Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
5.B.2. Approve Plans and Specs for Shakopee Valley Marketplace Drainage Repair Project No. 2009-6-Res. No. 7028
CITY OF SHAKOPEE "ON"ENT Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Bruce Loney, City Engineer SUBJECT: Approve Plans and Specifications for the Shakopee Valley Marketplace Drainage Repair and Authorize Staff to Obtain Quotes, Project No. 2009 -6 DATE: July 7, 2009 INTRODUCTION: Attached is Resolution No., which approves the plans and specifications for the Shakopee Valley Marketplace Drainage Repair, Project No. 2009 -6. The project site is located north of the building containing Kohl's and Target. Attached are the plans for Council approval. BACKGROUND: Staff has completed a review of the proposed 2009 -2013 Capital Improvement Program (CIP), which includes an annual erosion control project within the City. The existing ditch erosion has progressed to a point where it is necessary to perform grading improvements to restore the ditch bottom and side slopes, repair or replace rip - rap that has broken down over time and eroded away at the culvert aprons and install any necessary pipe or control structures. Plans have been prepared by staff to restore the channel and adding measures to control the storm water flow to the Mn/DOT pond. Attached is the cost estimate for the project which is $55,503.00. Since the estimate is less than $100,000.00, staff can obtain quotes for the construction and bring these back for Council at a future meeting. By approving the plans, staff can also submit for permit approvals from Mn/Dot, MPCA and encroachment agent with Xcel Energy. ALTERNATIVES: 1. Adopt Resolution No. 7028. 2. Deny Resolution No. 7028. 3. Table for additional information. RECOMMENDATION: Staff recommends Alternative No. 1, so that the proposed Shakopee Valley Marketplace Drainage Repair Project No. 2009 -6 can proceed for quotes for construction and to obtain the necessary permits and encroachment agreement. ACTION REOUESTED: Offer Resolution No. 7028, A Resolution Approving the Plans and Specifications for the Shakopee Valley Marketplace Drainage Repair, Project No. 2009 -6 and move its adoption. ruce Loney, P Public Works Director BUPmP ENGPJ2009 ENGINEERING PROJECTSISHAKOPEE VALLEY MARKETPLACE DRAINAGEMORDNEM- APPROVE PLANS = SPECIFICATIONS RESOLUTION NO. 7028 A Resolution Approving The Plans And Specifications For The Shakopee Valley Marketplace Drainage Repair Project No. 2009 -6 WHEREAS, pursuant to Resolution No. 6917 adopted by the City Council on July 7, 2009, Bruce Loney, Public Works Director has prepared plans and specifications for the Shakopee Valley Marketplace drainage System along the north side of the building housing Kohl's and Target by performing grading improvements, pipe, control structure, replacing rip -rap, turf establishment and any appurtenant work and has presented such plans and specifications to the Council for approval. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA: 1. Such plans and specifications, a copy of which is on file and of record in the office of the City Engineer, are hereby approved. 2. Staff is hereby authorized to obtain quotes for the making of such improvements as required by law. Adopted in session of the City Council of the City of Shakopee, Minnesota, held this day of , 2010. Mayor of the City of Shakopee ATTEST: City Clerk ENGR/2009 ENGWEERING PROJECTSISHAKOPEE VALLEY MARKETPLACE DRAINAGE REPAIR\WORD/RES7028- APPROVE PLANS - SPECIFICATIONS PRELIMINARY COST ESTIMATE 28- Jul -10 SHAKOPEE VALLEY MARKETPLACE DRAINAGE IMPROVEMENTS JWS /BAL CITY PROJECT NO. 2009 -6 EST. NO. ITEM UNITS QTY- UNIT PRICE TOTAL 1 MOBILIZATION (5% MAX) L.S. 1 $ 4,000.00 $ 4,000.00 2 COMMON CHANNEL /DITCH EXCAVATION (P) CU YD 2,000 $ 3.00 $ 6,000.00 3 POND EXCAVATION (P) CU YD 500 $ 5.00 $ 2,500.00 4 SALVAGE AND REINSTALL PIPE APRON (ALL SIZES AND MATERIALS) EACH 3 $ 500.00 $ 1,500.00 5 27" PIPE SEWER RCP CLASS III LIN FT 8 $ 36.00 $ 288.00 6 36" PIPE SEWER RCP CLASS III LIN FT 40 $ 50.00 $ 2,000.00 7 24" PIPE SEWER HDPE LIN FT 48 $ 50.00 $ 2,400.00 8 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020 EACH 1 $ 3,000.00 $ 3,000.00 9 CASTING ASSEMBLY (STORM) EACH 1 $ 200.00 $ 200.00 10 TRASH GUARD FOR 24" PIPE APRON EACH 1 $ 500.00 $ 500.00 11 RANDOM RIPRAP SPECIAL (CLASS IV FIELDSTONE) CU YD 130 $ 100.00 $ 13,000.00 12 GEOTEXTILE FABRIC TYPE IV SQ YD 495 $ 5.00 $ 2,475.00 13 TOPSOIL BORROW CU YD 250 $ 15.00 $ 3,750.00 14 SILT FENCE TYPE, HEAVY DUTY LIN FT 300 $ 5.00 $ 1,500.00 15 FILTER LOG TYPE WOOD FIBER BIOROLL LIN FT 240 $ 5.00 $ 1,200.00 16 SEED MIXTURE 328 LB 125 $ 30.00 $ 3,750.00 17 FERTILIZER TYPE I LB 420 $ 2.00 $ 840.00 18 MULCH MATERIAL TYPE III TON 1.60 $ 500.00 $ 800.00 19 DISK ANCHORING ACRE 0.75 $ 800.00 $ 600.00 20 EROSION CONTROL BLANKET CATEGORY IV SQ YD 2,600 $ 2.00 $ 5,200.00 ESTIMATED CONSTRUCTION COST $ 55,503.00 5% CONTINGENCY $ 2,775.15 SUBTOTAL $ 58,278.15 15% INDIRECT COSTS $ 8,741.72 TOTAL ESTMATED PROJECT COSTS $ 67,019.87 SHAKOPEE LEGEND �— EXISTING SANITARY SEWER EXISTING STORM SEWER SHAKOPEE VALLEY MARKETPLACE GOVERNING SPECIFICATIONS —�+-- I — EXIST ERMAIN DRAINAGE IMPROVEMENTS HAKOPEE VA ON TH MA THE OF TRANSPORTATION ION -STANDARD DRAINAGE IMPROVE DARD RIGHT-OF-WAY THE 2005 EDITION OF E MINNESOTA DEPARTMENT ANDARD CENTERLINFLIN E (� UMUTY CATIONS FOR CONSTRUCTION" AND THE LATEST EDITION DITION O THE C "ST OF THE EAM STANDARD SPEFNA — r-r-v- EXISTING RETAINING WALL SHAKOPEE MN UPUTRAFFCICONTIONS. —s— PROPOSED SANITARY SEWER INCLUDING THE MANUAL S FOR TEMPDRARY CONTROL ZONE LAYOUTS. MUTCD —»— PROPOSED STORM SEWER CITY PROJECT NO. 2009 -6 ALL TRAFFIC CONTROL DEMCES SHALL HAVE RETROREFLECPVE SHEETING. PROPOSED WATERMAIN PROPOSED SAW CUT LINE STORM SEWER, GRADING & APPURTENANT WORK —UE— UNDERGROUND ELECTRIC LINE —TEL— UNDERGROUND TELEPHONE LINE INDEX —FO— UNDERGROUND FIRER OPTIC LINE )IIIIq1II❑ ❑��❑ gG� a�® — C UNDERGROUND CAS LINE z cE n r DESCRIPTION SHEET N0. CONCRETE SURFACE $ w G 17 ® a . IDTH avE " L rcR T TITLE SHEET B 4 r 2 EROSION CONTROL - SWPPP NOTES BITUMINOUS SURFACE A 3 DETAIL$ GRAVEL SURFACE 0TH E � �6 \ f O 4 O SEWER AND GRADING N - 110 T D Lf � 5 EROSION ON CONTROL AND TURF ESTABLISHMENT EXISTING HYDRANT n RFfk ® u � o� pw DA s cT ^nusnn S THIS PLAN CONTAINS 5 SHEETS EXISTING VALVE MANHOLE EXISTING VALVE ® EXISTING SANITARY SEWER MANHOLE x INffq I �••, r , S� OO EXISTING STORM SEWER MANHOLE N � LU' S � E CATCH BASIN UTILITY TILITY N -�( POLE RR[90E Z � YI IN R v SIGN / POLE ^ � ILL � - III 3 DECIDUOUS TREE c L! A O N k B( GOMFEROUS TREE ��VII HEDGE 4 ��� eaTREUx 0 4 TELEPHONE 809 169 AvE ® ELECTRIC BOX E GUY WIRE g G? W � i)TH a4E E '-+ PROPOSE. HYDRANT z IT H V N PROPOSED VALVE ul aaAR nb "n OY o�° i6 ly I O FROG) oT o E 1 rI PROPOSED MANHOLE I6 �� x li. .�cl I LIu u �I�LL m 1TTH AVE E S PROPOSED CATCH BASIN ALL APPLICABLE FEDERAL, STATE AND LOCAL LAWS AND ORDINANCES WILL PDED BE COM r ` xc� ° n g G Ci $ REMOVE AND DISPOSE EXISTING I`u�)( /u ^� "T"'"�' WITH IN THE CONSTRUCTION OF THIS PROJECT. CT CT BITUMINOUS DRIVEWAY AS DIRECTED �I ) ❑ REMOVE AND DISPOSE EXISTING ,uR wn CONCRET A E DRIVEWAY /WALK AS r DIRECTED s dP wv 7 r DESIGN ENGINEER: I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME OR UNDER MY DIRECT SUPERVISION AND THAT I AM A DULY LICENSED PROFESSIONAL ENGINEER UNDER THE LAWS OF THE STATE OF MINNESOTA. A. � a d" ua BRUCE A. LONEY 7 30TH Si W 78 78 ��� � s zzND a vauer MEw aD DATE DC. NO. THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES THAT ARE SHOWN, ARE SHOWN IN AN APPROXIMATE WAY ONLY IT IS NOT GUARANTEED THAT ANY OR ALL EXISTING CITY OF SHAKOPEE, MN UTILITIES ARE SHOWN. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF P FOR ANY ECT LOCATION 129 SOUTH HOLMES ST ALL EXISTING BEFORE COMMENCING WORK. HE AGREES BE FULLY ► RESPONSIBLE FOR ANY ANO ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS COUNTY : scow SHAKOPEE, MN 55379 FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. PLAN REVISIONS (952) 233 -9300 phone NOTIFY GOPHER STATE ONE -GAIL DISTRICT METRO DATE SHEET NO. APPROVED BY - (952) 233 -3801 fax 1 -800- 252 -1166 OR 651- 454 -0002 S OFEE SCALES JJ �� THE SUBSURFACE UTILITY INFORMATION IN THIS PLAN IS INDEX MAP COMMUNM E CEflM UTILITY LEVEL B. THIS QUALITY LEVEL WAS DETERMINED soo IooD ACCORDING TO THE GUIDELINES OF CI /ASCE 38 -02, PLAN MAP ENTITLED "STANDARD GUIDELINES FOR THE COLLECTION AND ®D DEPICTION OF EXISTING SUBSURFACE UTILITY DATA." PROFILE MAP ® SHEET NO. 1 OF 5 SHEETS 0 5 TO now DwECTpx PLAN REQUIREMENTS FIELD REQUIREMENTS MAINTENANCE DURING CONSTRUCTIOt THE CITY WILCOMPLETED NP L SUBMIT A COMDES//55DpS APPLICATION THE PERMITTEE MUST AMEND THE SWPPP AS NECESSARY TO INCLUDE FORM W11H THE E400 APPUCATON FEE TO THE MPCA. ADDITIONAL REQUIREMENTS SUCH AS ADDITIONAL OR MODIFIED BMPS, MANTAN ALL EROSION CONTROL ITEMS, REMOVE ACCUMULATED DESIGNEE, TO CORRECT PRSBLEMS IDENTIFIED OR ADDRESS SITUATIONS SEDIMENTS, CLEAN UP MUD TRACKD FROM THE SITE ON TO ° t ew�FBcExWUiE o u THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH WHENEVER: ADJACENT PAVED SURFACES, AND CONTROL DUST (PER MN OT SPEC 2130 AS ALL TERMS AND CONDITIONS OF THE NPDES /SDS PERMIT. NECESSARY TO ELIMINATE SIGNIFICANT DUST PER REQUIREMENTS OF € 1. THERE IS A CHANGE IN DESIGN, CONSTRUCTION, OPERATION OR ENGINEER, OWNER, AND/OR CITY UN SUCH TIME AS THE THE CONTRACTOR MUST MONITOR AND REPORT ON STORM WATER MAINTENANCE. ENGINEER HAS ACCEPTED TIL WE WORK, MANAGEMENT REQUIREMENTS PER MPCA. 0. N FlELDBIBNE 2. WEATHER OR SEASONAL CONDITIONS THAT HAW SIGNIFICANT EFFECT TEMPORARY STOCKPILES ON -541E WILL NOT BE PERMITTED FOR MORE > THE CONTRACTOR MUST IDENTIFY A PERSON KNOWLEDGEABLE AND ON DISCHARGE. INSPECTION A REQUIRED W1 INCH 24 HOURS OF A THAN 8 HOURS. A m y m EXPERIENCED IN THE APPUCATON OF EROSION PREVENTION AND RAINFALL EVENT GREATER THAN ONE -HALF INCH. SEDIMENT CONTROL BMPS WHO WILL: 3. NSPECTIOI OR MVESTGATION BY SITE OPERATORS, OT LOCAL. STATE, RESTORATION G rc A. OVERSEE WE IMPLEMENTATON OF THE SWPPP. OR FEDERAL OFFICIALS INDICATE THE SWPPP IS N EFFECTIVE. 2. OVERSEE WE INSTALLATION ON IN AND MAINTONANCE OF EROSION PREVENTION AHD SEDIMENT CONTROL BMPS BEFORE AND 4. THE SWPPP IS NOT ACHIEVING THE GENERAL OBJECTIVES OF THE OWNER AND /OR CONTRACTOR SHALL ALSO SUBMIT AN NPDES NOTICE OF s c lr�r wH OFE M1V a WRING CONSTRUCTON. CONTROWNG POLLUTANTS OR THE SWPPP IS NOT CONSSIENT WIN TERMINATION TO MPCA WWIN ONE WEEK OF FINAL RESTORATION ACCEPTANCE E THE TERMS AND CONDITIONS OF THIS PERMIT. BY THE OWNER. txOTExnIE FABRIC THE CONTRACTOR MUST IDENTIFY WHO WLL HAVE THE LONG -TERM A 4 RESPONSIBILITY FOR LONG -TERM OPERATION AND MAINTENANCE OF S, THE MPCA DETERMINES THAT DISCHARGE MAY CAUSE OR CONTRIBUTE RESPREAD TOPSOIL AND ESTABLISH TURF ON ALL ROUGH GRADED AREAS THE PERMANENT STORM WATER MANAGEMENT SYSTEM AND DEVELOP A TO NON- ATTAINMENT OF ANY APPLICABLE WATER QUALITY STANDARDS VATHIN 48 HOURS AFTER COMPLETION OF EARTH MOVING. CHAIN OF RESPONSIBILITY WITH ALL OPERATORS ON WE SITE TO OR THE SWPPP DOES NOT INCORPORATE THE REQUIREMENTS RELATED o8 ENSURE THAT THE SWPPP WILL BE IMPLEMENTED AND STAY IN TO AN APPROVED TOTAL MAXIMUM DAILY LOAD (TMDLT: THE RUNOFF RESPREAD TOPSOIL AND ESTABLISH TURF ON ALL FINAL GRACED AREAS W�WIN EFFECT UNTIL FINAL STABIL32AMON AND SUBMITTAL OF THE NOTICE MOM THE SIZE DISCHARGES TO AN WPAIRD WATER Kkl HAS AN 72 HOURS AFTER COMPLETION OF FINAL GRADING. N OF TERMINATION- APPROVED WDL AND HAS NOT BEEN PROPERLY DETAILED IN THE SWPPP. THE CONTRACTOR SHALL COMPLETELY REMOVE ALL TEMPORARY EROSION WE SWPPP INCLUDES- AND SEDIMENT CONTROL MEASURES UPON ESTABLISHMENT OF FINAL Flew DIRECTI08 °° ALL EROSON CONTROL MEASURES AND PROTECTIVE FENCING MUST BE MEASURES AND SITE STABILIZATION. CONTRACTOR TO FILL TEMPORARY sok 1. LOCATION AND INSPECTED BY THE CITY OR LOCAL GOVERNMENT UNIT SEDIMENTATION TYP E OF ALL TEMPORARY AND PERMANENT INSTALLED AND TION BASINS COMPACTING TO SPECIFIED E,ENSTES REMOVE EROSION PREVENTION AND SEDIMENT CONTROL BMPS, INCUDING PRIOR TO BEGINNING OF ANY GRADING. ALL UNSTABLE SEOIMEaT PER RECOMMENDATION OF THE ENGINEER. B PROCEDURES USED TO ESTABLISH ADDITIONAL TEMPORARY SUPS AS -- NECESSARY FOR THE STE CONDITIONS DURING CONSTRUCTION - WE PERMITTEE MUST IMPLEMENT WE SWPPP AND INSTALL BMPS GEDTXTIE FABaW SECT OL =_ EROSION CONTR PLAN. IDENTIFIED TH IN E SWPPP IN AN APPROPRIATE AND NNCTONAL MANNER. _ 2. A SITE MAP WIN EXISTING AND FINAL GRADES - STREET SHEETS THE LOCATION OF AREAS NOT TO BE DISTURBED MUST BE DELINEATED ON THE NOTICE OF TERMINATION SIZE BEFORE DEVELOPMENT BEGINS. s.p6 3. A WATERSHED DEUNEATCH SHO'MNG DRAINAGE & DIRECTION OF FLOWS FOR PRE - AND POST - CONSTRUCTION STORM ALL EXPOSED AREAS WITH A CONTINUOUS POSITIVE SLOPE MUST HAYS PERMITTEES MUST SUBMIT A NOTICE OF TERMINATION (NOT) W91HIN 3U CHECK DAMS =;; WATER RUNOFF DRAINAGE AREAS AND ALL POST ^CONSTRUCTON STORM TEMPORARY EROSION PROTECTION OR PERMANENT COVER FOR THE EXPOSED DAYS IF ONE OR MORE OF WE FOLLOWNG CONDITIONS NAVE BEEN MET: �° WATER WTFALLS LEAVING THE SITE. ACTWLYABEINGRWORKED: NO LATER THAN 14 GAYS AFTER THE AREAS NOT 1 FINAL STABILIZATION HAS BEEN ACHIEVED ON ALL PORTIONS OF THE SITE %5 4. LOCATION OF AREAS NOT TO BE DISTURBED - AREAS OUTSIDE OF THE FOR WHICH PERMITTEE IS RESPONSIBLE, INCLUDING THE REMOVAL OF ALL = ° e PROJECT UNITS. TEMPORARY MEASURES SUCH AS SILT FENCE. gf'; WE NORMAL WETTED PERIMETER OF PINY TEMPORARY OR PERMANENT 2. ANOTHER OWNER HAS ASSUMED CONTROL OVER ALL PORTIONS OF THE SITE 5. LOCATION OF AREAS WHERE CONSTRUCTION WLL BE PHASED DRAINAGE DITCH THAT DRAINS WATER FROM A CONSTRUCTION SINE OR THAT HAVE NOT ACHIEVED FINAL STABILIZATION. E� a TO MINIMIZE DURATION OF EXPOSED SOIL AREAS - NO PHASING DIVERTS WATER AROUND A SITE MUST BE STABIUZED W1THN 200 FEET FROM WE PROPERTY EDGE, OR FROM WE POINT OF DISCHARGE TO ANY PERMITTEE MUST ENSURE FINAL STABILIZATION OF THE SITE AND SUBMIT WE `_ Sw 6. ALL SURFACE WATERS SURFACE WATER WITHIN 24 HOURS OF CONNECTING TO A SURFACE WATER. NOTICE OF TERMINATION WITHIN 30 DAYS OF FINAL STABILIZATION. ALL DETAILS ARE ] EXPOSED SOIL�AREAS F O SO FINAL . ULCH B AND A MOD FIBER BLANKET. CLEAN OF O SEDIMENT BY SWEEPING PAVED SURFACES MEN PAVED SIGNIFICANT FINAL STABILIZATION CAN BE ACHIEVED IN THE FOLLOWING WAY; ACCUMULATION OF SEDIMENT OCCURS ON THESE SURFACES. ANY SEDIMENT 1. ALL SOIL DISTURBING ACTIVITIES ARE COMPLETE AND A UNIFORM NTS PERMIT REWIRES THAT THERE BE NO UNBROKEN SLOPE LENGTH TRACKED OFF -SITE IS TO BE REMOVED WINN 24 HOURS. PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70% OVER THE ENTIRE GREATER THAN 75 FEET FOR SLOPES WITH A GRADE OF 3;1 OR PERVIOUS SURFACE HAS BEEN ACHIEVED. INCLUDING: Z STEEPER, CONTRACTOR SHALL BE RESPONSIBLE FOR IMPLEMENTING THE FOLLOWING NOTE ALL WORK SHALL BE DONE IN POLLUTION MANAGEMENT MEASURES ON THE SITE; - STAMUZATON OF CHANNEL. O - REMOVAL OF ALL MPORARY SYNTHETIC n C AND STRUCTURAL BMPS. COMPLIANCE WITH THE CITY OF SHAKOPEE & I. F EC WASTE AS DEMOLITION EBRIS OTHER C PERMANENT E WATER TEM EUALITY OM STTORM WATER CO AND SPUC STANDARD DETAIL PLATES SEQUENCE OF CONSTRUCTION RI MUST BE DISPOSED OF PROPERLY AND MUST COMPLY WITH MPCA W DISPOSAL REQUIREMENTS. K 1. THE EROSION PREVENTION & SEDIMENT CONTROL BMPS SHALL BE INSTALLED AS NECESSARY TO MINIMIZE EROSION FROM DISTURBED 2 ' SUBSTANCES BE STORED, INNC UDING OA ANY CONTAINMENTS PROJECT DESCRIPTION SURFACES AND CAPTURE SEDIMENT GNS1E. AND SMALL MEET WE NPDES TO pREVENT $PILLS, LEAKS OR OTHER DISCHARGES. RESTRICTED ACCESS $WALE TYPICAL SECTION PERMIT PART IV CONSTRUCTION A DE REQUIREMENTS ALL TEMPORARY TO STORAGE AREAS MUST BE PROVIDED TO PREVENT VANDALISM. STORAGE EROSION CONTROL STRUCTURES AND DEVICES WHICH CAN BE INSTALLED THE CITY OF SHAKOPEE IS CONTRACTING THE REHA&UTATION OF A DRAINAGE 2 BOTTOM (STA 0 +00 to STA 3 +00) PRIOR TO CONSTRUCTION SHALL BE INSTALLED PRIOR TO DISTURBANCE AND DISPOSAL OF HAZARDOUS WASTE MUST COMPLY W11H MPCA REGULATIONS. DITCH FROM MARSCHALL ROAD TO 800 FEET EAST. WORK INCLUDES BY WE CONTRACTOR. 3. A DEFINED AREA OF THE SITE MUST BE DESIGNATED FOR USE AS A WASH AREA GRADING AND INSTALL STORM SEWER AND RIP RAP, 2. CONTRACTOR TO WNTACT CITY FOR APPROVAL OF SEDIMENT CONTROL FOR TRUCKS AND OTHER EQUIPMENT. NO ENGINE DEGREASING ALLOWED ON 9TE, DEVICES PRIOR TO COMMENCING WORK. TEMPORALLY AND PERMANENT SEDIMENTATION BASINS MUST BE DRAINED AND RECEIVING WATERS 3. CONTRACTOR TO GRADE DITCH, INSTALL STORM SEWER AND RIP -RAP. SEDIMENT REMOVED ONCE THE SEDIMENT COLLECTED REACHES ONE THIRD THE •• U W STORAGE VOLUME 1WTNIN 72 HOURS, AS FIELD CONDITIONS ALLOW, 4. CONTRACTOR TO INSTALL TEMPORARY EROSION CONTROL DEVICES AS STORMWAIER VALL 0E COlLEC1E0 BY WE EXISTING STORM SEWER S AND NECESSARY. ALL SEDIMENT DEPOSITS WITHIN SURFACE WATERS MUST BE REMOVED AND STORMWATER IS DISCHARGED TO AN ADJACENT WATER QUALITY BASIN AND (/) TH RESTABIUZED WITHIN ] DAYS OF DISCOVERY. THIS INCLUDES DELTAS AND EVENTUALLY TO THE MINNESOTA RIVER. ') V0.ry S v WAYT CL � 5. E CONTRACTOR IS TO PLACE SEED, MULCH AND WOOD FIBER AN BER BLKET. STORM SEWER SEDIMENT DEPOSITS. 6. ONCE ALL DISTURBED AREAS HAVE BEEN STABILIZED, OBTAIN APPROVAL DURING IXCAVATION, SEDIMENT AND EROSION CONTROL DEVICES SHOULD BE SPECIAL WATERS �'� `3'b vNB� , w a FROM THE CITY ENGINEER WITHIN TWO WEEKS OF FINAL STA &LIZATION. UTUZD TO PREVENT SEDIMENTATION AND THE AREA MUST BE STAKED OFF AND 1' Y d Z MARKED SO THAT HEAVY CONSTRUCTION EWPMENT "LL NOT COMPACT THE SqL DI; E OX VILh _Q ]. CONTRACTOR TO REMOVE SEDIMENT CONTROL DEVICES WITHIN TWO WEEKS STORM WATER IS OISW C OLLE CTE D RG D To ANADJAL ' NTWAT RQUALITTY AND B F7&M wL A .w0 IuAxxEr I �\ ' ¢ > a F OF APPROVAL E VENTUALLY T O T MINNESOTA RIYFR As DIFEClEO ¢t ExpxQA I 1 .I Q vU 8. SUBMIT NOTICE OF TERMINATION TO MPCA WITiIN 30 DAYS ONCE T O MPCA INSPECTION AND RECORD RETENTION v) FINAL STABILIZATION HAS BEEN CALCULATIONS -DD` aI�� SHGWR «PrS wM TIF STAINED xEENwNN�AR. �d J WE SWPPP, ALL CHANGES TO IT, AND INSPECTIONS AND MAINTENANCE RECORDS GRADE A SIRUBxT MADE m To[ of DncH SLOPE TO TIE cRncwc uulis J :2 O J MUST BE KEPT AT THE SITE DURING CONSTRUCTION BY WE PERMITTEE NHO ATINO IMPERVIOUS SURFACE AREA s Do ACRES J - X Q 1 SWPPP ON FILE O F L OR TREE WARS THE SUBMITTAL OF NOTQ F AREA EXoIS TO �SU E EERVI0U5 AREA KX %ACRES � W Z n. PRECONSTRUCTION ACTIVITIES IERMINATON, INCLUDING WE FOLLOWING INFORMATION: NPDES TREATMENT PERMIT REQUIRE X.X ACRE FEET. c) 1. ANY OTHER PERMITS REQUIRED FOR THE PROJECT. W Q OCJ 2. RECORDS OF ALL INSPECTION AND MAINTENANCE CONDUCTED DURING W Z THE ENGINEER WILL INSPECT SILT FENCE PRIOR TO ANY LAND ALTERATION. CONSTRUCTION. RESPONSIBLE PARTIES d Q Z ALL SILT FENCE SHALL BE CONSTRUCTED WIN WOOD OR STEEL POSTS 3, ALL PERMANENT OPERATION AND MAINTENANCE AGREEMENTS THAT HAVE BEEN (SEE DETAIL), (MPI£MEN1E0 INCLUDING ALL RIGHT -OF -WAY, CONTRACTS COVENANTS, AND C) w- 5) PERSON CONTROL MEASURES MUST BE INSTALLED AND MAINTAINED OTHER BIND REQUIREMENTS REGARDING PERPETUAL MAINTENANCE. CONTRACTOR IS RESPONSIBLE FOR IMPLEMENTATION OF THE SWPPP AND THE Y Q N ALL ACCORDING TO THE DETAILS INCLUDED IN TIE CONSTRUCTION DOCUMENTS. 4, ALL REQUIRED CALCULATIONS FOR DESGN OF THE TEMPORARY AND PERMANENT INSTALLATION, NSPECTON, ANO MAINTENANCE OD THE EROSION PREVENTION SWALE TYPICAL SECTION Q STORM WATER MANAGEMENT FOR AND SEDIMENT CONTROL BMP'S SPORE AND DURING CONSTRUCTION. THE CITY ALL SILT MUST BE REMOVED FROM SILT FENCE WHEN IT REACHES A HEIGHT AND TIE CONTRACTOR ARE C0- PERMMES FOR THE NPDES PERMIT. THE CITY 6' BOTTOM (STA 3 +00 to STA 8 +39) = K EQUAL TO ONE -THIRD OF THE HEIGHT OF THE SILT FENCE. WE CONTRACTOR WE CONTRACTOR MUST ROUTINELY INSPECT THE SITE ONCE EVERY ] DAYS WRING IS RESPONSIBLE FOR LONG TERM MAINTENANCE. (n W MUST PERFORM ANY CORRECTIVE MEASURES ORDERED BY THE RESIDENT ACTIVE CONSTRUCTION AND WITHIN 24 HOURS AFTER A RAINFALL EVENT GREATER ENGINEER, LOCAL GOVERNMENT UNIT, OR MPCA W1HN 24 HOURS OF SUCH THAN 0.5 INCHES W 24 HOURS. QWNER CONTRACTOR NOTICE THE CONTRACTOR SHALL AL50 PLACE ANY ADDITIONAL EROSION �v ••VARIES CONTROL MEASURES DEEMED NECESSARY BY THE CITY OR MPCA WITHIN 24 ALL INSPECTIONS AND MAINTENANCE CONDUCTED DURING CONSTRUCTION CITY OF SHAKOPEE TO BE DETERMINE aart HOURS NOTICE. ALL MEASURES MUST BE REPLACED OR REPAIRED WIN THE MUST BE RECORDED IN WRITING AND RETAINED WIN WE SWPPP. BRUCE LONEY s �E APPROVAL OF THE ENGINEER CITY, AND MPCA. WHEN THEY BECOME 129 SOUTH HOLIES STREET NONFUNCTIONAL SIAKOPEE-93, MN 00. 55379 D ALL GOWN GRADIENT PERIMETER CONTROLS SHALL BE N PLACE MUST INCLUDE: (952) 233 CE BEFORE P4 R+{Y W ANUNTIL \ 0 Y UP GRADIENT DISTIRBANCE BEGINS, AND MAINTAINED FIN AL 1. DATE AND THE OF INSPECTIONS. I «'T a ry•A ' YH STABILIZATION. 2 NAME OF PERSON CONDUCTING INSPECTION. 'I vpRRS 3. FINDING OF INSPECTION INCLUDING CORRECTIVE ACTON. DETAILS OF LOCATION OF SWPPP REQUIREMENTS "Hn - ROCK CONSTRUCTION ENTRANCES OR EQUIVALENT SYSTEM MUST BE CORRECTIVE ACTON ((DALE. TIME, PARTY COMPETING MAINTENANCE). USED TO MINIMIZE TRACKING FROM SITE. 4. DALE AND AMOUNT DF RAINFALL GREATER THAN 0.5 INCHES IN 24 HOURS A. DOCUMENTATION OF CHANGES TO SWPPP. SUMMARY OF IMPERVIOUS SURFACE SHEET 5aL sEm \ E DIRECTON OF FLOW SHEET 4 B rtR T nuzea, MULW AND I ER BL.Wx[i \ N AREAS OF PROJECT WHERE FINAL STABIUZATON IS COMPLETE, RECEIVING SURFACE WATERS SHEET EER �4 A5 wRECTA ...N - Pa NSPECTIONS CAN BE REDUCED TO ONCE A MONTH. PERMANENT EROSION CONTROL SHEET 4 YJd TEMPORARY EROSION CONTROL SHEET INSPECTIONS CAN BE SUSPENDED DUE TO FROZEN GROUND CONDITIONS DRAINAGE STRUCTURES SHEET 4 DNN BN PLUn ARw sHAU. BE BTM:ED w THE FtflD BY TIE &lGINEBt. UNTIL FIRST RUNOFF OCCURS OR CONSTRUCTION ACTMTES RESUME. EROSION CONTROL DETAILS SHEET CONiRAC1GP 9HAlL MADE A E.- ERADE RtoM THE TOE of wicx xcPC io Mf mABwc uwts. SHEET NO. IOCATTON OF PONDS SHEET 4 2 8' • POINT 1 MUST BE A MINIMUM OF 12" 2" K 2" WOOD POST HIGHER THAN POINT 2 TO ENSURE AT 4' AT SPACING �HDTW DUTY SILT FENCE THAT WATER UNIT OVER THE DIKE I AND NOT AROUND THE ENDS Lp 8" X B" TRENCH WITH LEADING •�_ {._ EDGE OF CATEGORY 3 EROSION `o a CONTROL BLANKET STAPLED AT PLAN VIEW Y n1VERVALS AND BACNFILLED NTH NATURAL SOIL POINT T GEOTEMILE FABRIC f f 2" K 2" x 18" LONG WOODEN m V STAKES a MIN. 2' SPACING. 30" MIN. DRIVE 7NRW,N TUFTING k FABRIC ANCHORAGE TRENCH. WAS FILTER LOG, DIRECTED OF BACKFILL W11N TAMPED RUNOFF FLOW FLOW \ lW7URA. SOIL a ��0`P \�QN �,� /\ [}• g 1 ,1141 . /\� / \��� /� /\ 1.S' MIN. e" PONT A POST EMBEDMEW IAN. $ 5 'YR POINT B POINT 2 5 Ee e W BIORDLL PER BY 17 GAUGE METAL 3 ELLVATION MEN TPE 33897 STAPLES SPACED 2' O.C. SILT FENCE NOTES: 1. POINT A MUST BE A MINIMUM OF 12 INCHES HIGHER THAN POINT B. CATEGORY J EROSION FILTER lOG - ° 2. HEAVY DUTY SILT FENCE SHALL CONFORM TO THE REQUIREMENTS OF (3886) CONTROL. BLANKET STEEL T STUDDED POST 3. DIMENSIONS SHOWN ARE FOR TYPICAL B' DITCH BOTTOM. MODIFICATIONS MAY BE NECESSARY FOR S' MN. LENGTH 'ss VARYING SLOPES AND DITCH WIDTHS. 3 - PLASTIC OF TIES AT S' MAX SPACING 4. REFER TO PLAN OR MN /DOT EROSION CONTROL MANUAL FOR SPACING INTERVALS OF CHECKS. (50 I.B. TENSILE) LOCATED IN TOP 8" DITCH CHECK AF C I ro � °r9 x a a 50• M BRIO, MEW WOE -..I F--3 LEVEL (MN.) ? 'MWiMW POST NOTCHES 1b FACE FABRIC, 38" NDE (MNDCT 3888.3) d" OVERIAF AWAY FROM FABRIC FACE auCMn m AL-- FABRIC ANCHORAGE TRENCH. ALL DETAILS ARE GAG'. WISH TAMPED • ALL DETAILS Aq NATURAL son. TUTS now �! Kn z 1 -1/2" - Y COARSE � NOTE: ALL WORK SHALL BE DONE IN '' /� /\ '" wASxx2o COMPLIANCE WITH THE CITY OF SHAKOPEE & - \ \j \ \' GEOTIXm.E FABRIC SPUC STANDARD DETAIL PLATES 6" \/� w POST MIN. a V l' SPACING ON STAPLES 8"AUN. DEPTH �1.� ' ROCK CONSTRUCTION ENTRANCE EROSION CONTROL BLANKET LFOLD UNDER 6" NOTE O O O HEAVY DUTY SILT FENCE SHALL BE HAND INSTALLED. llJ om :MMUNI D NOTE F 2 (41, F M m 12" M N D 25 MACHINE SLCW SLIT FENCE U MIMMVM F 2 WIGS (4�, � (n S MNOOT 25]3 FOR MACHINE SLICED SILT FENCE REWNiFMENiS MAtIMUM OF 18' n4C1.UDNG CABLING CASTING AS SPECmm ROADWAY SU HEAVY -DUTY SILT FENCE Il'L"I RFACE Z IWAL MnDCT STANDARD PLATE WU y IF COVER REQUIREMENIs La WITH CEMENT MORTAR v BVTIED T ON ECGE ¢ 0 7 1 CONSWUCTION SNFl.I. BE H TWINE OR WIRE i DITCH PI BS n PRECAST PIPE, IXCFPT O jjj BE ASIA - MAY C 178 O O O A W CRETE PIPE BEE STANOAtO TE 3000 (NO TONGUE OR O O O �`� YAROVE AT TOP OR BOTTOM OF ECTI ✓ ' // W SON) C4ST -IN -PLACE O O O NOTE: POINT A MUST BE A CRETE ALLOWED ONLY IF MINIMUM OF 12" HIGHER, W BY ROVED EENGINEER O O O BALE DITCH CHECK THAN POINT B W Z Z O O O BALE DITCH CHECKS ARE O � ONLY PERMITTED WHEN O THE GROUND Is FROZEN. OTHERWISE SILT FENCE, < BIOROLL OR R DITCH S RISER TO PLANS CHECKS SHALL BE USED. (n FOR PIPE REQUIRED STRUCTURE NOTE B" POURED CONCRETE BASE, OR A TIREWE PRECAST COMAM 3" x 6' STRUCTURE MARKER SIGNS SHALL BE FURNISHED AND MALLED BASE SEE MADOT STANDARD PLATE 4011 (MODIFY DIAMETER AND FOR ALL STRUCTURES LOCATED OUTSIDE OF 114E SWEET RIGHT OF WAY Y RAISED AREA TO FIT REQUIRED DIAMETER. AND SHALL BE CONSIDERED INCIDENTAL y MOW THICK ALUMINUM SIGM FLOW — I I i P: O REFER TO STANDARD PLANS FOR HBGW AND BLACK LETTERB ON GREEN OR BLUE HIGH INTENSITY REFIECTORRED BACKGROUND. ` DIAMETER REQUIRED. U- CHANN6 POST. / MINIMUM 1.2 LB. /FT. 6'- B" LONG, PANTED GREEN. OPTION T OPTION 2 P� © A NO H E EE E ST BE POLYPROPYLENE PLASTIC REINFORCED OC- FLARED WITH NOTE: y� d A N0. 2 DEFORMED STEEL ROD GRADE 1S0 AND SPACED iB" OC. FL ON OW. POST SHALL NOT BE POSITIONED IN A WAY THAT WILL WILL m TWO a'x 27 WOOD STAKES OR STEEL RBNFORGNG BARS IN EACH SALE AND BLOCK Q3 REINFORCEMENT AS PER SPEC 3301. GRADE 60. EMBEDDED N THE GROUND TOP MINIMUM. SHEET NO. STANDARD MANHOLE FOR STORM SEWER STRUCTURE MARKER SIGN BALE CHECKS 3 GR TRABH GUARD W f -per fi i %= T � i • - -- F& 5 C.Y. RIP -RAP (CL IV FlELOSTONE) o p RESHAPE OUTLET AREA AS "_° DIRECTED BY ENGINEER �^ E PLUNGE POOL -cBEl DETAIL C \ ' F &I 41 C.Y. RIP IV FlEIASTONE) �'� /.,- -�v s' / ' - - - - -` 00 �.�" c - "' 0 50 1 c .i1.Y. GEOlEX11LE FABRIC /� ��;; %': % /+Y _°. f= �_____ oo! ° •" ! �� ° ' :'\ ® m F &i 48 DROP MH R - 810.00 _ _" " sT. `_�J 1�'- ' " "'+r i �•'���_'_' _ o °mac I (NE) = �f'i _ _ z__ _ . _a__� -_ __ _ +tea =• '`� 1 PLUyG6POd� SEE DETAIL Fdd 34 C.Y.TtIPRAP (CL IV FlELOSONE) - a F ' & 68 S.Y. GEOIE %TILE FABRIC _ F&J 40' -36' RCP PIPE O .5G>: GRdJ]I�t'a LIMIT SALVAGE AND REINSTALL ` E%ISTNO 36' FES. 810.50. s ; = :'J ', �,'T.a -d_: x~n- �� S� - 0 ° - f° I °--- u�.n CONTRACTOR TO VERIFY INVERT i ELEVATION PRIOR TO CONSTRUCTON. .• - ' ro 's /_ - _ =E "R - F &I 40' -24' HOPE PIPE O 0.508 ° S_ REINBTALL EXISTING 24 FES m 801.4 DETAIL A DETAIL B DETAIL C x z 3G - -a=te 8 " -" F &I 8'-24' HOPE PIPE O OSOR SALVAGE EXISTING 24' FM CONTRACTOR TO VERIFY INVERT e2a.sELEVATION PRIOR TO CONSTRUCTION. PLUNGE POOL - SEE DETAIL A ' F &I 2B C.Y. WRAP (CL IV FIELDSTONE) i & 92 S.Y. GEOTE TILE FABRIC PLAN PL4N PLAN Z FM 8' -27' RCP PIPE O O.SSX I w Ln SALVAGE AND REINSTALL EXISTING 27' FES m 814.75 F& 1 5 C.Y. RIPRAP (CI. IV FIELDSTONE) SEGiION A -A SECTION A -A SEC11 - -A w U $ � .. cralmnc rawc Is ccamPVe rawa " c�mvm�e rmcc " � FVl- � SECTION B -8 SECTION B -8 SECTION B -B F� w Z fy- °o u LJ a fy CD -2 2x < T d E PRO J W o w x - ISTNG CEN UNE PROFl ? -- ° W z M N o� o0 e N _ NOTE: F &I 24' CHECK DAM PER UETAI - NJd S< �o- rr m 80r '2,0 &o n SHEET NO. mm mm m �m m I e 2 m m >A 9m 4 0 +00 0 +50 1 +00 1 +50 2 +00 2+50 3+00 3+50 4 +00 4+50 5+00 5 +50 6 +00 6 +50 7 +00 7 +50 8+00 8 +50