HomeMy WebLinkAbout4.C.5. Ordering Preliminary Engineering Report for the 2016 Reconstruction Project No. 2016-1, Res. No. 7604 101/161111 Consent Business 4. C. 5.
SHAKOPEE
TO: Mayor and City Council
FROM: Jeff Weyandt, Assistant City Engineer
DATE: 09/01/2015
SUBJECT: Ordering the Preliminary Engineering Report for the 2016
Reconstruction Project No. 2016-1, Res. No. 7604 (E)
Action Sought
Adopt Resolution 7604, which orders a Preliminary Engineering Report for the
2016 Street Reconstruction Project; authorize the appropriate City officials to
execute an Agreement with ITCO Allied Engineering Company to perform soil
borings; and authorize the appropriate City officials to execute an Agreement with
WSB & Associates, Inc. to perform engineering services.
Background
Staff has completed the review of the proposed 2016-2020 Capital Improvement
Program which includes street reconstruction projects on the streets listed below.
Due to the size of the project, staff is requesting an early start on the project.
Attached is a map showing the proposed study area for the 2016 Street
Reconstruction Project. In the preliminary engineering report, staff will investigate
street reconstruction along with utility replacement.
In order to reconstruct these streets during the summer months of the 2016
construction season, soil borings, a topographical survey and the preliminary
engineering report should be authorized at this time.
It is staff's intent to prepare the preliminary engineering report in accordance with
the current assessment policy of assessing 30% of the street improvements to the
benefiting properties. This will require 70% of the street improvements to be city
funded.
Attached is Resolution No. 7604, which orders a preliminary engineering report to
be prepared for the following streets:
•3rd Avenue from Spencer Street to CSAH 17
•Minnesota Street from 1st Avenue to 4th Avenue
Also, attached is a proposal from WSB & Associates, Inc. to perform surveying
services and a proposal from ITCO Allied Engineering Company to perform soil
borings.
Recommendation
1. Offer Resolution No. 7604, A Resolution Ordering a Preliminary Engineering
Report for the 2016 Street Reconstruction Project and move its adoption.
2. Authorize the appropriate City officials to execute an agreement with ITCO
Allied Engineering Company to perform soil borings.
3. Authorize the appropriate City officials to execute an agreement with WSB &
Associates, Inc. to perform engineering services.
Budget Impact
If the project is approved, it will be funded by the Sanitary Sewer Fund, Storm
Sewer Fund, Shakopee Public Utilities, special assessments and Capital
Improvement fund or tax levy.
Relationship to Vision
This supports Goal E: Deliver effective and efficient public services by a staff of
well-trained, caring, and professional employees.
Requested Action
Adopt Resolution 7604, which orders a Preliminary Engineering Report for the
2016 Street Reconstruction Project; authorize the appropriate City officials to
execute an Agreement with ITCO Allied Engineering Company to perform soil
borings; and authorize the appropriate City officials to execute an Agreement with
WSB & Associates, Inc. to perform engineering services.
Attachments: RES. NO. 7604
Location Map
WSB Agreement
ITCO Allied Engineering Co. Agreement
RESOLUTION NO. 7604
A Resolution Ordering The Preparation Of A
Report On An Improvement To
The 2016 Street Reconstruction Project
WHEREAS, it is proposed to improve 3rd Avenue from Spencer Street to CSAH 17 and
Minnesota Street from 1st Avenue to 4d' Avenue by reconstruction of sanitary sewer, watermain,
storm sewer, concrete curb & gutter, aggregate, bituminous paving and all appurtenant work and to
assess the benefitted property for all or a portion of the cost of the improvement, pursuant to
Minnesota Statutes,Chapter 429.
NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY
OF SHAKOPEE, MINNESOTA, that the proposed improvement be referred to Bruce Loney,
Public Works Director, for study and that he is instructed to report to the Council with all
convenient speed advising the Council in a preliminary way as to whether the proposed
improvement is feasible and as to whether it should best be made as proposed or in connection with
some other improvement,and the estimated cost of the improvement as recommended.
Adopted in session of the City Council of the City of Shakopee,
Minnesota,held this day of ,2015.
Mayor of the City of Shakopee
ATTEST:
City Clerk
ENGR/20I6-PROJECTS2016-RECONSTRUCTION/WORD/RES7604ORDER-REPORT
x
11 HENNEPIN A •
.•
CARVER
CO . . .
...
•
•
CO . - f .
SCOTT ,. _. .._ . . . ._ .....,.,.,
,- „---, - - V in nesotc
CO .
R i v e r
. „
, ---
. BLuF
clik i0E.iliP3TEIIIIII.. c„ic\N p,UGN Fibr-
\D .:1 Ilk*
4 *
u..1
411111111111111 -1r-IC:\ 2nd P'\IE .0000°.*„..• LZI \c
• tail 01"-- \---5\
io-
vierlos two° PNE' iiii fclik o
...... i .\
o
\----L--6 t-ui a-
NO cc
icir..2
'\D
wis
z ‹ ...._
.... 0
o \s)1_00
. . 0
Y o
1
5kb Ve--r--"Agij 1-j
cfj /
[ J
< D
0
_le
F
1 E 4 s t ct
3011111 8t1- AVFJ F. -->) ; lk-Li
,,...0
,
n, „IIII
SHA KOP EE AVE. --,,
I
\
m
' 1 1 O I tn 10th\ ' 31F. il
II \\
\-jlij (i)Ld LIL---
1._
WU 2016 STREET RECONSTRUCTION DRAWING NO:
1
SHAKOPEE PROJECT LOCATION
A
WSB
Infrastructure■ Engineering• Planning•Construction 701 Xenia Avenue South
&Associates,Inc. Suite#300
Minneapolis,MN 55416
Tel: 763 541-4800
Fax: 763 541-1700
August 26, 2015
Mr. Jeff Weyandt, PE
City of Shakopee
129 S. Holmes Street
Shakopee, MN 55379
Re: City of Shakopee 2016 Street Reconstruction Project
Estimate of Cost to Provide Topographic Survey Services and Construction Staking
Services
Dear Mr. Weyandt:
We propose to provide survey services for this project, as described below, on an hourly cost-
reimbursable basis in accordance with our current fee schedule. The areas for this work are
listed below and as shown on the attached figures from your RFP:
• 3rd Avenue -from Spencer Street to CSAH 17
• Minnesota Street—from 1st Avenue to 4th Avenue
Scope and Prosect Understanding:
• WSB will have the same survey crew throughout the project that will do all of the
topographic survey and construction staking. This will ensure that they are familiar with
the project and continuity throughout the construction will be maintained. This aspect
has been our past practice and the City can be assured the same staff will be there each
time.
• WSB will complete a topographical survey of the project area.
• WSB will submit the points for the various project areas to the City by October 20, 2015.
• City staff will plot the topo.
• The horizontal datum shall be on the Scott County coordinate system.
• The vertical datum shall be on the NAVD88 sea level datum.
• The project area extends 10-feet beyond the right-of-way (we will shoot the houses
corners)
• Survey will include all shots necessary to prepare a set of construction plans including
but not limited to the following:
1. Shots at all match in points
2. Shots to establish existing vertical and horizontal alignment
3. Property irons to establish existing right-of-way
4. Cross sections every 50 feet, including at a minimum centerline, gutter line, top
of curb, sidewalk, right-of-way line, grade breaks and 10-feet beyond the right-of-
way.
K:\Shakopee\2016 Recon Survey RFP\LTR Prop Shak 2016 Survey 8-26-15.doc
Mr. Jeff Weyandt, PE
City of Shakopee
August 26, 2015
Page 2 of 3
5. Manhole reports including pipe sizes, pipe types, inverts block or precast and
condition.
6. Boring locations (coordinate with ITCO Allied Engineering)
7. Small utilities (have utilities located through Gopher State One Call and maps
of all small utilities in the area sent to the City).
8. All curb stops (WSB will coordinate the location of all curb stops with Shakopee
Public Utilities).
9. QA/QC review of the topographic survey and manhole reports
Deliverables to the City:
• ASCI point file and points in a Cad file in AutoCAD format with all topographic survey
shot information included.
• Private Utility Maps collected from Gopher 1 Locates in paper and/or electronic PDF
format.
Topographic Survey Work:
Cost not to exceed fee for the above described areas is given below:
• 2016 Street Reconstruction: $6,400
Construction Staking:
Based on similar project size and scope we have completed for the City of Shakopee we
estimate our fee to complete the construction staking for this project at:
• 2016 Street Reconstruction: $14,000.00
Construction staking will include sanitary sewer, water main, storm sewer and curb stakes.
As-builts:
As-built surveys we estimate to be competed for a fee for each of the areas is given below:
• 2016 Street Reconstruction: $2,000.00
The as-built work would include rim and invert elevations on all project structures and
coordinates on service locations. We will provide Cad file on disk in AutoCAD format with all as-
built survey shot information included.
Our hourly billing rates for a 2-person crew are $160/hour and office survey work at$101/hour
for our in house survey technician.
This letter represents our understanding of the requested services. If you are in agreement,
please sign on the space provided and return one original signed copy to us for our records.
If you have any questions concerning this letter or fee as discussed herein, please feel free to
contact me at 763-287-7175. We greatly appreciate the opportunity to assist you and the City of
Shakopee in the completion of these projects.
Sincerely,
WSB &Associates, Inc.
Tom Voll, P.E.
Project Manager
K:\Shakopee\2016 Recon Survey RFP\LTR Prop Shak 2016 Survey 8-26-15.doc
Mr. Jeff Weyandt, PE
City of Shakopee
August 26, 2015
Page 3 of 3
I hereby authorize WSB &Associates, Inc. to proceed with the above-referenced Scope of Work
in accordance with the company's current fee schedule.
City of Shakopee Authorized Representative Date
K:\Shakopee\2016 Recon Survey RFP LTR Prop Shak 2016 Survey 8-26-15.doc
Title
1 inch = 752 feet
- P 41'
SHAKOPEE
August 7,2015
Map Powered by Data Link
Title
MOS H. ,.
C
•
• . � ►
11791
a „ • J 1'0) ' -�
l) r�nr
• MM. • i8su a o 0.. �l ► ' 1790
■ IMO i ISN
•v ♦ 1755 ` S ► O•1751
63v �� a0fi't-- N .1 i .. •••• I ED142
612 _ •-1a. 1t
F O8 , CDD2A - •
4� e..)
`535 ED37A
2,4611
8904 v '�.� IN* 894s n EG136 • E
A. �LT"� . ED 3S 4 0 G c>
CD242 CD ir .2-31 •a _�M . �M ED37 !
• 519►e- ► ►
U
904
Cts Q
CCM •
r f E9‘.43. ED42 r 0, E C 9. X0271 •
t .E04g 0.DD31• 1 4.1" P 8965
A.
1.5 CON 8964
' EDS()
CDSI. - EUd6 ED 183 8c63'
CD4!►0D44 4 i c- ' A •
c 1
A A Edkt ■i
CD54 ► CD643c siri! ®tlf 7 Ef}43 ►. Ei2
MI .1- • 1:59 1060 0 ) � D 3
o
ti
C • 9869
arNFL ,, c r ED131 E B
11191111M 4 D256 p. EDI 80
;r.•- v tut\c•
9857
CDS() 1023 1025
MIA ti C'..: 1 CD49 1 i±0" C : Ct • ED131 EDt28
l.
It.41T. ,
7
1 inch = 752 feet
Sewer Gravity Storm Inlets Storm Detention
Mains Areas
Catchbasin
Sewer
11111.61kiAl Manholes Standard — . -✓
Sewer
SHAKOPEE Di
Pressurized m
Discharge
Mains Points
August 7,2015 StormStorm Gravity
_
Manholes Mains
Map Powered by DataLink
ITCO ALLIED ENGINEERING C O.
AN ALLIANCE OF INSTANT TESTING COMPANY AND ALLIED TEST DRILLING
Jobsite and Laboratory Testing, Geotechnical Services
Commercial, Residential and Municipal
7125 West 126th Street, Suite 500, Savage, MN 55378
Telephone: 952-890-7366 • www.itcoallied.com • Fax: 952-890-5883
August 17,2015
Mr. Jeff Weyandt, P.E.
City of Shakopee
129 Holmes Street North Phone: 952-233-9362
Shakopee, MN 55379-1351 Fax: 952-233-3801
Re: Proposal for Soil Exploration -2016 Street Reconstruction Project
We are pleased to submit this proposal for geotechnical engineering services for the above referenced
project.This proposal letter presents our planned scope of work and the associated fees for this project.The
purpose of our work would be to obtain information regarding subsurface conditions.
The project site is located along 3rd Avenue East from Naumkeag Street to Spencer Street, and along
Minnesota Street from Bluff Avenue to 2" Avenue. The site consists of existing roadways that will be
reconstructed.
ITCO Allied Engineering proposes to put down six borings on the site at locations as shown on the site
plan. With this proposal we assume that the project site is accessible for a truck mounted drilling rig. If we
find that the site is inaccessible to our drilling rig,we will contact you to discuss other field exploration
options. Flagging or other traffic control is not included in this proposal. If this is necessary it would be
done at additional cost.
The borings will be Standard Penetration Test (SPT) borings with samples taken every 2.5 feet. SPT
borings are recommended because they provide a more accurate soil profile than other types of borings.We
have also included costs for conducting 6 gradation tests and 6 P.I. tests in order to determine the
AASHTO soil classes and estimate the R-values.If pavement subgrade soils consist of sandy soils the P.I.
tests would not be necessary.
The results of our field exploration program, along with the boring logs and a boring location diagram
would be presented in a final engineering report. The fees for our field exploration are presented in the
following table.
1
Quantity Units Unit Cost Extended Total
Mobilization 1 L.S. $300.00 $ 300.00
SPT Borings 6 Each $210.00 $1260.00
Pavement Patches 6 Each $ 10.00 $ 60.00
Gradation Tests 6 Each $ 70.00 $ 420.00
P.I. Tests (if needed) 6 Each $ 75.00 $ 450.00
Engineering Report 1 L.S. $500.00 $ 500.00
Subtotal $2990.00
Ten Percent Discount $(299.00)
Total Estimated Cost $2691.00
If undocumented fill or poor soils are encountered at the proposed drill site and depths,additional bores or
deeper sampling may be required to develop an adequate soil profile. If deeper sampling and/or additional
borings are recommended,we will notify you and obtain your authorization,prior to proceeding with this
work. The cost for our services would not exceed the estimated total cost given herein, unless
unanticipated conditions are encountered and your authorization is obtained.
If this proposal is acceptable please sign in the space provided below and return one copy with your
original signature. If you have any questions regarding this proposal, or if we can provide additional
assistance,please do not hesitate to contact us at(952) 890-5909.
ITCO Allied Engineering Company
Robert Sullentrop P.E.
Project Engineer
AUTHORIZATION
I, representing
(name)
hereby authorize
(company or self)
the above described soils investigation to be performed on the subject
property. This authorization provides the right of entry to ITCO Allied
Engineering Co. for all required soils investigation work. Payment is due
upon receipt of the invoice unless other arrangements are made in writing.
SIGNATURE DATE
2