Loading...
HomeMy WebLinkAbout3. CSAH 101 Update and Input10/11 /2010 ~~~; '~:1r. County Highway 101 (1St Avenue) Fillmore Street to Marschall Road Project Aesthetics Light Poles, Bollards, Sidewalks & Boulevards Presented to City Council by Chris Chromy, P.E., P.T.O.E. Bolton & Menk, Inc. _- October 11, 2010 j',~'c~tt SHAKOPEE Aesthetic Treatments ^ Street Lighting - Replacement of existing street lighting - Pole style, height, and effectiveness - Costs - Location/Limits of Lighting ^ Decorative Sidewalks and Boulevards - Project includes 5' sidewalk and 4.5' concrete boulevard along both sides of CSAH 101 - Surface treatment and color options - Costs ^ Bollards == -Separation of sidewalk from adjacent parking lots • / - Locations, style and color options 11 -Costs 1 10/11/2010 Existing Street lighting Downtown to Main Street Main Street to Marschall Road ~; Street lighting ^ Replacement of existing street lighting system eligible for Mn/DOT Turn Back reimbursement (Fillmore street to Dangerfield's) - Estimated at approximately $390,000 - Average II{umination of 1.0 foot candles and Uniformity Ratio of 4.0 (average/minimum) ^ SPUC Contribution of approximately $25,000 to $30,000 for energy efficient LED fixtures ^ Additional Cost for increased aesthetics - 3 Style Options - Option 1: Luminaire style consistent with Huber Park, 17' height Option 2: Luminaire attached to 6' decorative arm, 27' height - Option 3: Luminaire attached to 6' decorative arm, 30' height All include: Fluted 8-sided stainless steel pole, decorative stainless ~f` steel base, and banner arms ~ Pull n ~ -~ ,* E ,,.~,._; ~:~, 2 10/11 /2010 Street Lighting Option 1: Luminaire style consistent with Huber Park, 17' Height ;,_~, ~,J~CO~ SHAKOPEE • ~I~ / ~~` City of Shakopee Costs: Total Street Lighting Costs: $545,000 Minus MnjDOT/SPUC Contribution: 420 000 Estimate City Cost: $125,000 (Approx. $95,000 more to extend to Huber Park) ...~ /~CO,~+ Sl ~AKOPE E 3 Street Lighting Option 1: Luminaire style consistent with Huber Park, 17' Height 10/11/2010 Street Lighting Option 2: Luminaire attached to 6' decorative arm, 27' height .._., _. ~~ . r.. ~~~ .:., _ ~ . _._ _ ~ -, i . __ ii ~~ -" ,__ i ,~CDtt SI IAKOPEE 11 Street lighting Option 2: Luminaire attached to 6' decorative arm, 27' height l i ~ ~ ~..~ ~ ~ ~ ~ . City of Shakopee Costs: Total Street Lighting Costs: $500,000 Minus Mn/DOT/SPUC Contribution: 420 000 Estimate City Cost: $ 80,000 (Approx. $82,000 more to extend to Huber Park) ~+..~.. -SCO~ S 4 10/11/2010 Street lighting Option 3: Luminaire attached to 6' decorative arm, 30' Height i ~,. _s ;- ~ „> ~. ~~ .-" ~~ _- _. !' ~o !' I. J_> ''"` ~ ,~ ._ ~'~'CO~ SHAKOPEE d Street Lighting Option 3: Luminaire attached to 6' decorative arm, 30' Height ..,~~ ~„ ~. ~ o, fi -~ ~ -ns ~ -r L _.. _ _. ~, ~, ~ , _. ~ . ~,~, ,~,, .o ._, ,~,,_ 9 e ~, ~, . A , :, 1 - - .,,, ,. ~ ~, e City of Shakopee Costs: Total Street Lighting Costs: $530,000 Minus Mn/DOT/SPUC Contribution: 415 000 Estimate City Cost: $115,000 (Approx. $85,000 more to extend to Huber Park) • ~ • "~ "~ C~~ SI IAKOPEE 5 10/11/2010 Street Lighting Considerations ^ Effectiveness of Lighting Options for Roadway and Sidewalk Lighting - Option 1: Average Illumination of 1.2 and 3.9 Uniformity Ratio - Option 2: Average Illumination of 1.2 and 3.9 Uniformity Ratio - Option 3: Average Illumination of 1.1 and 1.4 Uniformity Ratio ^ City Costs (Above Mn/DOT Turn Back) - Option 1 = $125,000 - Option 2 = $80,000 - Option 3 = $115,000 ^ Extension to Huber Park/Downtown - $82,000 to $95,000 (complete replacement) - $60,000 to $75,000 (poles and fixtures onlvl nn ~ • /~\ ~~ "^-~ ~~~ SI IAKOPEE Decorative Sidewalks & Boulevards ^ Project to include 5' concrete sidewalk and 4.5' concrete decorative boulevard ^ Mn/DOT Turn back eligible for standard concrete in boulevard ($3.25 per SF, approx. $75,000) ^ Concrete boulevard recommended - Aesthetics/Inability to grow turf - Separation between pedestrians and vehicles ^ Choose one of each to create custom aesthetic look: - Decorative boulevard pattern - Color for boulevard concrete ,.~. • ~ ~~~~~ SHAKOPEE 6 10/11 /2010 Decorative Sidewalks & Boulevards ^ 3 Options for Decorative Boulevard Pattern - Simple Squares (additional joints in concrete) - One Stamp (Ashlar or Basketweave pattern) - Two Stamp (Soldier Course and Running Bond pattern) ^ 3 Options for Boulevard Concrete Color - Brick Red (match downtown and Huber Park playground) - Brown - Charcoal/Dark Gray ., 1 CO~ SI IAKOPEE 7 10/11 /2010 Decorative Sidewalks & Boulevards s" Sidewalk Decorative BoulPVard Pattern s'-o• ~ a'-s• Blud- ^ Option 1 - Standard Concrete Finish Regular concrete-- j'--a• with Simple Squares j - Brown Concrete ~ Sidewalk 4' 0" - Cost: $4.00 per SF (approx.) Light Pole------- ~„ R1'0" City Cost: $17,000 SHAKOPEE ....~. SCOT Bollard--- Colored concrete (brown) 8 10/11/2010 Decorative Sidewalks & Boulevards 6" Sidewalk ~" Sidewalk Decorative Boulevard Pattern ~ s-o• ~ a'-s° ~j"-~ B1vd. ^ Option 2 - Concrete with One-Stamp Regulaf concrete--;--s Finish I - Basketweave in Brick Red Sidewalk i a•-o" Li h P l - Ashlar in Charcoal g t o e------- - Cost: $5.00 per SF (approx.) '' ei•-o° ~I City Cost: $40,000 ~~~~- -'r`~ s x ~ Bollard---------~ l ~ ' J 4', ~~ „9 ~5~ ! _ ~ a r ~ .:~-t "` -" g " h~ ~,-< w~ ~ ~ "~ Basketweave ----~---------i ~- ~~' ~~- ~ ~ .-~ t. ` stampedcolofed ~' ,~. ~~.. ` . `~w ` f „~ ~ (red) concrete ~ ~ Y. ~ td F r ~ ~ ~$x L ..~~- ~,~ ~ .o I Decorative Sidewalks & Boulevards 6" Sidewalk Decorative Boulevard Pattern ~ s•-o° ~ as• ~~_,• Blvd. ^ Option 3 - Concrete with Two Stamp Regular concrete--=--i Finish - "Soldier Course" and Sidewalk "Running Bond" Stamps in a~ o° Light Pole------- Charcoal R~•-o" - Cost: $7.50 per SF (approx.) ~ More complex to construct ' City Cost: $97,000 ~ rt~ Bollard---------,-~r i ,~ .; ~ . ~ i ~ ~; ~ qty' } . ¢ ' ' ~~ Soldlef COOfSe ---1-------- ' ~ ~ ~ ~ ~ and running bond ~ ~ ~ ~ '{ ~ s i stamped colored • (charcoap concrete Q ~ $J a • k.'4~ .. Xu 9 10/11/2010 Decorative Boulevard Considerations ^ Colored Concrete achieves separation between pedestrians and vehicles ^ Option 1 presents lowest on-going maintenance ^ Some support voiced for charcoal color, opposition to red ^ City Costs (Above Mn/DOT Turn Back) - Option 1 = $17,000 - Option 2 = $40,000 - Option 3 = $97,000 • 1~^+ " ~ ,, /a~~~ St-IAKOPEE Bollards ^ Proposed in areas where parking lots are adjacent to sidewalks ^ 3 Style Options - Option 1 - 8" embedded pipe filled with concrete, rounded cap - Potential for any color or plastic sleeve - Optional chain - Option 2 - Aesthetic precast concrete - Colors available include sand, gray, brown, and brick red - Optional chain - Option 3 - Aesthetic cast aluminum ~ - Style and color can be chosen to match light poles ~~ d - Optional chain 1 10 10/11 /2010 Bollards Proposed in areas where parking lots are adjacent to sidewalks ^ 3 Tier Criteria - Tier 1 (approx. 20) - At access closure locations where visual cue may confuse motorist - Tier 2 (approx. 90) - Tier 1 locations - At locations with zero set-back parking lots and physical separation between parking lot and sidewalk - Tier 3 (approx. 180) - Tier 1 & 2 locations - At locations with non-conforming parking lot set-back (less than 1 ' d minimal separation between parking lot and sidewalk • ~+ ~''~ ' /+.~ ~~~ SI-IAKOPEE 1 Bollards Option 1 ^ 8" steel pipe filled with concrete ^ Cost =approx. $500 each (installed) ^ Low Maintenance Tier 1 Total Cost: $10,000 Tier 2 Total Cost: $45,000 Tier 3 Total Cost: $90,000 ..... • a, f,~'CIO~ SIIAKOPEE t ~ 11 10/11/2010 Bollards Option 2 ^ Aesthetic precast concrete ^ Cost =approx. $600 each (installed) ^ Annual Maintenance w-_- ,, K .: ,;~a+*•, Tier 1 Total Cost: $12,000 Tier 2 Total Cost: $54,000 Tier 3 Total Cost: $108,000 r,.'~cOtt SHAKOPEE ~ Bollards Option 3 ^ Aesthetic cast aluminum ^ Cost =approx. $1200 each (installed) ~II i t j 'BANNER EYE BOLT -06" I I,` I ",1 ~15'~-~ Tier 1 Total Cost: $24,000 Tier 2 Total Cost: $108,000 Tier 3 Total Cost: $216,000 ,.~ I ~ . 1~~,+~C>fl~ Sl~hKOPEE " 12 10/11/2010 Bollard Considerations ^ Tier 1 and 2 have pedestrian safety and aesthetic benefit ^ Tier 3 primarily aesthetic benefit ^ Some support for aesthetic value ^ City Cost yet to be determined - Assume Tier 1 & 2 and use of Option 2 style for planning purposes ($54,000) ~~ • -~ ~~ „ ~,,~CO~ S>=IAKOPEE Existing Condition: CSAH 101 West of Marschalf -- ~# .F: ~~. .. ,- ~" .rr~.d 13 10/11 /2010 14 10/11/2010 15 10/11 /2010 City Cost Considerations ^ $325,000 budgeted for "Other Improvements" - Decorative Street Lighting (27' pole): $ 80,000 - DecorativeJColored Concrete Boulevard: $ 17,000 - Bollards: 54 000 $151, 000 A// COSt and OUtS%de agency COntr%bUtlons are pre/iminary and subject to change ^ Other City Costs - 25% of Traffic Signal Costs $75,000 to $90,000 - Lighting Replacement West of Fillmore St. $60,000 to $95,000 - Engineering and other costs pending ... • -~ ~ .. ,~ ~~' b G ~,~COtt S1-IAKOPEE 16