HomeMy WebLinkAbout6.C.4. Authorize Additional Payment for Engineering Services for the CSAH 83 Culvert Improvements Project No 2015-3 10111/6611 Consent Business 6. C. 4. SHAKOPEE TO: Mayor and City Council FROM: Jeff Weyandt, Assistant City Engineer DATE: 12/01/2015 SUBJECT: Authorize Additional Payment for Engineering Services for the CSAR 83 Culvert Improvements Project No. 2015-3 (E) Action Sought Authorize staff to add $13,100.00 to the CSAH 83 Culvert Improvements extension agreement with Bolton and Menk, Inc. Background On 12/16/14, Council authorized an extension agreement in the amount of $41,382.00 with Bolton & Menk, Inc. for design and construction services for the CSAH 83 Culvert Improvements Project. During easement negotiations with the property owners, the city agreed to add a driveway crossing. This driveway crossing was not included in the original scope of work provided by the consultant. As a result, the consultant incurred additional costs totaling $13,100.00. A memo from the consultant detailing the extra costs is attached. Recommendation Authorize staff to add $13,100.00 to the CSAH 83 Culvert Improvements extension agreement with Bolton and Menk, Inc. Budget Impact All costs associated with this project will be funded by the Trunk Storm Sewer fund. Relationship to Vision This supports Goal E: Deliver effective and efficient public services by a staff of well trained, caring and professional employees. Requested Action Authorize staff to add $13,100.00 to the CSAH 83 Culvert Improvements extension agreement with Bolton and Menk, Inc. Attachments: Bolton & Menk, Inc. Extension Agreement Memo 40N$� BOLTON 8.i. M �N K , I NC, p �Z Consulting Engineers & Surveyors \ / A' 2638 Shadow Lane,Suite 200•Chaska, MN 55318-1172 ^a\ ,/ Phone(952)448-8838•Fax(952)448-8805 k's."gs,' www.bolton-menk.com MEMORANDUM Date: 11/17/15 To: Jeff Weyandt,Asst City Engineer,City of Shakopee From: John Swanson Subject: CSAH 83 Culvert Improvements City Project No.2015-3 Extension Agreement For Inclusion of Field Entrance and Associated Culverts Mr.Weyandt: Bolton&Menk has incurred additional costs during data acquisition,plan preparation,and construction of the above referenced project as a result of the addition of the design and construction of a field entrance/driveway and associated culverts across the existing ditch for the Weckman property. The subject ditch crossing is located approximately 1200 feet west of CSAH 83. The Extension Agreement fee estimate submitted on 1/8/15,included work associated with installation of a culvert(s) below CSAH 83,per the City's request. The subject field entrance/driveway and associated culverts design and construction were not included in the original project scope,and were added to the project at the City's request. Subsequently,throughout the project development and design process,the inclusion of the field entrance and culverts was added,deleted,and then ultimately added back in to the project for bid and construction. The original Extension Agreement fee estimate total amount was$41,382.00. It is our understanding that the project is now complete, and asbuilt plans have been submitted to the City in accordance with City requirements. Bolton and Menk's costs incurred through 11/6/15 are$54,495.50.Thus we have incurred extra costs of $13,113.50($54,495.50-$41,382). All of these additional costs are attributed to the addition of the field entrance and associated culverts to the project,design,agency coordination,coordination with the City, plan preparation,bidding,construction and asbuilts. We have reviewed our project billing records and have accrued the following staff hours and associated costs associated with the field entrance and associated culverts addition: Staff Hours Rate Cost Senior Engineer 28 145 $4060 Design Engineer 35 102 $3570 Senior Technician 41.5 110 $4565 Survey Crew-Topo,Stake, 6.5 100 $650 Asbuilts DESIGNING FOR A BETTER TOMORROW Bolton&Menk is an equal opportunity employer '" �, ! Paget Survey Manager—Topo, 2.5 144 $360 Staking,Asbuilts Total $13205 The above cost summary shows that the Bolton&Menk design team spent about 1 week of time to coordinate, preliminarily design,remove, add back in,complete final design and restoration plans, specifications,and asbuilt drawings for the field entrance and associated culverts for this project. Considering the above,we respectfully request an Extension Agreement addition of$13,100.00 to the above referenced project as follows: Costs Incurred through 11/6/15 (Final): $54,495.50 Original Fee Estimate: $41,382.00 Total Additional Cost Incurred: $13,113.50 Extension Agreement Addition: $13,L00.00 Total Final Extension Agreement Amount: $54,482.00 Please contact me with any questions or comments you may have.