Loading...
HomeMy WebLinkAboutJanuary 08, 2002 TENTATIVE AGENDA ADJ. REG. SESSION SHAKOPEE, MINNESOTA LOCATION: 129 Holmes Street South Mayor William Mars presiding 1] Roll Call at 4:30 p.m. 2] Pledge of Allegiance 3] Approval of Agenda 41 Discussion Items JANUARY 8, 2002 4:30-- Northwest Associated Consultants, Inc. —Downtown/First Avenue Cooridor Special Area Study 5:00- Library Design Presentation— BKV 5:45 - Police Station Design Presentation — BKV 5] Other Business 61 Adjourn to Tuesday, January 15 at 7:00 p.m. Comprehensive Plan Update and Special Area Studies P"A City of Shakopee • -• Current Comprehensive Plan will be reviewed and updated based upon recent development (post 1999), current demographic information and trends. The major focus of the work program will concentrate on 4 specific Area Studies: 1. Downtown 2. 1 'Avenue / Riverfront 3. CSAH 171 Marschall Road Corridor 4. West End - Shopping Center Area Studies will include detailed land use and transportation analysis to develop revitalization plans that address business retention and re- investment, neighborhood vitality, river front redevelopment, land consolidation, historic preservation as well as pedestrian /transportation management. Process and Approach The update of a Comprehensive Plan and development of area studies are, for NAC, a highly individualized process. Each step of the project is determined by the outcomes of the previous steps. However, there is a defined outline to our approach which entails five general phases of work. 1. Issue Identification A. Project initiation meeting with the City Council, Planning Commission, City Boards and Commissions, City staff and consultants. B. Conduct community interviews with business groups, community organizations etc. C. Conduct two general community workshops (one designed for residents; one designed for business owners). D. Four neighborhood open house sessions (one for each of the study areas). E. Preparation of report to the Planning Commission. F. Identification of additional public participation needs. G. Presentation of Issue Identification report to the Planning Commission. Northwest Associated Consultants, Inc. December- 2001 Comprehensive Plan Update and Special Area Studies c, r x City of .Shakopee A. Collect maps, records, and other data available through the City or other sources. B. Work with the City staff and consultants to map the available data to illustrate relationships with other issues. C. Highlight noteworthy issues apparent from the collected Inventory. D. Cross -check the physical Inventory information with issues and information collected at the community workshop and interviews. E. Prepare a summary report with comments on the relevant topic areas raised by the Inventory analysis. F. Meet with the Planning Commission to discuss the Inventory results. G. Finalize the Inventory chapter for inclusion in the Comprehensive Plan. A. Consultant development of goal and issue categories for policy consideration. B. Preparation of Goals and Policies report. C. Meeting with Planning Commission and City Council to review draft Goals and Policies. D. Finalization of Goals and Policies chapter. E. Additional meetings as may be necessary. . Development Framework A. Preparation of concept plan and alternatives, as appropriate. B. Presentation of concept plan and alternatives to the study area neighborhoods /businesses. C. Presentation of concept plans, alternatives and study area recommendations from neighborhoods /businesses to the Planning Commission. D. Development of draft Development Framework chapter utilizing input from the Planning Commission. E. Update and development of sub - chapter plans supporting the land use element (transportation, utilities, community facilities, etc.). F. Presentation of Development Framework to the Planning Commission and City Council. G. Finalization of Development Framework chapter. Northwest Associated Consultants, Inc. December 2001 Comprehensive Plan Update and Special Area Studies zr City of Shakopee 5. Implementation A. Prepare Implementation section. B. Meeting with Planning Commission to discuss Implementation. C. Provide final copy of plan for City approval. D. Conduct open house /public hearings. E. Final City Council approval of the plan. PROJECT SCHEDULE Feb Mar Apr May Jun Jul Aug Sep 2002 2002 2002 2002 2002 2002 2002 2002 Issues F, Identification Y C ..,.:,• ,fir.. ,AZ4, .Y x_0 1. �..�ttl Y Inventory f Policy Planning u { ryx Develo p nt me Ty1 Framework t � ' K�4'�V'Y7 F�T7 Y ImplementationA r .r A Introductory Meetings Project Initiation Conference Planning Commission Meeting/Workshops (with City Council and public invited) Public Hearings * City Council Approval Meetings Scheduled: Park Advisory Board Economic Development Authority Vision Shakopee City Council Environmental Advisory Board Public Utilities Commission Planning Commission December 17, 2001 January 3, 2002 January 8, 2002 January 8, 2002 January 9, 2002 February 4, 2002 February 7, 2002 Northwest Associated Consultants, Inc. December 2001 L/ CITY OF SHAKOPEE Memorandum TO: Mayor and City Council FROM: Mark McNeill, City Administrator SUBJECT: City Facility Funding Update DATE: January 4, 2002 As part of the meeting with the architects to discuss Library and Police design issues on January 8 there will need to be a discussion on funding for the major City projects upcoming in the next five years. The Building Fund was established approximately five years ago as a way of putting money aside to fund a new Library, without having to rely upon referendum approval. As I recall, $1.5 million was earmarked initially, and came from excess revenues resulting from primarily building permit and development fees. The philosophy was that as growth was fueling the need for expanded City facilities, revenues from that growth should help to fund those new facilities. Since the City began to grow significantly in the early 1990's, City facilities have grown as well. The City Hall offices were moved to the current facility in 1993; the Community Center was opened in 1995, and voters approved a new Fire Station in 1997. However, other facilities providing basic services are now in need of replacement or expansion. The Five Year Capital Improvements item identifies several of these, including a new Library, new Police Station, expanded Public Works facility, and the need for more City Hall space. In 2000, a space needs analysis was performed by an architect, who recommended the number of square feet needed for the different facilities over a ten year cycle, and estimated the costs of each. Those estimates were incorporated into individual Five Year Capital Improvements Projects, a summary of which is shown on attachment " As shown, with the exception of three fire station expenditures projected for 2003 -2004 (to be funded through referenda - approved bonds), the City has intended to construct the major facilities through the Building Fund. The Building Fund has been created and increased over the years through annual transfers from "rentals" as shown in operating budget (depreciation on the existing buildings), and also periodic transfers into the Building Fund from excess revenues resulting from either under spending the General Fund budget, or excess revenues, again primarily from development and building permit fees. The previous Council's philosophy was to avoid referenda wherever possible to construct City facilities, in part recognizing the future need of I.S.D. 720 to construct facilities through referenda. However, it has become apparent that the ability to construct all major facilities solely through development fees may be optimistic. Reasons for that include: Reduced development fees as a result of a cooling economy. Increased draws on the fund as a result of major renovations and other expenses — reroofing, ice arena cooling towers, furniture, etc. Concern that the Legislature may limit the development fees that local governments may generate. The previous Council recognized the highest priorities as being a new Library and Police Station, and hired BKV Architects to design both, with the intent that the contract for construction could be let for both. However, it was recognized that that created a cash flow problem. As shown in attachment A, without additional revenues, by the time both the Library and Police Station are finished with construction 2003, there will be a deficit of $1.079 million. That deficit, however, is significantly better than what had been anticipated a few months ago, and before S2.5 million transfer was made by the City Council in December. Note however, that these projections assume a continued annual transfer of $700, 000. If that amount is changed significantly, so too are the balances available. Anticipating that there would be a deficit of some amount, the previous Council directed staff to provide a report on the methods of funding through interfund loans that would allow the construction of these two facilities to take place. Faffl � There are two primary internal funds that could serve as a loan: Santa Sewer Fund — Shown as attachment `B ". This fund has done well. Even with the anticipated expenditures over the next five years, it projects a total balance increasing from $8.9 million as of the end of 2001, to nearly $13.3 million by the end of 2006. This increase was one reason that the Council in December reduced sanitary sewer rates. Therefore, a $1.079 million loan could easily be accommodated by this fund. A recommendation would be to repay this with development/building rental fees over time, with interest. Capital Improvement Fund — The other source of revenues would be from the Capital Improvement Fund (Attachment "C "). The source of funding for this is premature payoffs of assessments, monies leftover after engineering projects are completed, and the like. As of the end of 2001, it had a balance of $4.46 million. It is projected to increase to $5.54 million by the end of 2007. Note that it is used as a primary source of funding for assessments on projects that the City would normally pick up. If the Council chooses to use the Capital Improvements Fund, it would not be necessary to repay this, or if the decision were made to repay the fund, it would not necessarily need to include interest. D N I 10 DIM The Council has directed Councilor Link to continue to negotiate for purchase of the 43- acre parcel of land east of Lake O'Dowd for acquisition as a community park. Those negotiations continue, and if acquisition is made in the $1.0 to $1.3 million range, it would likely come from the Park Reserve Fund. The Park Reserve Fund could pay that off (see exhibit D), but it would mean other park projects would need to be deferred. An alternative to taking it all from the Park Reserve Fund up front would be to take part from the Park Reserve Fund, and the balance as a loan from one of the above listed funds. ,G 0 . I - DPA D 1 f As discussed, both the Library and Police building can be constructed with an interfund loan. However, it does not address how a badly needed Public Works expansion will be able to be constructed in 2005 as currently anticipated. In addition, it also leaves no funding for the new City Hall, currently planned for 2007 at a cost of over $7 million. In addition, there should be some policy discussion by Council as to what should actually qualify for funding by the Building Fund. So that the fund is not tapped for things that might otherwise be defined as operating expenses — arguably such things as carpeting replacement, roof top air compressors, etc, some dollar limit as a threshold for use by the Building Fund should be considered. It should be fairly significant, perhaps $100,000. Exvy ffl f � The purpose of this update is to provide Council with information. If there is a change desired in terms of the direction that funding has been going, Council should so discuss and give direction. 9 'f Mark McNeill City Administrator uM -Ow m X x m '0 < CA CA mmzzZ?i Omm-<Mnmz 0�0 �� z CD m m m —� O CD CD 0 -+ 0' - 0' O � ; O * . w —. X O O` m m m "= m e `G o CD w, 0 o,, C CD Cn 2 Z3 c � vi m M-0 o o °� °� 3 m a o v= C m v v v, x s �' n o `� 0 0 0 a o 0 �. o m m m �' N CD 3 W CD 2 7 = 0 Q � 7 N N O :3 W i CD G O Cn Cn .p W O_ O CD p� GL CD i n Q y O N y co CD l< CD CD c CD .-r. .-� CD `G N 'U O O O G CD C O N N O C7 5 cn co cn CD w 3 o N cn �. 7 cn Efl O .P O V CO W 91 O PP O O O 0 0 0 0 o O O N � O O s N —� O O O O O O O O O O O O O O O o o O O W � O O O P O O O O O O O o o O o cn cn C.) CZ) Ul o cn ° 0 0 O _ O � CD Cyl O O O O ON o O cn N -P co W m 1 co � 4 ? O co C:) 1 cn CD q O v O rn O M O ss O O 'J co w IV co Cl) W O ° W O p P � 8 4 O O 0 co � CD o rn m O -A O ? -I N W P O W A O 4 00 O G CO p : Cn v C.) a, o) cn co w o v o O .P O V CO W 91 O PP O O O 0 0 0 0 o O O N � O O s N —� O O O O O O O O O O O O O O O o o O O W � O O O P O O O O O O O o o O o cn cn C.) CZ) Ul o cn ° 0 0 O _ O � CD Cyl O O O O ON o O cn 4 O o w m cfl co � co N O co C:) 1 O U W O C N O O O O O � O O O 'J co C7i o Cn -P W O ° W O p -4 co N Cl 4 O O O 69 4 -A O ? -I O v U W Cn CO 0 0 cp O G co O O c0 C v v W C O .P O V CO W 91 O PP O O O 0 0 0 0 o O O N � O O s N —� O O O O O O O O O O O O O O O o o O O W � O O O P O O O O O O O o o O o cn cn C.) CZ) Ul o cn ° 0 0 O _ O � CD Cyl O O O O ON N cn O C,) O -P O N O cn CJ) O O O O O O c„ a a ti Q) co C:) O U W O O a O O O O O O N O C,) V O N N O cn CJ) CD O N 4 CD 0 CD CD �o 6s W O m N 0 °00 OoCD ti O CD O co �o mCD co C:) ow w � 0 0 0 v O cn W O ° W N Cl Ul O O A 69 O co O O O O O O co O O O G co O O O CD m O O O v O Ui O O N A N W O N O O O A A � N O O N N n O 0 W + O o O Cf) M n W CD O o 3 c CD -0 Q 7I c CD CD Q CD CD O :3 cn O O CQ v 3 D N O O N N 0 O K O cn O -h n 0 O (n v O O . II) 0 O CD CD w CD c� 0 O =r CD 0 N < O CD tD O cn 3 N �' O fl1 � O C4 3 co 0 o r- c� a) Cn c 0 c m mp z x x n m W m X n z m m -i n n X 0 W X N < < y II) x'o < (n X x '0 3 v `G < pj HT CD 0 CD 7 0 CD = N O > > C C = 7 0 (DD 7 0 CO ; 7 S C1 0 n 0 C1 = - 0 C C a) n N C1 C a) n y C1 n C CD D C W y C 7 CD CD CD DI CD y (D C7 cn CD CU X 0 C 01 CD 0 m m cn x � 2) CO m D c� 0 m 0 m CD ` 0 CD m m CD' w F . Z7 D o o A (D = rm o rt r n CD r ° = C " C) � to - n c � n � S c � o 01 IV N CD N l) cc N . C , CD 3 C4 M c CD C C CD ` F_ m CD m m � W m .6s IV# 4 40 N O W U7 N - co 4 -� W A -i N O W O co N V O lO m N O V O -i O J (P Ut A CD (37 CA O w A O 0 CT 0 ? 0 w 0 O V U7 T A (A J A O O J J O CD O O O W O A C) N O) N O O co w w m O o 0 0 O A O co O C" W O N O U7 O CJt 00 0 0 A O A O O O O O A W O O O N O O O O O O O Ef) 69 fA 1 -0 N C)D U7 U1 W i W IO i W O N O O N N J U7 O to Ut CO (T J O -- to CA O CA O O P -> U7 O] O W O N m CO 0 O V m W it O O J A to O N Cl O O N to CA O O O m w O w W CO O J (o O O m O O O O co V O O O J A to A Cl co O O D. w 0 c 0 w w W O O O co O of 1 -4 fR t!a Hr N to Ut W j W N O CA O w 8 -P CA to N 8 W -� A N � N A N O CD N O= O (b A N N A O O O CA IQ � W N - � O V O co O J O V <O O o y m co Cn tp O J J Cp m V O O O N to O m O N w O V Ut V O (T J U) W W O O O O to O O O O co .A U) A 0 (D <D O (b A N O O O W O V O O J W 69 fA N_ V V O N O O W w w V N N N A O V O to A co J (T O O i 8 A O W O N O M A N O Uf V O (b W CO N O 00 V U) to (b N Ul m V CA (D O N U7 O N N V O A O O -P U7 O A to A O CO Co C; U7 O V J w A O 0) O ? 03 A O m O A N O O N fA -60 fA tf) 1 19 W N V O GJ W O A — A V N N (n M V CA W W w to N N N N V O m N to co co O W CO Cl to N N CA W N 6) N CA O Cn N N U7 CO W N (b N U1 W V J O W 07 N (b N U7 (� O O O O co i O co tD W O cn CD O CD to .� J A 41- to Un V O 0) O W co co co N A W v O O i Ef3 4A lA EA GH W W W V J N O CT N 6) J A O W co O N co N W to O IO co O s CD O N O W W W [O A W N N w O N CA N N CU CA W U7 y V J W Cm tJt co CT W O) N O A O Un — O) G) A to 0) Ca Cn A N O J -� O i p O W A O W N A J to m N A to N O N U7 -P to m w O v O -P U7 W W W O co A (S) O O A N O O N N 0 O K O cn O -h n 0 O (n v O O . II) 0 O CD CD w CD c� 0 O =r CD 0 N < O CD tD O cn 3 N �' O fl1 � O C4 3 v - O m r' x v Q W P o = P p P < D t31 n �" N m z O) m z CD x o ° m 0 0 -a 0 o 0 0 0 c < CD CD 0 v CL 0 c z - m c m CD C- c m CD 0 O CD D 0 y z m x 0 CD < CD D O O N 0 0 m < Cl) c N Q CD z n c m cn N 0 TI to G7 — O CD O O O 3 n m Cn p c CD r 4N U CD CJt W a n c cn W O —I O in co C31 C>7 C31 — -P O Vy � n -P O O Ol co � O N CD m O 4� X 0 0 W N CO , O 0 — 0 0 to f� co C N N N 0 0 C�3t 0 CO O O O N O N P O O W cn O CD m W O O O O O W O O E W O O O O O O O ff3 cn m � C>1 C31 � Cfl 61 1 1 1 1 1 ,&�, I I I I I lu!) _ N r' N p W P o 0 0 0 CD P p P ' , O O— D t31 n co N N O) N •P O N O N °—° . 0 0 0 o 0 0 0 O O cc.n N , cn 0 O O -r- -Pl. ,&�, I I I I I lu!) e» I I I 1 1 �69 pl _ N r' 0 O -P -? 0 0 0 CD O O O O 0 CD D t31 n co N N O) N •P O N O N 0 0 0 o 0 0 0 rn O N — cn 0 O O O 000 O C)) C31 Cfl , -P O 0 — 1 0 0 e» I I I 1 1 �69 pl _ N r' 0 - 00 w 0 0 0 0 CD O O O O O O N •P O W -P co 4� O O 4�1 - O O O N 0 0 0 o 0 0 0 rn c C 31 cn 0 O -P cn y N P O O O N d1 C31 �I W -P 0 0 Z, N N O O N O O N O N N O O O O O O O -Ge 6e 4N O CJt W W —4 N 1 P cat O O p cn W O —I O co cat co C31 C>7 C31 — -P O Vy W O -P O O Ol m O O O N Ol O O 4� X 0 0 W N CO , O O — — 0 0 to f� co N N N 0 0 C�3t O O O O O O N O N P O O W cn O O cat cn O O W O O O O O W O O 3 W O O O O O O O ff3 � C>1 C31 � Cfl Cat —4 N NO O O W v O Cat O v O CD v N •P O •I , O � W CD W CJ1 cn O 0 0 0 N W C0 O O CD Cfl O O 44 � , O O � v O O N O O N N O C7 �G � -O O + O h cn CD v �3 0 Q-0 CD 3 C O CD - = -s Q O r' CD CD CD C3CD -I cn CD 0 = Q v -p O 3 t N O O N 1 N -4 . o .< M -0 O + 0 -D C/) ( D" v C) (D Z7 O CZ CD C) CD , 0- CD �0 r— - n C) 3mc- Cn CD Cn O O CQ Sll 3 o� - n m ;a v x m Z Q Z3 mmmmmmm c»5 u ;uomm UD m -I x x x x x x Z -0-0 o O CD - M Z CD CD N x O -0-0-0-0 0 O 3 CD m R7 C D 3 C t m n m cn m ����n �� - - - - - -- C -CD -z o'= CD - - vi v cn x c c c c c m cn_ _ cn Q cn o C- 0 CD m m m m m m m CD ° 3 CD CD :3 (n (n cn cn cn 0 C c a Q a-0 -0 -0 _0 _0 c CD o CD CD CD CD CD CD 1 CD r r- f' r r r CD CL Cl) N N N om+- y to CD i i i 1 i i O- I0C zZ m D > ° z CD m --i � G� CD z C/) M . l< CD N W CO Cn P N CO C� N CD co N W C31 00 N C31 — co co N N O iZ W N W 6) O C31 4 O O O � � 00 O O O O CD 0 O N N 0 cn cn o O O O o 0 0 o O O c Q- 6 w w Cl) N co 1 cn N N CC) O -P -P N ? 0) .A O O C31 0) O CO O O O n 0 A w O O O O — O 1 1 O N CD W 0') W O- O O O v O O C31 C31 O O O O O O O O O 69 6s O Cb W (b Cl cn N W N C31 co O W N C) N O CA a) O C31 — CA CO 01 O W O O C31 C3) CTi O O O O N CS) to O 0 0 0 0 0 0 O O O O O O W co W N O 0 0 0 0 00 Cb O coo O C31 Cat O O 0 0 0 O O O O 0 0 0 0 0 -69 69 O O N C31 W O 1 Cfl -4 -� N C3) do O U1 C3) C>7 C31 O O Cb CS) C31 O O A O P N Cb CA O O O O O O O O N A O 1 O O O O O O C31 C31 O O O 0 0 O O O O O O O m -P O N O p O cn C31 C31 C cn C31 0 0 CD N N O O C31 O C31 CD C31 C31 O O O O O O O 1 O O -P -P O O O 0 0 O O O O O cn C37 O O O O O O O O O O 1 N CTI N N V v O O p N CO O O 00 O p 01 C31 O O O O O O 6s (� W z N v P Cb O N N C)7 P p N CA m O 00 00 �I p O N co N O O �! N V N co O O O CO 1 1 i O j a Cn 0 O O 0 O O N O O N 1 N -4 . o .< M -0 O + 0 -D C/) ( D" v C) (D Z7 O CZ CD C) CD , 0- CD �0 r— - n C) 3mc- Cn CD Cn O O CQ Sll 3 Shakopee Public Library Shakopee, Minnesota 1536.01 Shakopee Public WTMMIV Architect, Structural, Mechanical, Electrical Engineer and Interior Desi n: Boarman Kroos Vogel Group 222 North Second Street Minneapolis, Minnesota 55401 Consulting Architect: Jeff Kelley Architects 4827 Queen Avenue South Minneapolis, Minnesota 55410 Civil Engineer: Schoell & Madsen 10580 Wayzata Blvd. Suite 1 Minnetonka, MN 55305 Landscape Architect Damon Farber Associates 253 Third Ave South Minneapolis, MN 55415 Cost Estimator: Constructive Ideas, Inc. Suite 300, 901 Jefferson Street St. Paul, Minnesota 55102 FOTOT • . 1 Shakopee Public Library Shakopee, Minnesota 1536.01 Owner Review /Approval Signature Sheet Visioning / Design Concept Statement Code Review Design Development Schedule and Cost Estimate Design Development Drawings • Site Plan • Floor Plans • Exterior Elevations 1 pg 1 pg 1 pg 2 pg 3 pg Design Development Presentation Book Shakopee Public Library Shakopee, Minnesota 1536.01 TO: Mark McNeill, City Administrator FROM: John G.Sponsel, AIA CLIENT: City of Shakopee PROJECT: Shakopee Public Library COMM. NO.: 1536.01 •• • RE: Approval of Design Development Documents Please sign below indicating your review and acceptance of the Design Development documents, as included in this report. The signature below indicates authorization for BKV Group to proceed to the next phase. Please sign and return one copy of this report to BKV Group. BKV Group cannot proceed further without this written authorization. Name Signed _ Company Title Date Shakopee Public Library Shakopee, Minnesota 1536.01 BKV Group was commissioned to design a new two story library building for the City of Shakopee, to be operated by the Scott County Library System. The functional and space program was developed by BKV Group /Jeff Kelley Architects under the direction of the Scott County Library System. The site is the half block occupied by the current library building scheduled to be demolished, bounded by Lewis Street, Third Avenue and Sommerville Street. The building is planned to include approximately 24,000 square feet, with the possibility of expansion for future public uses such a performing arts center, green space and additional public parking. A future third floor option was considered and rejected due to cost and practical staffing issues. The new library will house significantly increased collections, and will be a service hub for the Shakopee community. Expanded library programs will include new centers for children, adult readers, and access to technology. Meeting and conference spaces will allow hosting of public discussions, presentations and larger meetings. Larger on -site parking will increase customer convenience. Staff operational areas will be modernized to speed library service delivery capabilities. As a major new civic presence on the edge of the Commercial Historic District Boundaries, the new library responds to the Shakopee Downtown Design Guidelines through the use of traditional materials and architectural design elements, interpreted for the contemporary functions and needs of a modern library to ensure long -term value. The building siting, massing and relationship to the surrounding community establish it as a downtown marker and destination, visible and identifiable for both pedestrian and automobile- oriented users. Public entrances on Lewis and Third promote easy access from two directions. Design of windows, skylights, high interior volumes and an open floor plan visually connected between two floors creates a comfortable environment for leisure, work, study and public interaction. Shakopee Public Library Shakopee, Minnesota 1536.01 A preliminary code review was performed by BKV Group and reviewed with the City of Shakopee building official during schematic design. The building design conforms to the current Minnesota Building Code and related life safety codes for mixed Occupancy Groups A3 (Assembly) and B (Business), using Type V -One Hour construction to permit use of structural wood decking at upper roof /ceiling areas and clearstory spaces. The building will include an automatic sprinkler fire protection system and visual /audible fire alarm system. The entire facility including site access and parking will meet accessibility requirements. 1 - • - • • ' • • i , • • Shakopee Public Library Shakopee, Minnesota 1536.01 Upon approval of the Design Development phase, we anticipate the following schedule for design completion: • Construction Documents • Bidding • Construction January 8 — March 20, 2002 March 21 —April 19,2002 May 1, 2002 — May 30, 2003 The schedule for bidding and construction may be delayed as necessary to bid the Library and Police Station projects simultaneously. Currently the Police project is one design phase behind the Library. The attached budget update and cost estimate is based on the design development documents included in this report, with estimates prepared by Constructive Ideas, Inc. The estimate represents full project costs, including construction as well as "soft" costs as identified by the owner. The estimated site and building construction cost of $4,477,900 includes a 7.5% construction contingency, and is $92,900 (2 %) over the budget of $4,385,000. A series of eight deduct alternates are available, totaling up to $217,200 of cost reduction available. Based on these figures, the project budget can be readily met with a combination of alternate deducts. A detailed breakdown of estimated costs is available. Shakopee Public Library and miscellaneous costs not listed above. Deduct Alternates Al Delete Roof Monitors (131,650) A2 Reduce Canopy Size ...... C BE1 f s ST ...... A . ........ : ...: :.....::.'•' >..........nary BudgeC >:_:_::>:.:.... 5 siiniaie (9,490) 2 :......... ornate (4,870) ::::::: June 4; 20Q9 , <Vovember7., 200] .:. ?:.:_:.:. :.aahuaty.8 (1,870) Total Deduct Alternates (217,210) ............................. ............................... ............................................................................... ............................................................................... ...................................................... ............................... ............................... ................. .... ............................... ........ ............................... .................. ....... ........................ ........................ ........................ PROPERTY COST Land Cost 0 City Owned City Owned City Owned Soils Correction allowance $50,000 $50,000 $50,000 Survey allowance $4,000 $4,000 $4,000 Preliminary Soils Testing $3,500 $3,500 $3,500 Financing costs verify Unknown Unknown Unknown Legal fees verify $10,000 $10,000 $10,000 Otherfees verify $5,000 $5,000 $5,000 SUBTOTAL $72,500 $72,500 $72,500 CONSTRUCTION COST Building Cost Budget @ $175 per s.f. Size 24,000 s.f. $4,200,000 $4,137,000 $4,285,100 Site Development Costs $185,000 $163,000 $192,800 (including building demolition) Design Contingency $0 $85,000 $0 SUBTOTAL $4,385,000 $4,385,000 $4,477,900 OTHER PROJECT EXPENSES Professional Fees $395,000 $395,000 $395,000 Needs Assessment Fee $0 $0 $0 Furniture & Equipment Allowance Furniture County Expense $0 $0 Signage County Expense $0 $0 Audio Visual County Expense $0 $0 - Telephones County Expense $0 $0 Equipment $0 $0 $0 Water Availability Charge allowance $4,000 $4,000 $4,000 MCES Sewer Charges allowance $6,000 $6,000 $6,000 City Sewer Charge allowance $3,000 $3,000 $3,000 Reimbursables, printing, travel etc. allowance $18,000 $18,000 $18,000 Special Testing costs allowance $10,000 $10,000 $10,000 $436,000 $436,000 $436,000 Subtotal Subtotal Project Costs $4,893,500 $4,893,500 $4,986,400 Owner's Contingency 10.00% $489,350 $489,350 $498,640 COST ESTIMATE $5,382,850 $5,382,850 $5,485,040 'Owner's separate costs should include hazardous material abatement costs for existing building demolition and miscellaneous costs not listed above. Deduct Alternates Al Delete Roof Monitors (131,650) A2 Reduce Canopy Size (19,340) A3 Delete Wood Ceiling (38,140) A4 Revise Susp. Ceiling (9,490) A5 Delete Plaza Pavers (4,870) A6 Deduct Site Furniture (8,300) A7 Delete Cork Flooring (3,550) A8 Delete Rubber Flooring (1,870) Total Deduct Alternates (217,210) Project Budget and Cost Estimate - 1 DDcost- budget.xls �- • /- - • • ji� 11 • i • • Shakopee Public Library Shakopee, Minnesota 1536.01 The attached drawings document the design development as reviewed with the City staff, Library Study Board, and County Library personnel. These form the basis of the Design Development Cost Estimate, supplemented by additional drawings, details and specifications. Design Development drawings are not complete for construction, but illustrate how the design conforms in detail to programmatic and site requirements. This design development will be fully detailed and completed during the Construction Document phase to follow. p it l• '• ,1 M 7 � C N ' oil R R ® . c IN mot -ELM- n �C C ° II II •'.I I.'.I P Om O fl (Q N n • 11� 11 11 3 7 Z O O LT m�� S N m = 00 Q � `1 11 II II � 1 II 11 11 Z a g F i 3g Q � 0_7C c7 " (C) PP H n 0 NNZ0 (o 3 C (((,2��,� CJ CL .- C N ' oil R R ® . c IN mot -ELM- n aam = ° c CID ii P Om O fl (Q N n ZO c 3� n o D �� "i g 70 C O Cc H m r= 3 7 Z O O LT m�� S N m = 00 Q c Z a g F i 3g Q � 0_7C c7 " (C) PP H n 0 NNZ0 (o 3 C (((,2��,� CJ CL 0 7C n LEN I S STREET Ye N n O m O O Q (Q (D n Z C 3 451-r I 3oCD o - 3 (u 0m m Q 0 �� p 0 R 0 . ' N. 0 n ® W® (Q C O O o t t�+ Z ~ >1'11 (0,,�� "a C�Ca a r ^ CTw Cm � N Z -< O N�O9 3 NN _. -a } s r. %•S� "r.I�� iC9Ytl t i -V�}� Ai•�u}.VY }'A Vr rn AFOO rn rn LIZ t44ry\ •4, try •t, :t it. 4• i 4w t., v, v . ' : •.,. • +. ti i v `•• \ ti •, ti \ .4 • i`. 4 ' i ti i \ . ±vt4i,44.•�`v 4 '•4 4, 4 •h + +,, �v4�vt�,+t • i, •'• ti.t�: v t 'i ' i t `t t `v 4 ` , v • 4, �t,Ly `. vt \'••'•,''•, v 4 4 '• t t k v + \ 1•• tiny' � f' � +y' + � + z -•y• ` \•4 i `k4•• \ ` i' ' v ` 4v�, +':'4t +' +'•'v4v v +t + \''v +4 .4;'t. .'i i`i. t4ti •. 4 \ •. ' + i.ti �ti 4\ •• •'` • • +4 • \ ` k .t � ��•. • `v�`+ 4 ti �4 M1 � 4•h +'• ,� i` +•4.t"',,''•ti`t �� ��''L'•k•,4+. :`4+ � �•� `iv+ ,,tiiti , ` h ''• t• `i' i' v v v `' ��' + 4 +, v 4 i :4'i�'• , t + ti4 • .' 4 •• ' i e e SOMM ERV I LLE STREET N n O m O O Q (Q (D n Z C 3 3oCD o - 3 (u 0m m Q 0 �� p 0 R 0 . ' N. 0 n ® W® (Q C O O o Z ~ >1'11 (0,,�� "a C�Ca a r ^ CTw Cm � N Z -< O N�O9 3 NN _. -a 1 _ ... _ _ __ BKV G R O U P I . Architecture i — -- Interior Design —1 —_1 Engineering Boorman . 1 . - .., 1. Ai ' Mi k >RpJ ��t]�� , Kroos I Vogel • I I � 3_: _ � , . ; , { I Inc. Group s 222 North Second Street i I Minneapolis, MN 55401 as q . , r . a L . - . Na, ti4 -- -- _ _ _ 4,11s4.1., __ _ .. � Telephone: 6123393752 ' 0 WEST ELEVATIO A/PLOTS /A4 N lI T - r Facsimile: 612.339.6212 NEST I - I'-O' www.bkvgroup.com I I CONSULTANTS i1 W I PROJECT TITLE SHAKOPEE PUBLIC LIBRARY 11111 DD 0SOUTH ELEV ATION - L I e SCA I /e'- Ii -0' A/PLOTS/A4 � PROJECT LOCATION { I 1 ` - I SHEET WILE EXTERIOR ,. ELEVATIONS . c •en- y r te , .._ . j i ccszvanac 1 5.)R—re,. plp; :'.— - - CERBNCATION ELEVT ww a�rm y direct supeMsion and that I vv.. II -0AION ' ,A,,,,..0„-5,A4 1 «report w« «aPOred W me ««.dm m a duty Licensed Hafeseond NW1ect under S. lows of he Slate of Mlmesola PRELIMINARY I Il A7 _ O CONSTRUCTION License Number . ..: - REVISIONS [ME 1 — I i — In I MI ii I . C I= i C PA + ® DRAWN BY 1/02/02 CHECKED is DATE COMMISSION NO 1536 O SHEET NUMBER I A4 /� EAST ELEVATION — s. ../ SCALE. Ve'. Ii_O Arm:9 5/A4 - - -� 0 2001 BKV Group I I Shakopee Police Shakopee, Minnesota 1536.02 • '` ' • = 1! Architect Structural, Mechanical, Electrical Engineer and Interior Design: Boarman Kroos Vogel Group 222 North Second Street Minneapolis, Minnesota 55401 Civil Engineer: Schoell & Madsen 10580 Wayzata Blvd. Suite 1 Minnetonka, MN 55305 Landscape Architect Damon Farber Associates 253 Third Ave South Minneapolis, MN 55415 Cost Estimator: Constructive Ideas, Inc. Suite 300, 901 Jefferson Street St. Paul, Minnesota 55102 Shakopee Police Shakopee, Minnesota 1536.02 Ilq Owner Review /Approval Signature Sheet Visioning / Design Concept Statement Code Review Schematic Design Project Cost Estimate Schematic Design Drawings • Site Plan • Floor Plans • Exterior Elevations • Images Appendix • Space Program • Schematic Design Specifications 1 pg 1 pg 1 pg 1 pg 8 pg Separate Document Schematic Design Presentation Book Shakopee Police Shakopee, Minnesota 1536.02 TO: Mark McNeill, City Administrator FROM: William M. Baxley, AIA CLIENT: City of Shakopee PROJECT: Shakopee Police COMM. O.: 1536.02 D. •0 RE: Approval of Schematic Design Documents Please sign below indicating your review and acceptance of the Schematic Design documents, as included in this report. The signature below indicates authorization for BKV Group to proceed to the next phase. Please sign and return one copy of this report to BKV Group. BKV Group cannot proceed further without this written authorization. Name Signed Company Title Date Shakopee Police Shakopee, Minnesota 1536.02 BKV Group was commissioned to design a new Police Facility for the City of Shakopee The functional and space program was refined by BKV Group with City Staff and police Personnel. Refer to the Appendix for complete details. The site is located along Gorman Street across from the current City Public Works facility. A small parcel of land adjacent to the site to the East is also available for future parking requirements should the new City Hall building be located on the site as well. The building is planned to include approximately 26,000 square feet, with the possibility of expansion for future use to the north. Secured parking is accommodated for 87 stalls at this time with expansion capabilities to 128. 47 staff and public parking spaces are provided with 86 additional spaces available on the adjacent lot. The new building will house increased areas for patrol, investigations administration, and property and evidence. A small detention area with two cells, a juvenile holding room, a booking area, and a drive through sally port will provide four hour holding capabilities. An expanded property and evidence room will utilize a two -story storage area for efficient cataloging of large quantities of material. A training room will be located off of the main lobby for approximately 72 officers and or staff. This room will have the capability to be subdivided into two separate spaces. Additional spaces include locker rooms, roll call, Break room, exercise room and a computer room. The new building will utilize similar materials as the new library to begin to extend a palette that responds to the definition of civic building in the city of Shakopee. The police facility will respect the specific requirements of this building type yet present a face to the community that is approachable. Shakopee Police Shakopee, Minnesota 1536.02 A preliminary code review was performed by BKV Group. The building design conforms to the current Minnesota Building Code and related life safety codes for mixed Occupancy Groups B (Civic Administration, S -3 (Squad Garage), 1 -3 (Detention), and A -3 (Training) using Type V -one hour. The detention component will be constructed utilizing type two -F.R construction. The detention component will also be separated from the rest of the construction utilizing a two -hour area separation wall. The other occupancies will be separated via one -hour occupancy separations as required. . The building will include an automatic sprinkler fire protection system and visual /audible fire alarm system. The entire facility including site access and parking will meet accessibility requirements. • • i • • Shakopee Police Shakopee, Minnesota 1536.02 •, • • The attached budget update and cost estimate is based on the schematic design documents included in this report, with estimates prepared by Constructive Ideas, Inc. The estimate represents full project costs, including construction as well as "soft" costs as identified by the owner. The estimated site and building construction cost is $4,282,130 and includes a 10% estimating contingency. This is for a building of approximately 26,000 square feet including the mechanical mezzanine. Two budget scenario's had been previously submitted to the city, the first for a 24,000 sf building - $4,090,000, and a second for a 28,000 sf building - $4,730,000. A detailed breakdown of estimated costs is available. Shakopee Police Station Q:PROJ\l536.02 \BUS \COST- SD.XLS SIIENIATICaJ SIGfY COST ES.T11k1AT� »»:.:.:=:=:=... :.::.» .:::::........ :.:.:.:.> :.:.:.:.:.:= :.:.:.:.:.:.....» »: »::=:::.>:=:=:-:-:.:.:.: - :- :- :- :- :- :...:.:.:......:.: ...... ........... .............. ........................................................................................... lI8 02 .................................................... ............................................................................................. ................................................................................................... ................................................................................................... ...................... ........................................ ..................... ............................... ....... ......... ............................... . ............................... I.............................. ............................... PROPERTY COST Land Cost allowance Unknown Soils Correction allowance $100,000 Survey allowance $5,000 Preliminary Soils Testing $1,500 Financing costs verify $30,000 Appraisal fee verify $3,000 Legal fees verify $10,000 Otherfees verify $5,000 SUBTOTAL $154,500 - CONSTRUCTION COST Building Cost Budget @ $160 per s.f., including site costs and 10% bidding contingency Size 26,000 S.F. $4,282,130 SUBTOTAL $4,282,130 OTHER PROJECT EXPENSES $342,570 Professional Fees Needs Assessment Fee Furniture & Equipment Allowance Furniture $324,000 Signage $10,000 Audio Visual $30,000 Telephones $15,000 Equipment $0 Water Availability Charge allowance $4,000 MCES Sewer Charges allowance $6,000 Soils Testing- detailed allowance $4,000 City Sewer Charge allowance $3,000 Reimbursables, printing, travel etc. allowance $18,000 Special Testing costs allowance $10,000 $766,570 Subtotal Subtotal Project Costs $5,048,700 Contingency 10.00% $504,870 COST ESTIMATE $5,553,570 Project Budget Page 1 m 0 ' O 0 n T '� N 0 CD D IJ czN �o�am D � ! �� O "j lI `® O O Q LT CD m'o00 °_ RI m m> G O to > 0 y O O o A C m I"' P'CI 7D W W Z Q- 0 6 a c N O �O -40 (.TI N O� W C1i az � o r -i -G m O N V 1a CD z �_ NNOC -D �a \)� / K 0 \ { §O !2 i/ ee\g /o «r 9\« o {\ \\ 2 §§ 3 § ra- ___ §2§ \ =ice §o /2 !/ o k § \� \ § : /�q�/ §\\ } ag >HH? m2� }\ CD / { 22 §\ \ \\ : w * , f |,{ > — 3 a = z \ § -< § \� \7 $F R > ]G\e& In I (\ @ e,e tea `« ° : a o zfi A 0 0 0 n� ° 33 ° °Szz& ±J� m 1 r`A� §�� § ! § D E { /!& *i -�Q {7 (\ / \r` §z! 2 > 7' m \ 3 § k 2 \ / �S) 2 » 0 i _ -° G\a C: e / /p z 2 §86z= f7 ( q� § /jm 2 !]! > ;Gq §i � )| . ;| k 0 / { - � . �2 } \e \ /e\ ~{� �� 0 r \ \ {Zi1 \� � 0�� _ « \ EE0 7 »` \ 7"R § ƒ3 .n 2§ \ \ \- � 9 a a ® \ . � S; § \\�Z 3 QG\% � . � IF ( \\ F § « � n §(� ( \ } -,} 0 / { - � . �2 } \e \ /e\ ~{� �� 0 r \ \ {Zi1 \� � 0�� _ « \ EE0 7 »` 7"R ƒ3 .n 2§ \ \ \- � 9 a a ® \ S; § \\�Z 3 QG\% ET ° ƒ� O M = Ml %& o - ee2cko} m =E�§ G/Z § \ O 3 ƒ} � _ � § \\\ � } §® � § � %& o - ee2cko} m =E�§ G/Z § \ O 3 ƒ} � _ � s o « w ° c0 & !;!,!m § . , )k § G & > $ \)/ , § \ƒ m « - \� c ® \}§ m �° § s 2 \ b ° � \ / > k / °m qi� ƒ //# § z 02 a p eel,, z § c m 9 a>� 0 ��oa 2)j\\ s o « w ° c0 =m, o 3 §£ ®d & m , § \ƒ o / \{ \� i- i- IE- mm o Q m� N �« W D N n z Eli A r"ose3� �� m mr, p O� O 3 rn o p 0 H 3 p p m 3z- q (n 3a R3z 171 C mn p M "o �m Q �" p CD n O S 7 = 0 -- L e— o� m CD in. n 9 �'-g Z Z oC O N N O 7 C �=3 IT1 oN LP m —_ n ° �o in L m r < i D po N O Z m n O z Z z N n m m _@ � _Z � N D Ulm a N n n - - I I I E �,.. 0 9 � O 9 7 �� ¢ y -2 � 2 i !2 o o Q m� N �« W D N n z Eli A r"ose3� �� m > ON p O� O 3 rn o p 0 H 3 p p m 3z- q (n 3a R3z 171 C v �S in M D 5 "o �m Q �" p CD n O S 7 = 0 L e— CD in. n 9 �'-g Z Z Z D o O N N O 7 C �=3 IT1 W W Z L1 n ° �o in L m 2 D po N O a r t r 0 E .'rgaRwA g � �^ 0 0 o m �N � �«- -- D n Ou i 0 z - t�iy a� r 03� ® _ (A : ^. o Z cc � o fl 9. 2. s 3.a m p _0 cD H 3 o 0 = g m m m "O = _- n O Cgg� -n ;K D D ID o� °- m (fl �• G n CQ o n — � Q O r Z � V 0 o � N N � :3 � •--) S o R Z m ` I m w cW.� Z 0 � N N 2 rt ; n |O e !e»!In ®!\ TEITI , n ( \ \ 3 z' ` \ \® &. \ C & g — .\ R § 0 � \ O Z` c – \ x \r 2 A . § // / / \� 2 \ >0 \ \\\ >� T T - &\ \ > o § �m \ \ . \ » \ *`} &� � \ \& _ \ \ QE ®` \ \ \ G \� § \W // 2 � eQ /e$ \ « : \ — � . \ [ a .... . . � . _ \ \ � ; n |O e !e»!In ®!\ )> , n ( 2% \> \R#)/ 3 z' ` \ \® / R § 0 � \ /3\ Z` 2 . § E / / \� §§ \ >0 \ \\\ >� > o § �m 0 L� e *`} r-M _ \\\ƒ& QE ®` \ z G \� § \W // 2 � eQ /e$ / ƒ779}& o 'ac0oyoy ) E ®§ (D m S :3 3 Ja ; I PM 117-TO • • i • • Shakopee Police Shakopee, Minnesota 1536.02 The attached drawings document the concept design as reviewed with the City staff, and Police personnel. These form the basis of the Schematic Design Cost Estimate, supplemented by additional schematic details and specifications (Refer to Appendix). Schematic Design drawings are conceptual in nature, and illustrate how the design conforms to programmatic and site requirements. This concept will be refined and adjusted during the Design Development phase to follow. • .; • i • • Shakopee Police Shakopee, Minnesota 1536.02 0•,• "s The appendix information is available in a separate document. • t Memorandum TO: Mayor and Council Mark McNeill, City Administrator FROM: Gregg Voxland, Finance Director RE: Cash Balance DATE: January 8, 2002 The attached schedule shows the current cash balances on the records of the city. The numbers are not final numbers for the year because there are many transactions to yet be recorded. While most of the revenues are included in the figures, there are about six weeks worth of bills yet to be paid out of the cash on hand. 12/31/00 had $985,000 in bills to be paid just for the General Fund. There are several project contracts that the city has entered into that have to be paid out of the cash on hand as well as future planned projects and other liabilities. The General Fund needs about 1.5 million just for cash flow to pay bills until the first tax settlement is received in June. Other uses of fund balance include a cushion against the unanticipated costs or decreases in revenues such as a loss of state aid. Special Revenue funds are monies for a specific purpose and generally not available for general operations or other uses. Debt Service funds are only for the payment of bonds. There is about $4 million dollars in payments due 2/1/02. Park Reserve fund is designated for park acquisition /development. CIF is restricted by Ordinance to street /utility /building construction and acquisition. Other capital project funds are generally supported by bond issues and any left over money in a project fund goes to the respective debt service fund. TIF funds are restricted by law to TIF purposes. Enterprise funds are for the operation of utility systems and have cash flow need like the general fund. Sewer and Storm accumulate cash for the future replacement and expansion of the long lived assets of the system. The Escrow fund is mostly other peoples money held for a specific purpose or guarantee of performance. City of Shakopee Cash Balance 12/31/01 - Not Final General Fund Need about 1.5 M for cash flow Need about 1M for bills Subtotal Special Revenue Funds Forfeiture Fund Police use Transit fund Restricted to transit purposes Grant Funds specific use EDA Fund Development /redevelopment Debt Service Funds Dedicated to bond payments Capital Projects Funds Park Reserve Fund Capital Improvement Fund Capital Projects Funds Specific projects TIF Funds Restricted to TIF purposes Enterprise Funds Sewer Fund six months operating expense Trunk expansion money Storm Fund six months operating expense Trunk expansion money Recreation Fund six months operating expense Subtotal Internal Service Funds Equipment Fund Building Fund Trust and Agency Funds Escrow Fund Money held for others Investment Trust Fund Interest not yet allocated Cash $ 4,258,535 49,184 500,484 1,192 432,974 7,664,186 Available ?? $ 4,258,535 (1,500,000) (1,000 ,000) 1,758,535 936,095 936,095 2,949,116 398,601 188,462 9,457,708 9,457,708 (600,000) 5,901,203 5,901,203 (125,000) (1,500,000) (86, 900) (86, 900) (550,000) 12,497,011 888,837 8,706,635 888,837 8,706,635 1,244,075 2,505,419 $ 45,995,806 1,150,000 $ 25,937,113