Loading...
HomeMy WebLinkAbout5.E.3. Petition to Reconstruct Atwood Street between Shakopee Avenue and 10th Avenue .*.E.3 CITY OF SHAKOPEE Memorandum CO S E T TO: Mayor & City Council Mark McNeill, City Administrator FROM: Jeff Weyandt, Assistant City Engineer SUBJECT: Petition to Reconstruct Atwood Street between Shakopee Avenue & 10 Avenue. DATE: June 5, 2012 INTRODUCTION: This agenda item is to accept a petition from the residents on Atwood Street between Shakopee Avenue and 10 Avenue to have the street reconstructed and the sanitary sewer replaced. BACKGROUND: On May 16, 2012 staff received the attached petition signed by nine of the ten residents on Atwood Street between Shakopee Avenue and 10 Avenue. A number of them are experiencing sewer problems and would like the sewer replaced on Atwood Street. Recently residents on Van Buren Street also submitted a petition for a street reconstruction project. Staff is preparing the 2013 Capital Improvement Plan. Given the recent petitions, staff recommends that Atwood Street between Shakopee Avenue and 10 Avenue be included with a street reconstruction project on the west end of the City in 2013. Attached to this memo is the proposed CIP sheet for the 2013 Street Reconstruction project and the petition from the residents on Atwood Street. ALTERNATIVES: 1. Accept the petition from the Atwood Street residents and direct staff to consider this project in the 2013 CIP. 2. Table for additional information. RECOMMENDATION: Alternative No. 1, accept the petition from the Atwood Street residents and direct staff to consider this project in the 2013 CIP. ACTION REQUESTED: Accept the petition from the Atwood Street residents and direct staff to consider this project in the 2013 CIP. Ottel) Jeff Weyandt Assistant City Engineer ENGR/2012- PROJECTS /2012- COUNCILPetitionReconAtwoodSt City of Shakopee Capital Improvement Program 2013 -2017 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2013 Street Reconstruction $2,375,000 A. Expenditure Items: 2013 2014 2015 2016 2017 Land & ROW Construction 1,900,000 Improvements Engineering /Admin. 475,000 Total 2,375,000 - - - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 350,000 SPU State Aid Assessments 485,000 Sanitary Sewer Fund -Base 225,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 200,000 Storm Drainage Fund -Trunk Tax Levy 1,115,000 Total 2,375,000 - - - - ,p, _ Description: : ,a, p,,i''i' :, 1, . t `;yam .' Street, Sanitary Sewer, Storm Sewer, and Watermain reconstruction of Harrison ,. vo `' 01404 Street Van Buren Street, Jackson Street, Tyler Street, 12th Avenue and Atwood •0 . : 6 M - , ,,,. 4 Street. eikw t " � Justification: {Y „1e r. x � . ,.. ;',, ' � gy ( , To continue with the rehabilitation of the City's infrastructure in the older sections * „ ,,. " .~ � A , E * s,. of the City. J rr , + a t �e �� Cay% 7 �`�'� a !' / ti" r '7 a ''.9 ilk e { b sw " ' Other Comments: ,� '4 '� t 1 ; 0. a t � � ° ' ^+ , , , Staff anticipates sewer failures to start occuring in this area a s� yam, m , " ,, , . ,, t s, a '. fit �� ri tie , � • ,; a .. sa . . .k .. 1 e 2" w Y,, f;, , , ? + ` w " "" t �, e ! ,, Y . ,„\-,-.11 8 Operating Costs: , a �....,, „ . .. .41 . PROJECT LOCATION DATE: May 16, 2012 To City of Shakopee: Some residents an Atwood Street S. between Shakopee Ave and 10 Street are intermittently experiencing sewer problems. Everyone has had someone vow and clean out their sewer lines several times. A camera was used and showed tree roots and orange burg pipe collapsing causing sewage to leak into the ground. Some have had to get roots augured out every few months. If we have to replace sewer lines in the street now and then m two to three years the city does our street, we would be charged again. We would be charged twice and seems to be unfair. We would like to have our street done sooner before our sewer fails us completely. It would be appreciated if you would consider our request, to move up the timeframe sooner to have our street redone. Thank you. ,s t jz s ry —� 1 \ ,✓a (� - 51-- 9 � � T s1 `;� A �00� 6 /1-4", c--?0 s 0, / .19() 7 95 4 04,ac t iO s� i 5 ? 7 a el ig-;0-- 767,3 c=i-vtx 6." 4 _ i _ wto 4 ci®s s, t CO, 5. E, 3 �dd�-�o� � � SHAKOPEE AVE / 906 905 916 913 x w 926 925 -� .� .� w 934 � 933 i C O O o ,� 3 ✓� 940 Q 945 952 9�3 962 963 972 971 lOTH AVE �Q 1�� Residents Requesting Street Improvement a--�--� SHAKOPEE � � �.,.��n�.,��.�,�.. Stgned Petition o ao so izo Feec