HomeMy WebLinkAbout5.B.2. Change Order for Shakopee Valley Marketplace Drainage Improvements Porject No. 2009-6DATE: December 7, 2010 INTRODUCTION: BACKGROUND: ALTERNATIVES: CITY OF SHAKOPEE Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Work Director SUBJECT: Approve Change Order #1 for the Shakopee Valley Marketplace Drainage Improvement Project (2009 -6) r 77 , 3 n, The purpose of this agenda item is to approve change order #1 for the Shakopee Valley Marketplace Drainage Improvement project. The change order involves the addition of a stronger erosion control blanket in the ditch bottom and the grouting of riprap at the thirty -six (36) inch flared end section. During construction it was decided to upgrade the erosion control blanket being placed in the ditch bottom as a means to provide added protection against washouts during the late fall and early spring runoff events. The upgrade, from a category 4 to a category 7 blanket, is deemed necessary as the late construction start did not allow for the establishment of turf. The stronger blanket in the ditch bottom will further protect the topsoil and seed until well after it has taken root and can withstand runoff on its own. The grouting of the riprap at the end of the flared end section was added to eliminate future maintenance concerns caused by the runoff shifting the riprap over time. The total amount of change order #1 is $5,953.41. Please see the attached breakdown received from the contractor and reviewed by engineering. 1. Approve a motion accepting change order #1 in the amount of $5,953.41 for the Shakopee Valley Marketplace Drainage Improvement project. P'E'A 2. Do not accept change order #1 in the amount of $5,953.41 for the Shakopee Valley Marketplace Drainage Improvement project. 3. Table for additional information. RECOMMENDATION: Staff recommends Alternative No. 1. ACTION REQUESTED: Approve a motion accepting change order #1 in the amount of $5,953.41 for the Shakopee Valley Marketplace Drainage Improvement project. BL /pmp Bruce Loney, P Public Works Director ITEM No DESCRIPTION OF WORK SCHEDULED QUANTITY UNIT SCHEDULED UNIT PRICE SCHEDULED TOTAL PRICE WORK COMPLETED Total Completed to Date % Complete Previous Requests This Request Qeaetlty Amount Quantity 1 Amount Quantity I Amount 10 MOBILIZATION 1 LS $2,000.00 $2,000.00 a $0.00 I $2,000 1 $2,000.00 20 COMMON EXCAVATION 1800 CY $4 .00 $7,200.00 0 $0.00 1800 $7,200.00 1800 $7,200.00 100% 30 POND EXCAVATION 500 CY $5 50 82.750.00 a $0.00 500 $2,750.00 500 $2,750.00 100% 40 SALVAGE & REINSTALL PIPE APRON 3 EA $400.00 $ 1.200.00 0 $0.00 3 $1.200.00 3 $1.200.00 100% 50 27" PIPE RCP CL III 8 LF $47 00 $376.00 0 50.00 8 $376.00 8 $376.00 100% 60 36" PIPE RCP CL III 40 LF $98.00 $3,920.00 0 $0.00 40 $3,920.00 40 $3.920.00 100% 70 24" PIPE HOPE 48 LF $38.00 $1,824.00 0 50.00 48 $1,824.00 48 $1,824.00 100% so CONST DRAINAGE STRUCTURE DES 48 -4020 1 EA $2.800.00 $2,800.00 0 $0.00 1 $2,800.00 I $2,800.00 100% 90 CASTING ASSEMBLY 1 EA $500.00 $500.00 0 $0.00 1 $500.00 1 $500.00 100% 100 TRASH GUARD FOR 24" APRON 1 EA $700.00 $700.00 0 $0.00 1 $700.00 1 $700.00 100% 110 RANDOM RIP RAP CL IV FIELDSTONE 130 CY $75.00 $9,750.00 0 $0.00 130 $9,750.00 130 $9,750.00 100% 120 GEOTEXTILE FABRIC TYPE IV 495 SY $2.50 $1,237.50 0 $0.00 495 81.237.50 495 $1,237.50 100% 130 TOPSOIL BORROW 250 CY $13.50 $3,375.00 0 $0.00 48 $648.00 48 $648.00 19% 140 SILT FENCE 175 LF $1.65 $288.75 0 $0.00 168 $277.20 168 $277.20 96% 150 FILTER LOG TYPE WOOD FIBER BIOROLL 220 LF $3.00 $660.00 0 $0.00 200 $600.00 200 $600.00 91% 160 SEED MIX 328 115 LB $6.50 $747.50 0 $0.00 135 $877.50 135 $877.50 117% 170 FERTILIZER TYPE I 350 LB $0.50 $175.00 0 $0.00 350 $175.00 350 $175.00 100% 180 MULCH MATERIAL TYPE III 1 TON $155.00 $155.00 0 $0.00 1 $155.00 1 $155.00 100% 190 DISK ANCHORING 0.5 AC $500.00 $250.00 0 50.00 0.5 $250.00 0.5 $250.00 100% 200 EROSION CONTROL BLANKET CAT IV 3660 SY $1.25 $4,575.00 0 $0.00 4000 $5,000.00 4000 $5,000.00 109% CHARGE ORDERS Erosion Control 'Minkct Cat 7 1000 SY $5. to $5,100.00 0 $0.00 1000 $5,100.00 1000 $5,100.00 0% Concrete Grout I LS $853.41 $853.41 a $0.00 1 $853.41 1 $853.41 100% $0.00 $0.00 0 $0.00 0 $0.00 0 $0.00 MDIV /0l $0.00 $0.00 0 $0.00 0 $0.00 0 $0.00 MDIV/01 $0.00 $0.00 0 80.00 0 $0.00 0 $0.00 II DIV /Of $0.00 $0.00 0 $0.00 0 $0.00 0 511 on •DIV/01 City of Shakopee, Valley Marketplace Drainage Imp MN Dirt Works, Inc. BASE PROJECT TOTAL CHANGE ORDER TOTAL GRAND TOTAL $44,483.75 $5,953.41 $50,437.16 $0.00 $48,193.61 REQUEST NUMBER: FOR PERIOD ENDING: Previous Retalnage: 0% $ This Retalnage: 0% $ Total Retalnage: Previously Paid Amount: $48,193.61 108% I $0.00 $0.00 Amount Due: 848,193.611 11/16(2010 Change Order Number: 1 Project #: 2009 -6 Date: November 23, 2010 Completion Date: No Change Contractor: Minnesota Dirtworks, Inc. By: Date: APPROVED AND RECOMMENDED: CHANGE ORDER Project: Shakopee Valley Marketplace Drainage Improvements Original Contract Amount $ 44,483.75 Change Order(s) Number 1 thru Number $ 5,983.41 Total Funds Encumbered Prior to Change Order $ 44,483.75 Description of Work to be Added: • Grouting of riprap at plunge pool #2 = $853.41 • Addition of category VII erosion control blanket = $5,100.00 The amount of the contract shall be increased by $ 5,983.41 The number of calendar days for completion shall be (increased /decreased) by: N/A Original Contract Amount $ 44,483.75 Change Order(s) Number 1 thru Number $ 5,983.41 Total Funds Encumbered $ 50,467.16 The undersigned Contractor hereby agrees to perform the work specified in this Change Order in accordance with the specifications, conditions and prices set forth. City Engineer Date