201 Annual Budget Operating Budget
201 – 202 Capital Improvement Program
Capital Improvements are theprojects thatrequire the expenditureof public fundsfor the acquisition, construction
or replacement of the infrastructurenecessary for communities. Capital planning is critical to continuation of
essential public services, aswellasbeing an important componentofa community’s economic development
program. Thecreation andupdateof multi-year capital plan allowsfor the community toplanfor the current and
longererm needsof the constituents. Thisplanis often integrated with the maintenance needs and funding sources
that will providefor the delivery of servicestoa community.
Capital projects are different from the operating budgets of a City, as they often represent large financial obligations
that may span more than one year. The unique nature of capital projects allows for a different presentation to the
governing board, than the process used for operational budget discussions. The information and tracking needs of
projects requires an adequate system of management, to ensure the impact to the capital plan, as well as the
operational budgets.
The development of a capital improvement plan is prepared with the following elements:
Identification of needs, utilizing strategic plans, comprehensive plans as well as input from citizens, staff
and Council.
Determination of the projects specific to repair, maintenance, replacement or new construction.
Recognition of the revenue sources that will be utilized to fund the planned projects
Need for debt issuance for future needs
Identification of the need for policy updates or creation
It is critical that the full cost of the projects be developed as well as the timing and coordination of the project with
other entities, both public and private. The planning process that brings all the impacted parties into play will result
in a program that can clearly detail not only the original construction costs, but future year maintenance and
operational costs. With this information as a base, the future year plans as well as affordability of the projects can
be evaluated, based on more consistent and reliable information, establishing a strong and consistent Capital
Improvement Program.
Theplan for the City of Shakopee lists theprojects scheduledfor the upcoming5 years, and details the activities for
the Capital Funds, includingPark Funds, aswell as theSanitary and SurfaceWater Enterprisefunds. CIP is
preparedby the City staffItis then submittedto the CityCouncil for approval, as the 5-year programis utilized by
stafffor the long range planning and budgetneeds of the City.
201 Annual Budget Operating Budget
Park Reserve Fund
Description of Service:
The park reserve provides for the acquisition and improvements on City Parks. These services
are overseen by the Park and Recreation Director with the help of other staff as required.
Goals:
1.Provide public gathering spaces and facilities.
CITY OF SHAKOPEE
2017 BUDGET
PARK RESERVE FUND
20162016
20142015OriginalRevised2017
ActualBudgetBudgetBudget
Actual
Revenue
Licenses & Permits
Park Dedication Fee$ 752,552$ 934,456$ 2,018,028$ 1,300,000$ 1,500,000
Intergovernmental
Federal Grant 2,645 150,000- 150,000 -
Miscellaneous 2,679 3,430 - - -
Interest 33,508 24,708 5,000 5,000 -
Contributions 20,000 290,000- 390,000 610,000
Total Revenues 811,384 962,594 2,463,028 1,845,000 2,110,000
Expenditures
Riverside Fields/Bluffs 26,631 31 - - -
Huber Park 68,301 71,605 - - -
Quarry Lake Phase 1 (Park) 31,023 303,224 1,790,000 1,790,000 -
Quarry Lake Phase 2 (Trails) - - - 2,000,000-
Quarry Lake Phase 3 (Building) - - - 2,200,000-
Southbridge Community Park 934,026 170,983 - - -
High School Joint Site Development - 600,000- - -
Riverview Park - 75,000- - -
Tahpah Park Improvements 300,520- - - -
Total Expenditures 1,059,981 846,363 2,465,000 1,790,000 4,200,000
Interfund Loan - - ---
Transfer In 150,000- - - -
Transfer Out (513,995)- - - -
Other Financing Sources (Uses) (363,995)- - - -
Excess (deficiency) of
Sources over Uses
$ (248,597)$ (247,764)$ (1,972)$ 55,000$ (2,090,000)
Fund Balance- January 1
$ 1,877,028$ 1,628,431$ 1,380,667$ 1,380,667$ 1,360,667
Reserved for Delayed Projects
- - (75,000)- -
Fund Balance December 31
$ 1,628,431$ 1,380,667$ 1,378,695$ 1,360,667$ (729,333)
Delayed Projects:
Riverview Park 75,000
Park Reserve Fund
Projected Fund Levels
2017-2021 Capital Improvement Program
REVENUES:20172018201920202021Unfunded
Park Dedication Fees$ 1,500,000$1,700,000$ 500,000
$ 500,000$ 500,000$ -
Grants -
- - - - 1,900,000
Donations/Misc. 600,000
100,000 150,000 100,000 100,000 500,000
Cost Sharing 10,000
10,000 10,000 10,000 10,000 -
Interest -
- - - - -
Total Revenue 2,110,000
1,810,000 660,000 610,000 610,000 2,400,000
EXPENDITURES:
Expenditures per List CIF
Huber Park Improvement -
- 75,000 - - 2,400,000
Quarry Lake Phase 2 (Trails)2,000,000
- - - - -
Quarry Lake Phase 3 (Building)2,200,000
- - - - -
Quarry Lake Phase 4 -
- - - - 2,000,000
Tahpah Park Improvements -
- 300,000 - - -
Jennifer Lane Park-
250,000 - - - -
Total Expenditures 4,200,000
250,000 375,000 - - 4,400,000
Excess (Deficiency) (2,090,000)
1,560,000 285,000 610,000 610,000(2,000,000)
Transfer Out to CIF
Southbridge Trail Development- (75,000)-
- - -
TH 169 Pedestrian Bridge -
- -(500,000) - -
Fund Balance January 1*
1,360,667 (729,333)
830,667 1,040,667 1,150,667 1,760,667
Fund Balance December 31
$ (729,333)$1,040,667$ (239,333)
$ 830,667$ 1,150,667$ 1,760,667
* Balance equals cash balance per cash flow projection with project carry forward.
City of Shakopee Capital Improvement Program
Project ManagerProject Title:
Jamie PolleyQuarry Lake ParkTotal Project Cost:6,200,000
A. Expenditure Items:20172018201920202021Unfunded
Land & ROW
Construction2,000,0002,000,000
Improvements2,200,000
Engineering/Admin.
Total4,200,000----2,000,000
SFunding Source:
B.
General Fund
Capital Improvement Funds1,500,000
Park Reserve Fund3,700,000
Grants (specify)
Donations (specify)500,000500,000
State Aid
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total -4,200,000 - - - 2,000,000
Description
This project would provide funding for construction of the restored Aggregate Industries quarry
site.
Justification
This project would develop the facility as recreational amenity for the city. If possible, work
would be coordinated with the Watershed District's plans for channel improvements.
Other Comments
Funding sources include grants and partnerships with committee members. $30,000 Xcel
grant, $10,000 Polaris grant in 2006. $150,000DNR grant in 2014. All costs listed are
estimates. Due to the inability to obtain public access the grants received in 2005 and 2006
had to be returned. With publicaccess additional grants will be sought by the City and the
Waterski Association.
$500,000 possible donation from Emerson for the Community Building
Operating Costs
Costs would depend on scope of development.
City of Shakopee Capital Improvement Program
Project ManagerProject Title:
Jamie PolleyJennifer Lane Neighborhood ParkTotal Project Cost:250,000
A. Expenditure Items:20172018201920202021Unfunded
Land & ROW
Construction
Improvements250,000
Engineering/Admin.
Total-250,000----
SFunding Source:
B.
General Fund
Capital Improvement Funds
Park Reserve Fund250,000
Grants (specify)
Donations (specify)
State Aid
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total 250,000- - - - -
Description
Futureneighborhood Park off of Jennifer Lane. It is anticipated to get land from the 1st and
2nd developments of Jennifer Lane.
Justification
Landis obtained from the development. Funding to buildi the park would be from the Park
Reserve Fund.
Operating Costs
The estimated operating costs for asmall neighborhood park is approximately $2500/year.
City of Shakopee Capital Improvement Program
Project ManagerProject Title:
Jamie PolleyHuber Park Improvements; Shelter & Riverbank Total Project Cost:2,475,000
Stabilization
A. Expenditure Items:20172018201920202021Unfunded
Land & ROW
Construction2,400,000
Improvements75,000
Engineering/Admin.
Total--75,000--2,400,000
B. Funding Source:
General Fund
Capital Improvement Funds
Park Reserve Fund75,000500,000
Grants (specify)1,900,000
Donations (specify)
State Aid
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total--75,000--2,400,000
Description
The addition of a 38' X 50'openair shelter within Huber Park will be used for community
rentals and special events. A small shelter is planned for 2019 for daily use. Stabilization of
river bank along Huber Park.
Shelter design took place in 2013 for $1100, City Council chose to construct the shelter
utilizing the $150,000 grant from the SMSC. Construction in 2014. The shelter will resemble
the performance stage and support building, Beyond2017-RiverbankStabilization
Justification
This project addsan addition seasonal rental facility. The small shelter will be built in the NE
corner of the playground where the area is pad ready and planned for a small shelter. It also
completes the redevelopment of Huber Park by stabilizing the river bank, constructing river
overlooks, and reconstructing trail segments.
Operating Costs
$500year.
City of Shakopee Capital Improvement Program
Project ManagerProject Title:
Jamie PolleyTahpah Park ImprovementsTotal Project Cost:700,000
A. Expenditure Items:20172018201920202021Unfunded
Land & ROW
Construction400,000
Improvements300,000
Engineering/Admin.
Total--300,000--400,000
SFunding Source:
B.
General Fund
Capital Improvement Funds
Park Reserve Fund150,000 250,000
Grants (specify)100,000
Donations (specify)150,000 50,000
State Aid
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total -- 300,000 - - 400,000
Description
FutureUnfunded-Baseball field Construction on open fieldto west of stadium, City will
apply for a grant from Baseball of America in the amount of $100,000. (Anticipates donation
of labor or in house labor for some work.)
Justification
This project would complete development of Tahpah Park with an additional baseball field in
2016.
Other Comments
The project for 2016 is contingent onthe joint development of the HS site for grass turf
fields. The Parks Department will be extending the outfield fences of fields 5-8 concurrently
with the lighting project.
Operating Costs
The estimated operating costs for additional baseball field is approximately $2,000 per year.
Lighting two softball fields with lights would add $800 per year for operating 4 nights per
week.
201 Annual Budget Operating Budget
Capital Improvement Fund
Description of Service:
The Capital Improvement Fund is for various infrastructure projects in the City. These services
are overseen by the Public Works Director/City Engineer with the help of other staff as required.
Goals:
1.Provide improvements to roads and trails.
2.Address needs of the community through planning processes.
CITY OF SHAKOPEE, MINNESOTA
2017 BUDGET
CAPITAL IMPROVEMENT FUND
20162016
20142015OriginalFinal2017
ActualActualBudgetBudgetBudget
Revenue
Capital Improvement Fund Levy-$$ -$ -$ 385,000-$
Tax Increment Financing ($2.3M
over 9 years)-- 255,556255,600255,600
Franchise Fees-- - 915,000-
Special Assessments2,124,944635,0551,070,0001,070,0002,425,000
Intergovernmental
Federal Grants1,101,600- -
- -
State Aid Construction879,6981,070,397971,000971,0001,025,000
SMSC50,000- -
- -
Interest100,39683,13757,95154,60061,300
Miscellaneous/Donations40,74027,210440,000440,000580,000
Total Revenues4,297,3781,815,7992,794,5072,791,2005,646,900
Expenditures
CR 101 Trail ext.343,935-
- - -
101 Trail Improvement1,892-
-- -
Quarry Lake Trail166,3891,600-
- -
Scenic Heights Trail Repair15,416-
- - -
Overlay1,161,570817,6151,420,0001,420,0002,020,000
Valley View Road530,460(47,095)- -
-
Re
construction Project1,226,9971,255,764 2,400,000-
-
CSAH 17/Vierling Inter. Improv.1,809,7326,588-
- -
Shenandoah Bus. Park. Improv.693,42263,959-
- -
Vierling Dr- C.R. 69 to Taylor Street- 1,500,000-
- -
Trail Rehabilitation-- 80,00080,00080,000
Southbridge Traffic Signal Modification 65,126--
- -
Reclamation 5,083- 4,380,0004,380,000-
CSAH 16 Reconstruction-- 1,500,0001,500,000-
3rd Avenue Reconstruction-- 2,070,0002,070,000-
4th Avenue Reconstruction 75,969--
- -
Street Lighting45,236- 250,000250,000-
Vierling Drive Payvement Rehab 2,231--
- -
Flashing Yellow Lights-County- 105,000-
- -
CSAH 78/79 Trail Extension- 120,000-
- -
17th Avenue Extension West of CR 15- 625,000-
- -
Lewis Street Parking Lot & Alley- 430,000-
- -
-
CR 79/Vierling Roundabout86,631
- - -
County Trail Work50,406-
-- -
Miscellaneous8,119144,683-
- -
Total Expenditures6,140,2052,391,5239,700,0009,700,0007,280,000
Transfers In
General Fund1,750,0001,396,8221,200,0001,200,000-
Sewer-- 310,000310,000370,000
Storm-- 1,735,0001,735,000190,000
Transfers Out(30,664)(321,082)- -
-
Other Financing Sources (Uses)1,719,3361,075,7403,245,0003,245,000560,000
Excess (deficiency) of
Sources over Uses
$(123,491)$500,016$(3,660,493)$(3,663,800)$(1,073,100)
Fund Balance January 1
$5,753,669$5,630,178$6,130,194$6,130,194$2,386,394
Reserved for Delayed Projects
(80,000)
Fund Balance 12/31
5,630,1786,130,1942,469,7012,386,3941,313,294
Reserved for Delayed Projects
Trail Rehabilitation80,000
Vierling CR 69 to Taylor1,300,000
Vierling CR 69 to Taylor (100% Assessed)(1,300,000)
2015 Delayed Projects
80,000
Capital Improvement Fund
Projected Fund Levels
2017-2021 Capital Improvement Program
City of Shakopee, Minnesota
REVENUES:20172018201920202021Unfunded
Capital Improvement Fund Levy385,000 485,000 555,000 655,000 630,000
-
Franchise Fees915,000 915,000 945,000 945,000 970,000
-
Special Assessments2,425,000 565,000 190,000 100,000
- -
County Portion of Project - - 3,000,000-
- -
TIF (2.3M over 9 years) 255,600 255,600 255,600 255,600 255,600
-
Intergovernmental MSA 1,025,000 1,025,000 1,025,000 1,025,000 1,025,000
-
SPUC Portion of Project 580,000 640,000 130,000 20,000 25,000
-
Federal/MnDOT Funding - - 2,000,000-
-1,500,000
Interest 61,300 23,900 13,100 10,500 7,300
-
Total Revenue 5,646,900 3,909,500 3,113,700 8,011,100 2,912,900 1,500,000
EXPENDITURES:
Expenditures per List CIF
Overlay 2,020,000 1,890,000 2,290,000 1,160,000 1,980,000
-
Reconstruction Projects 2,400,000 2,740,000 910,000 270,000-
-
Trail Rehabilitation 80,000 80,000 80,000 80,000 80,000
-
- -
Flashing Yellow Lights-County 105,000 --
-
CSAH 78/79 Trail Extension 120,000 - - -
- -
17th Avenue Extension West of CR 15 625,000 - - -
- -
Lewis Street Parking Lot & Alley 430,000 - - -
- -
Concrete Alleys - 420,000 - -
- -
12th Avenue Trail - - 240,000 -
- -
l - - 150,000 -
Savanna Oaks Park to Southbridge Parkway Trai
- -
Vierling CR 69 to Taylor 1,500,000 - - -
- -
TH 169 Pedestrian Bridget - - 3,000,000-
- -
Reclamation - - - 400,000
- -
CSAH 42 Improvments - - 1,200,000-
- -
CSAH 83 Intersection - - 4,000,000-
- -
CR 15 Interchange & Trail Improvements - - - -
-2,500,000
CR 79 Pedestrian Underpass - - - -
-125,000
CSAH 16 Trail Extension - - - -
-100,000
Total Expenditures 7,280,000 5,130,000 3,670,000 9,840,000 2,330,000 2,725,000
OTHER FINANCING SOURCE
Transfers In
Park Reserve Fund - - 75,000 500,000
- -
Sewer 370,000 420,000 60,000 10,000 15,000
-
Storm 190,000 535,000 100,000 1,020,000 50,000
-
Total Other Financing Source 560,000 955,000 235,000 1,530,000 65,000
-
(321,300) (298,900) 647,900 (1,225,000)
Excess (Deficiency) (1,073,100)(265,500)
Fund Balance January 12,386,3941,313,2941,047,794726,494 427,5941,075,494
Fund Balance 12/31$1,313,294$1,047,794$726,494$427,594$ 1,075,494$(149,506)
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyFlashing Yellow Lights-County $105,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction
Improvements
Engineering/Admin.105,000
Total105,000-----
B. Funding Source:
General Fund
Capital Improvement Fund105,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total105,000-----
Description:
Retrofit of Traffic Control Signals in Scott County
Justification:
To Upgrade signals to flashing yellow arrows to various intersections
Other Comments:
City cost is estimated at $105,000.00 per Scott County.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet improvementsTrail Rehabilitation$400,000.00
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
АЎͲЉЉЉАЎͲЉЉЉАЎͲЉЉЉ
Construction 75,00075,000
Improvements
Engineering/Admin.5,000 5,000 5,000 5,000 5,000
Total80,000 80,000 80,000 80,000 80,000 -
B. Funding Source:
S
General Fund
Capital Improvement Fund80,000 80,000 80,000 80,000 80,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total80,00080,00080,00080,00080,000-
Description:
Rehab existing trails in the city.
Justification:
Other Comments:
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet improvementsC.R. 78/79 TRAIL EXTENSION$120,000.00
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
ЊЉЉͲЉЉЉ
Construction
Improvements
Engineering/Admin.20,000
Total120,000 - - - - -
B. Funding Source:
S
General Fund
Capital Improvement Fund120,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total120,000-----
Description:
Extension of a bituminous trail on the North side of CSAH 78 from CSAH 17 to
CSAH 79 and on the East side of CSAH 79 from CSAH 78 to CSAH 16.
Justification:
Other Comments:
This is a County led project. Costs above are estimated City costs only and
approximately half of local match on a Federal funded project.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction2017 Bituminous Overlay$2,020,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction1,870,000
Improvements
Engineering/Admin.150,000
Total2,020,000-----
B. Funding Source:
General Fund
Capital Improvement Fund1,920,000
Park Reserve Fund
Grants (specify)
Donations (specify) SPU30,000
State Aid
Assessments
Sanitary Sewer Fund-Base20,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk50,000
Tax Levy
Total2,020,000-----
Description:
Bituminous overlay of various streets throughout the City.
Justification:
Continuation of the City's Pavement Preservation Program to maintain existing
infrastructure.
Other Comments:
Bituminous overlays are more cost effective than reconstructing pavements.
Streets will be evaluated on a yearly basis and may be moved up or moved
back in the CIP.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction2017 Street Reconstruction$2,400,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction2,100,000
Improvements
Engineering/Admin.300,000
Total2,400,000-----
B. Funding Source:
General Fund
Capital Improvement Fund1,020,000
Park Reserve Fund
Grants (specify)
Donations (specify) SPU550,000
State Aid
Assessments340,000
Sanitary Sewer Fund-Base350,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base140,000
Storm Drainage Fund-Trunk
Tax Levy
Total2,400,000-----
Description:
Street, sanitary sewer, storm sewer and watermain reconstruction: Shakopee
Avenue from CSAH 17 to 11th Avenue.
Justification:
To continue with the rehabilitation of the City's infrastructure.
Other Comments:
Staff has received several resident communications for this project.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet ConstructionVierling Drive - C.R. 69 to Taylor St.$1,500,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction1,200,000
Improvements
Engineering/Admin.300,000
Total1,500,000-----
B. Funding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments1,500,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total1,500,000-----
Description:
The construction of street, utility , sidewalk and trail system from County Road
69 to Taylor Street.
Justification:
Vierling Drive completion is needed to provide access to commercial property
south of Shakopee Town Square and North of the Shakopee By-Pass while
completing this east-west collector system.
Other Comments:
Need to design roadway after future end user is identified.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet ConstructionLewis Street Parking Lot & Alley$430,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction370,000
Improvements
Engineering/Admin.60,000
Total430,000-----
B. Funding Source:
General Fund
Capital Improvement Fund170,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments60,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base200,000
Storm Drainage Fund-Trunk
Tax Levy
Total430,000-----
Description:
To rehabilitate Lewis Street parking lot and three blocks of downtown alleys.
Justification:
To rehabilitate parking lot and restore alley pavement with improved drainage
Other Comments:
Utility companies need to make improvements to their systems in the alleys.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction17th Avenue, from C.R. 15 to 1000 $625,000
feet west
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction500,000
Improvements
Engineering/Admin.125,000
Total625,000-----
B. Funding Source:
General Fund
Capital Improvement Fund100,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments525,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total625,000-----
Description:
Extension of 17th Avenue from County Rd 15 to 1000 feet west.
Justification:
Development of this area may warrant the extension of 17th Avenue.
Other Comments:
The County has determined that this should be a county road. Extension of
road would be done in conjunction with development.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction2018 Bituminous Overlay$1,890,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction1,770,000
Improvements
Engineering/Admin.120,000
Total-1,890,000----
B. Funding Source:
General Fund
Capital Improvement Fund1,830,000
Park Reserve Fund
Grants (specify)
Donations (specify) SPU20,000
State Aid
Assessments
Sanitary Sewer Fund-Base20,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk20,000
Tax Levy
Total-1,890,000----
Description:
Bituminous overlay of various streets throughout the City.
Justification:
Continuation of the City's Pavement Preservation Program to maintain existing
infrastructure.
Other Comments:
Bituminous overlays are more cost effective than reconstructing pavements.
Streets will be evaluated on a yearly basis and may be moved up or moved
back in the CIP.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction2018 Street Reconstruction$2,740,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction2,340,000
Improvements
Engineering/Admin.400,000
Total-2,740,000----
B. Funding Source:
General Fund
Capital Improvement Fund1,060,000
Park Reserve Fund
Grants (specify)
Donations (specify) SPU620,000
State Aid
Assessments460,000
Sanitary Sewer Fund-Base400,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base200,000
Storm Drainage Fund-Trunk
Tax Levy
Total-2,740,000----
Description:
Street, sanitary sewer, storm sewer and watermain reconstruction: Shakopee
Avenue from CSAH 17 to Market Street and Dakota Street and Minnesota
Street from Shakopee Avenue to 10th Avenue..
Justification:
To continue with the rehabilitation of the City's infrastructure.
Other Comments:
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet ConstructionConcrete Alleys$420,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction320,000
Improvements
Engineering/Admin.100,000
Total-420,000----
B. Funding Source:
S
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments105,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base315,000
Storm Drainage Fund-Trunk
Tax Levy
Total-420,000----
Description:
Reconstruct existing alleys with concrete pavement.
Justification:
To rehabilitate existing alleys and improve drainage.
Other Comments:
Estimate is for 5 city blocks of alley improvements. Locations to be determined.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction2019 Bituminous Overlay$2,290,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction2,140,000
Improvements
Engineering/Admin.150,000
Total--2,290,000---
B. Funding Source:
General Fund
Capital Improvement Fund2,230,000
Park Reserve Fund
Grants (specify)
Donations (specify) SPU20,000
State Aid
Assessments
Sanitary Sewer Fund-Base20,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk20,000
Tax Levy
Total--2,290,000---
Description:
Bituminous overlay of various streets throughout the City.
Justification:
Continuation of the City's Pavement Preservation Program to maintain existing
infrastructure.
Other Comments:
Bituminous overlays are more cost effective than reconstructing pavements.
Streets will be evaluated on a yearly basis and may be moved up or moved
back in the CIP.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction2019 Street Reconstruction$910,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction750000
Improvements
Engineering/Admin.160000
Total--910,000---
B. Funding Source:
General Fund
Capital Improvement Fund490,000
Park Reserve Fund
Grants (specify)
Donations (specify)110000SPU
State Aid
Assessments190000
Sanitary Sewer Fund-Base40000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base80000
Storm Drainage Fund-Trunk
Tax Levy
Total--910,000---
Description:
Street, sanitary sewer, storm sewer and watermain reconstruction: Scott Street from Levee Drive to
2nd Avenue, Atwood Street from Levee Drive to 1st Avenue; Levee Drive, from Scott Street to
Holmes Street and 7th Avenue from Spencer to Sommerville.
Justification:
To continue with the rehabilitation of the City's infrastructure in the older sections of the Community.
Other Comments:
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction12th Avenue Trail$240,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW40,000
Construction160,000
Improvements
Engineering/Admin.40,000
Total--240,000---
B. Funding Source:
General Fund
Capital Improvement Fund240,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total--240,000---
Description:
Construct a bituminous trail from CSAH 83 to Quarry Lake Park.
Justification:
Provide a trail connection from CSAH 83 to Quarry Lake Park.
Other Comments:
Right of Way Easements will be needed.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyTRAILSavanna Oaks Park to Southbridge $150,000
Parkway Trail
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction130,000
Improvements
Engineering/Admin.20,000
Total--150,000---
B. Funding Source:
General Fund
Capital Improvement Fund75,000
Park Reserve Fund75,000
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total--150,000---
Description:
Provide trail connection to Savana Oaks Park & Dean Lake Trail from other
areas of Southbridge.
Justification:
Trail connection would complete a trail gap in trail system and connect park to
other areas of Southbridge.
Other Comments:
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction2020 Bituminous Overlay$1,160,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction1,040,000
Improvements
Engineering/Admin.120,000
Total---1,160,000--
B. Funding Source:
General Fund
Capital Improvement Fund1,110,000
Park Reserve Fund
Grants (specify)
Donations (specify) SPU20,000
State Aid
Assessments
Sanitary Sewer Fund-Base10,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base20,000
Storm Drainage Fund-Trunk
Tax Levy
Total---1,160,000--
Description:
Bituminous Overlay of various streets throughout the city. Project area to be
determined.
Justification:
Continuation of the City's Pavement Preservation Program to maintain existing
infrastructure.
Other Comments:
Bituminous overlays are more cost effective than reconstructing pavements.
Streets will be evaluated on a yearly basis and may be moved up or moved
back in the CIP.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction2020 Bituminous Reclamation$400,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction330,000
Improvements
Engineering/Admin.70,000
Total---400,000--
B. Funding Source:
General Fund
Capital Improvement Fund300,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments100,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total---400,000--
Description:
Bituminous Reclamation of Vista Ridge Lane and Westridge Drive.
Justification:
Continuation of the City's Pavement Preservation Program to maintain existing
infrastructure.
Other Comments:
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet ConstructionCSAH 42 Reconstruction$1,200,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction1,000,000
Improvements
Engineering/Admin.200,000
Total---1,200,000--
B. Funding Source:
General Fund
Capital Improvement Fund200,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base1,000,000
Storm Drainage Fund-Trunk
Tax Levy
Total---1,200,000--
Description:
Reconstruction of CSAH 42 from CSAH 83 to CSAH 17.
Justification:
Other Comments:
Costs above only include City costs. This project is in the County TIP for 2020.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction12th Avenue & CSAH 83 $4,000,000
Improvements
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW100,000
Construction3,300,000
Improvements
Engineering/Admin.600,000
Total---4,000,000--
B. Funding Source:
General Fund
Capital Improvement Fund1,000,000
Park Reserve Fund
Grants (specify)
Donations (specify)3,000,000(County + Federal)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total---4,000,000--
Description:
12th Avenue & CSAH 83 Improvements
Justification:
Increased traffic from economic development and potential Canterbury retail
requires intersection improvements.
Other Comments:
TIF funding may be an option if Canterbury applies for TIF. County has
indicated submitting for Federal funding on CSAH 83 and this intersection.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet ConstructionT.H. 169 Pedestrian Bridge$3,000,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction3,000,000
Improvements
Engineering/Admin.
Total---3,000,000--
B. Funding Source:
General Fund
Capital Improvement Fund500,000
Park Reserve Fund500,000
Grants (specify)
Donations (specify)2,000,000(Federal)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total---3,000,000--
Description:
An additional pedestrian bridge east of C.R. 83 over T.H. 169 along PLSLWD
channel is needed to complete trail connections. Project is to build a new
pedestrian bridge utilizing Federal Aid Highway Funds.
Justification:
CƚƩƦĻķĻƭƷƩźğƓƭƚƩĬźĭǤĭƌźƭƷƭƷƚĭƩƚƭƭ͵I͵ЊЏВ͵
Other Comments:
Coordination meetings are needed with Mn/DOT and Scott County for this
project to obtain funding a project is dependent upon receiving Federal funds.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction2021 Bituminous Overlay$1,980,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction1,830,000
Improvements
Engineering/Admin.150,000
Total----1,980,000-
B. Funding Source:
General Fund
Capital Improvement Fund1,930,000
Park Reserve Fund
Grants (specify)
Donations (specify) SPU20,000
State Aid
Assessments
Sanitary Sewer Fund-Base10,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base20,000
Storm Drainage Fund-Trunk
Tax Levy
Total----1,980,000-
Description:
Bituminous Overlay of various streets throughout the city.
Justification:
Continuation of the City's Pavement Preservation Program to maintain existing
infrastructure.
Other Comments:
Bituminous overlays are more cost effective than reconstructing pavements.
Streets will be evaluated on a yearly basis and may be moved up or moved
back in the CIP.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet Construction2021 Street Reconstruction$270,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction240,000
Improvements
Engineering/Admin.30,000
Total----270,000-
B. Funding Source:
General Fund
Capital Improvement Fund160,000
Park Reserve Fund
Grants (specify)
Donations (specify) SPU5,000
State Aid
Assessments70,000
Sanitary Sewer Fund-Base5,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base30,000
Storm Drainage Fund-Trunk
Tax Levy
Total----270,000-
Description:
Street Reconstruction of Park Ridge Drive. A majority of the curb can be
protected to significantly lower costs. Sanitary sewer and watermain will not
need to be replaced.
Justification:
To continue with the rehabiliation of the City's infrastructure.
Other Comments:
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet ConstructionCR 15 Interchange & Trail $2,500,000
Improvements
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction2,200,000
Improvements
Engineering/Admin.300,000
Total-----2,500,000
B. Funding Source:
General Fund
Capital Improvement Fund1,000,000
Park Reserve Fund
Grants (specify)Federal1,100,000
Donations (specify)MnDOT400,000
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total-----2,500,000
Description:
Interchange improvements to improve safety and construct trail connectors
along CR 15 from 17th Avenue to Vierling Drive.
Justification:
Improvements to the Interchange is for safety and to provide safe pedestrian
crossings of the CR 15 bridge over TH 169.
Other Comments:
Would need Federal Grant selection to receive federal funds or MnDOT
Cooperative Agreement funding. It is anticipated that this section will be turned
back to the City for the County.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet ConstructionCR 79 Pedestrian Underpass$125,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction100,000
Improvements
Engineering/Admin.25,000
Total-----125,000
B. Funding Source:
General Fund
Capital Improvement Fund125,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total-----125,000
Description:
To construct a pedestrian underpass under CR 79 for the Upper Valley
Drainageway trail.
Justification:
Safety concerns of crossing a County road of this trail which not as an
intersection.
Other Comments:
Best pricing would be to install the underpass when the County is
reconstructing the road.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStreet ConstructionCSAH 16 Trail Extension$100,000
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction80,000
Improvements
Engineering/Admin.20,000
Total-----100,000
B. Funding Source:
General Fund
Capital Improvement Fund100,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total-----100,000
Description:
Construct missing trail segments along CSAH 16 between CSAH 18 and CSAH
21.
Justification:
Other Comments:
The City asked the County to include this in the County TIP. As of now the
project is not in the County TIP. Costs above only include City costs.
Operating Costs:
201 Annual BudgetOperating Budget
ENTERPRISE FUNDS
The Enterprise Funds are maintained to account for the operation of the sanitary sewer, storm
drainage systems and refuse. Since the operation of these systems is financed by user charges
and are self-supporting, they are accounted for in a manner similar to private business. The Storm
Drainage Fund was established by Ordinance 176 in 1985.
The intent of the City Council is to have a cash balance to at least equal accumulated
depreciation. This follows the City Auditor’s recommendation. Accumulated depreciation is a
reflection of historical costs of depreciable assets. Replacement cost is expected to be two to
two and one half times as much as historical costs. Cash balance is also expected to have
approximately 4 months of operating expenditures for cash flow purposes. The City reviews
fees annually to determine appropriate revenue levels.
Operating Budget
201 Annual Budget
Sanitary Sewer Fund
Descrition of Services:
p
Activity in this fund reflects the operations of the Municipal Sanitary Sewer System. This includes repair and maintain
current sewer lines, manhole rehabilitation/replacement, repairing lines, GIS/GPS hardware.
Goals:
Maintain and operate the Municipal Sanitary Sewer System.
1.
Continue to comply with Federal and State mandates as they are updated or expanded
2.
Undertake reviews and studies of the existing system to ensure that it can meet the expansion needs of the
3.
community and commercial/industrial entities.
4.
Coordinate with the State and County construction and Capital Improvement Plans, to ensure that rate payers
receive hi
ghest level of service for the capital commitment
5.Review and maintain rates that meet the current and near future needs of the rate payer.
Sanitary Sewer Fund
Projected Net Position
2017-2021 Capital Improvement Program
City of Shakopee, Minnesota
20172018201920202021
Net position as of January 1 (excluding capital assets)
Less: Restricted cash balance
Available net position as of January 110,315,3588,218,5587,027,8586,204,9585,546,858
Revenues:
Monthly Flat Fee917,500988,1001,058,7001,129,2001,199,800
Flow charges2,335,9002,522,8002,724,6002,867,6003,018,200
City SAC100,000100,000100,000100,000100,000
Trunk Charges50,00050,00050,000
Metro SAC25,00025,00025,00025,00025,000
Interest103,20082,20070,30062,00055,500
Interest on Interfund Loan8,5007,4006,4005,3005,300
Special Assessments
Transfer In
Total revenue3,540,1003,775,5004,035,0004,189,1004,403,800
Expenses:
Operation Expenses693,700707,600721,800736,200750,900
Treatment Costs2,578,2002,713,6002,856,1003,006,0003,163,800
Capital Equipment100,000100,000100,000100,000100,000
Transfer to General Fund125,000125,000125,000125,000125,000
Transfer to City Hall Capital Project Fund500,000----
Projects:
Service Replacement-750,000750,000750,000-
Trunk Sewer Extensions520,000150,000120,000120,000100,000
SCADA System Upgrades--125,000--
CSAH 18 Sewer Extensio750,000----
n
Transfer to Capital Imp. Fund for projects370,000420,00060,00010,00015,000
Total Expenses5,636,9004,966,2004,857,9004,847,2004,254,700
Excess (Deficiency)(2,096,800)(1,190,700)(822,900)(658,100)149,100
CashEstimated Net Position as of December 318,218,5587,027,8586,204,9585,546,8585,695,958
Accumulated Depreciation
$14,449,425$15,243,391$16,045,297$16,855,222$17,673,247
57%46%39%33%32%
{ğƓźƷğƩǤ{ĻǞĻƩCǒƓķ
tƩƚƆĻĭƷĻķ/ğƭŷ\[ĻǝĻƌƭ
ЋЉЊАЋЉЋЊ/ğƦźƷğƌLƒƦƩƚǝĻƒĻƓƷtƩƚŭƩğƒ
/źƷǤƚŅ{ŷğƉƚƦĻĻͲaźƓƓĻƭƚƷğ
ВͲЉЉЉͲЉЉЉ
БͲЉЉЉͲЉЉЉ
АͲЉЉЉͲЉЉЉ
ЏͲЉЉЉͲЉЉЉ
ЎͲЉЉЉͲЉЉЉ
ЍͲЉЉЉͲЉЉЉ
ЌͲЉЉЉͲЉЉЉ
ЋͲЉЉЉͲЉЉЉ
ЊͲЉЉЉͲЉЉЉ
ЋЉЊАЋЉЊБЋЉЊВЋЉЋЉЋЉЋЊ
υЉ͵ЎЉCƌğƷυЉ͵ЎЉCƌğƷυЉ͵ЎЉCƌğƷυЉ͵ЎЉCƌğƷυЉ͵ЎЉCƌğƷ
БіğƩźğĬƌĻБіğƩźğĬƌĻБіğƩźğĬƌĻЎ͵ЋЎіğƩźğĬƌĻЎ͵ЋЎіğƩźğĬƌĻ
ƚƷğƌƩĻǝĻƓǒĻƚƷğƌ9ǣƦĻƓƭĻƭ9ƭƷźƒğƷĻķbĻƷtƚƭźƷźƚƓğƭƚŅ5ĻĭĻƒĬĻƩЌЊ
CƌƚǞwĻǝĻƓǒĻǝƭƩĻğƷƒĻƓƷ/ƚƭƷƭ
ЋЉЊЎЋЉЋЉ
/źƷǤƚŅ{ŷğƉƚƦĻĻͲaźƓƓĻƭƚƷğ
ЌͲЎЉЉͲЉЉЉ
ЌͲЉЉЉͲЉЉЉ
ЋͲЎЉЉͲЉЉЉ
ЋͲЉЉЉͲЉЉЉ
ЊͲЎЉЉͲЉЉЉ
ЊͲЉЉЉͲЉЉЉ
ЎЉЉͲЉЉЉ
ЋЉЊАЋЉЊБЋЉЊВЋЉЋЉЋЉЋЊ
wĻǝĻƓǒĻƭʹCƌƚǞĭŷğƩŭĻƭ9ǣƦĻƓƭĻƭʹƩĻğƷƒĻƓƷ/ƚƭƷƭ
CƌğƷCĻĻwĻǝĻƓǒĻǝƭ9ǣƦĻƓƭĻƭΛƌĻƭƭƒƷ/ƚƭƷƭΜ
ЋЉЊЎЋЉЋЉ
/źƷǤƚŅ{ŷğƉƚƦĻĻͲaźƓƓĻƭƚƷğ
ЌͲЎЉЉͲЉЉЉ
ЌͲЉЉЉͲЉЉЉ
ЋͲЎЉЉͲЉЉЉ
ЋͲЉЉЉͲЉЉЉ
ЊͲЎЉЉͲЉЉЉ
ЊͲЉЉЉͲЉЉЉ
ЎЉЉͲЉЉЉ
ЋЉЊАЋЉЊБЋЉЊВЋЉЋЉЋЉЋЊ
aƚƓƷŷƌǤCƌğƷCĻĻ9ǣƦĻƓƭĻƭƌĻƭƭ
ƩĻğƷƒĻƓƷ/ƚƭƷƭ
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneySanitary SewerL-16 Improvements$75,000.00
A. Expenditure Items:20172018201920202021
Land & ROW
Construction60,000
Improvements
Engineering/Admin.15,000
Total-75,000---
B.SFunding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base75,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total- 75,000 - - -
Description:
Demolition of old L-16 building.
Justification:
Other Comments:
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneySanitary SewerTrunk Sewer Extensions$1,010,000.00
A. Expenditure Items:20172018201920202021
Land & ROW
Construction520,000150,000120,000120,000100,000
Improvements
Engineering/Admin.
Total520,000150,000120,000120,000100,000
B.SFunding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk520,000 150,000 120,000 120,000 100,000
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total520,000 150,000 120,000 120,000 100,000
Description:
Extension of trunk sewer through development. As certain areas within the City
develop trunk sanitary sewer will need to be extended.
Justification:
Sewer extension is part of City's sanitary sewer plan and is needed in order for
area to develop.
Other Comments:
Sewer will be extended as area develops. MCES MAY REQUIRE TRUNK
COST REIMBURESEMENT FOR ADDITIONAL FLOW AS PER
SHAKOPEE/CHASKA INTERCEPTOR COST SHARING AGREEMENT.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneySanitary SewerService Replacement$2,250,000.00
A. Expenditure Items:20172018201920202021
Land & ROW
Construction625,000625,000625,000
Improvements
Engineering/Admin.125,000125,000125,000
Total-750,000750,000750,000-
B.Funding Source:
S
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base750,000 750,000 750,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total- 750,000 750,000 750,000 -
Description:
Replace or line services located on mains that have been lined.
Justification:
To date, there are 750 services connected to sewer mains that have been lined.
Many of the sewer service pipes are over 40 years old.
Other Comments:
Lining of service pipes will be from the main to appoximately the right of way
lines.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneySanitary SewerCSAH 18 Sewer Extension$750,000.00
A. Expenditure Items:20172018201920202021
Land & ROW
Construction600,000
Improvements
Engineering/Admin.150,000
Total750,000---
B.SFunding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk750,000
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total750,000 - - -
Description:
Extend sanitary sewer to serve the Whispering Oaks development.
Justification:
To eliminate the existing lift station and eliminate flow into the Savage sewer
system. Savage Agreement needs to be revised.
Other Comments:
Need to coordinate with SPUC's booster station to serve area with Shakopee's
water. Also need County approval for installing line in County Highway 18 right-of-
way. Another alternate route is through Muhlenhardt Road and Horizon Drive.
Sewer study of area is recommended.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneySanitary SewerUtility Extension to Maras St. & $2,710,000.00
Hanson Ave.
A. Expenditure Items:20172018201920202021
Land & ROW
Construction2,210,000
Improvements
Engineering/Admin.500,000
Total--2,710,000--
B.SFunding Source:
General Fund
Capital Improvement Fund920,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments1,740,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base50,000
Storm Drainage Fund-Trunk
Tax Levy
Total- - 2,710,000 - -
Description:
Extension of sanitary sewer and water service to the properties adjacent to
Maras St. and Hanson Avenue. A majority of the properties will require sanitary
sewer grinder pumps.
Justification:
Other Comments:
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneySanitary SewerSCADA System Upgrades$125,000.00
A. Expenditure Items:20172018201920202021
Land & ROW
Construction
Improvements105,000
Engineering/Admin.20,000
Total-125,000--
B.SFunding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base125,000
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total- 125,000 - -
Description:
To improve the reliability and performance of supervisory control and data
acquisition (SCADA) system for major lift stations.
Justification:
The need for better reliability and data for major lift stations would reuire an
upgrade system and use of fiber.
Other Comments:
Fiber is nearby both L-16 and Southbridge lift stations.
Operating Costs:
Operating Budget
201 Annual Budget
Surface Water Fund
Descrition of Services:
p
The Public Works Department operates and maintains the surface water system for the City of Shakopee which includes 109
miles of storm sewer and 196 ponds. Participate in erosion control projects and implementation of the City’s Water Resource
Mana
gement Plan.
Goals:
To provide to protect, enhance, and restore water quality.
1.
Plan for annual erosion control and related maintenance of the Pond systems
2.
Prepare for needed wetland enhancement projects
3.
4.
Address issues as the community infrastructure ages
Surface Water Fund
Projected Unrestricted Net Position
2017-2021 Capital Improvement Program
City of Shakopee, Minnesota
20172018201920202021
Unrestricted Net Position January 112,605,79011,530,99010,922,89010,845,6909,977,290
Revenues:
User Fees1,034,8001,086,5001,108,2001,163,6001,186,900
Trunk Charges100,000100,000100,000100,000100,000
Interest100,000100,000100,000100,000100,000
Total Revenue1,234,8001,286,5001,308,2001,363,6001,386,900
Expenses:
Operation Expenses834,600859,600885,400912,000939,400
Capital Equipment50,00050,00050,00050,00050,000
Transfer to General Fund125,000125,000125,000125,000125,000
Transfer to City Hall Capital Project Fund500,000-
- - -
Projects:
Annual Erosion Control/Pond Cleaning125,000125,000125,000125,000125,000
PLSL Channel Improvement100,000100,000
- - -
Blue Lake Channel Improvements- 100,000-
- -
Blue Lake Channel Cooperative 100,000-
- - -
West End300,000
- - - -
CSAH 15 Ditch Improvements85,000
- - - -
Transfer to Capital Imp. Fund for projects 535,000190,000 100,000 1,020,000 50,000
Total Expense2,309,600 1,894,600 1,385,400 2,232,000 1,289,400
Excess (Deficiency)(1,074,800) (608,100) (77,200) (868,400) 97,500
CashBalance December 31$11,530,990$10,922,890$10,845,690$9,977,290$ 10,074,790
Accumulated Depreciation
$13,097,492$13,889,011$14,688,444$15,495,873$ 16,311,375
88%79%74%64%62%
{ǒƩŅğĭĻğƷĻƩCǒƓķ
tƩƚƆĻĭƷĻķ/ğƭŷ\[ĻǝĻƌƭ
ЋЉЊАЋЉЋЊ/ğƦźƷğƌLƒƦƩƚǝĻƒĻƓƷtƩƚŭƩğƒ
/źƷǤƚŅ{ŷğƉƚƦĻĻͲaźƓƓĻƚƭƷğ
ЊЋͲЉЉЉͲЉЉЉ
ЊЉͲЉЉЉͲЉЉЉ
БͲЉЉЉͲЉЉЉ
ЏͲЉЉЉͲЉЉЉ
ЍͲЉЉЉͲЉЉЉ
ЋͲЉЉЉͲЉЉЉ
ЋЉЊАЋЉЊБЋЉЊВЋЉЋЉЋЉЋЊ
ЉіЌ͵ЎіЌ͵ЎіЌ͵ЎіЌ͵Ўі
ƚƷğƌwĻǝĻƓǒĻƚƷğƌ9ǣƦĻƓƭĻ/ğƭŷʹ.ğƌğƓĭĻЊЋΉЌЊ
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStorm DrainageAnnual Erosion Control and Pond $750,000.00
Cleaning
A. Expenditure Items:20172018201920202021
Land & ROW
Construction125,000125,000125,000125,000125,000
Improvements
Engineering/Admin.25,00025,00025,00025,00025,000
Total150,000150,000150,000150,000150,000
B.SFunding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base150,000 150,000 150,000 150,000 150,000
Storm Drainage Fund-Trunk
Tax Levy
Total150,000 150,000 150,000 150,000 150,000
Description:
Annual Erosion Control Project and/or annual pond cleaning project.
Justification:
Areas may need to be fixed to meet NPDES requirements. Ponds may need to
be cleaned to meet NPDES requirements.
Other Comments:
The storm sewer outfalls and ponds must be inspected prior to determining a
project area.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStorm DrainagePLSL Channel Improvements$200,000.00
A. Expenditure Items:20172018201920202021
Land & ROW
Construction90,00090,000
Improvements
Engineering/Admin.10,00010,000
Total100,000100,000---
B.SFunding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk100,000100,000
Tax Levy
Total100,000100,000---
Description:
Additional capacity and control structures in the Prior Lake/Spring Lake Channel
to handle increased run-off due to development.
Justification:
Existing agreement with Prior Lake/Spring Lake Watershed District (PLSLWD)
requires the City to maintain the channel upon the City utilizing the channel for
urban development. Increased runoff from development will require a larger
channel.
Other Comments:
This segment will be upgraded when the property develops.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStorm DrainageConstruction of Pollution Prevention $2,000,000
Devices
A. Expenditure Items:20172018201920202021FUTURE
Land & ROW
Construction1,800,000
Improvements
Engineering/Admin.200,000
Total-----2,000,000
B.SFunding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base2,000,000
Storm Drainage Fund-Trunk
Tax Levy
Total- - - - - 2,000,000
Description:
Future water quality treatment project. Dependent on future requirements.
Potential locations include Market Street, County Road 17, Fuller Street and
Adams Street.
Justification:
This may be mandated in the future.
Other Comments:
MPCA & EPA Standards requiring additional Pollution Prevention devices has
not been mandated.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStorm DrainageBlue Lake Channel Regional Storm $100,000.00
Pond
A. Expenditure Items:20172018201920202021
Land & ROW
Construction
Improvements
Engineering/Admin.
Total100,000
B.SFunding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total100,000
Description:
Regional ponding of storm water, west of CSAH 83 to control storm water rate
and quality.
Justification:
Management of storm water in this area is necessary to prevent flooding and
management of water from areas south of the pond.
Other Comments:
Construction of ponding would be done with development.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStorm DrainageBlue Lake Channel Cooperative $100,000.00
Regional Storm Pond
A. Expenditure Items:20172018201920202021
Land & ROW
Construction
Improvements
Engineering/Admin.
Total100,000
B.SFunding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total100,000
Description:
To construct a Joint Regional Pond with the SMSC on the Blue Lake Channel
prior to outletting to the Prior Lake Channel.
Justification:
Control of storm water by ponding and infiltration prior to the Prior Lake Channel
is good management of storm water.
Other Comments:
Joint Powers Agreement with the SMSC would be necessary on this joint
venture.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStorm DrainageWest End Regional Pond & Trunk $300,000.00
Oversizing
A. Expenditure Items:20172018201920202021
Land & ROW
Construction240,000
Improvements
Engineering/Admin.60,000
Total300,000
B.SFunding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk300,000
Tax Levy
Total300,000
Description:
Additional capacity of ponding and better rate control of drainage entering into
the Upper Valley Drainage system.
Justification:
Contol of water rates are important to manage the system and reducing the
potential of flooding downstream.
Other Comments:
The oversizing of ponds and pipes will be coordinated with development.
Operating Costs:
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyStorm DrainageCSAH 15 Ditch Improvements$85,000.00
A. Expenditure Items:20172018201920202021
Land & ROW
Construction70,000
Improvements
Engineering/Admin.15,000
Total85,000
B.SFunding Source:
General Fund
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total85,000
Description:
To remove ditch on the west side of CR 15 to facilitate the placement of trail.
Justification:
Ditch will not be necessary upon development and storm sewer will allow for curb
& gutter and trail placement.
Other Comments:
Coordination with MnDOT and approval of CH 15 Turnback Agreement is
needed.
Operating Costs:
201 Annual Budget Operating Budget
Equipment Internal Service Fund
Description of Service:
This fund finances the multi-year Equipment Plan. Financing to purchase equipment is provided
by "rent" payments from the operating departments at rates established annually by the Finance
Department as part of the budget process. Equipment for the Sewer and Storm Drainage enterprise
funds is not included. The Equipment Fund shall "own" and acquire larger pieces of equipment
including but not limited to cars, trucks, graders, loaders, tractors and larger mowers or items
generally costing $20,000 or more.
Establishment:
The Equipment Fund was established by Resolution #4077 in 1994.
Goals:
1.To segregate funds for the acquisition of equipment to avoid budget problems caused by
large purchases in a single year.
Business Unit:
7800 – Equipment I.S. Fund
2017 Annual Budget
Equipment Internal Service Fund
201620162017
20142015OriginalFinalProposed
ActualActualBudgetBudgetBudget
Sources
Miscellaneous
Rentals701,338$ 464,384$ 612,868$ 612,868$ 861,100$
Sale of Assets- 85,405 - - -
Interest134,904 63,778 10,000 10,000 10,000
Note repaid95,000 - - - -
Total Revenue931,242 613,567 622,868 622,868 871,100
Uses
Capital Equipment621,163 2,190,829 1,243,000 1,243,000 1,109,500
Net
$ (1,577,262)310,079$ (620,132)$ (620,132)$ (238,400)$
Cash Balance December 317,464,033$ 4,900,827$ 4,280,695$ 4,280,695$ 4,042,295$
Equipment Replacement
Projected Fund Levels
2017-2026 Capital Improvement Program
City of Shakopee, Minnesota
SOURCES2017201820192020202120222023202420252026
Miscellaneous
950,724 969,738 989,133 1,008,916 1,029,094
Rentals 861,100 878,322 895,888 913,806 932,082
Sale of Assets
Interest 10,000 10,000 10,000 10,000 10,000
1 0,000 10,000 1 0,000 1 0,000 1 0,000
960,724 979,738 999,133 1,018,916 1,039,094
Total Revenue 871,100 888,322 905,888 923,806 942,082
EXPENDITURES:
Uses
Capital Equipment 1,230,750 509,000 783,750 1,729,000 2,286,750
1,109,500 1,504,750 778,000 778,000 1,162,000
1,230,750 509,000 783,750 1,729,000 2,286,750
Total Expenditures 1,109,500 1,504,750 778,000 778,000 1,162,000
EXCESS (DEFICIENCY OF
SOURCES OVER USES)
Cash Balance January 1 3,479,644 3,209,618 3,680,356 3,895,740 3,185,656
4 ,280,695 4 ,042,295 3 ,425,867 3,553,755 3 ,699,562
Balance 12/31$4,042,295$ 3,209,618$ 3,680,356$ 3,895,740$ 3,185,656$ 1,938,000
$ 3,425,867$ 3,553,755$ 3,699,562$ 3,479,644
CITY OF SHAKOPEE
Budget 2017 | 10-Year Equipment Projection
2017201820192020202120222023202420252026
EQUIPMENT FUND
Police
Patrol - Marked255,000260,000159,000216,000270,000275,000163,000
245,000 100,000 150,000
Patrol - Unmarked/Administrative72,00038,00039,000
Patrol - Sargeants 4x4 53,00058,000
48,000
Utility Vehicle Pickup Truck45,000
Fire
Pumper Truck1,200,000700,000
Rescue Truck380,000900,000
Truck - Telesquirt1,000,000
Truck - 1-Ton 4x4 With Grass Pak100,000
Chief's Vehicle120,00048,000
46,000
Fire Inspector Vehicle43,000
All-Terrain Vehicle/Grass Pak40,000
Building Inspection
Inspection Vehicle30,00031,00035,000
Facilities
Truck - Pickup 4x4 w/Plow, Lift Gate50,000
Scissor Lift
15,000
Truck - Pickup 60,000
Engineering
Truck - Pickup 4x4 37,00039,00080,000
Natural Resources
Truck - Pickup 4x4 35,000
Street Maint
Loader220,000225,000
Truck - Single Axle Dump530,000540,000
250,000 520,000
Truck - Pickup39,00040,000
Truck - Pickup 4x4 w/Plow45,000
43,000
Skidsteer Loader4,500
4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500 4,500
Sign Truck70,000
Park Maint
Large Mower155,000160,000165,000
150,000
Pickup Truck 4x4 w/Plow47,00048,000
Pickup 4x4 1.5T w/Box Hoist Plow78,000
44,000
Bucket Truck120,000
Tractors19,5007,50019,5007,50019,5007,50019,500
7,500 19,500 7,500
Skidsteer Loaders (2)9,0009,0009,0009,0009,0009,0009,000
9,000 9,000 9,000
Pickup 2x4 1.5T
50,000
Small Mowers (3)21,75021,75021,75021,750
21,750
Stump Grinder
10,000
Enclosed Trailer
20,000
Rotary Blade Grinder
12,500
V-Plow
7,000
Ice Resurfacer 3pt.
15,000
Pickup Truck40,00060,000
Hook Truck w/Equip
240,000
Recreation
Minivan30,000
Pickup Truck w/Plow/Lift51,000
Ice Resurfacer
130,000
1,109,5001,504,750 778,000 509,0002,286,750
Total Governmental Funds
778,0001,162,000 1,230,750 783,7501,729,000
9ƨǒźƦƒĻƓƷLƓƷĻƩƓğƌ{ĻƩǝźĭĻCǒƓķ
ЍͲЎЉЉͲЉЉЉ
ЍͲЉЉЉͲЉЉЉ
ЌͲЎЉЉͲЉЉЉ
ЌͲЉЉЉͲЉЉЉ
ЋͲЎЉЉͲЉЉЉ
ЋͲЉЉЉͲЉЉЉ
ЊͲЎЉЉͲЉЉЉ
ЊͲЉЉЉͲЉЉЉ
ЎЉЉͲЉЉЉ
ЋЉЊАЋЉЊБЋЉЊВЋЉЋЉЋЉЋЊЋЉЋЋЋЉЋЌЋЉЋЍЋЉЋЎЋЉЋЏЋЉЋАЋЉЋБЋЉЋВЋЉЌЉЋЉЌЊЋЉЌЋЋЉЌЌЋЉЌЍЋЉЌЎЋЉЌЏЋЉЌА
9ǣƦĻƓķźƷǒƩĻƭwĻƨǒĻƭƷĻķwĻƓƷwĻǝĻƓǒĻ/ğƭŷ.ğƌğƓĭĻğƷwĻƨǒĻƭƷĻķwĻƓƷwğƷĻ/ğƭŷ.ğƌğƓĭĻğƷ/ǒƩƩĻƓƷwğƷĻ/ǒƩƩĻƓƷwĻƓƷwĻǝĻƓǒĻ
201 Annual Budget Operating Budget
Park and Recreation Asset Internal Service Fund
Descriptionof Service:
This fund finances the replacementof park assets. Financing toaccomplish this
is provided by"rental" paymentsfrom the parkmaintenance division at rates
established annually bythe FinanceDepartmentas part of thebudget process.
Establishment:
The fund was established in 2007.
Goals:
1.To segregate funds relating to parks and recreation assets to avoid budget problems caused
by large purchases in a single year.
Business Unit:
7805 – Park Asset I.S. Fund
2017 Annual Budget
Park and Recreation Asset Internal Service Fund
201620162017
20142015OriginalFinalProposed
ActualActualBudgetBudgetBudget
Sources
Rentals437,064$ 374,660$ 385,900$ 385,900$ 684,200$
Other 26,306 5,000 - - -
Sale of Assets
1,820 4,280 - - -
Interest
37,010 26,248 5,000 5,000 5,000
Donations
- - - 250,000 10,000
Total Revenue
502,200 410,188 390,900 640,900 699,200
Uses
Trail Overlay
- - 65,000 65,000 60,000
Westminster Hockey Rink
- 32,653 - - -
Lions Park Improvements
221,678 12,652 350,000 - -
Lions Park Trail
50,797 - - - -
Lions Park Warming House
- - - 500,000 -
Lions Park Rink
- - - - 180,000
Lions Park Playground Equipment
- - - 400,000 -
Scenic Heights Park Building
- 24,039 - - -
Tahpah Lighting
- 154,697 - - -
Tahpah fence extension
- 162,507 - - -
Field 8 Backstop and Fence--
20,000 20,000 -
Memorial Park Bridge
- - 300,000 375,000 -
Schleper Stadium- Scoreboard
1,194 - - - -
Schleper Field Stadium Seating
26,250 - - - -
Schleper field lights/roof
- 284,980 - - -
Schleper Painting
- - - - 125,000
Gazebo Levy Drive
- - - - 20,000
Community Center Parking Lot
- - - - 200,000
Community Center Bathroom Counters
- - - - 100,000
Community Center Curbing
20,903 - - - -
Community Center Lift Replacement
34,692 - - - -
Community Center Study
- 40,650 - - -
e
Community Center Basketball Hoop Replac
- - 50,000 50,000 -
Community Center Locker Replacement
- - 105,000 105,000 -
Backstops
- - - - 30,000
SV- Pool Slide
22,491 - - - -
SV- Pool Diving Well
- - - - 35,000
SV- Pool Slide Pump
- - 15,000 - -
Skate Park Relocation
- - - 200,000 -
Playground Equipment
- - 75,000 75,000 50,000
Riverview Fence
- - 25,000 25,000 -
Maps
- 453 - - -
Total Expenditures 1,005,000 1,815,000
378,005 712,630 800,000
Excess (deficiency) of
Sources over Uses
$ 124,195$ (302,442)$ (614,100)$ (1,174,100)$ (100,800)
Transfer In
210,000 - - - -
Net
$ 334,195$ (302,442)$ (614,100)$ (1,174,100)$ (100,800)
Cash Balance December 31$ 2,290,580$ 2,081,738$ 1,467,638$ 907,638$ 806,838
2017 Annual Budget
Park and Recreation Asset Internal Service Fund
2017 - 2021 Capital Improvement Program
20172018201920202021
Revenues:
Rent from Park Maintenance$ 372,000$ 372,000$ 372,000$ 372,000$ 372,000
Rent from Building (CC, IA and SV) 312,200 364,100 364,100 364,100 364,100
Interest
5,000 5,000 5,000 5,000 5,000
Donation
10,000 20,000 10,000 10,000 10,000
Total Revenue
699,200 761,100 751,100 751,100 751,100
Expenditures:
Recreation Facility Projects:
CC Basketball Hoop Replacement
- - - - -
CC Boiler Replacment
- - - 100,000 -
CC Parking Lot
200,000 - - - -
CC Bathroom Counters
100,000 - - - -
SV Main Pool Pump
- - 20,000 - -
SV Small Drop Slide
- - 15,000 - -
SV Pool Filter Replacement
- - - 50,000 -
SV Pool Diving Well
35,000 - - - -
SV Pool Slide Pump
- - - - 15,000
Total Recreation Facility Projects 335,000 - 35,000 150,000 15,000
Park Facility Projects:
Trail Overlay 65,000--
60,000 60,000
Playground Equipment 50,000
75,000 - - -
Playground Equipment (Holmes)
- - 80,000 - -
Playground Equipment (Hiawatha)
- - - 80,000 -
Playground Equipment (Huber Park)
- - - - 150,000
Benches
- 20,000 - - -
Fence Replacement
- 15,000 - - -
Field 8 Backstop & Fence
- - - - -
Gazebo Levy Drive
20,000 - - - -
Lions Park Parking Lot
- - - 100,000 -
Lions Park Playground Equipment
- - - - -
Lion's Park Rink
180,000 - - - -
YB Interior Chinking
- 50,000 - - -
Scenic Heights Rink
- 30,000 - - -
Backstops
30,000 - - - -
Bleachers
- 15,000 - - -
Schleper Painting
125,000 - - - -
Memorial Park Bridge---
- -
Memorial Park Bathroom Replace
- - 250,000 - -
Memorial Park Trails
- - - 125,000 -
Memorial Park Parking Lot
- - 100,000 - -
Riverview fence
- - - - -
Skate Park Ramps
- - - - -
Skate Park Relocation
- - - - -
Total Park Facility Projects
465,000 265,000 495,000 305,000 150,000
Total Expenditures
800,000 265,000 530,000 455,000 165,000
Excess (Deficiency) (100,800)
496,100 221,100 296,100 586,100
Cash Balance January 1
907,638 806,838 1,302,938 1,524,038 1,820,138
Cash Balance 12/31
806,838 1,302,938 1,524,038 1,820,138 2,406,238
201Annual Budget Operating Budget
Governmental Building Asset Internal Service Fund
Description of Service:
This fund finances the future purchase, major reconstruction, and additions to City owned
buildings including City Hall, Library, Public Works, Police, and Fire Stations. Financing to
accomplish this is provided by "rental" payments from the operating departments at rates
established annually by the Finance Department as part of the budget process. The Building Fund
shall "own" and acquire these buildings.
Establishment:
Council established the Building Fund in 1998. The scope of the fund was expanded in 2000 to
include major repairs defined as those without which the building would be unusable for its
intended purpose. It was further expanded in 2008 to include energy savings or green initiatives
such as lighting upgrades, boiler modifications, etc..
Goals:
1.To segregate funds for the acquisition of buildings to avoid budget problems caused by
large purchases in a single year.
Business Unit:
7810 – Building I.S. Fund
2017 Annual Budget
Governmental Building Asset Internal Service Fund
201620162017
20142015OriginalFinalProposed
ActualBudgetBudgetBudget
Actual
Sources
Miscellaneous
Rentals635,815$ 517,910$ 533,450$ 533,450$ 610,200$
10,000 10,000 10,000
Interest 106,253 72,654
Miscellaneous
911 654 - - -
Gain (loss) on asset disposal
- - - - -
Total Revenue 543,450 543,450 620,200
742,979 591,218
Uses
Capital Construction
Library Exterior Restoration
- 90,900 - - -
Engineering Building Roof
- - - -600,000
Engineering Building Lighting
64,283 - - - -
Public Works Building Roof
- - - - -
Public Works Storage Shed
- 110,661 - - -
Fire Station 1 Parking Lot
- - - -160,000
Fire Station 1 Carpet
23,143 - - - -
Fire Station 1 Curb and Grading
15,712 - - - -
Fire Station 1 Vierling East Roof
- - - - -
Fire Station 1 Rooftop Unit 150,000
- -150,000 -
Fire Station 2 Concrete Pavement
- 79,820 - - -
Fire Station 2 Roof 32,515---
-
City Hall Electrical Panels
5,982 - - - -
City Hall Study
13,555 7,165 - - -
City Hall Roof
- - - - -
City Hall Condenser Unit
- -50,000 - -
Building Furnishings
34,595 5,700 - - -
Total Expenditures 200,000 150,000 760,000
157,270 326,761
Excess (deficiency) of
Sources over Uses
343,450 393,450 (139,800)
585,709 264,457
Interfund Loan (500,000) 50,000 50,000 50,000
50,000
Transfer Out City Hall Construction (120,000)
- - -(2,040,000)
Transfer Out Debt Service (465,000) (466,680) (466,680) (346,680) (340,000)
Net
$ (379,291)$ (152,223)$ (1,943,230)(73,230)$$ (549,800)
Cash Balance December 31$ 5,850,245$ 5,701,935$ 5,628,705$ 3,758,705$ 3,208,905
2017 Annual Budget
Governmental Building Asset Internal Service Fund
2017 - 2026 Capital Improvement Program
Year/Serv.2017201820192020202120222023202420252026
Police Station-2003
Roof (Built-up)$ 50,000-$$-$-$-$-$-$-$-
$ -
Rooftop Sallyport unit----- 50,000---
-
IT equipment rm. AC unit------ 75,000--
-
Boilers (3) 80,000--------
-
Fire Station 1-Vierling East-1998
Roof (Ballasted Membrane)---- 200,000----
-
Boilers (3) 130,000--------
-
Parking Lot160,000--------
-
AC condenser unit 100,000--------
-
Fire Station 2-Vierling West-2012
2 Rooftop units---- 225,000----
-
Engineering Bldg-1974
Roof600,000--------
-
Small Rooftop Unit (Southeast)------ 55,000--
-
Large Rooftop Unit (Northeast)------- 150,000-
-
PW Building-2006
Roof--- 800,000-----
-
4 Rooftop Units--- 450,000-----
-
Boilers (2)--- 100,000-----
-
Library-2003
Roof----- 500,000---
-
Grand total by Year$760,000$360,000$-$ 1,350,000-$$425,000$550,000$130,000$150,000
$ -
Cash Balance, January 13,758,7053,208,9053,059,1053,269,3053,479,5052,339,7052,124,9051,785,1051,865,3052,215,505
Cash Balance, December 313,208,9053,059,1053,269,3053,479,5052,339,7052,124,9051,785,1051,865,3052,215,505
2,835,705
City of Shakopee Capital Improvement Program 2017-2021
Project Manager:Project Type:Project Title:Total Project Cost:
Bruce LoneyBuildingFire Station No. 1-back parking lot $160,000
repaving
A. Expenditure Items:20172018201920202021
Land & ROW
Construction150,000
Improvements
Engineering/Admin.10,000
Total160,000----
B.SFunding Source:
General Fund (Building)160,000
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total160,000 - - - -
Description:
Rehabilitation of Fire Station No. 1 rear parking lot.
Justification:
Pavement is failing and not supporting weight of fire trucks.
Other Comments:
Front Parking lot was done previously and as concrete pavement.
Operating Costs:
OUNTY
CARVER C
TT
SCO
Y
COUNT
2018 L-16 Improvements
BLUE LAKE
101
VANAUGH
CA
DR
2019 Street
Reconstruction
FISHER LAKE
17
4TH AVE
4TH AVE
2020 Bituminous
2017 Lewis Street
2017 Bituminous
Overlay
69 Parking Lot and Alley
Overlay2017 Bituminous
83
UV
Overlay
2018 Bituminous
INEWOOD DR
YP
GREENWA 101
169
Overlay
P
ARK
WAYTIMOTHY
CT
2021 Bituminous
PQ
EASTWAY AVE
Overlay
ALYSHEBA
CT
2018 Bituminous
2019 Street
2020 Bituminous
Overlay
Reconstruction Z
Overlay
2A
2A
2018 Street X
WY
2B
2B
Reconstruction
2C
SHAKOPEE AVE 2017 Street
Reconstruction
JEFFERY
P
LAC INNOVATION
17 E
ALLEN DR
2018 Bituminous
10TH AVE
Overlay
10TH AVE10TH AVE
11TH AVE
10TH AVE
2020 12th Avenue &
14 2021 Street
15
CSAH 83 Improvements
Reconstruction
2
THOM
11TH AVEAS AVE
11TH AVE11TH AVE
11TH AVE
2018 Bituminous 4
DAVIS CT
GOL
ST15
Overlay 10 2017 Bituminous
12TH
HENNES AVEAUSTIN ST
AVE
12TH
Overlay
8PRAIRIE12TH
AVE
AVE
2020 T.H. 169
MENKE
MEN
KE
2019 12th Avenue Trail
LARKSPUR
CIR 2019 Bituminous
CT Pedestrian Bridge
2017 Street 16
AVECT
CT
Construction
CR 79 Pedestrian
9 Overlay
Construction
MURPHY DR
Underpass
169
12TH AVE7ONYX
5
R
13TH AVE
GRANITE
DR
PRER
CIBERWICK
DAL
DAKOTA
SWAKEFIELDCIR
EDINGTON
2018 Bituminous
MINT CIRCIR2D
2021 Bituminous
CIR
CIR
2FGR
CIDER
Overlay APPLEWOOD
CIR11132G Overlay
T
3B
CIR12
WAY
FIRESIDE
PARKVIEW
SAGE
I
LOV
3WATERFORD
CT
NG
CTCT
13TH AVECT
DRWINDSOR
DR N
ABLU
LESTN3C
EM
LILAC 2019 Bituminous
CCN
AVEDLADCIR
MCT
2019 Sanitary Sewer and
CT 169
DASHTON
HAR
ORC
MND Overlay
69 MOUAN
DE
2020 Bituminous2019 Bituminous 3D
F1 Water Service Extension
KWY
P
NJUNIPER
DR
OverlayOverlay
N 21
Trunk Sewer Extension West of EBUR
HBRACTASHBOURNE
I 2021 Bituminous
SNCIR
AD 2019 Savanna Oaks Park
ST
FDR
CSAH 15 O
ST Overlay
to Southbridge Parkway Trail SUSSEXAVE
NE
I
CT
G CR 15 Interchange RD
HAN
HCA
RRIAGE
83 N.
OSSUM
APPLEBL6
& Trail Improvements CT
CHARTREUX
NLNBLVDS
169 G
AVESUSSEXROV
E
W.BERKSHIRE
22002211 BBiittuummiinnoouuss RE
2020 Bituminous PL
CTHANSEN AVE
169 BULRUSH
DOWNING AVE
OOvveerrllaayy
Overlay
16
WEST EAST 16 CIR
17 2Z
2P2T2XBERK
79 A
DONGOLAPOTTOK2V
17TH AVE E
2019 SCADA System
SHIREOLD
Y
2QKWA
2MCIR
DEAN LAKE CAR
RI
PROVIDENCE DRE
GREENWOOD2R
OXFORD Upgrades for Lift Stations
MORA2RAVEAVE
BKISO2N2N
TOWNSHIP
CT
DEANSPLDS
2SN
2U2WWI
AVE2Y
NN LN
AVE
17TH AVE E17TH AVE E
WHITEHALL
2017 CSAH 15 Ditch 16 PL
2017 West End Regional A
H
16
ARDENNES
17TH AVE ERYMARKTURNBRIDGE
AVE2HROCHELLE
Improvements 2H
CIR 2019 Bituminous
ARABNFARIBAULTIT
Pond & Trunk Oversizing IA
CT
2IE
CURVECT
CTWINDSOR
TURNBRIDGE
2I 2017 Bituminous
NEWPORTAVE Overlay
CIR 18
MONTECITO
2LGROVE PL
16 2J Overlay 21
18TH
FRENCH TRACEAVE EDR
17TH WOOD
AVE E
17TH
ANT O N AVEQUILT
17THJACK RUSSELL
OLIVECT
FOX
AVE
CTANTON
RDRUN
2016 PLSL Channel
ANUBE AVE
D 2020 Bituminous CT
FRANCIS
LIA
CT Improvements LOBE
VIEW Overlay
CUING
BLAZ
LNCROSSINGS
PRESERVE
2017 17th Avenue, from C.R. 15
ST FRANCIS AVEAL
2021 Bituminous BASS
TAR
SCT
CIR
15 CIR
to 1000 feet West
Overlay AND
GROVELA
CIE
RALN
RD
DR
JURA WAY
THRUSHST
VALLEYMOOERS AVE
VIEW
CTHRUSHSTOAKRIDGE TRL
IR 2018 Bituminous
16
OAKRIDGE TRL
KA
WAY
Overlay CT
O
TIFLAWN
CT
HILLWO
ODRIVER
OAKRIDGE
VIOLA
DRDRBLUFF
CIR
LN
CHESTER
CT
77 CT
CT
18
LAHOMA
ALDEN AVE
PAMPASFO
69
CT WILHELM
LAKELN
PLCT
BL
R
NOLLD
K
CLARY
LN
2018 Bituminous
16
JACKSON
TEAL
CT Overlay
WHISUMMERHILL CSAH 16
DRSTCRANE ST
TOWNSHIP CIRCT
2021 Bituminous
DR
Trail Extension
ROCK
WOODWARD AVE
17
RIDGE
CARRIAGE
Overlay
S
2017 CSAH 78/79
CIRCIR
CORTLAND
DANITA
Trail Extension
CIRDR
IRASARUM CT
C
78 DANITA 21
MC
B
22ND AVE S
EL
S
130TMOL
H SINA ST
T W
130TH ST W 78 HOR
MOLINA STIZON
RIDGE
TINTA LN
VALLEY VIEW RD
RIDGE 2017 Sanitary Sewer
CT
Extension
HOR
IZON
CIR
MAPLE RIDGE
DR
MAPLE
ABBEY
2018 Blue Lake Channel
RIDGE
PT
Ì
CT Cooperative Regional Storm Pond
LOUISVILLE
ST
RAVE
D
TOWNSHIP WILDWOOD
VEN 83
ION
DOMIN
CIR
PEACE
LANGSTON
CIR
CT
G
W 18
2019 Blue Lake Channel
17
Regional Storm Pond
PAHA
LN
18
CIR
2019 Bituminous D
79
INGTRL
IOR LAKE
Overlay PR
TR
PRIOR LAKE
WOOD
WOOD DUCK TR
HERON
LONDO
17
15
2020 CSAH 42
Reconstruction
4242
29TH AVE29TH AVE
2017 - 2021 CAPITAL IMPROVEMENT
21
SAKPE DR
LAKE
O'DOWD
PROJECTS MAP
WACIPI DR
N
L
SIOUX TRL
PENINSULA
2017 UTILITY/MISC IMPROVEMENTS
MULBERRY
THOLE LAKE
CIR
2018 UTILITY/MISC IMPROVEMENTS
GRASS
NORTON
DR
2019 UTILITY/MISC IMPROVEMENTS
SYCAMORE
CIR
LN 2020 Bituminous
Reclamation
2020 UTILITY/MISC IMPROVEMENTS
17
2021 UTILITY/MISC IMPROVEMENTS
T E 14
150TH S
35TH AVE
14
2017 STREET IMPROVEMENTS
2018 STREET IMPROVEMENTS
2019 STREET IMPROVEMENTS
SCHNEIDER
LAKE
2020 STREET IMPROVEMENTS
01,4502,900
2021 STREET IMPROVEMENTS
79
Feet
LOUISVILLE
TOWNSHIP
17
2017 Capital Improvement Plan (CIP)
2017CIP
2017 Capital Improvement Plan (CIP)
City maintains roughly 160 miles of streets
Review the projects in the current CIP
Review the ages of existing streets and inspect streets
that are close to an overlay, sealcoat, or reconstruction
based on age
Review the pavement condition rating of each street and
inspect streets that are close to an overlay or
reconstruction based on pavement rating
2017 Capital Improvement Plan (CIP)
Prepare the CIP trying to balance costs
2017 Capital Improvement Plan (CIP)
Review projects in the current CIP
Review televising reports and maintenance records
Review the age of the existing system
Review the need for trunk extensions due to possible
development
2017 Capital Improvement Plan (CIP)
StreetImprovementProjects
2017 Capital Improvement Plan (CIP)
SanitarySewerProjects
CityofShakopeeCapitalImprovementProgram 2017-2021
Project Title:Total Project Cost:
Project Manager: Bruce LoneyProject Type: Sanitary Sewer
Service Replacement$2,250,000.00
A. Expenditure Items:20172018201920202021
Land & ROW625,000625,000625,000
Construction
Improvements
Engineering/Admin.125,000125,000125,000
Total750,000750,000750,000-
B. Funding Source:
General Fund750,000750,000750,000
Capital Improvement Fund Park
Reserve Fund Grants (specify)
Donations (specify) State Aid
Assessments
SanitarySewerFund-Base
SanitarySewerFund-TrunkStorm
DrainageFund-BaseStorm
DrainageFund-TrunkTaxLevy
Total750,000750,000750,000-
Description:
Replace or line services located on mains that have been lined.
Justification:
To date, there are 750 services connected to sewer mains that have been lined.
Many of the sewer service pipes are over 40 years old.
Other Comments:
Lining of service pipes will be from the main to appoximately the right of way lines.
Operating Costs:
CityofShakopeeCapitalImprovementProgram 2017-2021
Project Title:Total Project Cost:
Project Manager: Bruce LoneyProject Type: Sanitary Sewer
CSAH 18 Sewer Extension$750,000.00
A. Expenditure Items:20172018201920202021
Land & ROW Construction
600,000
Improvements Engineering/Admin.
150,000
Total750,000---
B. Funding Source:
General Fund750,000
Capital Improvement Fund Park
Reserve Fund Grants (specify)
Donations (specify) State Aid
Assessments
SanitarySewerFund-Base
SanitarySewerFund-TrunkStorm
DrainageFund-BaseStorm
DrainageFund-TrunkTaxLevy
Total750,000---
Description:
Extend sanitary sewer to serve the Whispering Oaks development.
Justification:
To eliminate the existing lift station and eliminate flow into the Savage sewer system.
Savage Agreement needs to be revised.
Other Comments:
Need to coordinate with SPUC's booster station to serve area with Shakopee's water.
Also need County approval for installing line in County Highway 18 right-of-way.
Another alternate route is through Muhlenhardt Road and Horizon Drive. Sewer study
of area is recommended.
Operating Costs:
CityofShakopeeCapitalImprovementProgram 2017-2021
Project Title:Total Project Cost:
Project Manager: Bruce LoneyProject Type: Sanitary Sewer
Utility Extension to Maras St. &
$2,710,000.00
Hanson Ave.
A. Expenditure Items:20172018201920202021
Land & ROW2,210,000
Construction
Improvements
Engineering/Admin.500,000
Total--2,710,000--
B. Funding Source:
General Fund920,000
Capital Improvement Fund
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments1,740,000
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base50,00
0
Storm Drainage Fund-Trunk
Tax Levy
Total--2,710,000--
Description:
Extension of sanitary sewer and water service to the properties adjacent to Maras St.
and Hanson Avenue. A majority of the properties will require sanitary sewer grinder
pumps.
Justification:
Other Comments:
Operating Costs:
CityofShakopeeCapitalImprovementProgram 2017-2021
Project Title:Total Project Cost:
Project Manager: Bruce LoneyProject Type: Sanitary Sewer
Trunk Sewer Extensions$1,010,000.00
A. Expenditure Items:20172018201920202021
Land & ROW Construction
520,000150,000120,000120,000100,000
Improvements Engineering/Admin.
Total520,000150,000120,000120,000100,000
B. Funding Source:
General Fund520,000150,000120,000120,000100,000
Capital Improvement Fund Park
Reserve Fund Grants (specify)
Donations (specify) State Aid
Assessments
SanitarySewerFund-Base
SanitarySewerFund-TrunkStorm
DrainageFund-BaseStorm
DrainageFund-TrunkTaxLevy
Total520,000150,000120,000120,000100,000
Description:
Extension of trunk sewer through development. As certain areas within the City
develop trunk sanitary sewer will need to be extended.
Justification:
Sewer extension is part of City's sanitary sewer plan and is needed in order for area
to develop.
Other Comments:
Sewer will be extended as area develops. MCES MAY REQUIRE TRUNK COST
REIMBURESEMENT FOR ADDITIONAL FLOW AS PER SHAKOPEE/CHASKA
INTERCEPTOR COST SHARING AGREEMENT.
Operating Costs:
2017 Capital Improvement Plan (CIP)
SurfaceWaterProjects
CityofShakopeeCapitalImprovementProgram 2017-2021
Project Title:Total Project Cost:
Project Manager: Bruce LoneyProject Type: Storm Drainage
West End Regional Pond & Trunk
$300,000.00
Oversizing
A. Expenditure Items:20172018201920202021
Land & ROW Construction
240,000
Improvements Engineering/Admin.
60,000
Total300,000
B. Funding Source:
General Fund300,000
Capital Improvement Fund Park
Reserve Fund Grants (specify)
Donations (specify) State Aid
Assessments
SanitarySewerFund-Base
SanitarySewerFund-TrunkStorm
DrainageFund-BaseStorm
DrainageFund-TrunkTaxLevy
Total300,000
Description:
Additional capacity of ponding and better rate control of drainage entering into the
Upper Valley Drainage system.
Justification:
Contol of water rates are important to manage the system and reducing the potential
of flooding downstream.
Other Comments:
The oversizing of ponds and pipes will be coordinated with development.
Operating Costs:
CityofShakopeeCapitalImprovementProgram 2017-2021
Project Title:Total Project Cost:
Project Manager: Bruce LoneyProject Type: Storm Drainage
Blue Lake Channel Regional Storm
$100,000.00
Pond
A. Expenditure Items:20172018201920202021
Land & ROW Construction
Improvements Engineering/Admin.
Total100,000
B. Funding Source:
General Fund
Capital Improvement Fund Park
Reserve Fund Grants (specify)
Donations (specify) State Aid
Assessments
SanitarySewerFund-Base
SanitarySewerFund-TrunkStorm
DrainageFund-BaseStorm
DrainageFund-TrunkTaxLevy
Total100,000
Description:
Regional ponding of storm water, west of CSAH 83 to control storm water rate and
quality.
Justification:
Management of storm water in this area is necessary to prevent flooding and
management of water from areas south of the pond.
Other Comments:
Construction of ponding would be done with development.
Operating Costs:
CityofShakopeeCapitalImprovementProgram 2017-2021
Project Title:Total Project Cost:
Project Manager: Bruce LoneyProject Type: Storm Drainage
Blue Lake Channel Cooperative
$100,000.00
Regional Storm Pond
A. Expenditure Items:20172018201920202021
Land & ROW Construction
Improvements Engineering/Admin.
Total100,000
B. Funding Source:
General Fund
Capital Improvement Fund Park
Reserve Fund Grants (specify)
Donations (specify) State Aid
Assessments
SanitarySewerFund-Base
SanitarySewerFund-TrunkStorm
DrainageFund-BaseStorm
DrainageFund-TrunkTaxLevy
Total100,000
Description:
To construct a Joint Regional Pond with the SMSC on the Blue Lake Channel prior to
outletting to the Prior Lake Channel.
Justification:
Control of storm water by ponding and infiltration prior to the Prior Lake Channel is
good management of storm water.
Other Comments:
Joint Powers Agreement with the SMSC would be necessary on this joint venture.
Operating Costs:
CityofShakopeeCapitalImprovementProgram 2017-2021
Project Title:Total Project Cost:
Project Manager: Bruce LoneyProject Type: Storm Drainage
CSAH 15 Ditch Improvements$85,000.00
A. Expenditure Items:20172018201920202021
Land & ROW Construction
70,000
Improvements Engineering/Admin.
15,000
Total85,000
B. Funding Source:
General Fund
Capital Improvement Fund Park
Reserve Fund Grants (specify)
Donations (specify) State Aid
Assessments
SanitarySewerFund-Base
SanitarySewerFund-TrunkStorm
DrainageFund-BaseStorm
DrainageFund-TrunkTaxLevy
Total85,000
Description:
To remove ditch on the west side of CR 15 to facilitate the placement of trail.
Justification:
Ditch will not be necessary upon development and storm sewer will allow for curb &
gutter and trail placement.
Other Comments:
Coordination with MnDOT and approval of CH 15 Turnback Agreement is needed.
Operating Costs:
CapitalEquipment
FLEET MANAGEMENT BY SHAKOPEE PUBLIC WORKS DEPARTMENT
2017 BUDGET
2017 Requests
Administration
•
Facility Maintenance
•
Public Works
•
Park Maintenance
•
Sanitary Sewer
•
Storm Drainage
•
Street Maintenance
•
Fire
•
Police
•
Parks and Recreation
•
Ice Arena
•
Administration
Facility Maintenance
Scissor Lift: $15,000
•
Additionto fleet
•
Public Works
Park Maintenance
Hook Truck w/Equipment: $290,000
•
Replace2002 Sterling Hook Truck (#111)
•
Light-Duty Truck 2x4: $50,000
•
Replace2007 F550 2x4 (#145)
•
Retain for seasonal
•
Enclosed Trailer: $20,000
•
Additionto fleet
•
Ice Resurfacer 3pt. Hitch: $15,000
•
Additionto fleet
•
V-Plow for Skid Steer: $7,000
•
Additionto fleet
•
Public Works
Park Maintenance
Stump Grinder: $10,000
•
Additionto fleet
•
Rotary Blade Grinder: $12,500
•
Additionto fleet
•
Tractor: $7,500
•
Replace –Repurchase Agreement2015 JD5085 (#143)
•
Skid Steer Loaders (2): $9,000
•
Replace –Repurchase Agreement2016 Bobcat (#15416 and #17416)
•
Sanitary Sewer
Eductor: $100,000
•
Replace2002 Versa Vac (#140)
•
Public Works
Storm Drainage
All-Terrain Utility Vehicle: $32,000
•
Additionto the fleet
•
Portable Steamer: $15,000
•
Additionto the fleet
•
Jack Hammer: $8,000
•
Additionto the fleet
•
Skid Steer Loader w/Tracks: $5,000
•
Replace –Repurchase Agreement2016 CAT 287D (#16616)
•
Tractor: $7,500
•
Replace –Repurchase Agreement2015 JD5085 (#17215)
•
Public Works
Street Maintenance
Single Axle Dump Truck w/Equipment: $250,000
•
Replace2002 Sterling Dump Truck (#101)
•
Skidsteer Loader: $4,500
•
Replace –Repurchase Agreement2016 Bobcat (#14716)
•
Fire
Chief’s Vehicle: $46,000
Replace2010 Ford Explorer (#9503)
•
Parks and Recreation
Ice Arena
Ice Resurfacer : $130,000
Replace2007 Olympia Ice Resurfacer (#0700)
•
Police
Marked Patrol (4): $196,000
Replace4 purchased in 2013 (#9131, 9132, 9133, 9134)
•
Unmarked Patrol (1): $49,000
Replace1 purchased in 2013 (#9135)
•
10-Year Projection
Click image below to open full document
Projected Fund Levels
Equipment Replacement
Projected Fund Levels
2017-2026 Capital Improvement Program
City of Shakopee, Minnesota
SOURCES2017201820192020202120222023202420252026
Miscellaneous
Rentals878,328895,894913,812932,088950,730969,745989,1401,008,9221,029,1011,049,683
Sale of Assets
Interest10,00010,00010,00010,00010,00010,00010,00010,00010,00010,000
Total Revenue888,328905,894923,812942,088960,730979,745999,1401,018,9221,039,1011,059,683
EXPENDITURES:
Uses
Capital Equipment1,109,5001,504,750778,000778,0001,162,0001,230,750509,000783,7501,729,0002,286,750
Total Expenditures1,109,5001,504,750778,000778,0001,162,0001,230,750509,000783,7501,729,0002,286,750
EXCESS (DEFICIENCY OF
SOURCES OVER USES)
Cash Balance January 14,045,0713,823,8993,225,0433,370,8553,534,9443,333,6743,082,6683,572,8083,807,9813,118,081
Cash Balance December 31$3,823,899$3,225,043$3,370,855$3,534,944$3,333,674$3,082,668$3,572,808$3,807,981$3,118,081$1,891,014