HomeMy WebLinkAbout7.A. 2007 Fee Schedule-Ord. No. 772
7. A.
CITY OF SHAKOPEE
Memorandum
TO: Mayor and City Council
Mark McNeill, City Administrator
FROM: Judith S. Cox, City Clerk
SUBJECT: 2007 Fee Schedule
DATE: November 30, 2006
INTRODUCTION
The City Council is asked to consider adopting the attached
ordinance setting fees for licenses, permits, services, and
documents for 2007.
BACKGROUND
Prior to the end of each year, the City Council adopts a fee
schedule by ordinance for the ensuing year. The fee ordinance
includes the fees for all licenses and permits issued within the
City of Shakopee. Department heads have been asked to re-examine
their fees and make appropriate recommendations for adjustments to
the City Council. A summary of those recommendations follows.
Please note that there are no adjustments proposed in the City
Clerk division at this time;
In the proposed ordinance, the stricken language is deleted
and the underlined language is inserted.
The Telecommunications Commission is recommending adjustments
and additions for video dubbing fees, page 3.
The Engineering Department is recommending adj ustments to
their Development and Grading fees, Storm Water and Sanitary Sewer
charges and also the grading permit fee, pages 18-22. They are
also recommending moving the charges related to assessments and
sewer service charges from the Administrative/Finance section to
Engineering.
Building Department - The SAC charge is being increased from
$450/unit to $475/unit, page 9. Other recommended building and
plumbing fees and adjustments are noted on pages 4-9.
Fire Prevention - additional fees and adjustments being
recommended are noted on pages 10-12, including false alarms. The
2007 Fee Schedule
November 30, 2006
Page -2-
false alarm fee is being removed from the City Code and added to
the fee schedule.
Finance Department - recommends increasing the monthly sewer
service charge by fifty cents (0.50) for both metered and
unmetered residential water accounts, and the charge for unmetered
residential water accounts from $15.00 to $15.75, page 21; and,
increasing the storm water drainage utility fee from $25.55 per
REF to $26 . 31 REF (residential equivalent factor) , page 21. Also
decreasing the water usage for properties using the Savage Sewer
interconnects from $3.00 to $2.93 and increasing other properties
from $1.60 to $1.65.
Police Department - recommends an hourly rate increase for
contracted police services from $52.00 to $60.00 and a fee is
being added for vehicle storage at the Police Department of $2.00
per day, with a maximum of $500, see pages 12-13. The false alarm
fee is being removed from the City Code and added to the fee
schedule.
Public Works - there are no changes recommended for 2007.
Planning Department - recommended adjustments and changes
that are noted on pages 14-17.
Park and Recreation - see attached memo from the Recreation
and Facilities Director. Changes to the fees for programs and
facilities are noted on pages 23-28.
ALTERNATIVES
l. Adopt fee ordinance as proposed.
2. Amend fee ordinance as drafted.
3. Table for additional information.
RECOMMENDED ACTION - after making any desired changes:
Offer Ordinance No. 772, Fourth Series, An Ordinance Setting
Fees for City Licenses, Permits, Services and Documents, and move
its adoption.
I:\clerk\judy\Fees-200S
CITY OF SHAKOPEE
MEMORANDUM
To: Mayor and City Council
Mark McNeill, City Administrator
A,
From: Mark Themig, Parks, Recreation, and Facilities Director
Meeting Date: December 5, 2007
Subject: 2007 Fees and Charges
INTRODUCTION
This agenda item proposes fees and charges for recreation services in 2007, as well as
the 2007 park dedication fee amounts. The Parks and Recreation Advisory Board
reviewed the proposed fees at their October and November meetings and recommended
the fees to Council as proposed.
BACKGROUND AND DISCUSSION
Service Fees and Charges
The attached list outlines our proposed fees and charges for 2007. Most fee increases
were deferred for 2006 in anticipation of completing the cost of service and fee study.
Since the city development fee study that would provide the information for the
recreation service fee study was not complete until this fall, we did not begin that study,
and therefore, did not implement any fee increases in 2006.
The proposed fees for 2007 suggest increases for most services. The increases are
based on the City's increased costs for providing the service (utilities, staff salaries, etc.),
as well as an evaluation of costs for similar services at other cities (ice rental, aquatic
park admission, etc.).
In general, we know that our fees do not cover our direct costs. What we don't know is
what the effect factoring in overhead (finance, payroll, city administration, etc.) would
have on total costs for services. The fee study will provide this information.
Once we have total cost information, the Advisory Board and City Council can make
educated decisions on what level of cost recovery the City should require in providing
park and recreation services.
Park Dedication Fees
The City's park dedication fees are based on land values. The land values are used in a
formula that was created in 1998 to determine park dedication fees. (The formula will be
reviewed as part of next year's comprehensive park plan update.)
Starting in 2006, we solicited a professional review of land values to ensure we are
making correct estimates. Patchin Messner and Dodd completed the land value analysis
that was used for 2006 fees, and provided an update that would allow us to establishi
2007 fees (attached). In the updated analysis, Patchin Messner and Dodd comments
that in discussion with market participants, land values have likely been stable over the
past year.
Due to the relative slowdown of development, there are less sales available for
comparison this year. In addition, not all of the sales are appropriate for this analysis.
Specifically, sales No.3 and 4 involve purchase agreements that were signed prior to
2006, sale No 2. was "discounted", sale NO.5 is far beyond the urban service area that
is used to determine average land values, and sale No.6 is guided for multi-
family/commercial. This leaves us with sale No.1 ($133,456/acre), which although isn't
specifically near Shakopee urban services, it is close to the urban service line for Prior
Lake.
With this analysis in mind, we are recommending that the average land value used in
2006 ($133,560), be used again to establish the 2007 fee. The proposed 2007 Park
Dedication fees, rounded to the nearest $10, would be:
Single Family $133,560/25 units per acre = $5,340 per unit
Multiple Family and Duplex $133,560/30 units per acre = $4,450 per unit
Commercial Increase Based on the Average Increase of the Single Family and Multi
Family Increases = $6,930
_m_' '._"00__"
,I
. . . . I
'. ". . . . I
'ATCHIN MESSNER & DODD.. ,I
. VALUATION COUNSELORS .
October 23; 2006 II
" .
. . '. . . .. . '..
". .' .', .. "'. .". . .... ; !
Shakopee Parks & Recreation, .'. II
Natural Resources, and Facilities :
1255 Fuller Street South .
Shakopee;MN,'5537.9,
. '.
A TTN: Marklheniigi DireCtor ...... ..... ..... m . ..
'. '. RE:. Summary of Development Land Sales I
'.' .... '.' . .,.... Shakopee, Minnesota
.... ........ I
Dear'MI'.Tllehiig::. . ...... . .' < .' I
PeryotirfeqLl~st; endosedisa summary grid of vacantdevelopment land sales. Bothsingle- I
. family density and multifamily density sales are included. Our search was limited to our I
. office files and Scott County records of development land sales occurring in Shakopee arid. . I
]acksonTownship in 2006.' Sales activity in the residential development market has slowed I
. in the last year. Discussions with market participants indicate that values have likely been '"
stable, or flat, over the past year. . '. ......... . . .
. Hopefully this i.nformation will be of help t~ybu. Please beadvised that the enclosed grid is :1
a summary of available information only and, as such, does not qualify as an appraisal. .In.. 'I
addi~ion, we have;notattemptedto analyze th.e enclosed data. If you have any questions or
requIre further aSSistance, please contact the firm. . .1
. . '. I
SinCe~eIYt:,. .' ........ .', ..,
'PATCi-HNMESSNER& DODD
m .
. . .'
U. '.
. . . .
. .'
',' : .... . ""
'. . .." '- ". ". . .. ". '. "
. .... .
. ".' .
........h....~...........
. . .' .
. ..
. .,.. ...
. . . '. . , .
. '" .",' '." ", .
., . '. .' ." . .
Sherril L Brumm; .... . .' . .' "
Minnesota Certified General Real Property. .' .
Appraiser License 20249948. .. ,
'. ". .... '. . !
jJ bL1JfJf/JiIJ I
Cr.rJoodd, MAl.. ... .. ....... ...... .... ..... I
Minnesota Certified General Real Property. I
Appraiser License 20019812 . .
,
Sunset Pond Executive Offices · 13967 West Preserve Boulevard · Burnsville, MN 55337 I
Phone: (952) 895-1205 . Fax: /952} 895~1521 ..... I
,
i
. . !
. . . .' !
N
0
Q)
OJ
Q)
DEVELOPMENT LAND SALES SUMMARY GRID i
Number of Total Sale Price
Compo Location Buyer Units Density Total Per Unit j
No. (Intended Use) Seller Date Land Area Units/Ac Sale Price Per AC Remarks
Sin!lle-Familv Densitv Sales
1 3000 County Road 42 Shakopee Mdewakanton Sioux 8 / 2006 N/A N/A $1,266,500 we, PID 27-929014-0 This site has some steep slopes and a small I
Shakopee. Minnesota Troy& Stacey Schuette 9,49 AC $133,456/Acre wetland area in the northeast portion of the site. The site is
(Tribal Purchase) improved with- a 4-level split single-family residence built in 1986.
This ptoperty is outside of MUSA boundaries. !
2 SWC Eagle Creek Bivd & Pike Lake Rd Independent School District 720 4 / 2006 NIA N/A $2,239,072 N/A Part of PID 27-914017-0; now PID 27-914017-3 Tollefson sold this I
Shakopee, Minnesota Tollefson Development, Inc. 18.86 AC $118,721/Acre property for development of a public school. They purchased the I
(Public School) entire 130-acre tract of land in November 2005 for $132,620 per
acre. A representative from Tollefson indicated that it is beneficial 1
to the overall development to be located adjacent to a school, and
they may have sold this property for less than market. I
3 N. Side Eagle Creek Blvd at Foothill Tr. The Ryland Group, Inc. 3 / 2006 101 Units 1.74 Units $5,180,000 $51.287 /Unit PIDs 27-914009-0; 27-914005-1; 27-914005-0; 27-914011-0;
Shakopee, Minnesota Liesener Charitable Trust, et.al. 49.20 AC $105,285/Acre 27-914007-0; 27-914006-0. This was fourtransaclions that are part I
(Single-Family Residential) of an assemblage of 58 acres for a 101-unit SFR development.
Ryland previously owned approximately 9 acres. Ryland subse-
quently sold. 58 acres plus two plaited lots to Matta my Partnership
for $8,243,000. This sale included preliminary plat entitlements.
The sile has significant wetland area and steep slopes.
4 7835 Eagle Creek Boulevard Mark L. & Lois L. Liesener 3 / 2006 N/A N/A $791,832 we, PID 27-914011-0 This property is part of Sale 3 that was sold to
Shako pee, Minnesota Gerald D. & Lucy A Klegstad 7.75AC $102,172/Acre The Ryland Group for a single-family residential development. This
(Single-Family Residential) sile has significant wetland area and steep slopes.
5 Marschall Road at County Road 14 Shakopee Mdewakanton Sioux 1/2006 N/A N/A $5,530,350 we, PID 27-929007-0 This property is rolling with wetland areas. It is
Shakopee, Minnesota Gilbert Schmitz, et. al. 52.79 AC $104,761/Acre outside of MUSA boundaries.
(Tribal Purchase)
Multifamilv/Commercial Sales
6 SWC U.S. Highway 169 & Marystown Rd Thomas J. Ryan 5 / 2006 N/A NfA $4,002,729 N/A Part of PID05-914004-1 The exact mix that will be developed on this !
Jackson Township, Minnesota Solveig O. Theis Revocable Trust & 20.02 AC $199,937/Acre 20.02 acres is unknown at this time. However, this property is part
(Mixed-Density ResidentiaUCommercial) Larry M. Theis Revocable Trust of a 32O-acre development concept plan that will include a mix of
commercial, attached housing and detached housing. It is likely
that this portion of the property will be developed with commercial
andlor higher density residential uses due to its location along Hwy
169. This is the second closing in a two-part sale of 42.20 acres.
This closing transferred ownership of the northern-most 20.02 acres.
The southern 22.18 acres closed In March 2005 for $4,397,443, or
I $198,262 per acre.
-.
~ .~
I .
ORDINANCE NO. 772, FOURTH SERIES
AN ORDINANCE SETTING FEES FOR
CITY LICENSES, PERMITS, SERVICES AND DOCUMENTS
WHEREAS, by Ordinance No. 743, the City Council established a fee schedule
effective January 1,2006; and
WHEREAS, amendments to the fee schedule were subsequently made with the
adoption of Ordinance No. 748 and Ordinance No. 767; and
WHEREAS, the City Council has determined that adjustments to those fees are
reasonable and appropriate.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of
Shakopee, Minnesota, that the Fee Schedule dated January 1, 2007, a copy of which is on
file in the office of the City Clerk, is hereby approved and adopted in its entirety.
BE IT FURTHER RESOLVED, that the Fee Schedule shall become effective on
January 1, 2007, unless indicated otherwise therein, and Ordinance Numbers 743, 748
and 767 and all other ordinances and resolutions inconsistent herewith shall be repealed
effective January 1, 2007.
Adopted in Regular Session of the City Council of the City of Shakopee,
Minnesota, held this 5th day of December, 2006.
Mayor of the City of Shakopee
Attest:
City Clerk
City Clerk/Misc. Business Licenses Fees
Commercial/Industrial/Mortgage Revenue Bond Fees
1] Application Fee 111 Oth of 1 % of amount issued with a $2,600 min\$6,330 max.
2] Legal expenses as billed in addition to above
3] Application Fee for refinancing 1/2Oth of 1% of amount issued with a $1,300 min\$3,150 max.
4] Legal expenses as billed in addition to above
Tax Increment Financing Fees (Authorized by Res. 3221)
Application Fee $5,200.00
Movies and Theaters (Authorized by City Code 6.42)
1] Annual Fee for showing 16 mm films $28.00
2] Annual Fee for showing 35 mm films (or larger) $110.00
3] Annual Fee for conducting theatrical play(s) $28.00
Currency Exchange License Review
State Law requries the City to review an application to the $40.00
State for a currency exchange license
Gambling/Bingo/Raffles
Licensed through State Gambling Board, no City fees.
Minnesota Home Finance Agency Rental
Rehab Grant Application Fees (Authorized by Res. 3181)
1-4 Units $150.00
5-8 Units $185.00 - 290.00
9-16 Units $325.00 - 570.00
17-24 Units $605.00" 850.00
25 or more $885.00 plus $35 for each unit in excess of 25
License for the Sale of Beer, Liquor, Wine, Set-up, Club
and Temporary Beer Licenses
(Authorized by City Code 5.06)
1] Annual fee for On Sale Beer License $312.00
2] Annual fee for Off Sale Beer License $100.00
3] Temporary Beer and Liquor License $15.00
4] Annual fee for Set Up License $125.00
5] Annual fee for On Sale Wine License 1/2 of On Sale Liquor or $2,000 whichever is less
1
6J. Annual fee for On Sale Club License $300.00
7J Annual fee for Sunday Liquor License $200.00
8J Annual fee for Off Sale Liquor License $150.00
9J Application and Investigation Fee for Off Sale Liquor,
On Sale Liquor, or Wine License
a) If investigation within MN $330.00
b) If investigation outside of MN City expenses up to $10,000 with $1,100 deposit
10J Application and Investigation fee for Off Sale and On $150.00
Sale Beer Licenses
11 J Annual fee for On Sale Liquor License:
Customer Used Floor Area
Under 1,000 $3,705.00
1 ,000 . 1,999 $4,390.00
2,000 - 2,999 $5,080.00
3,000 - 3,999 $5,765.00
4,000 - 4,999 $6,445.00
5,000 . 5,999 $7,140.00
6,000 - 6,999 $7,820.00
7,000 - 7,999 $8,510.00
8,000 - 8,999 $9,195.00
9,000.9,999 $9,875.00
Over 10,000 $10,570.00
Outdoor seating additional fee shall be computed at one-third of whatever the fee would be for the additional square footage of
customer used floor area for the outdoor seating.
Peddlers (Authorized by City Code 6.21)
1J Weekly License Fee $40.00
2J Annual License Fee $160.00
3] Six Month License Fee $105.00
Taxicabs and Drivers (Authorized by City Code 6.22)
1J Annual fee for taxicab license $275.00
2J Annual fee for taxicab driver's license $35.00
3J Annual fee for each vehicle $16.00
4J Initial license requires one time investigationfee
a. Taxicab license $150.00
b. Taxicab driver's license $100.00
Tobacco (Authori;;::ed by City Code 6.23)
1J Annual fee for Tobacco License $200.00
2J Initial license requires one time investigation fee $150.00
Show, Non-Transient Theme Parks, Amusement Parks, etc.
(Authorized by City Code 6.24)
1] Annual license fee equaling the number of rides $50.00/ride
x $50.00
2
2] Show without rides $80.00
3] Non-Transient Theme Parks As per agreement
Outdoor Performance Center (Authorized by City Code 6.248)
1] Annual license fee $520.00
Pawnshops, Precious Metal, and Secondhand Dealers
(Authorized by City Code 6.28)
1] Annual License Fee $2,500.00
2] Initial license requires one time investigation fee $345.00
3] Investigation fee for each new employee $100.00
4] Pawn Shop billable transaction fee $1.50
Tattooing License (Authorized by City Code 6.51)
1] Annual License Fee $315.00
2] Initial license requires one time investigation fee $345.00
3] Investigation fee for each new employee $100.00
Refuse Collection Rates (Authorized by City Code 3.15)
1] Annual fee for Refuse Collection License $110.00
Copies for Agenda/Minutes (Annual)
1] City Council Agenda $20.00
2] Planning Commission Agenda $20.00
3] City Council Minutes $40.00
4] Planning Commission Minutes $40.00
5] Copy of Audio Cassette $10.00
Video Dubbing Fees
Copies of Government or Public Access Proqramminq dubbed $10.00/each
onto SVHS, VHS, MiniDV or DVD (Does not include cost of
media)
Dubbed onto Mini DV (Does not includo oost of media) $15.00!oach
To public access producer(s) for the 1 st dub of a program No charge
created with Shako pee public access equipment and for
Shako pee public access playback (Does not include cost of
media)
Media Fees
VHS Tape $3.00/each $1.00/oach
Mini DV Tape $5.00/each
S-VHS Tape $10.00/each
DVD-R Discs $3.00/each
CD-R Discs $3.00 each
3
Building Inspector/Electrical Inspector
Electrical Inspection
City of Shako pee electrical inspection fees shall be paid according to the schedule contained in the current State Board of Electricity
- State of Minnesota - "Laws and Rules Regulating Licensing of Electricians and Inspection of Electrical Installations".
With the following exception:
The fee for single family dwellings shall be calculated by service size and number of circuits according to the State Fee Schedule
subpart 3 and subpart 4, with a maximum fee of $110.00 for 0-200 amp service and $165.00 for 200-400 amp service.
Plumbing Permits (Authorized by City Code 4.05)
1] Alter,Replacement,Repairs (Basement Finish) Minimum Fee $45.00 + $.50 State Surcharge
2] New Construction
Residential (Ordinance No. 659) $106.00 $120.00+ $.50 State Surcharge
3] Residential - Replacements Only
Water Heater - Gas $45.00 + $.50 State Surcharge
Water Softener - Installer must be licensed $15.00 + $.50 State Surcharge
or by homoownor plus $30.00 Inspoction Foo
4] Commorci::ll Plumbing Permit Foos 1.27% of Contr::lct Prico
Minimum Feo $60.00 + $.50 St::lto Surch3rge
41 Institutional/Education New Construction $770.00 + $.50 State Surcharge
Light Industrial/Commercial New Construction $210.00 + $.50 State Surcharge
Heavv Industrial/Commercial New Construction $380.00 + $.50 State /Surcharge
5] Sewer and Water Connection - Single Residential
Sewer Connection $4a,.OO $80.00+ $.50 State Surcharge
Water Connection $4a,.OO $80.00+ $.50 State Surcharge
Combination Water & Sewer Connection $4a,.OO $80.00+ $.50 State Surcharge
6] Sewer & Water Connection - Multiple Residential 1.27% of Contract Price
7] Sewer & Water Connection - Commercial/lndustrial 1.27% of Contract Price
81 Landscape Sprinkler System $80.00 + $.50 State Surcharge
Building Permit Fees (Authorized by City Ord. 676)
Building Value Fees
$1.00 to $500.00 $25.00
$501.00 to $2,000.00 $25.00 for the first $500.00 plus $3.25 for each additional
$100.00 or fraction thereof, including $2,000.00
4
$2,001.00 to $25,000 $73.75 for the first $2,000.00 plus $14.75 for each additional
$1,000.00 or fraction thereof, to and including $25,000.00
$25,001.00 to $50,000 $413.00 for the first $25,000.00 plus $10.75
for each additional $1,000.00 or fraction thereof,
to and including $50,000.00
$50,001.00 to $100,000.00 $681.75 for the first $50,000.00 plus $7.50 for
each additional $1,000.00 or fraction thereof, to
and including $100,000.00
$100,001.00 to $500,000.00 $1,056.75 for the first $100,000.00 plus $7.50 for
each additional $1,000.00 or fraction thereof, to
and including $500,000.00
$500,001.00 to $1,000,000.00 $3,456.75 for the first $500,000.00 plus $5.00
for each additional $1,000.00 or fraction thereof,
to and including $1,000,000.00
$1,000,001.00 and up $5,956.75 for the first $1 ,000,000.00 plus $4.00
for each additional $1,000.00 or fraction thereof
Construction Type and Classification Minimum Maximum Index Factor on "Gross" Permit Fee**
Residential
Single Family, sewered, less than 4000 sq. ft. * $580.00 $670.00 27.00%
Single Family, septic, less than 4000 sq. ft. * $550.00 $640.00 16.00%
Single Family, sewered, more than 4000 sq. ft. * $690.00 $800.00 31.00%
Single Family, septic ystem, more than 4000 sq. ft. * $660.00 $760.00 9.00%
Duplex $500.00 $580.00 28.00%
Townhouse Units - Per Unit $550.00 $640.00 45.00%
Multi-family Units - Per Unit $580.00 $670.00 43.00%
Commercial/Industrial
Light $790.00 $990.00 13.00%
Heavy $1,100.00 $1,380.00 28.00%
InstitutionallEducation $1,100.00 $1,380.00 3;00%
Plan Review Fees
Residential
Single Family, sewered, less than 4,000 sq. ft. * $480.00
Single Family, septic system, less than 4000 sq.ft.* $470.00
Single Family, sewered, more than 4,000 sq. ft. * $530.00
Single Family, septic system, more than4000 sq. ft. * $520.00
Duplex $290.00
Townhouse Units - Per Unit $560.00
Townhouse Units - Per Unit - SIMILAR Plans $140.00
Multi-family Units - Per Unit $390.00
5
Commercial/Industrial
Light $1130.00 Plus hourly charges for service
Heavy $1,630.00 Plus hourly charges for service
InstitutionallEducation $1,730.00 Plus hourly charges for service
*Units on Individual Sewage Treatment Systems (ISTS) are subject to an additional review fee by Scott County.
**"Gross" Building Permit Fees are to be calculated as per building permit fee schedule (City Ordinance 676) utilizing valuation.
The "Index Factor" would then be applied to the "gross" building permit to derive the "net" building permit fee which should be no
less than the minimum, and no more than the maximum Building Permit Fee.
Other Inspections and Fees:
Inspections outside of normal business hours $4+OO-$52.00/hr*
(minimum charge - two hours)
Reinspection fees $4+OO-$52.00/hr*
Inspections for which no fee is specifically indicated
(minimum charge - one-half hour) $47,OO$52.00/hr*
Plan review fees for accessory structures, additions, $4hOO$52.00/hr.*
basement finishes, decks, porches and pools. (Ord. 659)
Additional plan review required by changes, additions or
revisions to approved plans (minimum charge - one/half hr) $4hOO$52.00/hr*
For use of outside consultants for plan checking and
inspections, or both Actual Costs**
* Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, hourly wages
and fringe benefits of the employees involved.
** Actual costs include administrative and overhead costs.
Pbn Review Foe 65% of building pormit foo
as determined by the Building Offici31 or 3ssigns
REFUNDS: Upon request and review, up to 80% of the fee(s) paid may be reimbursed for permits that are abandoned or unused.
When plans/permit applications have been processed and then abandoned by applicant there will be only one waiver of plan review
fees per contractor per calendar year. Plan review fee will be 50% of building permit fee.
6
State Surcharge: Building Permits
(These fees forwarded to the State Treasurer)
Less than $1,000 $0.50
$1,000,000 or less .0005 x valuation
$1,000,000 to $2,000,000 $500 + .004 x (Value - $1,000,000)
$2,000,000 to $3,000,000 $900 + .0003 x (Value - $2,000,000)
$3,000,000 to $4,000,000 $1200 + .0002 X (Value - $3,000,000)
$4,000,000 to $5,000,000 $1400 + .0001 x (Value - $4,000,000)
Greater than $5,000,000 $1500 + .0005 x (Value - $5,000,000)
State Surcharge: Plumbing, Heating & Electrical Permits
Permittee less than $1,000 $0.50
Permit fee more than $1,000 Fee x .0005
Certificate of Occupancy (Authorized by Res. No. 2604)
Escrow
Commercial/Industrial .005 x value, or $500.00, whichever is greater
Residential .005 x value, with a $750.00 maximum
100% of the fee shall be refunded when a final certificate of occupancy is issued.
Landscaping Escrow: A $1500.00 escrow will be required in addition to the Building Permit fees and will be refunded in whole to
the Applicant when landscaping requirements have been completed. This escrow is separate from the existing Certificate
Occupancy fee.
Fast Tracking Issuance of Building Permits (Auth. Res. 2604)
Fast tracking building permit process City expenses up to 100% of building permit
fee with a 30% deposit.
Moving Permit $100.00
7
Demolition Permit $100.00 or 1.27% of contract price, whichever
is greater.
Reroofing Permit
Commercial 1% of contract amount, with a $50.00 minimum
Residential 1 % of contract amount, with a $50.00 minimum
Deck Permits $10.00 sq. ft. ::md will bo ::Icsossed a building
permit feo ::IS per building. pormit foe schedulo.
A $15.00 Sq. ft. will be assessed for valuation purposed onlv.
Detached Accessory Buildings All detached accessory buildings/structures in excess of 120 square
feet shall require a building permit.
Heating, Air Conditioning, Refrigeration, and
Ventilation Permits
Minimum Fee $45.00 + $.50 State Surcharge
Single Family Residence $80.00 + $.50 State Surcharge
Central Air Conditioning (at the time of new construction) $6.00 + $.50 State Surcharge
Fireplace - Includes Gas Permit $45.00 + $.50 State Surcharge
(Included with new single family residence above)
Commercial Fee 1.27% of contract amount + State Surcharge
$60.00 minimum fee
Lawn Sprinkler Systems - Residential $45.00
Lawn Sprinkler Systems - Commercial - (This includes
water connection from building piping to yard side of 1.27% of contract price
siphon breaker).
Gas Piping Permits exclusive hereby set as follows:
Minimum Fee $45.00 + $.50 State Surcharge
Residential - Each fixture or appliance $45.00 + State Surcharge
Alterations and Repairs Minimum Fee
Commercial Fee 1.27% of contract amount + State Surcharge
Appeal Fee
Appeal to Building Code Board of Adjustment & Appeals $90.00
Appeal to Housing Advisory and Appeals Board $90.00
Appeal to City Council $90.00
8
Residential Valuation Sauare Footaae Costs
AREA Square FootaQe Cost
BASEMENT
Unfinished $16.36
Finished $30.00
LIVING AREA
lowest Main level ~
Unfinished $79.78
Upper level $79.78
Additional level $79.78
Finish ExistinQ Area $13.64
COVERED ENTRY $15.00
Screen Porch $23.00
3-SEASON PORCH $26.00
DECK $15.00
ACCESSORY BUILDINGS
GaraQe $33.68
StoraQe BuildinQs $30.52
SWIMMING POOLS
In-Ground $25.00
Above Ground $15.00
Other $32.54
Sanitary Sewer Service Availability Charge (SAC) Units for various residential, commercial, public, and institutional
facilities will be applied as specified in the Metropolitan Council SAC Procedures Manual, latest.
Metro SAC Charge $1,550/Unit
(These funds are forwarded to the Metropolitan Council)
City SAC Charge (Res. No. 4165) $4W $475/Unit
Water Availability Charge (WAC)
To be collected by Shakopee Public Utilities beginning in 2004
VIP connection charge to the benefited area for the first
phase of the VIP sewer project - per acre. $919.95
VIP II connection charge to the benefited area for the second
phase of the VIP sewer project - per acre $346.99
9
Fire Prevention Bureau Permits
Fireworks
Consumer/Retail Fireworks Permit
Mixed Merchantle Sales Annual Fee - $100.00
Consumer Fireworks Retail Sales Facility Annual Fee - $350.00
Display Fireworks Permit - Permit is valid for 1 day $4G$100.00
plus $30.00 for each additional day
Fire Protection Equipment Permit
Contract Amount Permit Fee
$1.00 to $3,000.00 $40.00
$3,001.00 to $25,000 $40.00 for the first $3,000.00 plus $17.00 for
each additional $1,000.00 orfraction thereof,
to and including $25,000.00
$25,001.00 to $50,000 $414.00 for the first $25,000.00 plus $11.00
for each additional $1,000.00 or fraction thereof,
to and including $50,000.00
$50,001.00 to $100,000.00 $689.00 for the first $50,000.00 plus $9.50 for
each additional $1,000.00 or fraction thereof, to
and including $100,000.00
$100,001.00 to $500,000.00 $1,164.00 for the first $100,000.00 plus $6.00 for
each additional $1,000.00 or fraction thereof, to
and including $500,000.00
$500,001.00 to $1,000,000.00 $3,546.00 for the first $500,000.00 plus $5.50
for each additional $1,000.00 or fraction thereof,
to and including $1,000,000.00
$1,000,001.00 and up $6,296.00 for the first $1,000,000.00 plus $4.00
for each additional $1 ,ODD .00 or fraction thereof
State Surcharge .0005 x base fee (minimum $.50)
Fire Protection equipment including wet and dry fire sprinkler systems, clean agent suppression systems, wet and dry chemical
suppression systems, fire protection for commercial cooking operations and fire alarm systems.
10
Fire Protection Equipment Plan Review Fee ..1&%-1.5% of contract amount (minimum $25.00)
Clean agent suppression systems, wet and dry chemical suppression systems, fire protection for commercial cooking operations
and fire sprinkler monitoring systems.
Wet and dry fire sprinkler systems and fire alarm systems shall be reviewed by an approved outside review agency. Fees for such
reviews shall be paid by the applicant directly to the reviewing agency.
Flammable/Combustible liqUid Storage Tank Permit
1000 gallons or less $-75.00 $100.00 per tank
1001 gallons to 5000 gallons $150.00 per tank
5001 gallons or larger $200.00 per tank
Includes installation and removal of above ground and
underground storage tanks
Flammable/Combustible Liquid Storage Tank Plan Review .75% of contract amount
Dispensing Systems Permit
Attended Dispensing $+5 $100.00
Unattended Dispensing ~$200.00
Tents, canopies and temporary membrane structures:
Commercial Uses
Tents greater than 200 sq. ft. ~
Canopies greater than 400 sq. ft. $da-$40.00
Exempt: Fees for tents and canopies may be waived for certain governmental, civic or religious
organizations at the discretion of the authority having jurisdiction.
11
Residential Uses
Tents greater than 200 sq. ft. $10.00
Canopies greater than 400 sq. ft. $10.00
Burning Permit
Shako pee Residents $40.00
Township Residents $40.00
Fire Incident Report $10.00
Reinspection Fee $50.00/hr. (or the total hourly cost to the jurisdiction, whichever is
greater. This cost shall include supervision, overhead, hourly wages
and fringe benefits of the employee involved).
Additional plan review required for changes, addition, $58.00/hr. (or the total hourly cost to the jurisdiction, whichever is
revisions or re-submissions to original plans: greater. This cost shall include supervision, overhead, hourly wages
and fringe benefits of the employee involved).
Outside consultants for plan review and/or inspections. Actual cost (including overhead & admin costs)
False Alarms
False fire alarm user fee in excess of two (2) in a
calendar year $400.00/alarm
Administrative /Financo
Office Charges
1] Partial Release of Developers Agreement $25.00
2] Photo Copy Fee
General Public $0.20
Other governmental/non-profit public service $0.07
3] Service charge for each check returned $30.00
4] Fee for processing a replacement payroll check $25.00
(To be waived if employee immediately signs up for
direct deposit.)
5] Interest on past due invoices (monthly) 1.50%
* Administrative Costs - Actions requirinq payment for administrative costs may be billed to the applicant. Administrative costs
may include but are not limited to the followinq: staff time. publishinq costs. copyinq. printinq. mailina and consultinq costs. The
actual hourly rates of the emplovees will be used plus a multiplier of 2.5 times for benefits. overhead. etc.
Police - Report Copies
1] Reports (up to 100 pages) $.25/per side/pg.
2] Reports (100 pages and over) Per request basis
3] Audio Recordings $10.00
4] Video Recordings $30.00
5] State Accident Reports $.25/per side/pg.
6] Drivers License Printout $5.00
7] Pawn Shop billable transaction fee $1.50
8] Hourly rate for contracted police services $a2.,OO- $60.00
9] Photographs $1.00 per photo + $5.00 travel fee
10] Photo Disks $10.00
Room Reservation (Police Dept. Training/Community Room)
1] Organizations $0.00
12
2] Private Groups (Resident) 1st hour $50.00
Each additional hour $25.00
3] Private Groups (Non-Resident) 1st hour $75.00
Each additional hour $35.00
Storaqe of Forfeited Vehicles at the Police Department $2.00 a Dav/$500 Maximum
Towing and Impounding of Vehicles
Towing and impounding is done by a private contractor having appropriate impounding facilities. Fees are set by contractor.
Dog Licenses, Impounding Fees, etc. (City Code 10.21)
1] Dog Licenses (good for two years )(pro rate if for less $24.00
than two years)
2] Duplicate License $5.00
3] First Impoundment $20.00
4] Second Impoundment $50.00
5] Third & successive impoundment within a 12-month
period. $100.00
6] Amount charged per day when confined to the Pound $10.00
7] In the case of an unlicensed dog or a dog for whom proof of a current rabies vaccination
cannot be shown, there shall be an additional penalty or $10.00. (Owner is responsible
to furnish proof of license and/or rabies vaccination).
8] Large animal impoundment $35.00
9] Large animal board per day $15.00
Large animals are defined as animals other than household pets Ie; horses, cows, sheep
False Alarms
False alarm user fee in excess of two (2) in a
calendar year $ 120.00/alarm
13
Public Works
Equipment Rental
(Minimum Rental Time 2 Hours. All drivable equipment rates include operator)
Caterpiller Grader (private) $110.00/hour
Front end loader (Case) private $100.00/hour
Elgin street sweeper $95.00/hour
Roscue Side Broom $60.00/hour
2-1/2 ton dump truck (single) $65.00/hour
2-1/2 ton dump truck w/plow and wing $85.00/hour
1 ton pickups (w/plow add 10.00) $55.00/hour
Water tanker/flusher $85.00/hour
Trash compactor $55.00/hour
Mower tractor (turf type) Contract Rates
Weed Mowing (rough) Contract Rates
Asphalt roller (1-1/2 ton) $55.00/hour
Bobcat $65.00/hour
Gehl alley grader $65.00/hour
Wood chipper $50.00/hour
Sign replacemenUinstallation $110.00/sign
(w/o post less $10.00)
Street sign installation in new subdivisions $270.00
(per each sign pole)
Traffic Control Signs in new subdivisions $110.00 per sign
Sewer jet cleaning $110.00 hour
Vacuum Inductor $85.00/hour
Barricades w/flashers $10.00/barricade/day
Barricades w/o flashers $8.00/barricade/day
Cones $2.00/cone/day
Bituminous Street Repair Time and material basis only
Asphalt or Cold Mix $35.00/ton
Planning
I. Information/document fees
A. Long Range Planning Documents
1. Comprehensive Plan $00:: $65.00
B. City Codes
1. Chapter 11 - Zoning Ordinance $25.00
2. Chapter 12 - Subdivision Regulations $10.00
3. City Code $100.00
4. Annual revision pages for City Code $15.00
C. Maps
1. City Map (large) $10.00
2. Zoning (22"x34") $10.00
3. Any Printed Maps (blueprint) $.50/sq. ft.
4. Land Use Map (11 "x17") $3.00
5. Development Maps (11 "x17") $3.00
14
D. Services
1. Zoning Verification Letter $25.00
E. Recording Fees
Abstract and Torrens Documents $46.00
Plats/RLS/CIS $56.00
(Other fees according to Scott County)
F. Sign Permit Fees (City Code 4.30)
Permanent - Wall Sign $75.00
Freestanding Sign $125.00
Temporary $30.00
Retrieval of confiscated, illegal signs $45.00
II. Land Division Administration Fee:
A. Concept Review by Planning Commission
other than PUD $200.00 $350.00
Concept Review Escrow $1.400.00
B. Major Subdivisions
1. Pre-application Meeting Review Fee $200.00 for o3oh meoting 3ftor tho first $350.00
Pre-Application Site Review Escrow $1.600.00
2. Preliminary Plat $400 -+ $6110t $2.700.00
Plat Review Escrow or $400 -+ $4klGro, $13.000.00
'.vhichovor is gro3ter
3. Preliminary & Final Plat concurrently Prolimin3ry foo pluG fin31 fee $2.100.00
Plat Review Escrow $9.900.00
4. Final Plat 2W $1.410.00
Plat Review Escrow $12.700.00
5. Title Review Fee $300 or actual cost, which ever is greater
C. Minor Subdivisions
1. Lot Division/Lot Reassembly ~$500.00
2. Registered Land Surveys ~
D. Vacations
1. Vacations of Public Easements $250.00 $850.00
2. Vacations of Rights-of-way ~$850.00
E. Park Dedication Fees (City Code Sec. 12)
Cash in lieu of land dedication fees -
Residential/Single Family/Duplex (per unit) $5,340 per unit
Multi-Family/Apartment ( per unit) $4,450 per unit
Commercial/Industrial (per acre) $6,930 per acre
F. Woodland Management Regulations
1. Major Subdivisions $400.00 plus $40.00 per wooded acre
2. Minor Subdivisions - In which a lot, with woodlands, $100.00
is split into three or more lots.
15
3. Minor Subdivisions - In which a lot, with woodlands,
is split into two lots. $50.00
G. Annexation
1. Application Fee $430.00
2. Review Escrow $1.800.00
H. Comprehensive Plan Amendment
(jncludinq extension of MUSA) $1.910.00
III. land Use Administration Fees
Applicants will be liable for payment of costs incurred by the City over and above those covered by the following fees.
A. Application for Appeal of City Administration Decision
1. Appeal to Board of Adjustment & Appeals $150.00 $300.00
2. Appeal to City Council $150.00$300.00
B. Application for Variances
1. Single Family Residential ~
2. All others $200-$2.240.00
3. Appeal to City Council ~
C. Application for Conditional Use Permit
1. Home Occupations $200.00
2. Home Occupation Renewals & Amendments $200.00
3. CUP for Over-Height Fence $200.00
4. All Other Conditional Use Permits $250.00 $200.00
5. All Other Renewals & Amendments $250.00 $200.00
6. Appeal to City Council $150.00
7. Mineral Extraction & Land Rehabilitation Permit $300.00
plus $2,500 cash deposit*
plus all administrative costs**
plus all consultant fees***
8. Temporary Seasonal Sales $50.00
(including farm produce)
D. Application for Planned Unit Development
1. PUD Concept Review - Planning Commission $350.00
PUD Escrow Fee $1.400.00
2. PUD Concept Review (including City Council) $2.840.00
3. Determinations by the BOAA $150.00
4. Planned Unit Development $700'" $35!3Cro $2.750.00
*Agreement to pay actual additional costs. $1,000.00 $10.900.00 Escrow
5. Amendment to Planned Unit Development $aOO $2.750.00
*Agreement to pay actual additional costs. $1,000.00 $2.000 Escrow
16
E. Application for Environmental Review - the project proponent will be required to sign an agreement to reimbursement the
reimburse the entire and actual cost of conducting an environmental review.
1.Discretionary Environmental Assessment Worksheet No fee
2. Required Environmental Assessment Worksheet $1,000.00 Escrow
3. Required Environmental Impact Statement $4,000.00 Escrow
F. Zoning Ordinance Amendments
1. Map Amendments
Less than 2.5 acres $250.00
Greater than 2.5 acres $600.00
2. Text Amendments $500.00
G. Additional Notices - Applies to al types of applications
1. Rezoning Amendments:
Per Published Notice, in excess one published
notices for each of two hearings $25.00
Per Mailed Notice, in excess of 100 notices
for each of two hearings $1.50
2. All Other Applications
Per Published Notice, in excess one published
notice for one hearing $25.00
Per Mailed Notice, in excess of 100 notices
for one hearing $1.50
Notes for the Planning Department Fee Schedule
* Administrative Costs - Actions requiring payment for administrative costs may be billed to the applicant. Administrative costs
may include but are not limited to the following: staff time, publishing costs, copying, printing and mailing. Tho ::lCtunl hourly mtos
of the employoes will be used plus n multiplior of 2.5 timos for benefits, overhend, otc. 'Nhen n project has not beon established,
tho following rntos apply:
Community Development Director $59.00/hour
Planner II $40.00/hour
Planner 1 $35.00/hour
Community Development Secretary $35.00/hour
Administrative costs will accrue after the first meeting with the applicant.
17
Engineering
A. Private Developments
The development fees for private developments apply in situations where private developers choose to construct the public
improvements, rather than having them constructed by the City. The fees that the City charges in those situations are intended to
reimburse the City for all of the direct and indirect costs incurred by the Public Works Departments to process the development
application, to process and administer the project, to review and approve the plans for the project, and to inspect the construction of
the project. The percentage used for various items are based on the historical costs incurred by the City.
Streets and Utilities
The Development Fees for private developments include a lump sum of 8 Z.5% of the estimated construction costs for the following:
public sanitary sewer, public storm sewer, public street construction, sidewalks, boulevard trees and other appurtenances. +I1e-
8.5% lump cum if: b3sod on tho following bro3kdown: Storm water manaqement reviews will be charqed on an hourly basis. The
developer shall deposit 2% (minimum of $5.000) to Day for storm wataer manaqement reviews.
Administr3tivo Foo 4-.W%
Pl::ln Rovio'N Feo ~
Inspoction Fee 4-.W-%
Total M(W".
Watermain
The Development Fees shall also include a lump sum of 4.0% of the estimated construction costs for public water, based on the
following breakdown:
Administrative Fee 1.50%
Plan Review/Coordination Fee 2.50%
Total 4.00%
Note: Watermain inspection fees are charged separately from the Shakopee Public Utility Commission
18
Grading Fee - Costs up to $200,000
For grading projects up to $200,000, the Development Fees shall also include a lump sum of 5.~..Q% of the estimated construction
costs for site grading and erosion control, using the following broakdown: with a minimum fee of $50.00.
Pbn Roviow and Administration Foo ~
Inspoction Fee ~
Tot:::tl 5.0% (Min. foo of $50)
NPDES compliance inspections will be charged on an hourly basis. If outside consultants are used the costs will be charged to the
developer. If City employees are used the developer will be charged actual hourly rates plus a multiplier of 2.5
Grading Fee - Costs Greater than $200,000
For grading projects greater than $200,000, the Development Fees shall include a lump sum fee of $10,000, plus a 3.0% inspection
fee for the site grading and erosion control costs over $200,000.
B. Trunk Storm Water Charges
A fee of $-11-W per developable square foot wi/lbe charged to all new developments, per the City's Trunk Storm Water Charge
Policy. The term "net developable foot" means the total square footage of a development within the city limits minusihe portion of
the development used for public right-of-way, lakes, wetland areas, stormwater ponding easements, and parks.
C. Trunk Storm Water Storage and Treatment Charges
A fee will be charged to all new developments that utilize regional ponding systems, per the City's Trunk Storm Water Charge
Policy. This fee shall be as follows:
Developments having a net density of 3 or less lots/acre $.055-Oaa--per developable sq. ft.
Developments having a net density of more than 3 lots/acre $.101, per developable sq. ft.
Commercial, industrial, or institutional development ~ 4+4 per developable sq. ft.
A fee will be charged to developments that utilize regional
infiltration ponding systems as follows:
New impervious area of development $956 ~.OO/new impervious acre
D. Trunk Sanitary Sewer Charges
A fee of $1,850.00 $1918.00 per net acre will be charged to all new developments, per the City's Trunk Sanitary Sewer Charge
Policy. The term "net acre" means the acreage equal to 85% of the gross acreage of the development.
19
E. City Projects and Miscellaneous Engineering Work
The .:Jctu.:J1 hourl~' rntos of tho employoos will bo usod plus n multiplier of 2.5 f{)r benofitc, ovorhand, otc.
A 1 % project administration fee will be charged to all projects.
Other Costs incurred will be added in using the actual costs (ie. Consultant fees, testing laboratories, etc.)
F. Grading Permits
Grading Permit Fee - Estimated Costs up to $200,000
For grading projects where the estimated grading cost is up to $200,000,the grading permit fee shall be a lump sum of 5.2 Q% of
the estimated construction costs for site grading and erosion control, using the following broakdown with a minimum fee of $50.00
Plnn Reviow :md Administration Feo .:bOO%
Inspection Fea ~
Tot31 5.0% (Minimum fee of $50)
NPDES compliance inspections will be charged on an hourly basis. If outside consultants are used the costs will be charged to the
developer. If City employees are used the developer will be charged actual hourly rates plus a multiplier of 2.5
Grading Permit Fee - Costs Greater than $200,000
For grading projects greater than $200,000, the grading permit fee shall be a lump sum fee of $10,000, plus a 3.0% inspection fee
for the site grading and erosion control costs over $200,000.
Unauthorized work permit Fee is up to double the permit fee
G. Building Permit/Grade Check Fee
For all single-family building permits issued, a fee of $50 will be added to the building permit fee for review of the proposed grades
on the certificate of survey.
For all multi-family, commercial, industrial, and institutional building permits issued, a grade check fee of $50, plus an additional fee
of $20 per acre (area of the lot), will be added to the building permit fee.
20
H. Permit to Work in Public Right-ot-Way Fees
1. Registration Fee $50.00 per registration
2. Excavation Permit Fee
a. Hole $200.00
b. Emergency Hole $55.00
c. Hole tor new service connection $35.00
d. Trench $50.00 per 100 lineal teet plus hole fee
* The maximum length at a trench permit shall be
5,000 lineal feet.
3. Obstruction Permit $50.00 plus $.06 per lineal for each obstruction
* The maximum length of an obstruction permit
shall be 5,000 lineal feet.
4. Delay Penalty $25.00 plus $25.00 per week or portion thereof
5. Permit Extension (See Delay Penalty)
6. Degradation Fee Fee will be based on all costs to repair the street to the appropriate
street restoration detail plates if the permittee elects not to repair the
street.
7. Unauthorized Work Permit Double the permit fee plus $100.00
8. Curb Cut Permit $100.00
I. Wetland Conservation Act Administration
1. Certificate of Exemption Fee $75.00
2. Replacement Plan $75.00 plus hourly
J. Storm Water Drainage Utility'
City-wide tee ~ $26:31 per REF* acre per qtr.
*REF - residential equivalent factor
Administrative Fee for Delinquent Accounts Certification $25.00
K. Sewer Service Charges (Auth. by City Code 3.02)
1] Monthly sorvico chargo Fixed charqe per billinQ cvcle $+.00-$7.50
2] For every 1,000 gallons or part thereof of metered
flow or water usage - a. Properties using the Savage $a.oo $2.93
sewer interconnects
b. All other properties $1.65
3] Charge for unmetered residential water accounts ef-fleW- $15.00 $15.75
accounts
21
L. Other Fees
Flood Plain Vertification $30.00
Topographic Maps $30.00 plus $45.00/hour
(hard copy and electronic file) For computer file processing
Computer/Plotter Generated Maps $60.00 per hour ($15.00 min.)
Street Index Map $6.00 per map
City of Shako pee's Standard Specifications $50 per copy
City of Shakopee's Design Criteria $10per copy
City Map (large) $10 per copy
Zoning Map (22"x34") $10 per copy
Any Printed Map (Blueprint) $8.00
Land Use Map (11 "x17") $3.00
Development Maps (11 "x17") $3.00
Aerial (11" x 17") $15.00
Large Aerial $50.00
Assessment Searches $25.00
Complete or partial assessment rolls or reports $25.00 per report + $5.00 shipping if applicable
Splitting special assessments when permitted instead of
payoff. $600.00
22
Parks and Recreation Services
Proposed 2007 Fees and Charges
A. Communitv Center Fees
Memberships and 2006 2007
Admissions Resident/Nonresident Resident/NonResident
Family Membership $214.50/$321.75 $225.35/$337.75
(Immediate family residing (Plus sales tax.) (Plus Sales Tax)
at same address)
Adult Membership: Age 16 $159.50/$239.25 $178.50/$251.25
to 59 (Plus sales tax.) (Plus Sales Tax)
(Proposal to make Adult Membership and
Dailv Rate startinQ at aQe 18)
Youth Membership: Age 5 $82.50/$110.00 $86.75/$115.50
to 15 (Plus sales tax.) (Plus Sales Tax)
(Proposal to make Youth Membership and
Daily Rate valid until age 18)
Senior Membership: 60 $115.50/$173.25 $121.25/$182.00
and over (Plus sales tax.) (Plus Sales Tax)
Single 3 Month $79.75/$119.62 $83.73/125.75
(Plus Sales Tax) (Plus Sales Tax)
Senior Couples $165/$242.54 $182.00/$267.50
(Plus Sales Tax) (Plus Sales Tax)
Daily Admission - Adult $5/$6 $5/$7
AQe 15 to 59
Daily Admission - Youth" $2/$5 $2/$5
Age 5 to 16
Daily Admission - Senior $3/$5 $3/$5
Aqe 60 and over
Walking Track Free Free
Enrollment Fees for Month $20.00 $20.00
to Month
1. Memberships include skate park admission, open ice skating,open hockey, aerobics, and open swim
at the Jr. High pool.
2. Age 4 and under are free.
Skate Park 2006 2007
Resident/Nonresident Resident/Nonresident
Daily Admission 1 $1/$5 $1/$5
1. Admission included with Community Center membership
23
Room Rentals 2006 2007
Resident · $30 first hour · $20 per hour
Groups · $20 for hours 2-5 · $25 room clean-up fee if food served
· $15 for hours 5+ · (Plus sales tax.)
· $25 room clean-up fee if · Additional staff for large events or before/after hours
food served charged at $25/hour.
· (Plus sales tax.)
Nonresident · $35 first hour · $35 per hour
Groups · $30 for hours 2-5 · $25 room clean-up fee if food served.
· $25 for hours 5+ · (Plus sales tax.)
· $25 room clean-up fee if · Additional staff for large events or before/after hours
food served. charged at $25/hour.
· (Plus sales tax.)
Notes:
. Rotary Room, Gymnasium (per side)
. Current Facility Use Policy provides for unlimited use of meeting rooms during the weekday by
local/civic groups, and up to four meetings per year in the evening. Affiliated Sports Associations
have no restrictions.
. Annual permit fee of $50 for recurring meetings (more than four) that are held at no charge.
. Rental fees for facilities are waived under terms of agreements with Shakopee School District and
City-affiliated sports associations.
Teen Center 2006 2007
Rental
Special Event $100/2 hrs (plus tax) $100/2 hrs (plus tax)
Rental Additional staff at $15 per hr. each if Additional staff at $15 per hr. each if
needed. needed.
Equipment Rental 2006 2007
VCR/Monitor Use permitted with Rental Use permitted with Rental
Coffee Maker Use permitted with Rental Use permitted with Rental
Overhead Projector Use permitted with Rental Use permitted with Rental
Golf Cage Not Available Not Available
Locker Rental Provided free with membership Provided free with membership
. Equipment for use on Community Center premises only.
B. Ice Arena Fees
Ice Rental Rates Effective Dates 2006 "~ 2007""'
Fall-Winter Prime3 Resident 9/15-3/15 $145/hour $150/hour
(Plus sales tax.) (Plus sales tax.)
Fall-Winter Prime3 Nonresident 9/15-3/15 .
Fall-Winter Non-Prime" 9/15-3/15 $120/hour $125/hour
(Plus sales tax.) (Plus sales tax.)
Spring/Summer 3/16-9/14 $12Q/hour $125/hour
(Plus sales tax.) (Plus sales tax.)
1. Rate for Fall-Winter Prime would go into effect September 15, 200Z.
2. Rate for Spring/Summer would go into effect March 16, 200Z.
3. Fall/Winter Prime: 2:00 p.m.-11 :00 p.m., Monday-Friday; 6:00 a.m.-1 0:00 p.m. Saturday and Sunday.
Non-school days and holidays.
4. Fall/Winter Non-Prime: 11 :00 p.m.-2:00 p.m. Monday-Friday; 10:00 p.m.-6:00 a.m. Saturday and
Sunday.
24
Skate Services and Admission 2006 2007
Resident/Nonresident Resident/Nonresident
$3/ air $3/ air, $25 or $50 unch card
$3 $3
$5 $5
$2 $2
Open Skating-Adult $3 $3
1. Included with Community Center membership.
2. Included with Community Center membership or daily pass.
C. Recreation Proaram Fees
Recreation program participants are charged fees to cover costs associated with the program. These fees
are designed to cover the direct cost of the program, including part-time salaries and supplies, plus a
portion of administrative overhead, proposed to be an additional 20% of the program fee.
These fees vary depending on the program, supplies costs, ect. The following are examples of
approximate fees for 2007:
Program Length 2006Estimated 2007Estimated
T -Ball/Near Ball 6-8 weeks $40 $40(depending on # of
weeks)
Adventures in Summer 6-8 weeks $35 $35
Adventure Davcamp 5 days $90 $90
Micro Soccer 8 weeks $40 $40
.
Learn- To-Skate 8 weeks $57 $57
Learn- To-Swim 8 weeks $55 $57
Kiddie Crafters 6 weeks $26 n/a
Supers ports 6 weeks $28 n/a
Cheerleading 4 weeks + game $72 (12 week $72 (12 week program)
proQram)
Kiddie Cookers 6 weeks $26 n/a
Senior Programs Variable based on
expenditures
LifeQuard TraininQ Varies $165 $165
Music Classes 5 weeks $103 (10 Sessions)
Homeschool Open 8 Weeks NA NA
Gym
Ski Club 5 events $185 Aoorox. $205
PreSchool Dance 5 wks, 1-2 sessions per $34 $35
brochure
Science Explorers Varies $32 Vary from
5-10 offered $10 - $52
Little TiQers 4wks $46
Abrakadoodle 4 weeks $47
ProQrams
Skyhawk Sport 1 week Variable based on sport
PrOQrams offered.
Kid Smart 1 $32
Senior Expo 1 $10 $10
Teen Babysitters $85
TraininQ
25
Sports Association Fees
All City-related sports associations are assessed a fee to fund the administrative support the City
provides to association. This support generally includes promoting the program, processing registrations,
schedulino facilities and activities, and providinq assistance in administerinq the program.
Association 2006 2007
Youth Associations Standard Services: $12/participant Standard Services: $12/participant
. Football
. Girls and Boys Enhanced Services: $18/participant Enhanced Services: $18/participant
Basketball
. Baseball
. Softball
. Wrestling
. Soccer
. Volleyball
. Tennis
Adult Softball $340 $340
Adult Basketball $200 $200
Adult Volleyball $200 $200
istrations.
2006 2007
$21 $21
$0 $0
$21 $21
$11 $11
$5 $5
D. Park Facilities
NOTE: Beginning in 2004, facility users pay staffing costs required to prepare facilities for
weekend or holiday events, or where overtime is required during the week to accommodate
s ecial facilit re aration re uests.
T e 2006 207
Picnic Shelter, Resident Rental' . $40/day $40/day
Plus sales tax.) Plus sales tax.
Picnic Shelter, Non-Resident Rental $65/day $65/day
Plus sales tax. Plus sales tax.
Ball Field (one day) . $50/field $50/field
Plus sales tax. Plus sales tax.
Soccer Field . $50/field $50/field
Plus sales tax. Plus sales tax.
Schleper Staduim $1,000/day $1,000/day
Plus sales tax. Plus sales tax.
Concession Stand . $50/day $50/day
Plus sales tax. Plus sales tax.
Ball Field with Lights $75/night/field $75/night/field
Plus sales tax. Plus sales tax.
Free With Rental Free With Rental
Free With Rental Free With Rental
Volle ball Kit Free With Rental Free With Rental
1. $50 deposit for rental of picnic shelters that require keys, or for rental of equipment.
2. Requests for multiple day field use will be based on the single day rate. Three-field rental minimum
for weekend dragging.
26
3. Rental fees for these facilities waived under terms of agreements with Shakopee School District and
City-affiliated sports associations. Staffing costs noted above are not waived.
4. Rental fees for these facilities waived for local organizations where revenue generated from the event
is reinvested in the community. Staffing costs noted above are not waived.
Youth Building1
T e 2006 2007
Resident Rental (1 - 9pm) $150 $150
Plus sales tax. Plus sales tax.
Non-Resident Rental (1 - 9pm Weekday) $250 $250
Plus sales tax. Plus sales tax.
n/a n/a
$30/hr $30/hr
(2 hr Minimum) (2 hr Minimum)
Plus sales tax. Plus sales tax.
1. Rental fee waived for resident youth organizations and Shakopee School District and City-affiliated
sports associations. $25.00 fee if food is served.
2. $150.00 key/damage deposit on all rentals.
E. A uatics
Type 2006 2007
Resident/Nonresident Resident/Nonresident
A uatic Park
Daily Admission - Adults and Children (2 -59)
Twili Twili
Punch Card - 10 unches
Punch Card - 20 unches
Jr. High School
Dail Admission - Adults and Children (2-59 $2 $2.50
1. Children under 2 and adults 60 and over admitted free.
2. Punch Cards valid at both the Aquatic Park and Jr. High School Pool.
3. Open Swim at Jr. High included with Community Center membership.
Aquatic Park Season Passes * Communit Center Members received 50% discount from rate.)
2006 2007
Resident Rates Resident Rates
Before June 1st Before June 1 st
ges 3 - 59 $55 1st Person in Family ges 3 - $55 1 st Person in
$45 2nd Person in Family 59 Family
$35 3rd Person In Family $50 2nd Person in
$25 4th Person in Family Family
$15 5th Person in Family $40 3rd Person In
ny additional after 5 are free Famil~
$35 4 h Person in
Famil~
$30 5 h Person in
Family
ny additional after 5
are free
Resident Rates Resident Rates
June 15 and After June 15 and After
ges 3 - 59 $70 15 Person in Family ges 3 - $70 15 Person in
$60 2nd Person in Family 59 Family
$50 3rd Person In Family $60 2nd Person in
$40 4th Person in Family Family
$30 5th Person in Family $50 3rd Person In
Famil
27
ny additional after 5 are free $40 4 Person in
Familrr
$30 5 h Person in
Family
ny additional after 5
are free
Non Resident Rates Non Resident Rates
Before June 1st Before June 1st
ges 3 - 59 $85 1 st Person in Family ges 3 - $85 1 st Person in
$75 2nd Person in Family 59 Family
$65 3rd Person In Family $75 2nd Person in
$55 4th Person in Family Family
$45 5th Person in Family $65 3rd Person In
ny additional after 5 are free Familx
$55 4 h Person in
Familx
$45 5 h Person in
Family
ny additional after 5
are free
Non Resident Rates Non Resident Rates
une 1s and After une 1s and After
ges 3 - 59 $100 1 st Person in Family ges 3 - $100 1st Person in
$90 2nd Person in Family 59 Family
$80 3rd Person In Family $90 2nd Person in
$70 4th Person in Family Family
$60 5th Person in Family $80 3rd Person In
ny additional after 5 are free Familx
$70 4 h Person in
Familx
$60 5 h Person in
Family
ny additional after 5
are free
Park Dedication Fees
Type of Property 2006 Fee 2007 Fee
Residential Single Family/Duplex (per unit) 5,340 5,340
Multiple Family /Apartments (per unit) 4,450 4,450
Commercialllndustrial (per acre) 6,930 6,930
28
( Rw.o;.e.J ~e:, ~'1> ~eJ) 7.A.
("
..,....
,
D. Services
1. Zoning Verification Letter $25.00
E. Recording Fees
Abstract and Torrens Documents $46.00
Plats/RLS/CIS $56.00
(Other fees according to Scott County)
F. Sign Permit Fees (City Code 4.30)
Permanent - Wall Sign $75.00
Freestanding Sign $125.00
Temporary $30.00
Retrieval of confiscated, illegal signs $45.00
II. Land Division Administration Fee:
A. Concept Review by Planning Commission
other than PUD $200.00 $350.00
Concept Review Escrow $1.400.00
B. Major Subdivisions
1. Pre-application Meeting. Review Fee $200.00 for o::!ch mooting nftor the first $350.00
Pre-Application Site Review Escrow $1.600.00
2. Preliminary Plat $400... $6/10t $2.700.00
Plat Review Escrow or $'100... $4/ncro, $13,000.00
whichevor is greator
3. Preliminary & Final Plat concurrently Prolimin::!!)' foo plus fin::!l foe $2,100.00
Plat Review Escrow $9,900.00
4. Final Plat 2W $1.410.00
Plat Review Escrow $12,700.00
5. Title Review Fee $300 or actual cost, which ever is greater
C. Minor Subdivisions
1. Lot Division/Lot Reassembly $-:l-W-$500.00
2. Registered Land Surveys ~
D. Vacations
1. Vacations of Public Easements $250.00 $850.00
2. Vacations of Rights-of-way $2W-$850.00
E. Park Dedication Fees (City Code Sec. 12)
Cash in lieu of land dedication fees -
Residential/Single Family/Duplex (per unit) $5,340 per unit
Multi-Family/Apartment ( per unit) $4,450 per unit
Commercial/Industrial (per acre) $6,930 per acre
F. Woodland M::m::!gement Rogulations
1. M::!jor Subdivisions $400.00 plus $10.00 par wooded nero
2. Minor Subdivisions In which:) lot, with woodl:mds, $100.00
is split into three or more lots.
15
'\;
,
-..
"'-
,
..
3. MIAo, S"bd;v;~OA' '" which 0 lot, with weodlona,) Oe.l-*c:..
is split into two lots. ~
G. Annexation
1. Application Fee $430.00
2. Review Escrow $1 ,800.00
H. Comprehensive Plan Amendment
(includinQ extension of MUSA) $1 ,910.00
III. Land Use Administration Fees
Applicants will be liable for payment of costs incurred by the City over and above those covered by the following fees.
A. Application for Appeal of City Administration Decision
1, Appeal to Board of Adjustment & Appeals $150.00 $300.00
2. Appeal to City Council $150.00 $300.00
8. Application for Variances
1. Single Family Residential "-lClTE' ~~Ao.l&-e<$MiQ-$200'OO -If-
2. All others . $200-$300.00 -:Jf
3. Appeal to City Council $400-$300.00
C. Application for Conditional Use Permit
1. Home Occupations $200.00
2. Home Occupation Renewals & Amendments $200.00
3. CUP for Over-Height Fence $200.00
4. All Other Conditional Use Permits $250.00 $200.00
5. All Other Renewals & Amendments $250.00 $200.00
6. Appeal to City Council $150.00
7. Mineral Extraction & Land Rehabilitation Permit $300.00
plus $2,500 cash deposit*
plus all administrative costs**
plus all consultant fees***
8. Temporary Seasonal Sales $50.00
(including farm produce)
D. Application for Planned Unit Development
1. PUD Concept Review - Planning Commission $350.00
PUD Escrow Fee $1.400.00
2. PUDConcept Review(including City Council) $2,840.00
3. Determinations by the BOM $150.00
4. Planned Unit Development $700 -+- $35/acre $2,750.00
*Agreement to pay actual additional costs. $1,000.00 $10,900.00 Escrow
5. Amendment to Planned Unit Development $aOO $2,750.00
*Agreement to pay actual additional costs. $1,000.00 $2,000 Escrow
16
.f
/....
,.0
ny additional after 5 are free $40 4 Person in
Familx
$30 5 h Person in
Family
ny additional after 5
are free
Non Resident Rates Non Resident Rates
Before June 1st Before June 1 st
ges 3 - 59 $85 1 st Person in Family ges 3 - $85 1 st Person in
$75 2nd Person in Family 59 Family
$65 3rd Person In Family $75 2nd Person in
$55 4th Person in Family Family
$45 5th Person in Family $65 3rd Person In
ny additional after 5 are free Familrn
$55 4 h Person in
Familrn
$45 5 h Person in
Family
ny additional after 5
are free
Non Resident Rates Non Resident Rates
une 15 and After une 15 and After
ges 3 - 59 $100 1st Person in Family ges 3 - $100 1st Person in
$90 2nd Person in Family 59 Family
$80 3rd Person In Family $90 2nd Person in
$70 4th Person in Family Family
$60 5th Person in Family $80 3rd Person In
ny additional after 5 are free Familx
$70 4 h Person in
Familx
$60 5 h Person in
Family
ny additional after 5
are free
Park Dedication Fees ~~fl~~~-
~ Type of Property 2006 Fee 2007 Fee
t'- Residential Single F3mily/Duplex (per unit) ~ ~ L.\~cA \.v
~ Multiple F3mily /l\p3rtments (per unit) 4,4W 4,4W '9\~..v""~ ~ ~~ hJ -
Commercial/lndustri31 (per 3cre) ~ ~
(f1' "'S)
619
..Ie
#
Residential Valuation Square Footaae Costs
AREA Square Footaqe Cost
BASEMENT
Unfinished $16.36
Finished $30.00
LIVING AREA
Lowest Main Level w.JJ...
Unfinished $79.78
Upper Level $79.78
Additional Level $79.78
Finish Existinq Area $13.64
COVERED ENTRY $15.00
Screen Porch $23.00
3-SEASON PORCH $26.00
DECK $15.00
ACCESSORY BUILDINGS
Garaqe $33.68
Storaqe Buildinqs $30.52
SWIMMING POOLS
In-Ground $25.00
Above Ground $15.00
Other $32.54
Sanitary Sewer Service Availability Charge (SAC) Units for various residential, commercial, public, and institutional
facilities will be applied as specified in the Metropolitan Council SAC Procedures Manual, latest.
Metro SAC Charge .& $4-;5W $1.675/Unit -'F-
:I: Io.J c..C"' e.o... e. ~ I. \'2. S-:: -
(These funds are forwarded to the Metropolitan Council)
City SAC Charge (Res. No. 4165) $4W $475/Unit
Water Availability Charge (WAC)
To be collected by Shakopee Public Utilities beginning in 2004
VIP connection charge to the benefited area for the first
phase of the VIP sewer project - per acre; $919.95
VIP /I connection charge to the benefited area for the second
phase of the VIP sewer project - per acre $346.99
9