)
and will coordinate with their owners to identify the type and location of these facilities.
Task 3—Final Design and Plan Preparation
WSB will prepare a set of detailed construction plans in accordance with MnDOT Federal Statc Aid, County,
SPUC, and City of Shakopee standards. The final construction plans will include the following:
Title Sheet(if necessary)
General Layot►t(if necessary)
Estimated Quantities/Tabulations
Earthwork Tabulation
Scope of Work Page I K:sh�ti„p<�3ni�v�-ttd��op�»�rs�o�<<�rw„�x.e„�
Soils aud Construction Notes
Typical Scctions
Miscellaneous Details
Constniction Staging/Traffic Control Plan
Alignment Plans and Tabulation
Removal Plans
Constniction Plan and Profile
Drainage Plan, Details and Qiiantities
Sanitary Sewer Plans
Water main Plans
Turf Establishment/ Erosion Control Plans
Signing and Striping Plans
Cross-Sections
Task 4—Plan Review and Approval
WSB will siibmit the final plans, specifications, engineer's cost opinion, and other required design data to
MnDOT Federal State Aid, Scott County, SPUC, and the City for review and approval. WSB will make
appropciate chanbes based on any review comments.
Task 5—Specifications
WSB wi(1 provide specifications utilizing the City's SPUC, MnDOT, and CEAM standard specifications.
Each provision will contain a description, materials,construction requirements,method of ineasurement, and
Uasis of payment for each item. Deletions from and additions to MnDOT and CEAM standard specifications
will be written and included as necessary.
WSB wil( provide the Ciry with reduced size(1 1" x 17")reproducible plan sets, along with the bid proposal
quantities for the work. The City will be responsible for all acti�-ities related to contract bidding and award.
It is understood the City will perform the bid opening and prepare the tabulation of the bids. Time has been
included in our fee to assist in answering bidders' questions and issuing any necessary addenda for the
project.
Task 6—Engineer's Cost Opinion
Prepare a both a preliminary and final constniction cost opinion based on quantities generated as part of the
preparation of the preliminary design and final constniction plans. Costs will be split by funding source
(including pro rata of lump sum items or other percentage splits). WSB will identify pay itcros per the City
policies and procedures.
Task 7—Permits
Permits may be acquired as a part of the construction plan preparation. WSB will prepare and apply for the
necessary construction permits. The cost of the permits would be paid by the City of Shakopee.
Anticipated permits:
MPCA NPDES
MPCA Sanitary Sewer Extension
MDH Water Main Extension
Scott County Excavating and/or Obstruction Permit
Task 8—Construction Staking
WSB will provide a survey crew to do constniction staking for this project that will not be covered by the
County as part of the CSAH 17 project, including construction limits,roadway grading, alignmcnts, storm
sewer, water main, sanitary sewer utility, street facilities and appurtenances, signage locations, and other
survey needs for this project for the work identified in the construction plans as prepared by WSB for the
west half of Valley View Road.
Optional Additional Services:
Scope of Work Page 2 K��sn��:��i,�����oiz vv ad i>���i�„>�i s�„p����i a�,�r;.d�,�
1. Valley View Road East
We have also included additional optional service fees for the design and survey services for Valley Vie�v
Road east from of CSAH 17 to Sarazin Street which would only be used if authorized by the City. These
plans will be a City project along with its own set of standalone plans. The project may be tied and bid with
the County CSAH 17 project but wiil have a separate set of plans and specifications. To complete this work,
these tasks rvoirld be t{ie snn�e as tasks 1-8listed above rvitlx modific�etions to Task 3 shown below:
Task 3 — Final Design and Plan Preparation (for Valley View Road East)
WSB will prepare a set of detailed constniction plans in accordance with MnDOT, County, SPUC, and Ciry
of Shakopee standards. The final construction plans��ill include the following:
Title Sheet and lndex Map
General Layout
Statement of Estimated Quantities/Tabulations
Earthwork Tabulation
Soil and Construction notes
Typical Sections
Miscellaneous Details
Construction Staging/Traffic Control Plan
Ali;nment Plans and Tabulation
Removal Plans
Gonstruction Plan and Profile
Drainage Plan, Details, and Quantities
Sanitary Se�ver Plans
Water Main Plans
Turf Establishment/Erosion Control Plans
Signing and Striping Plans
Cross-Sections
Scopc of W ork Page 3 K:�sn��:�,�«�o i�vv ad e�,p�,�ars��p��F w�>��;.d��