HomeMy WebLinkAbout13.A.1. 2011-2015 Capital Improvment Program i3.}. CITY OF SHAKOPEE Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director SUBJECT: Draft 2011 -2015 Capital Improvement Program DATE: June 15, 2010 Please find attached the Draft 2011 -2015 Capital Improvement Program (CIP) for the sanitary sewer, storm drainage and street improvements of the City of Shakopee as prepared by the Public Works Department. Also included is the 2011 -2015 Park Asset Fund project list. The following is a list of highlights per each area for your review: SANITARY SEWER PROGRAM 1. Construction and completion of cured -in -place pipe lining project. Vitrified clay pipe that can be lined and not scheduled for reconstruction will be done in five years. 2. Other projects are potential development projects that may or my not occur. STORM DRAINAGE PROGRAM 1. Final project staged for the Prior Lake Channel improvement. 2. Channel stabilization project on the channel from Beckrich Park Estates to Patterson Drive. STREET IMPROVEMENTS 1. Construction of Pavement Preservation with annual seal coat project. 2. Major street reconstruction of 6 Avenue, from 10 Avenue to Webster Street and other streets in the Presidential street area. Need to use State Turnback funds by 2011. 3. Continuation of bituminous overlay in the downtown area and streets east of C.R. 17 north of Vierling Drive. 4. C.R. 101 improvements, which include sanitary sewer, water and storm sewer reconstruction. 5. C.R. 69 improvements, which include replacement of sanitary sewer, water and storm sewer. 2012 -2015 STREET IMPROVEMENTS 2012 A. No reconstruction project. Major street overlay project. 2013 A. C.R. 17 - Phase 1, from St. Francis Avenue to C.R. 78. B. Construction of Valley View Road to relocate hospital access. C. C.R. 17 and Vierling Drive improvements to add capacity. City responsible for project and 50% of cost beyond Highway Safety Improvement Project funding from State. 2015 A. Bluff Avenue Reconstruction Project — Need to discuss the timeline of project and should this project be incorporated in a Memo of Understanding with the County for the CR 101 project. B. Downtown Street Lighting Project - initial phase of replacement lights. PARK ASSET FUND Five -year project list includes bituminous trail overlays, fence replacement, shelter repair in Lion's Park and Tahpah Park, Lion's Park tennis court replacement and Schleper Stadium field lights replacement. OTHER ISSUES Other items to discuss with the city council are the combination of the CIF with the State Aid fund, and to discuss bituminous overlay assessments. The Capital Improvement fund (CIF) and State Aid fund are utilized in constructing or reconstructing infrastructure in the street and utility areas. City code does include buildings but this was done before a building fund was established. Staff would recommend that the funds be combined and that the code be updated to reflect the current standards. On the item of assessing a portion of bituminous overlays, a memo is attached from Jeff Weyandt, Assistant City Engineer for council consideration on whether to not assess overlays in the future. The city did not assess overlays prior to 1997 and did adopt an assessment policy change on March 18, 1997 by Resolution No. 4637. Staff also did present a Pavement management System plan on July, 2006 and recommended that assessments be changed from 25% to 30% for both overlays and reconstruction projects to help fund the program. Recently at the February 16 2010 council meeting, the council directed staff to increase the assessment period from one year to two years for overlay assessments. Staff is requesting discussion on whether to continue assessments for overlays or to change the policy to no assessments for overlays. See Jeff Weyandt's memo on assessment policy reasons to consider not assessing overlay projects and Gregg Voxland will be available to discuss the budget impact. This issue is a policy matter of how the city council wants to fund overlay proj ects. A presentation will be made at the June 15, 2010 Council meeting on the major CIP projects and the funding issues mentioned. //, Bruce Lon; .E. Public W • s Director ENGR/2010- PROJECTS /2010 - COUNCIL /2011- 2015- CAPITAL - IMPROVEMENT - PROGRAM City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Park Asset Various Park Replacement Projects $710,000 A. Expenditure Items: 2011 2012 2013 2014 2015 _ Land & ROW Construction 55,000 50,000 80,000 345,000 115,000 Improvements Engineering /Admin. 5,000 5,000 5,000 40,000 10,000 Total 60,000 55,000 85,000 385,000 125,000 B. Funding Source: General Fund Capital Improvement Fund Park Asset Fund 60,000 55,000 85,000 385,000 125,000 Grants (specify) Donations (developer escrow) State Aid Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk Tax Levy r Total 60,000 55,000 85,000 385,000 125,000 Description: 3 ,, . t, -_ ) Park replacement/repair projects. v � ' r jiy` ` 20 Justification: ,, i E 1 Replacement of park assets are necessary due to condition or end of life of the T a � 1 s 'n,:' asset. F _ Sir , '� f I 4 ;..d E li ,_ 1 1 r • T, 3 - - �', 1 ,. i s Other Comments: 1 � _. s' J . i� S - r Projects include Lions Park Shelter #2 repair, trail overlays, fence replacement, j ` `� {' Tahpah shelter repair, Log Cabin repair, Lion's tennis court replacement and �� y 1 ,; �,r,. f 4 : Schleper field lights replacement. L t , ,' 1 . - t .� ; ; , - f Operating Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Sanitary Sewer Annual Cured -in -Place Pipe Project $390 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 360,000 130,000 Improvements Engineering /Admin. 30,000 20,000 Total - 390,000 - - 150,000 B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund -Base 390,000 150,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base CY Storm Drainage Fund -Trunk Tax Levy - Total - 390,000 - - 150,000 '_, Description: f ra -_ k � , Annual cured -in -place pipe project. �. F7 uy ?t °, , S -, - ` , t ., o ff : r Justification. ' e e 3`' f f ,� ! Y s t t r : �,� 1�, ,f=� ; • , n ap : , A I , 1 Necessary to extend the life of existing sanitary sewer. : e7 7 4" J • r k f t 1 i ! sI tit• . ,,. 0 I r .- ' + t S 11 1 ''. ! t b t e L t 4 . - i H , - E .,� A u = KY.:,.'" � '' s ; 4 s , ti a k...'''''.11*'' la' � -. 14 y Other Comments: v 6- S ,' = Iri o;F t• ,y.. e 1 S � Project area to be determined based on yearly televising. S ia at• f.c- a t7 j -. J * '' S`4 i Y . a�vkF f . t' 4 t it t �� air f f 4' i ° 7 t L .1 ,<S t �, `' "1, ° t t 5 r. :. n z s i , - ti S ,�. } -}y 1 u . �� ,, Operating Costs: ��' �•' � :. ± �"+- -3,_ �.� , "- 1 ' �1 � ...J ;.•'cu - 5 �� "_ 'Y PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015. Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Sanitary Sewer CSAH 16 Trunk Sewer Extension $160,000.00 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 150,000 Improvements Engineering /Admin. 30,000 Total - 180,000 - - - E. Fundin. Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk 180,000 Storm Drainage Fund -Base Storm Drainage Fund -Trunk CO Tax Levy Total - 180,000 - Description: Extension of trunk sewer to serve future development. r 'i Justification: , - --- g • ' Sewer extension is part of the City's sanitary sewer plan and is needed in order for area to develop. 1 J i° )..'. wr y � � 4 a¢' Y 'n - t , �, q,; E ;� ; u Other Comments: . , ;;y > Trunk sewer will be extended as the area develops. i �a • __ i's 3 - -- �_ 1 J r = a Operating Costs: PROJECT LOCATION City of Shakopee Capital Improvement Progra Project Title: 2011 - 2015 Project Manager: Project Type: Total Project Cost: Bruce Loney Sanitary Sewer 2012 Sanitary Sewer Improvement.. X130,000.00 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 100,000 Improvements Engineering /Admin. _ 30,000 - Total - 130,000 - B. Funding Source: -- General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments itt Sanitary Sewer Fund -Base 130,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk Tax Levy Total - 130,000 - Description: Replace or line existing sanitary sewer north of Bluff Avenue. e � Justification: � _ Potential for high i nfiltrat i on. illippl _ ti '''', :j - ft= E� L� l - , - - -, ,„- ,..--,-,Vc* _.,..„:„..„___LI„., r a r P _ i yxr --' - yjxkt t � Other Comments: 4 ,�r .. `r" - 3 iki211411:=4 II{ , . . f - * ' t { �-a x . f � , Operating Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Sanitary Sewer Trunk Sewer Extension South of X300,000 - Valle View Rd. & W. of C.R. 83 A. Expenditure Items 2011 2012 2013 2014 2015 Land & ROW Construction 240,000 Improvements Engineering /Admin. 60,000 _ Total - - - 300,000 ° D. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 100,000 Sanitary Sewer - Fund -Fund Trunk Base Sanitary Sewer 200,000 Storm -B Storm Drainage Drainage Fund Fund Trunk ase in Tax Levy - 300,000 - Total - ° „ _•_%/ •.� Description: z a - rho,- ' zl r ? Extension of trunk sanitary sewer in developing area s outh of Valley View Road I . , , z � and west of County Road 83- ;u f . ` . � � 3 �: � a :�\ h Jus t i fi cation: i ii il i ! Trunk sewer will be needed to serve this area with munic services. i L 1 „' ` A - Ilk. ' 9 t . L' ''rB' - -�1 � ' y :� � -- .. 1 ILL''''' '� � '1' G Other Comments: "` R 11. J r i Timing depends on MUSH allocation property owners willing to develop. l f l "~ • _ $ �, � _ -� I Trunk sewer will be extended as area develops. and '' h p 1 " -�' � . r � r i € ,,_ , '- t: t - 7 '. ; : r -e, z lr- PROJECT LOCATION City ect Type of Shakopee Capital Improvement Program 2011 5 Project Manager: Proj Project Title: - Total Project Cost: Bruce Loney Sanitary Sever Trunk Sewer extens West 201 of $170,000.00 CSAH 15 _ A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 150,000 Improvements Engineering /Admin. 20,000 - Total - - 170,000 B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 170,000 CD Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund - Base Storm Drainage Fund -Trunk Tax Levy Total - - 170,000 - ' v r4 ,: i L r Description: g l € , t it ,,,, , 1 ., 1 t j s I t e " . „� , t.- / Extension of trunk sewer to serve area in MUSA. ¢ .. r ! 3 # , I f! rr Jev e- l , 4, ' 0 .- k 1 r1 tj - . e r , .. • �G r ; ��z, r+ y .1 �� � 4 14; Justification: a r VA''"`",-.7,•:- � � s A ., , . — Sewer extension is part of City's sanitary sewer plan and is needed in order for �� � i! 5 4� f� 1 � ; �� s 'rr � area to develop. • aei. I Y " 1 ,_ { Ail q ' { � � g 0. \ i J w' r,14 iJ ` ,. � t J N r Other Comments: r _ . . t I a . ! : a ,, , Sewer wi be exten as area develops. A 3r d k;-=---4, �# . at - ?fr . r,j t r a r t .� � � t c : .I- s s � . � a' �� ..�� ++ '� ' ! r . LE R � .y 1 ... . 1 e m - , ..���. -S� l A ) Y i t t � iY Y • s es I 'a e c c t Operatin Costs: PROJECT LOCATIt ?N City of Shakopee a ( Title: ital Improvement Program 2011 2 ®15. Project Manager: Project Type: P roject Total Project 110 Cost: 000 F3ruce Loney Sanitary Sewer let Avenue Sewe Ext. (Apgar) X140,00 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction , Improvements Engineering /Admin. 30,000 Total - - - - 140,000 B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 140,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund Trunk Storm Drainage Fund -d -Trunk Base Storm Drainage Fun Tax Levy .. 140,000 Total - - - f Description : u _ � �" '� '� Extension of sanitary sewer to serve an area without municipal sewer along 1st F t S �� < a c ,� !;,7;f7":;;;7,--- - , ff y � ,J % Avenue. r:.'-'- . *'°'� '�� ff.'s ;' ��0 a $ -4-; "L - �. j . ,'s� Just a z y �' ,� E, Just' ti # :' ��.�3 _ , To replace existing on site systems which may be at the end of their life with z ` ' - 1, municipal sanitary sewer service. '. ._ _ r :e' , p , .: 4,- 7,: -- ,it. - f:-- - 4"' 1?.: . - ,-r! � � a 1 ; , -- �. ; . 1 i - - rr i x t Syr -, Y , 4 r - ' y} { I' A �, BR. `.:.. BBB 999 """ 1 1 ' other is prof mments: �, 3 � > , ; " t This project needs to be in by existing property owners, redevelopment, or ' t 1A50-:.-1,1:.. ..i , - ,` § r _ t_ ' 4 ' ' public health hazard concerns. _V jl ` .. e p s � „ 1,'''''''' �� ' Operating Costs PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Project Cost: Bruce Loney Sanitary Sewer Demolition of Old L -16 Building $75,000.00 A. Expenditure Items: - 2011 2012 2013 2014 — 2015 - Land & ROW 60,000 Construction Improvements 15,000 Engineering /Admin. Total _ - - - 75,000 _ B. Funding Source: - --- General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 75,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base CO Storm Drainage Fund -Trunk — Tax Levy _ _ 75,000 Total - - Description: J r - , , 77 �1( Demolition of old L -16 building. ,_,_ . Jam ; ,-- ? "� � = r a s ,:,„,,..,,,ive , : - - a-- - - - - - .„,---,-, '____,_,_ ,1,,,,, I Justification: ��'�." � may. , ? l'-4, - W a� �! 7 - � ' a ri 4 '' !', r s SR Cc l o " _ L.,,,, 1- � C o mm ents Other C - �T,, ti N ' - ;---- - --, 4 # ' �� 1. r ' s 7 , 7 t ye -49 Al 6 • . Y 4 _ , R Operating Costs PROJECT LOCATION City o f Shakopee Capital Improvement Program 2011 -2015 Projec Manager: Project Type: Pr oject Ti tle: Total Project Cost: Bruce Loney Storm Sewer Annual Erosi Control $150,000.00 / A. Expenditure Items: 2011 2012 2013 2014 2015 _ Land & ROW Construction 125,000 Engineering / Improvements dmin. A 25,000 — Total 150,000 - = — - — S. Funding source: _ — Genera — Fund Capital Improvement Fund Park e Fund Grants Resery (specify) ify) Donations (spec State Aid _ Assessments Sanitary Sewe Fun - Sanitary Sewer Fund -Trunk Base Storm Drainage 150,000 Storm Drainage Fund - Trun Fund - Base k 150,000 en _ Tax Levy Total - ° Description: 4 " � ,. 1 °A Annual Erosion Control Project. a c r 7 3 a a r L� ^ �' Justification 7 x z a �.'� f s � Areas may need to be fixed to meet I�IPDES requirements. • �g sea a,) s E -_ �� � + 3 . rz ., # �{ t r l a ®Hier,' ®mm ents: M. s r,+ t-, 4 e r YF 3 T_�` q p a The sto sewer outfalls along the r iver must be inspected prior to determining a r �. � } �''c c Y �� a > project area r . r r F h 2 v c y+, C- , x ,,,1:1 , - • y ' 7, 7q C ' 1 7y`. _ � ' ,. r 4 z {i 1:„..(1 n I j - " t G .1.7:-T,„, , . ,` j ., I & 4 P .. Onerating COSTS: A a' v lx:l` # . t$iL'ti°6 i PROJECT L®CATIC)9'I City of Shakopee Capital I mp rovement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer Drainage Control System X100,000.00 A. Expenditure Items: 2011 2012 _ 2013 2014 2015 Land ROW 45,000 Construction 40,000 Improvements - Engineering /Admin. — _ 15,000 _ - — Total _ - 100,000 _ B. Funding Source: _ — General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 0 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund - 100,000 Base Storm Drainage Fund Trunk r _ Total Tax Levy _ - 100,000 -_ _ a . Description: s E �� # ) Construction of a drainage control system south of C.R. 78. The system will ' { utilize a combination of an outlet control structure and a pipe outlet. - `-'k X95 r .- ,- - . -..1- x -?-':-.2 ,f �. _ -, -` n , t <.e., " Justif ication: r t �3 ' s Developing properties in the area will produce more storm water run -off requiring x 41: 3 3 „ ,- r 7` -� t ou tlets to be constructed from existing wetlands. Ultimately, the outlets will y ,, ti reduce water running downstream to future developing properties It is t 4 t``> i' � ' � recommended as part of the City's Comprehensive Storm Water Management 4..) t t : ":4 ' • r, r it f - — Plan. { § 1 ''''°'1°'.1- ' `��_ Other Comments: i -- . 3 kv * t - i Controlled outlets will better manage: the storm water discharge rates and more 'f � , - fully utilize the ups tream storage available in existing wetlands. WI' ( 1 r it i i s 'a 1 � � ' 1 ice ' $ te .- � ' f , * r � Operating Costs: PROJE LOCATION City of Shakopee Capital Imp rovement Title: Program 2091 -2015 Project Manager: Project Type: Project Total Project Cost: Bruce Loney Storm Sewer Shenandoah ausiness Park $185,000 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 150,000 Improvements Engineering /Admin. 35,000 Total - 185,000 - — B. Funding Source: — General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund -d -Trunk Base Sanitary Sewer Fun Storm Drainage - - Storm Drainage Fund Fund -Trunk Base 185,000 *— r — Tax Levy - _ Total - 185,000 3' ®ascription: Construction of a s Y� storm sewer o thas . ` y v it:, � (Industrial sites) to the Minnesota River ugh e Murphy h LandingBusines Park . it r a '' ri' rp p. t - t A storm sewer outlet may be needed utlet to from prevent further erosion from occurring 3 r' 7 - = y now and to hand through the increased volume from industrial develop y ' _ r v C � 1 i Y i ( f .'y . g FU d ti �-+ -. ,, ° � w.r.c � y "F,. � ma y" --, ` -- A ter ®ther Comm ents: : '' � 1 1 ` el Project is dep endent on industrial development proceeding in this area. t s 14 - = . ,. ,,wt- z - `f i , i r , d' ! Coordination with Three Rivers Party; District will be required. '; : L r 4 . -.,, J �f , r ' tv k Ty I j s n yw i+f i }L it C y 5 Operating �✓O.stS: 9 >,.� ¢ xn. a j PROJECT LOCATION 011-2015 Project Cos City of Shakopee Capital Improvement Program 2 Project Manager: Project Type: Project Ti tle: Total Bruce Lone storm sewer Channel Stabilization $125,000.00 A. Expenditure Items: _ 2011 2012 2013 2014 2015 _ Land & ROW Construction 100,000 Improvements Engineering /Admin. 25,000 - _ Total _ - 125 000 - g Fund Source: B. Fundin — — Genera' Improvement Fund Park Reserve Fund Grants (spe Donations (specify) State Aid Assessments Sanitary Sewer Fu Sewe nd Base Sanitary r Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund-Trunk 125,000 N _ Tax Levy — r Total - 125,000 - m �. " Des 1 i i f � r Stabilize the dra channel east of ACC 2nd Addition. h t C.:�) ; k i B �:. i in 72 - '� r ' $ y � " 1 Justification: �� r } � ' j l 1 � ° �� s Channel may start to erode. F T � _ 1 � ," n T4 ' v ,4 tQ 1 . £ t ;. ' JIA � r . . 1 . 3 , E 'r1 c 1 `� f . . 4 Yr ' {: 1 t .. � 1 1 - k �- ` 1 - � � ,. CA' "fir rtiri .t€ � ,fx i p _ l 9 .9.' 3 7! i I ^ , te r t 9 .. '1 : Dr ' . _ � c � �� s : 3 i + € t i Other Comments: i s � � � . � 'i 1 � F { j t v k i L Q" t PI l a 7 + � F.s.. a+ S ! f z a : -0„0,,,,,,-.1, j� � . dax 5 it ii i � �s P y �l -•t r k 4 - 1 L � � ` = Operating Costs: is ?c- 3 ; .y�&aa rte°" E:. -'r '` i k" �'..,. -� - ..s+ PROJECT Loc ATIC)N City of Shakopee Capital Improvement Program 2011-2015_ Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer PLSL Channel Improvements X85,000.00 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 80,000 Improvements Engineering /Admin. 5,000 Total - - - 85,000 B. Funding Source: _ General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 85,000 CO Storm Drainage Fund -Trunk Tax Levy - _ r Total - - - 85,000 Description: //_.-;1_ ��' + ` ° `� r ii Ad ditional capacity and control structures in the Prior Lake /Spring Lake Channel � � , f L ea `� �` C � ' -� , � g�,�, -� � � , to handle increased run -off due to development. g -- - : + v f ar i i. + � ,- � 4 ,a � � r ,, � , " ° e !. ` 1 3 Justification: a, 3 ' ¢ ' r �; � ,s� 6w }fir i c 1 \ ms s s�r� � �.7 E4' i ti ;� : � h � 6 „, isa J 1, s , � � �{i Existing agreement lc'Sn Wts District WD T � e �� � � a s v �y .. -3/ f r °- t t t requires the City to maintain with Prior the La cheiannel pri g u pon Lak the City aer utilizing istr the channel (PLSL for ) 9 r-,,, ,'e, i+ s a �� o f s .' a {_ , ' . ,, � �.A ��+ �, �t .� urban development. Increased runoff from development will require a larger : i r i i , t R _- 3 ' a` i I t ; channel. + I , � * , 4 E 1 r - F 178 3 Yh """er `�- ��' p��Ag Other Comments: ,4 , h i. .) ;_. ;�, 3 3 r This segment will be upgraded when the property develops. ks �, \--,=-7,74,;,,z.--- '''4=' i � '3' � i.11,17 � x � _..y .✓ �Y+- �EIY$��t 1 �e 1 F - c � i t ; s d 'S 1 t f t ,,, }, a 1 Y ''� 6. t a te 4+ x y ...r,,„,,,,,,.. L t , Operating Costs: PROJECT LOCATION City of Shakopee C apital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: — Total Project Cost: truce Loney Storm sewer C onstruction of P ollution Prevention $1,000,000 Dev A. Expenditure Items: 2011 20 12 201 2014 2015 Land & R Construction 900,000 Improvements _ Engineering /Admin. 100,000 _ Total - - - 1,000,000 E. Funding S ource: — — - General Fund Cap ital Improvement Fund Park Reserve Fund Grants (specify) Donations (spec ,0 (Grant) et State Aid Assessments Sanitary Sewer Sanitary Sewer Fund -Trun -Base k Storm Drainage Fund -Base 500500,000 00 Storm Drainage Fund -Trunk '— r _ Tax Levy — Total - 1,000,000 ° Description: ' . ' � .� Construction ofi pollution prevention devices in the downtown to treat storm water, prior to discharging into the Minnesota River. A , Justification: This may be mandated in the future. 4i -, ' "1- J- . - e- e -47 ; . ...- .. -- .., d a i . '', �. ' s _ - sir - -- -1_ i 7. i a ts: _ ®that ®m n r ° � f 3 � � -� y" ( s I- t` ; . E ma - , , f 1 = -h3 11 i L µ l i t i i - -'' t 3 w � -� z s i '` 'ru, 2, . z � '1 ., k r '_ i 1 * _ s t n .' , v i ,1_. 1 ' ` t ; , - < , � _ :gam i : m om_ r t as t % .' ® eratinfl Costs: i . -. E ...,F.>: i , -11 41 - .c, .r- -. PROJECT LOCATIC City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Annual Seal Coat $421,700 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 421,700 415,000 457,318 453,578 450,000 Improvements Engineering /Admin. Total 421,700 415,000 457,318 453,578 450,000 B. Funding Source: General Fund Capital improvement Fund Park Reserve Fund Grants (specify) Donations (developer escrow) 16,700 7,318 3,578 State Aid 405,000 415,000 450,000 450,000 450,000 Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk in Tax Levy Total 421,700 415,000 457,318 453,578 450,000 r Description: Seal coat and crack seal. W " ! � � 4-•‘,"':,' r 0 ro � , Justification: Seal coats and crack seals are essential parts of an effective Pavemen , . t °, 4 Preservation Program. ter w ' �'# $ ` r ' � � fit` J , ; a �� ,� ; � "� � � #� � � � fi "' � Other Comments: :' t - Project area will be determined on a yearly basis. as " 4 . >' _k ' ' 4 ... ■ 1„. ,'� �. 3£. -` S � SF-+ L �°"b' p fr .„, Operating Costs: PROJECT LOCATION City of Shakopee Capital Improvement project Title: Program 2011 - 2015 Project Manager: Project Type: Total Project Cost: Bruce Loney Street Construction TH300 Reconstruction $2,200,000 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 1,750,000 Improvements Engineering /Admin. 450,000 _ - Total 2,200,000 - _ B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 250,000 (SPUC) State Aid 1,320,000 (State Turnback Funds) Assessments 380,000 Sanitary Sewer Fund -Base 250,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk r Tax Levy _ _ _ Total 2,200,000 -�- — Description: r Reconstruction of old T.H. 300. 6th ,Avenue, from 10th Avenue to Webster ' - _ f ; "� ^c Street and 10th Aven from 6th Avenue to C.R. 69. 1 v s7 .? 3 f -"'�` ,��� s � � ' ,� , r � i � : To continue with the rehabilitation of the City's infrastructure in the older sections Justification. � � x n '' p ct �;" ;, —"t ite ; of the community. =�n ,� s _ - , ;fps ' , , ` s yr ^�¢ {3-� )t-',,,,,,1,7 f.. '> , — , 1 3 -, rtv6 ; . 4,1 i � t y �'� l ; N T . Y ? 3 4 : " Y 1 4 F ?. f i 'tY r y a ,y tom x l ..;,....%-,%0-#4.,:: 5 af -" 0 : 3 - , ,011 1 -- tY F :mr ' x i c x P _ E fa� s \�§ e � 'i i Other Comments: ' , # � _ E -.. N t r -, . ' e0 t ---, ` - City does turn qualify backed for to State the turnback City. funds for improving Old T.H. 300, which has � `� .rt v � been i[[ , � ° .D 't G t",.- 3 �'�fi l.V u s =� T • J�}":. v a i l mss , : s' r &, ,m * ' ° , A, , i t Y -ri,' r ; r Y e 1w. % i � > ,- r ,; jH * -4 ` ' . 1 =7 � % Operating Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2011 Reconstruction Project $1,910,000 A. Expenditure Items: _ 2011 2012 _ 2013 2014 2015 Land & ROW Construction 1,710,000 Improvements 200,000 Engineering /Admin. Total 1,910,000 - - " B. Funding Source : General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 370,000 (SPUC) State Aid Assessments 335,000 Sanitary Sewer Fund -Base 320,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 100,000 Storm Drainage Fund -Trunk Tax Levy 785,000 - r Total 1,910,000 - - - Description: , :z , , t,,`: * "rte u / Street, sanitary sewer, storm sewer and watermain reconstruction. ,'? 3,,F L x ljT.jz '.... r §T ,� �) ,r 8 .K "- � - ` y '� " n: '7 x x �t � a 5 {' + .x+' Or e1: 4: }> <Ii'' i 3 " a.€ a �"a, T� _" To continue Justlflcatio with the rehabilitation of i City's infrastructure. . 4�h \ '' . I ' ` a ` ' �! '-4'1 � t ,;k''�y'- i, S-a "t e � ` s , F a "� F` is � ° ,• 4 1 ';1:1 xlx „� z`r . a a TI" < , k Rz 1 ' i " z ' -4 1 ' WS a s Other Comments: 'k � ' r °< 3 a < ° ; Streets should be reconstructed with old T.H. 300. Turnback funds for T.H. 300 :� , _ y � � ? „ ' ` ~, T' `, are available in 2011. s �' $ .„ rill ^.te P O - i c 3. "' -l."1f r K -fit :i i r 6 B t 7 13-1.' r ' rli.:,174:::-1 i ' ''''', 2 2 , - s "' _ a =r a Operating Costs: PR LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2011 Bituminous Overlay $510,000 A. Expenditure Items: 2011 2012 2013 2014 _ 2015 _ Land & ROW Construction 430,000 Improvements Engineering /Admin. 80,000 Total 510,000 - _ . B. Funding Source: - General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 150,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk CO Tax Levy 360,000 = - - r Total 510,000 - Description: < Bituminous overlay of 2nd Avenue and 3rd Avenue, from Atwood Street to s -- ? ` u r r b s �`a Spencer Street 1st Avenue, from Holmes Street to Sommerville Street Atwood d s � + '4� 4 ° a � ' Street, Fuller Street, Lewis Street and Sommerville Street, from 1st Avenue to 1 , _ ,..+,, ,-"-' }r r,fig � . , y9 5 VIZ 4th Avenue; and Holmes Street, from 1st Avenue to 3rd Avenue. F V -- 1. �r r , -- - iv . E.t " . Justification: r ' � . - Z , ivi „t g ,v r , r , ne ` �'-., City's Pavement Preservation Program to maintain existing w :: .. a - 'say__; - _ ,l i lt i -, E r ,�. � r ,- L � x �� ��� Continuation of the Cit infrastructure. Ti a il . : ,�* 1; ,01..*- ' U z ::0 y . -� �[ A,� F ?. r� k'ir��. Other Comments: is ,� ' ' I- . ' c ,� Bituminous overlays are much more: cost effective than reconstructing k,",01.:',..:2“, .,4 �� pavements. Streets will be evaluated each year and may be moved up or moved `C � - q�� e ''' ' *`:fir: .g� '� back in the CIP. +rte . 4c ' s , ' L }�5� ��E�t r = . �N��r � � �� � . ,&__ VA Operating Costs: PROJECT LOCATION City of Shakopee Capital Improvement Project Title: Program 2011 -2015 Pro ect Type: Project Manager: J Yp Total 550,000 ject Cost: Pro Bruce Loney Street Construction 2011 Bituminous Overlay A. Expenditure Items: 2 011 20 2013 2014 2015 Land & ROW Construction 480,000 Improvements 70,000 Engineering /Admin. Total 550,000 - ° _ B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid 130,000 Assessments 140,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 280,000 - Storm Drainage Fund -Trunk _ Tax Levy Total 550,000 - Description: ,� < � <�, z �' c `z 7 i Bituminous Overlay of Ruby Lane, Ruby Circle, Granite Drive, Granite Court and f x I`r' _ a � V ' , �.i ',,"1--.:# 3 ` i' Sapphire Lane, from Vierling Drive to Murphy Avenue; Heritage Drive, from rw a ak , , i ,.t.;;,- f 3 t S -a , < a ¢ �p s ' ' Onyx Drive, Ramsey St., Dallas Dr., Swift Cir.; and Vierling ' ' ! �; h id s � ra s"t�F a �t" E S a "' , � ` r 1; z - ` `. { ' - l Drive, from Limestone Drive to Ramsey Street. l y r t s '- i t Z y ''i `�- ^.1 r F ... � cT- .. & . i.t, a 3 +r � ' `'-1-1:‘":14 Justification: ,_ a: I d Tr 1 �7 st : Continuation of the City's Pavement Preservation Program to maintain existing . 14 th. F C A 4 4 : i f . tl Y .a. , 4 . 2% . t t t-, . - °+ e r .,/�� r ` infrastructure. t ' to 5 � e� , ti , r, -_ 'fO r 1*--, I + N.3C i t k j 10 tI +. i .' ° .' Other ts Com l bentvs: a Elk .- ` � ' - Aie41' -. ° " : Stree wil ealuted each year and may be moved up or moved back in the 7 x m I s a j pp x r _.„ Fs _ Y ,.,._ .eke _,,,....,,,,,,,,,,-- . -,-- --„,....,_ vii c:ii -Jr. - . ' Plitt k tl a , i f Qpera Costs: �{ PROJECT L City of Shakopee Capital Improvement Program 2012 -2015 Project Type: Project Title: Total Project Cost: Pro j yp Project Manager: Bruce Loney street constructio C.R. 101 Improvements, from CSAH $710,000 17 to Spencer Street 2011 2012 2013 2014 2015 A. Expenditure Items: Land & ROW Construction 570,000 Improvements Engineering /Admin. 140,000 - - Total 710,000 - B. Funding Source: General Fund Capital Improvement Fund 325,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund -Base 260,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 125,000 Storm Drainage Fund -Trunk 0 Tax Levy _ - N Total 710,000 - 1-- A_ - m-�.._- Description: sanitary sewer, storm sewer and watermain improvements to C.R. 101, F t l '' ' --7., i J' Street, q ' g.;'j," / from CSAH 17 to Spencer Street. F o Y 4 x � � '7.1:7! �i � T L'.z. • ' d .r„ -,-- t i" 3 `k. 3 ' sj ,, g Justification: . : ' ` t , . 7 z F' i f 4 +3 „,,....0,01,..z. A 7 -_,,,,-, _ ..,.t. -: 4: 4.. : .4= i te, -414 �� - ... ---,...,04,,v. ''''. -,-- -,-..- 'It -.F - ..„4:r - r e llk ' - , N - ”' � - , y �. - * - rt . ` Other Comments: _� t i. t ,t-„ t } _ sanitary ,� ' _ ,` This wo be a County • pro �Nith the City contributing funds for sanita to r } `3? v �- s- '� �.? 11� sewer, storm sewer, street lighting and sidewalk. Costs above are only for the t . , _ ,.r r City's portion of the project. ri � �� r+r ` } F � S + tai k ' : ;:z. -, ., -Pr: -.4''.. :. ,:'' i! " [ p 2 - " '� o Operating Costs: k ., g X " Lam " Y , e - A E f R p a " - i a3 :'�.,'� : . a'� o.. s Ail t i�ieS, - . �. '�.31 3:. , .Fm +. y sxic 4- , .. ` a PROJECT LOCAT City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Main Street Reconstruction $170,000 A. Expenditure Items: 201 l 2012 2013 _ 2014 2015 Land & ROW Construction 130,000 Improvements Engineering /Admin. 40,000 -- - — Total 170,000 - -- B. Funding Source: .. General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 50,000 (SPUC) State Aid Assessments 25,000 Sanitary Sewer Fund -Base 45,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk r Al Tax Levy 50,000 — - — Total 170,000 - - Description: Reconstruction of Main Street north of Hwy. 101. ,� .. :. r ,, :" - i Justification: . ' Aging infrastructure should be replaced and sanitary sewer should be rerouted to ' ° � -� -� ��� ��� - ' " � eliminate shallow lines. q S 'z E. .,,,. -`�` _, ∎ V- i'' v. . . --5.--',-,' 'fi - ' ,s ' S E` " - '' b v ‘,,,ii. 2; F1 F - I . i . 4 L r ,� 4g4 Other Comments: � —- '�- t " � *` Coul be cons as part of the Hwy. 101 improvements. (t z i s 1 ��- ' `?{ ; u `� -,T. '- '"1 - 'el-4'1' ,.e ... ' . ' 4 .'''-' 7 j 1 ;o voss _� \9 9 � t f , - - a . r t f ° . , _� � - t � a Operating Costs: i T PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction C.R. 69 Improvements $300,000 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 250,000 Improvements Engineering /Admin. 50,000 _ Total 300,000 - - - - B. Funding Source: _ General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund -Base 150,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 150,000 Storm Drainage Fund -Trunk Dl Tax Levy - N Total 300,000 - - - - J Description: J' The County is planning on making surface improvements to C.R. 69 in 2011. R « rig - Staff will review the sanitary sewer and storm sewer needs in the area to r r determine if new facilities are needed or existing facilities need to be improved. j. � Justification: 3 . _ '- t% 6 - fi i. t } = 4. F ,,`a :_ ti.. '4 r:-:1-1" M pg t.� �, #TF " = Other Comments: �r ,gyp ,,,. - '{�-t c` 1t" " �zr `�$ ? �..�,"" c y .,,ti. a°�` 1 + ,.;11:74,�< � � � � y1� fi n " x5 a fF , A , l '&� j � 1 ` t' d y , , i ha' i 1-1 i 5 3 - ` `� 1 : A 1' T ab. *'''".```` i l ': : : - _5.e . - 43 -;1 4' fi -, - � � ti , F f , ', � , Operating Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2012 Bituminous Overlay $355,000 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 305,000 Improvements Engineering /Admin. 50,000 Total - 355,000 - .. - B. Funding Source: - General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 90,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk Iii Tax Levy 265,000 _ IN Total - 355,000 Description: ' �G j n 11 rt ''' s�°) x ` ' 1 f Bituminous overlay of Minnesota Street, from Vierling Drive to 11th Avenue, p ' er" , t � � 14:6 &-W - '' � a�'n 7{ 6 Minnesota Court, Clover Court,Vierling Court, Londonderry Cove and Lewis � t , i i�l<s5 fc ,�� Street, from 4th Avenue to 10th Avenue. % as #' ,l . { "1.1'!: � f r ,f � Q - „ w�. Justificat � . �'to t `` tea..3 a , rg � { � � , � � �- r � ,�� � _ �' Continuation of the City s Pavement Preservation Program to maintain existing 3 �¢e.. � 3 i "�� er f � sS _�' ,'A c s ' infrastructure. Sr,� f --W,-:' i + ' a.s '''A3: ^4 a ? f ' art' '+' - L� t r ' � s ' _ '� Other Comments: �,,,, - 0,. ,: a g fi * c ' � ` ` 41 '` Bituminous overlays are more cost effective than reconstructing pavements. .- i i r� 3i , i t tea` q 4r �,. Streets will be evaluated on a yearly basis and may be moved up or moved back rr * � , � - ' r *... 4 -, in the CIP. i r r a i ° r a ., to 0-.. - . ,, , F;p: ‘t _, , I ;' l' 4- 4 - 2 , ig . 4`;_fi4 INT ' 4.; .,. - t ,14.: ,..i , ...,.� _ . _ , _ :_ , �ti � -. t4; Operating Costa: PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: l Project Cost: Bruce Loney Street Construction 2012 Pavement Preservation $540 A_ Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 470,000 Improvements Engineering /Admin. _ 70,000 Total - 540000 - - 13. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 145,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund - Base Storm Drainage Fund -Trunk ei• 395,000 Tax Levy — Total - 540,000 - - Description: 3 T� k t > _ H r4� , Bituminous overlay of 11th Avenue, from Po Street to Adams Street Monroe ,s.'�` 1 a+_ , � �, t ,. Street, Madison Street and Jefferson Street, from lk 10th Avenue to 11th Avenue �� y am€ -. `� ` d t . ,fit l d ' and south of 12th Avenue; Polk Street, Harrison Street and Jackson Street, from � � , u x , 1 - py�4 ,4 0,4.43...-4.'-'-;,11:;,. ;`-� ti '\ � '' 11th Avenue to 12th Avenue and 13th Avenue west of Polk Street. ; °. : -E �g - ,4 -. Justification: ! 1. _ - F Continuation of the city's pavement preservation program to maintain existing sa y (e' _ _�{ infrastructure. 1 • s' T - y y . . 9 o - Si.�L t S :.d �.t ..� { I E ''} ! t p' t R Y Y Z t . 3? j 2 ;. 1 ' G -- a c a ' s 7 r J � i 1 Other Comments: ` � : f t _ ' 1 �' 4 Bituminous overlays are more cost effective than reconstructing pavements. a " ; E ,� � , _ Streets will be evaluated on a yearly basis and may be moved up or moved back ° 3 ; v } in the CIP. '' 1-1.: ,'�..� '.- 4 _ E y f 1 1 3 3 A y 1. 2 n '—z- f f{ 5 1 ``.. ti f. YY ii , ,F U t c1F M1•1- e - -,f t r-- •- .� at ", 1 -, 5 'T Y - , f � -... q 1R d t r ' 41;-.C. r da d— r a - - ' ' e R di ! Operating Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Proj Manager Project Type: Project Title: Total Project Cost: Bruce Loney Street Co Vierling Drive Bituminous Overlay $540,000 A. Expenditure Land Items: 2011 2012 2013 2 0'I4 _ 2015 & ROW Construction 470,000 Improvements Engineering /Admin. 70,000 Total - 540,000 , - - - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grts (specify) Don) State anations Aid (specify IC Assessments 405,000 135,000 Sanitary Sewer Fund Sanitary Sewer Fund -Trun k Storm Drainage Fund -Base Storm Drainage Fund -Trunk Tax Levy Total - 540,000 - - Description: �, ; , i D as - �ti �'i ,[L4'" T r q ` ; x _ -; Bituminous overlay of Vierling Drive, from Spencer Street to the west end, F � excluding the segment east of CSAH 15 constructed in 2003. Ya ,•,....--,,, —4. k t �5� } ' t Justi i- .0 �, y f : .. i,{rr �i 1S ® a __T z r 4 tea x sr ' I.; - X • r r b r � �; " � , � aV#i( 1 , { � r - A , Continuation of the City's Pavement Preservation Program to maintain existing ` , ,` 7 -. r' , ,# �, ' r > i'� H infrastructure. t to J 3 ,-- , '# `}` ,; .$ r Bituminous -,� �f F - # l It :..G 0 . 1 1 . r 'f J - ' 1. ' y. i F z' ly , r- llk g } ' rte Y �,' � 3 � � r J1 r i+'ti � E 4 4 i ' ' , s , ,� Other Co a- f overlays are much more cost effective than reconstructing f a ' � fi ° ~ ` � ,' pavements. Streets will be evaluated ea ch year and may be moved up or _, sI moved back in the CIP. ` � q Operating Costs: PROJ LO CATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street construction Beckrich Park Estates Bitumiinous $175,000 Overlay A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 145,000 Improvements Engineering /Admin. 30,000 - - Total - 175,000 - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 50,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk us Tax Levy 125,000 _ - - 01 Total 175,000 - 4 Description: z r . l I� I' , - 9 - Z r ''' Bituminous overlay of Barrington Drive, Carriage Circle and Cortland Circle. �" s w^ - . '#P � 6 s : r , i , s ' -1 t Justification: y , _ , A. ij �� , Continuation of the City's Pavement Preservation Program to improve paved 77 i , '' roadways. • { , # l ips x^ - , r 7 � U 1: i 1 [ A 1� ] 1- 4 - +tl 7 yL 6 . - t: is , I Y f t - • j--,----1,,, 71 �._s..`. .' .4. 3 . `` ' ;. , } —" - 4 , . ; . €s * `ir b` ? Other Comments: ' t W B it um in ous overlays are much more cost effective than reconstructing ., {f ,. i j, 1 - c , g pavements. Streets will be evaluated each year and may be moved up or moved back in the CIP. y t - '11 1 ..r.---, r x L ' .4 I, Operating Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction T.H. 101 Trail Extension $50,000 A. Expenditure Items: 2011 f 2012 2013 2014 2015 Land & ROW Construction 40,000 Improvements Engineering /Admin. _ 10,000 — Total _ - 50 y - - E. Funding Source: --- General Fund Capital Improvement Fund 50,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk r-- Tax Levy Total - 50,000 - - - a , i4 x .� n F-- r v - . i 1 A y er 4 ' m 4 '? °g37r T Description: s = e , _ t °44, k : � : i ` 4 Construction of a bituminous trail on the south side of C.R. 101, from Sarazin - . �� Lx,�t� 4 y� ', Street to the bridge over the Mill Pond. Y& ' _�( f �N yeJleti+iS +' r , `r'a. � G` a i t ' { a= a y z t ' 7 t^ ? F�s : x `w Justification: - CAff j ? Pedestrian traffic in the area may warrant construction of this trail. { t It 3s K� _3 2 - '!2^ t 3� fi ,- mac^ (.y ..-: 3 ' Z' S "' 0=-I` e5d> [{ . . r i ' l FY t S 1t 1 , N is ...ill J ` ,� n Other Comments: .._,_._,,,,,..,_c___--u„ .,.,,,._..": 7, J.,. is �Y m y E 04 3 v r .4 r , ' j I k` ' �:, • � i s 3 v 1 5 99 '�� ^ , �. ` j 1 , 1 ' t : ° i i i ' a e r. el . - l f 5 , r Operating Costs: PROJECT LOCATION City of Shakopee Capital Impro vement P rog ram 2011 -2015 P Manager Project Type: Project Title: Total Proj Cost: Bruce Loney Street Construction 2013 l3ituminou� Overlay $290,000 A. Expenditure RO Items: 2011 2012 2013 2014 2015 W Construction 250,000 Improvements Engineering /Admin. 40,000 Total - - 290,000 - B. Funding So General Fun Capital Imp rovement Fund Park Reserve Fund Grants (specify) CO (specify) State Donations Aid CY Assessments 60,000 Sanitary Sanitary Sewer Sewer Fund -Trun -Base k Storm Drainag Fund -Base Storm Drainage Fund Trunk Tax Levy 230,000 _ - Total - - 290,000 - - ,"5 . Description: x t t " ; , #7 // . 4 � . B overlay Sharon Parkway; Tyrone Drive and Park Place. 1 ,� 4,== ,.4-t --- r { -, - r � z.c ' e � � } 3 ; E #' Justif ication: � g �� i� = Co of the C ty's Pavemen Preservation Program to maintain existing F , �. Wi z , % 0 F !It 4 . 3 j infrastructure. ��:��3 2 S• `�. �, I ` I e s '9 s�`.� � tW If r� .. ta, �1,� @ S 1Y {. a ,, „; 8,r A� '�'Y x � '..� ; - Y �J� fir.., s� I i -x,. . 6w-a� k 33 1 t r { ,, a 4 U Other Comment ale I ' ` v "ti` - � - -- .� � .- Bituminous overlays are much more cost effective than reconstructing 1 � - t � � pavements. Streets will be evaluated each year and may be moved up or moved s ki g a k ��� , z, back in theC ,.. . t A r � ' , F s a �is _ t0 ' - era � �.a �'' a 4 z l " C C �� "� r k stating Cost: A � P ROJ E CT L OCATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Constructio Bituminous CiertainTeed Reclamto ation CSA of Ave. $320,000 from H 83 4th A. Expenditure Items: 2011 _ 2012 _ 2013 2014 2015 Land & ROW Construction 250,000 Improvements 70,000 Engineering /Admin. Total - _ - 320,000 B. Funding Source: _ General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid 230,000 Assessments 90,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk 0.11 Tax Levy _ Total - - 320,000 - Description: 7 F r ; Y f Bituminous reclamation of 4th Avenue, the ;_ ' , _ 83 and construction of a right turn lane at from CSAH Cer 83. aainTeed property to CSAH � "1 - 1. _ : Justification: ,..,?,-::,',-.--":-_,TI,. ^�ti g a - i - J AS - - Pavement is in need of rehabilitation due to age and truck traffic. ' i T_ l r • 7, i 1, Iy 31 €,t i -i-7-_-„,,-, 7 p 4,1 ' C l ' '. t ' i 0 1` Y Other Comments: ' 1 3 . + fc � t d °r i•,•‘;:=, r � s � i I " ► Traffic levels from development do riot warrant construction of a three lane t c s I a1a1 1 roadway. si fax s . t -V- .. i t F'' . l s . - } i a z 1 3 -)-- U� 3 .c t " -t k 7 1 Rf r^n t Y 7 a...� tl � �,un• y i - t l ' i i ' ° �' . , ,j ® Operating Costs: I . _ I 1 ` � Via :, , .� r L f PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Proj Cost: Bruce Loney Street Construction CSAH 17 Expansion $25 Total ,000,000 ect A. Expenditure Items: 2011 2012 2013 20 2015 _ Land & ROW Construction 12,000,000 11,000,000 Improvements Engineering /Admin. _ 1,000,000 1,000,000 Total - - 13,000,000 12,000,000 - _ B. Funding Source: — — General Fund Capital Improvement Fund 250,000 250,000 Park Reserve Fund Grants (specify) Donations (specify) 12,200,000 11,200,000 (County) State Aid 300,000 300,000 000 Assessments Sanitary Sewer Fund Base Cri Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 250,000 250, Storm Drainage Fund -Trunk _ Tax Levy - Total - - 13,000,000 12,000,000 - Description: 1::, � „,..7.1r.,,,,. �� - ��� , i';1 Expansion of CSAH 17, from St. Francis Avenue to , _,_ r .. 1, ` 5 - e �I .�' Justi mss' . t k = Justification: ' ` 4,1 i t4- Projected traffic volumes warrant the expansion of CSAH CSAH 17. 42. t ,, '_ e t 3 { 1. i. 1a4' 6 d • '''''':1- . � l 2 . _ � ' °� 5 E - • � � l F RtR.L , +� .ti 3�sv.- .�. -� -- : I 4•• ' . rj6 , .,t ' r _ 7 ' C� 4 P {�' i t Other Comments: - °' 1. ; ` ". G- ,r 4 l City costs will be for a b trail, storm sewer and concrete curb &gutter. • y�„ -- A �q q g £ S & .? # t 4 1 7 3 � 'T _ t l ! ,, P ' 1 .- - =: C t.v _- � �.i , 4 'gy 4' � � S � . t `" :' V` '. ' � 1 i { y r } c ' • � ' , r , -...J� 4 - 1 i " Operating Costs: 1, z t a PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Project T e: Project Title: Total 350 Pro ject Cost: - Project Manager: 1 yp Bruce Loney Street Construct 3rd Avenue Street Reconstruction $1,,00 A. Expenditure Items: _ 2011 2012 2013 2014 2015 — Land & ROW 1,100,000 Construction Improvements 250,000 Engineering /Admin. _ - 1,350,000 - — Total _ - — B. Funding Source: General Fund Capital I Fund Par R eserve Fund Grants (specify) 260,000 (SPUC) Donations (specify) State Aid 240,000 Assessments 240,000 Sewer Fund - Sanita Sanitary ry Sewer F Trun k 50,000 Storm a - Storm Drainage Drinage Fund Trun k j. 560,000 _ ,– Tax Levy _ - Total - - 1,350,000 Description: �°' Street, sanitary sewer, storm sewer and watermain reconstruction on 3rd Avenue, from CS 1. 17 to Spencer Street and on Minnesota Street, from 3rd Y 1 R:� Avenue to C.R. 10 1. w r s £ Justification: €: p r s� ne To continue with the rehabilitation of the City's infrastructure in the older sections " t �'t s ,�,.a. z ., t 0 " �� ' t "t;1 .[¢r x � .' - of the Community. y _`t " ,- - R g x ::: z°x"� j - - I Rte+ 4 - .� `F t q ymr A - fit) ! t "� `_, , vr' ` ,, r 4 ?, � r ., J . Other Comments: r.. -- - ° �_: s -,{"r ^ t g! 0 g '. -7 "' ! n om` rt :� A' r4.. �'� . r rte` �4 4 1 t � "fl''''',:-.:,.:;,T.,, ` 1 8 d@ � � '" ', * � ` ` �. G S k�y ' C� F j 't r' . a t. `– E `` ,� F k Operating Costs: plit(3 L OCATION City o Shakopee Capital Improvement Program 2011 -2015_ Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney S treet Construction 2013 Bituminous Reclamation $250,000 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 200,000 Improvements Engineering /Admin. _ 50,000 _ Total - - 250,000 - - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 75,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk cs Tax Levy _ 175,000 CO Total - - _ 250,000 - Description: "' •'. I . Bituminous reclamation of streets located in Hillside Estates. !i: 11.j. ?-f 1 I . ? 1 , li . ... , - -- „,..-6-k, , ...,;7 ,W.,:-.i ^ x _ y t a� • _ t � Justification: ' , , T 5f W . i r} , e �. f . Other Comrnents: :'" 1 - -r--4 AL - ,-,.. ,, .1.;.„, ,______;- t ,-,.._ .., -_--1....,1 ----.“--- - - : N , 1 ..- --' ■:-.-:_ ,t. -, , ,1, "- r it i , A t i `l F - ` *t R-V r. Operating Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2011-2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 12th Avenue Trail $200,000 A. Expenditure Items: _ 2011 2012 2013 2014 2015 Land & ROW Construction 160,000 40,000 — Improvements Engineering /Admin. _ _ Total - - 200,000 B. Funding Source: -- General Fund Capital Improvement Fund 100,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid 100,000 Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk co _ Tax Levy — _ _ - Total - - 200,000 Description: Construct a bituminous trail from CSAH 83 to Quarry Lake Park. ,,.., - "-i --.- grf ` l k`tA` ' ' -* -tik ,1-- - 44, :i!, , 1,44-; ,71. 4 1 ..-:-:-.Y. -- In 41 si p- � , x ` _ ,. .-§� �� . � a Justification: a r ,,_;"%7 f".=-W.41:-,- �. a 1 / 1 -9s i i s + f. u , i P-� � v l y j 4 - dY �' -a°`Ah ' S � q S b . t � � 1F i 4 _ I, is' _ I tt � ''' , Other Comments: of l Y� �.� r i i s 3 u ' " a 99 j am. r f .- „ y ?- --- ft' , Operating Costs: 1:'''''''''.41' x i ',*-4-1--f,;::-^-7, ,..., ,bra a ✓ , t r.,'f. s 1 PROJECT LOCATION • City of Sha kopee Capital Improvement Program 2011 - 2015 Project Manager: Project Type Project Title: Total Project Cost: Bruce Loney Cons truction CSAH 771vierling Drive Intersection $1, 700,000 Improvements A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW 200,000 Construction 1,200,000 Improvements Engineering /Admin. 300,000 Total - - 1,700,000 - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 1,080,000 (Federal) 310,000 (Coun State Aid 310,000 Assessments Sanitary Sewer Base Sanitary Se Sewer Fund - Fund -Trunk Storm Storm Tax Levy Total Fund -Be Drainage Drainage Fund -Trunk as ct CO _ - - 1,700,000 - Description: °'�°�� CSAH 17Nierling Dr intersection improvements. i en jkx " . '•,t14°. � 14 p' . I s r � 5 y r�° f ' $4°,.` . ,a� -. J' y a � }-H - °'°°. €i �* � �I lg +'y ! `§t I f 3 0 -- 1 ` F ti� 'r 7t5d F a.Ai k,. t 1 , -,i ` - . --,- Y � s , 1 i 3:'t k r e d t� ' x { . ai d Just i f ication: rlrA "�4 , a n -a - --- .te --x i r ' 4 � { � - 'S r� �s' r x *`7 a 4 x - , 7, " ' `. i a, ,, - •i t r' .i3ry i F S � j £ �^ , ags I .1' ,, 1 x -- s. .. �- r- � `� �Z ' t� N `� �a r t "'t �} . , ,R r 7 _1 r � { A. w q � Pt „� 4y - f ; .,,tr.1,ii. iV i s t v 3 iS . + r Z - -r t { _ � a• r h I __ � `� t - e ' ___ t � . . x vi ,. r" x; $ 3F ° �(�� Other Comments: .......„____ 1 � , a 3 — ( , . 1 _ �; s i s f E r F � j ' ICY Itr ? �1 �� Operating Costs: PROJEC LOCATIION City of Shakopee Capital Improvement ect Title: Program 2011 -2015 Proj Total Project Cost: Project Manager: Project Type: J Bruce Loney Street Construction Memorial ParkPedestrian Bridge $250,0 A. Expenditure Items: 2011 ! 2012 2013 2014 2015 Land & ROW 200,000 Construction Improvements Engineering /Admin. 50,000 Total - - 250,000 B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 250,000 (DNR) State Aid Assessments Sanitary Sewer Fund -Base Cal Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk IL, Tax Levy .. - 250,000 Description: Total � r , 4 ` f - Replace the existing Memorial Park 'pedestrian bridge. v, '1 _. ' V ex ' .i �#ff. . 4 ;' V ai :,:t-,...*,,,, :.d. 4"1.0 ' i rkeillW''', , qt"...i:ft-' S 7 Y i 3 % ` .'3';'`.:1:7 r Justification: 0 . 0 � �° 7 : ; , a , ' ' f * a ca p 4' r 'o r ,, . ! E 1- ' • s t 441 i- • k 4� r = 3, 01„-- - ' Other Comments: r . i 1 n ti , 'ate 4 fi � � c3 v -. £ • �`y CS 11 � c F ti . .2 P '` "¢. 1,;!-3;%R.-i'iji, �ii �: s � ¢ {,tj r p ; Operating Costs: -} ? ' '�t , i - ;,-`�. <-:;.4 . .a K-, ; . i • `a tai PROJECT LOCATION City of Shakopee Capital Improvement P Project Manager: Project Type: Project Title: rogram 2011 -2015 _.__ $300Total Pro ject Cost: Bruce Loney Street Construction 2014 Bituminous Overla , A. Expenditure Items: 201 @ 2012 _ 2013 2014 2015 Land & ROW Construction 250,000 Improvements Engineering /Admin. - - 50.,000 - Total _ - 300 „000 S. • Funding Source: _ General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 75,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk co Storm Drainage Fund -Base Storm Drainage Fund - Trunk Tax Levy 225,000 - Total - - - 300,000 Description: y k � ,. ti + Bituminous overlay of S arazin Street, from Eagle Creek Boulevard to Avenue; � < , ;_ �- ` , ~ Market Street, from 7th Avenue to T.H. 101, Disc Drive and Secretariat 4th Drive. s ue - ri -- � -:- t£ ` � , 4�t m c a �'� --a? ,, t rt lia & e P g € t ~ r- l Justification: r,t .1 a , (.,ri t .-. ' ! , `: Continuation of the City's Pavement Preservation Program to maintain existing mil s - k - � .-t s< „,,..1: , - , i infrastructure. J y -) j -f��. ,, 't , : 4 - . � "� ,y r - � . �,. Other Comments: 1 4 i T E t " - ''- + B ituminous overlays are much more cost effective than reconstructing pavements. I = � Streets wil! be evaluah year and may be moved up or moved ted each back in the 5 c- , ty 0 -�q�°a !,4 stn , -.'''C.2." ' .*-- t r : :.. �, .w • .z p to ,,,--.27 X - - c! +- .3 E e i� -: ' x F r `' ' `�"' a -- .` f Y' '� �� Jam = t " e ` & - . � -- ' 1 Y Operating Costs: ,, PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -20 Project Manager: Projec Type: Project Title: E x t ens i on o Total Project Cost: Bruce Loney Street Construction Valley View &i Control Signal at CSAH $1,000,000 17 & Valley View A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 800,000 Improvements Engineering /Admin. 200,000 Total - .. 1,000,000 - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 100,000 (County) State Aid 260,000 Assessments 640,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Cal Storm Drainage Fund -Trunk Tax Levy Total - - 1,000,000 - �_� >. -- x r , - - - p tion: • �° -�` � � � j 1 kd Ex tension of V alley View Road to Sarazin Street and construction of a new traffic q: _,, :s :: - " "° K 4 € ; :" (( J ki r . 1 control signal at the Valley View Road and CSAH 17 intersection. �3� $..G34e�'� -x A z ? ! qq` [r l: Gtt „,w -- >- Justific + R � Growth in the area and traffic will warrant construction of this roadway. Sufficient 11 4 /7:'''''::::— � { ` " �,�� is r traffic movements may warrant the signal system. A warrant study will need to * ; ''`tl i - be done to just th si gnal yy - ✓ r $ � 5 . s7 k 3 1 , F , �� .�' ., _ v t �� - �� -k � x . [ 4 i =' ! . - ' . .,.4,„,,i- v. r l{{ ' f � = Other Com ments � , �� i , t; ,� Will need to co ordinate the project with the County. "'4' ',� i y s � 1 �� te r d •] ,, __.„--,4i ti iv - y I '''-' 47:4 � r �y c � � � ���� i5 g'+5 i� — � * v D^ I Cr J s �*y � z *-..„,1,. :').F"--14 f -"-- ' t Operat Costs: - - rte• - • t ,`9-i7 -- ;- -�-r`� } .. ... ' -'' PROJECT LOCATION t� Shakopee Capital Improvement Program 2011 -2015 City of Shako ee Ca ital Im rovement r Pro Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2014 Street Reconstruction $500,000 A. Expenditure Items: _ 2011 2012 2013 2014 2015 Land &ROW Construction 400,000 Improvements Engineering /Admin. _ 100,000 _ Total - - 500,000 - _ B. • Funding Source: 4 General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 20,000 (SPUC) State Aid Assessments 125,000 Sanitary Sewer Fund -Base 20,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 45,000 Storm Drainage Fund -Trunk CO Tax Levy — 290,000 CO Total - - - 500,000 - Description: .. S treet, sanitary sewer, storm sewer , a watermain reconstruct: Stt t .0. ; �' and At wood Street, from Levee Drive to nd 1st Avenue; Levee Drive ion, from co Scott 4 ..1 ' 4 Street to Holmes Street. h , 4 Justification: t x � „ . '° . - �' To continue with the rehabilitation of the City's infrastructure in the older sections r. � � of the Community. L i i S: e .. -1. - ., a - 0 - ` ... $ t r� _ l kl .. " :,. : +Y t a " L. r ,y.- , C �.g m.� e a , ` ,�,���' "P _ � �: � , ' � : � Other Comments: . , r t ' , r . ' ^ ' ` t - 1' t 3 It> 54 ii, l t '1 4- , fit y Y . ' ' 'T- 'i"" -f-7 f � ' " ti _ti � „ , 6} -5, 04-,,,,,' � a ®peratin COS$S: PROJECT LOCATION 2011 -2015 Total Pr City of Shakopee Capital Improveme Program Project Manager: Project Type: Project Title: Pr oject Cost: Bruce Loney Street Construction Independence Dr. Mile South of $3 10 , 000 Valley View Rd. A. Expenditure Land & ROW Items: 2011 2012 2013 2014 2015 Construction 25060,000 Improvements Engineering /Admin. ,000 Total - - - 310,000 - B. Funding Source: - General Fund Gag ital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 80,000 230, 000 Sanitary Sewer - Sanitary Sewer Fund Fund -Trun k Storm Drainage Fund -Base Storm Drainage Fund -Trunk In Levy M Total - - - 31® „000 a , 5 , � ` Description nstruction on n e d waterma t Collector street co Independence Drive for a 1/8 mile south of Valley 1.t!,-44-, �� A x e as r rt 44...17:=.1;4 „„,4;.,.`;'-'1' , View Ro ad. Includes sanitary sewer an s t om .,. k r ,t-J- r , � f , , , Justification: , �r s a� a Zr t ...� . tl t` ; 7 ;, y, Colle ctor street needs to be installed to provid acces to p roperties south of a �; "r",,,,' = , � r ` ` € 14 r-:: fi ` " -4 1 Valley View Road. a y „ 41 . :.'-' , - -- - 4 -..' . �k s FY F 4 - r S II k -N �.i'. -,, 1 t 4e. Y S P w -_-a - -sue • a - ; �` ' ' -; + ' ., s'a �� �,3rrw Other Comments: k, - �—= '` Project is dependent on development. 1 I` Operating Costs: t , . _ t---P p PROJECT LO CATION City of Shakopee Capital Improvement Program 2011 -2015 • Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2015 Bituminous Overlay $1,000,000 A. Expenditure Items: 2011 2012 2013 2014 _ _ 2015 Land & ROW 900,000 Construction Improvements 100,000 Engineering /Admin. Total - - - 1,000,000 B. Funding Source: - - - General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Ad 250,000 Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk 750,000 _ icr Tax Levy _ _ 1,000,000 Total - Description: '� s 91 6 � W r � ' v y 1� Bituminous overlay of various streets throughout the City. dd; yes , r. r r rs ' . l a : J [1i1;i, v ik } , " r " - �� '� o ' ` i' 74— a , � t c , r x 3 �, t t= ,n �' .4" F x k + 11� - 4 $ i 1 'f r 5 ,A € , s 3 r 'j Justification: �, , .� F �- ''',,,,'''''C„. � a � �� �, ft, � 5 N� 2 Continuation of the City's Pavement Preservation Program to maintain existing k . � [ i�' 4r i nfrastructure. 4,17',!:: , ' 'I' V ' MG :,--------'-- -, ii-V ';i4 , - - 1 - 4 - ,. ;-. "ieVe : [ , . v4� + =1 "t<7 i 3 aka a -- r n r a,.Y a i 3 «>i? a � � r } 7,1 - 3 r i Other Comments: 1 L t � _ " ' -Q _ r Bitum overlays are much more cost effective than reconstructing • f i ' s 4 a_ > T „� ,'� � Y pavements. Streets will be evaluated) each year and may be moved up or moved � "' �r� a�� back in the CIP. t o-w� `h. ° � + .ate ". „... -,-;r11`.-K. - . „,,.. j . .r+ • b. _Yr ; Y x.. r ` . !fi a ;i 3 _� :t Operating Costs: • PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -201� Project Manager: Project Type: Project Ti tle: Total Project Cost: Bruce Loney S treet Construction Bituminous Over of Eag Creek $790,000 Blvd. Roundhouse St. A. Ex • enditure Items: 2011 2012 2013 and 2014 2015 Land & ROW 700,000 Construction Improvements 90,000 Engineering /Admin. - 790,000 Total - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 240,000 State Aid 200,000 Assessments r Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 790,000 Storm Drainage Fund -Trunk 350,000 - yr Tax Levy _ - Total Description: ;, i , �3� y „ s = Bituminous overlay of Eagle Creek Boulevard and Roundhouse Street. r 4 { , ,. s r.P,.� 9� - rr3- �. (} ^ j t n t �� fi ue j�sl' _, 1 x i ?3, V , tI a �` Justification: � a f =� ',, � % - t Continuation of the city's Pavement Preservation Program to maintain existing ;i, ' ' , infrastructure. t rz � . l �' ,v `''y n ix ,. a�v �5 } +q ¢� t��{ ": Zy9 ` i y T t 'PO'' ,g''114. Y r '-''',7':11 4ii I t r ' t ` i ` Yi t l :4-',=•,1"-• � 4-- ' }' r i , ' ? ` ` ;,Z 4 , ' : Other Comments: �,� �N ter '� i`� $ a `tP saK, .� Bituminous overlays are much more cost effective than reconstructing h * ;Tv:, j f'E x pavements. Streets will be evaluated each year and may be moved up or moved , 4 i€ Y,� 1 ,,.,--y9,--73;'---:„..:1,-, , # - , , ,�, ., *.,�_ � ti — - - back in the CIP. s � m a � °°"� J l e4F a d t i „ " Operating Costs: -'-- 1 Z� ' 4 i r1 ' =11' ,i' t 5, , . Y . 1 i 1 PROJECT LOCATION City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2015 Street Reconstruction Program $1,150,000 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 980,000 Improvements Engineering /Admin. 170,000 Total - - - - 1,160,000 B. Funding Source: General Fund _ Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 20,000 (SPUC) State Aid Assessments 710,000 Sanitary Sewer Fund -Base 50,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 100,000 Storm Drainage Fund -Trunk DJ Tax Levy 270,000 *.t Total - - - 1,150,000 — Description: `.•_ ' ' `. 4 j( Street, Sanitary Sewer, Storm Sewer, and watermain reconstruction: Bluff Avenue from Main Street to Marschall Road , q Main Street and Prairie Street from E3luff Avenue to 1st Avenue y ; : f ? ;. O.V f Dakota Street from Bluff Avenue to 2nd Ave " . �., x ( r � 7,,-.4--,....,-; Naumkeag Street from 1st Avenue to Bluff Avenue =`s A - = ka Minnesota Street from Bluff Avenue to 1st Avenue lilt � ` fig, r::.4 �y_ ` �� jiP s 3-: t. -. ° t'silti i _ t � s t Pi t t' t , ,, t ° i t 5t ,', � G r , To continue with the rehabilitation of the City's infrastructure in the older sections Justification: ,, �.,, ,, , t' -4 t ,, 1� r-1 - s, �; �. of the community. ter.. V .2 � N � �. ....�^.^'...`...'_' 4 °_yx" s � y' eirkii fiv - ` c h i , a" .4 , -. -- ,� i :e - � Other Comments: . iy Reconstruction of streets should be done in conjunction with redevelopment of j� , t ' 3T i ' l rF ' "•°' _ the area SPUC has not determined the extent of the watermain improvements. " x a 1;1 i J Benefit appraisal al should be done to determine special benefit to parcels. �t #. = "f �} _.. s �� �;' �� ...� - F L �I� t _�-- i , .. i ,�"� PROJECT LOCATION Operating Costs: City of Shakop Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney street con struction contests Alleys $420,000 A. Expenditure Items: 2011 2012 2013 2014 2015 _ Land & ROW Construction 320,000 Improvements Engineering /Admin. — _ — 100,000 Total - - - 420,000 _ B. Funding Source: — = General Fund Capital Improvement Fund Par Reserve Fund Grants (specify) j " Donations (specify) State Aid 210,000 Assessments Sanitary Sewer Fund -Base Sanitary Sewer Storm Drainag Fund -Base Fund -Trunk 210,000 Storm Drainage Fund -Trunk CO it Tax Levy — _ _ 420,000 Total - s , Description: ,� EY i rx ` t °; Reconstruct existing alleys with concrete pavement. ,�,.:• r ?_r v- a , ; a = Justificatio „ r +� To rehabilitate exis alleys an improv drainage. 4 , t } fir i q ? t V ""' mA" ,..% , t 1 :::: , ttt- :0,4 __E .. -, . - 3 - r-':' ..,....„......5_7,_.....4....:.„.„ „...,‘ . .. ..,_,...,..4.,•.r.,„ :17 . ` .. � , y "'� „ = a � : Others Comrrient�: t - ;*'_,P R 1 4 i l � ° Project location has not been deterrnined. si x ' s d - ,rii,-,, n km, � ; m 4 rx 1 id ' '- 1 ,r :pri. i:- .41 . g'` , ''- Ift, rt,i'.f. ;,;,=. Is -' RS - 2- __-_ 4, __, _. ,.. , ..., .,„...,.., _, ".,7A:44-1.- } i Operating Cosh: g j - 1i. of PROJECT LOC r- City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Street Light Replacement $150,000 A. Expenditure Items: 2011 2012 2013 I 2014 2015 Land & ROW 150,000 Construction Improvements Engineering /Admin. - f _ Total - _ - _ 150,000 B. Funding Source: . .. — General Fund Capital Improvement Fund 150,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk 'c' Tax Levy - - Total - - - 150,000 Description: L '' ,,.( --'" Replacement of street lights in the downtown area. f . f4 _ .�.. k - d .y� �' i F* Y0 3t fC� t r F r aY 1 . ' � . - - ` F 0 0 . , "� , Justification: > t-' -' Z'�"' - ,A,-.0„. '�� . vim i � ` °k r. a , . -- - ,r te " ' . ,,. ; t, - - . , ' i 1 Other Comments: c s y r } * F �t "S sa '4. y ,. .1.6 � Y PROJECT LOCATION Operating Costs: 2011 Capital Improvement Plan (CIP) 2011 CIP 2077 Capital Improvement Plan ( C/P1 ■ Each year residents state that overlays are a maintenance activity and ask why their taxes don't pay for the entire overlay. Residents have stated that they would rather have a small monthly increase in their taxes than a $500 assessment bill. ■ If the City did not assess overlays over the last seven years the average impact to each household would have been approximately $0.55/ month. ■ Due to Chapter 429 requirements. Assessing projects adds approximately $10,000 to $15,000 in extra project costs. ■ Assessing projects does not give the City flexibility to add streets to the project if bids are favorable. 2011 Capital Improvement Plan (CIP) State Aid / Street Fund 2008 20.2 2010 2011, 2012 2013 2014 2015 (actual) (actual) Balance 111 $3,068,948 $4,299,103 $4,337,295 $3,709,101 $4193,919 $4,652,707 $4,298,551 $4,753,001 Maintenance Allocation $215,010 $248,331 $378,131 $380,000 $382, 000 $383,000 $384,000 $385,000 Construction Allocation $1,039,812 $320,547 $510,000 $750,000 $750,000 $750,000 $750,000 Turn Back Funds $1,320,000 Interest $194,788 $1•3,732 $151,805 $129,819 $146,787 $162,845 $150,449 $166,355 Total Revenue $4,518,558 $5,031,713 $4,867,232 $6,048,919 $5472707 $5,948,551 $5,583,001 $6,054,356 Mies Transfer $29,054 $4,699 Expenditure $190,401 $351,388 $780,000 $1,450,000 $405,000 $1,200,000 $380,000 $240,000 Transfer to general fund $338,331 $3781 31 $405,000 $415,000 $450,000 $450,000 $450,000 Balance $4,299,103 $4 $3,709 $4,193,919 $052 $4 $4,753,004 $5,364 Assumes 3.5% interest on previous end of the year balance. UPDATED 6/10/10 2011 Capital Improvement Plan (CIP) State Aid ! Street Fund (Funding overlay assessments) 2008 2 009 2010 2211 2012 2013 2014 2015 (actual) (actual) Balance 111 $3,068,948 $4,299,103 $4,337,295 $3,709,101 $3,903,919 $3,932,557 $3,493,196 $3,844,458 Maintenance Allocation $215,010$248,331 $378,131 $380,000 $382,000 $383,000 $384000 $385,000 Construction Allocation $1,039,812 $320,547 $510,000 $750,000 $750,000 $750,000 $750,000 Turn Back Funds $1,320,000 Interest $194,788 $163,732 $151,805 $129,819 $136,637 $137,639 $122,262 $134,556 Total Revenue $4518,558 $5,031,713 $4,867,232 $6,048,919 $5,172,557 $5,203,196 $4,749,458 $5,114,014 MiscTransfer $29,054 $4,699 Expenditure $190,401 $351,388 $780,000 $1,450,000 $405,000 $1,200,000 $380,000 $240,000 Transfer to general fund $338,331 $378,131 $405,000 $415,000 $450,000 $450,000 $450,000 Overlay Assessments $290,000 $420,000 $60,000 $75,000 $450,000 Balance $4,299,103 $4,337,295 $3,709 $3,903,919 $3,932,557 $,493,195 $3,844,458 $3974,014 Assumes 3.6 interest on previous end of the year balance. UPDATED 6/10/10 2011 Capital Improvement Plan (CIP) ■ Review projects in the current CIP ■ Review televising reports and maintenance records ■ Review the age of the existing system ■ Review the need for trunk extensions due to possible development �` a 2011 Capital Improvement Plan (CIP) ■ City maintains roughly 155 miles of streets ■ Review the projects in the current CIP ■ Review the ages of existing streets and inspect streets that are close to an overlay, sealcoat, or reconstruction based on age ■ Review the pavement condition rating of each street and inspect streets that are close to an overlay or reconstruction based on pavement rating • 2077 Capital Improvement PIanJCIP1 ■ Prepare the CIP trying to balance costs ■ Enter the proposed CIP into CarteGraph ■ Run a 5 -year projection of what the city's overall pavement rating will be if we complete the 5 -year plan ■ The goal is to maintain an overall pavement rating in the range of 73 to 75 2011 Capital Improvement Plan (CIP) Sanitary Sewer Projects 0 r .., i ii, 111 1:116 CLAY PIPE 'TO E EVALUATED / -s---1- CLAY PIPE LINED -6.57 m�ee -.-- r aA r CLAY PIPE ANTICIPATED TO BE REPLACED 5 MILES t x ' „ wit ., ‘ { -, - k . 9 . _ 41H AVE liri n ii rtilr IC AC ' n ii "1"7 ::,..01 1'1 r-- - 1 11111 :1 11111' -----' Iii ':: . , i -, ,, . . ., OfreZ7C:t;; GC C c ; :\ *I f38 ‘ °C:5 ‘if i E3 II III . II 111 III it., opia iii elm um iii , u[ It • r_. \414‘' 2 ' i ill 111 ... 01 Ili C7—] {:—] DO ET 4 , TWO MI t 1 { i le . i r r r QQ . , ., , _ 4 , ,. ,„..., ' / , i 1 I IF a ;„ .'.1 - .,, . n je.111,111. 1 , r .,., 2. MENKE a n .. ' CIR maii 1 _ n ? ., n 1 n 9 -, • 'I l t w it t , ti - . .7 z. CiCli a, w. DIiKDTA 111 .� - cm .�. Y-y, *lt 1' I �i .111 .. � L m y �.��, \ ,l r r, 1 07 CLAY FEPE TG LE EMnE.UA7E it i r 't.'7.' F } 4r ..„......E....0: , , , , , / / "" . r, , , T . , , , 4 ;; ; ;1 I ) 7 t' 1 . . . . 1110A:otr7liu , , , , 10000, 0 0 5 : : : i 0.! t . It '.'-°k : 6 , / . - .- it b _ ii 9 B= El _ iii ili gig CLAY PIPE LINED-4.67 mfmiles „_,,, : � � � � = �y r ��� r , ,; iii,,,,,,u„.,..,r...,,i_i oc ''' --- 4' rivi: CLAY PIPE ANTICIPATED TO BE REPLACED - 5 M .ES ” x' r► �� , , , , , ,,,.:),- - . ,,,:t L ., r, .,i [11 :,:, r,!„. ,,,,, .. , 0 -,,,, ._.t.,. ? -^' ' it , I ' P r. r 11111. , / i. 1 . IL .•. • . , • ,. 0 .,.. A • .. • ,- E.. •,- .•,,, . ., ., . - r , , .. ? 111 ..: 11111 ' .., ' * " . . E00, • '4 1 ilk f N 4 . 1 „ 7-, ' W KM - as i---1 • r I ;41 4. . . ... ri •;,, I• :. .. , ,r, Q{:} ,.,n7,‘ ,. ',, . ' " r' --- • DAKOTA ilh . .. 1. 1 . V: Y. ----- 1 :Ai 1;4*"..41111111ff " iiii - . : . _ 20 11 Capital Improvement Plan (CIP) Street Improvement Projects 1 C it y o f Shakopee Capital Im provement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction Annual Seal Coat $421,700 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 421,700 415,000 457,318 453,578 450,000 Improvements Engineering /Admin. Total 421,700 415,000 457,318 453 450,000 B. Funding Source: General Fund 7,318 Capital Improvement Fund 16,700 Park Reserve Fund Grants (specify) Donations (developer escrow) 3,578 State Aid 405,000 415,000 450,000 450,000 450,000 Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Ba se -Trunk Tax Levy Total 421,700 415,000 Storm Drainage Fund 457,318 453,578 450,000 Description: y ` ' Seal coat and crack seal. a ..t '�'' , ''' .- ' ` a- �1�k°` r ! ® ;t F r , =y . � , Ju stification: �; � � ,` ' Seal coats and crack seals are essential parts of an effective Pavement 3 t� - Y 1 �_ ry ` y - r 4 , r,° n, Preservation Program. -,-,?:-'1--- % F 11 } f t J � .. a t L I E , ' t 3 ','-'-'11- � ` Other Comments: Y � - t`� '� Project area will be determined on a yearly basis. jj t 1 1 N i t a to � � 1 ; `_ Y ,..-f,. � ,-'' � � � t . _ ma ` j ,--'i,,>, , '! 1 ! s �:' '- ' "� a e �.! ' t y y i r r - „' t sue, '� '+ , , , = � ' Operating Costs: P R OJ ECT LOCATION 1 ' s ; City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction TH300 Reconstruction $2,200,000 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 1,750,000 Improvements Engineering /Admin. 450,000 Total 2,200,000 - - - - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 250,000 (SPUC) State Aid 1,320,000 (State Turnback Funds) Assessments 380,000 Sanitary Sewer Fund -Base 250,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk Tax Levy Total 2,200,000 - - Description: >. , ,. m„ e r• if Reconstruction of old T.H. 300. 6th Avenue, from 10th Avenue to Webster ,z. c , - g Street and 10th Avenue, from 6th Avenue to C.R. 69. v 'tea rte n Justification: f �o .'; ,z,-a f,% � - To continue with the rehabilitation of the City's infrastructure in the older sections r3 -0 ` } ' of the community. ':---- '' -.'. .c. ,..-- - --', * "',, „. i's - .‘'. '' 4 � t t o . t fi r . _f ¢ ..i t ' ,� t , } S „- it ( y 3 � y ? � E �'�� J n S r > .7 4c ' -� cl s 3 C 3 ', R rt `t : , i ¢ T �a, it t �01. 1. ' }'tzi -'''v.,'' " i Other Comments: . '' ''�` ` r � i City does qualify for State turnback funds for improving Old T.H. 300, which has o A. ' _ F , ,., y 4 ,, ' . n t ., IX y t , 1 been turn backed to the City. • 4, Ph t ' rT T r g � }. ` « � � , 1�� � , R ;� , - 4 , � :� > J :� > _..; Operating Costs: PROJECT LOCATION a , S City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2011 Reconstruction Project $1,910,000 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 1,710,000 Improvements Engineering /Admin. 200,000 Total 1,910,000 - - B. Funding Source: _ General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 370,000 (SPUC) State Aid Assessments 335,000 Sanitary Sewer Fund -Base 320,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 100,000 Storm Drainage Fund -Trunk Tax Levy 785,000 Total 1,910,000 - - Description: ,„ * t `'� , ° Street, sanitary sewer, storm sewer and watermain reconstruction. vvpqr Justification: ,‘,.. ' 'y ''" To continue with the rehabilitation of the City's infrastructure. } f ..a I _` 4 _ �x' ` Other Comments: `'I ,� ' , 4...' i ; Streets should be reconstructed with old T.H. 300. Turnback funds for T.H. 300 { - A ' .k - are available in 2011. -� � . -...'t "' �- , . ' Operating Costs: ". PROJECT LOCATION 3 . . City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2011 Bituminous Overlay $510,000 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 430,000 Improvements Engineering /Admin. 80,000 Total 510,000 - - - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 150,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk Tax Levy 360,000 Total 510,000 - - - - Description: - ", Bituminous overlay of 2nd Avenue and 3rd Avenue, from Atwood Street to ., ...--47* 11t F t . * 41 Spencer Street; 1st Avenue, from Holmes Street to Sommerville Street Atwood Street, Fuller Street, Lewis Street and Sommerville Street, from 1st Avenue to _...."--L.---- -- A - .%' ' t" , C s ‘ t ' � - . , Ti-- , , 4th Avenue; and Holmes Street, from 1st Avenue to 3rd Avenue. ' +` u ° " - Justification: e : x„ r. $. � ' `Zip + -; 4: , ? 's�` 3 ""�- � °: .It" �' '' t i Continuation of the City's Pavement Preservation Program to maintain existing �j, ' *, , `. infrastructure. �-, 1 a 4 t a c 1 �' y' a + ' > ._ " � ., ,... 1: ^ L , � . ` �''� Other Comments: � � " w ; ;' §:+ •, _�: ;.- • 1 .1 Bituminous overlays are much more cost effective than reconstructing y ,� ,f ,: _ 4r , pavements. Streets will be evaluated each year and may be moved up or moved l t+ t'4s .,Pe': � y 3 lit a , t 1 • i. # 7= °; : , .r `. '° _ back in the CIP. 4 55 � A ., , ( � q �J � `� 4:: � � -''Sf� .1' " �F� S -�, '�{ b 1 s �a �' �' � A f3 ,.. „ •. .s ' , - � .. - ^ - Operating Costs: PROJECT LOCATION 4 • C ity of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Proect Type: Project Title: Total Project Cost: Bruce Loney Stre et Construction 2011 Bituminous Overlay $550,000 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 480,000 Improvements 70,000 Engineering /Admin. Total 550,000 - - - B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid 130,000 Assessments 140,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk Tax Levy 280,000 Total 550,000 - - ' Description: ' ' ,.,,,,,:i...,.. h „f minu Oely Rubn, Ru Circle, nite ve, Granite Court and g R eF � -x � � :7,7:- �d w� &� S apphire B itu o Lane v , from r a Vierling Drive e to by Murphy AvenGraueHDrieritage Drive, from +� yru g _ ^ fir °, �t } f Vierling Drive to Or] Drivey , La Ramsey St., Dallas Dr., Swift Cir.; Gr and Vierling v . $ -, ;''- --: fi Drive, from Limestone Drive to Ramsey Street. a , 1 4 i � 14 , 4 Justification: '43; ,p,', t ; s , . ,_ ' ,. 3 ' Continuation of the City's Pavement Preservation Program to maintain existing , ,� � r ,-_�- �' y ; ,, .,` ` ,, 4,. . infrastructure. F , , , ,. Ivy' 1 , M ' d IK • N, i 1 j s e `9 [ � r� i �''s ' .v � * , a , ` a ;,L':�, t- .""' �- � ' ' d 9f fs - ---±(_!' .,1 J - r� 1 I ,i � '�ir � ,.w= -a"f; ; l '- Other Com ments be : :-.tior 1 I .S.....-'--'s j?, ei . *°; )- 4,4, 1 , r 1...",1-, « 4l t x i ; - t Streets will evaluated each year and may be moved up or moved back in the . .�' ,ur 1 C`"`z'"' ;sue ,,, r , : - �.— ----_ aX - .,' : ,, - 1 , ;,,,,,,,:,?-. , i- ,..,.----:,', IT 1p i, l'''. ril : '-E' � fi , a '- ij i I fi _ t =, ' .. Operating Costs: PROJECT LOCATION 5 • City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction C.R. 101 Improvements, from CSAH $710,000 17 to Spencer Street A. Expenditure Items: 2011 2012 2013 2014 Land & ROW Construction 570,000 Improvements 140,000 Engineering /Admin. Total 710,000 _ - - - B. Funding Source: _ General Fund Capital Improvement Fund 325,000 Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund -Base 260,000 Sanitary Sewer Fund -Trunk 125,000 Storm Drainage Fund -Base Storm Drainage Fund -Trunk Tax Le _ Total 710,000 - - Description: t r , Street, sanitary sewer, storm sewer and watermain improvements to C.R. 101, -`" X � ^ from CSAH 17 to Spencer Street. i ;i' 0. { if � ,, `F ff 1 '-" A Justification: t t t a .. . , - `s , T . ' '4.' ate"` ` ; l � � :. - - ,, ,.. -, : - , - -t-,--. - ty ' ' '`,L -' Wt. x -0.. F y gg • ,� y •; ° ," Y ` �+ pht} t ''- c;' , { ,, ; _ Al jf . j �, ` Other Com ments: � ' 4 ? This wo uld be a County project with the City contributing funds for sanitary ;- y * y w gr` ti; r �' sewer, storm sewer, street lighting and sidewalk. Costs above are only for the - .„411 ,, ' , 7. 1 . : ° - '.',4;4 -- c 4 * 1,ti` r City's portion of the project. -:':„.y.,;12 s'3 � G 't "r .. r i� t X _ ' g °tl ', t „ Operating Costs: PROJECT LOCATION 4 . - 2011 Capital Improvement Plan (C1P) Storm Sewer Projects ••—._ City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Storm Sewer Annual Erosion Control $150,000.00 A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 125,000 Improvements Engineering /Admin. 25,000 Total 150,000 - - - B. Funding Source: - General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 150,000 Storm Drainage Fund -Trunk Tax Levy Total 150,000 - - - Description: a . Annual Erosion Control Project. ' g.� ��� ti t ", � � , 4 4 � ": y - - ' i. I c � Justification: �" ' .f - � ' .� '-,. ' � t 1 . , , Areas may need to be fixed to meet NPDES requirements. } , r �i - Y�p ..— 'a rt - -'t i e ; 4 1 r , a ' y " ' t 1 " , e1 '+ 447 ... a _ - t - ' $ �t } 4t Other Comments x 1..,.......:4::?-4'7,-'1 . j ' The storm sewer outfalls along the river must be inspected prior to determining a r. ` . . .-+ st ,' j -tf} ,.' i t 7 k . . ' ' £ -. project area a . t om • Y i ,:c. } a ' �w � z - Operating Costs: scar PROJECT LOCATION 2011 Capital Improvement PIanJCIP1 Miscellaneous Projects 1 • City of Shakopee Capital Improvement Program 2011 -2015 `Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2015 Street Reconstruction Program $1,150,000 A. Expenditure Items: 2 011 2012 2013 2014 2015 Land & ROW 980,000 Construction Improvements Engineering /Admin. 170,000 Total - - - - 1,150,000 B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 20,000 (SPUC) State Aid 710,000 Assessments Sanitary Sewer Fund -Base 50,000 Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 100,000 Storm Drainage Fund -Trunk Tax Levy 270,000 Total - - - - 1,150,000 Description: 4 '` ' 1 '-r j Street, Sanitary Sewer, Storm Sewer, and watermain reconstruction: mss` :, . C = Bluff Avenue from Main Street to Marschall Road s :1:,,''.:7,1..; I`` Main Street and Prairie Street from Bluff Avenue to 1st Avenue .�. :"" ' '�.k Dakota Street from Bluff Avenue to 2nd Ave t } .'1 r, x e ,+` Naumkeag Street from 1st Avenue to Bluff Avenue Minnesota Street from Bluff Avenue to 1st Avenue _ ' u t%. 4,21V,;. .S". fir,i A * ' ■LI ,y: . t ' :r 1 << ,.,..,:k1:3,--. F y r � ', f # { � 4 t Justification: Ej * ;•—„ a s1 ' To continue with the rehabilitation of the City's infrastructure in the older sections �-a t � � � � , _ - ��, of the community. : - .1 ' mot ; r .F *. r ::454 r Other Comments: 'I ' � - .: ‘% , ',. Reconstruction of streets should be done in conjunction with redevelopment of ''f `- . ' N ;.' 1 * ^�'.- -; the area SPUC has not determined the extent of the watermain improvements. s F�� lY F , ) Y ' Y ` �¢ i i :11 Benefit apprai should be done to determine special benefit to parcels. =Z ` '` '' Operating Costs: PROJECT LOCATION 8 City of Shakopee Capital Improvement Program 2011 -2015 Project Manager: Project Type: Pro Title: Total Project Cost: Bruce Loney Street Construction CSAH 1 7Nierling ts Drive Intersection $1,700•000 _ Improve A. Ex penditure Items: 2011 _ 2012 2013 2014 _ 2015 Land & ROW 200,000 Construction 1,200,000 Improvements Engineering /Admin. 300,000 _ Total _ - - 1,700,000 - B. Fund Source: 1, General Fund ent Fund Capital Improvem Park Reserve Fund Grants (specify) 080,000 (Federal) Donations (specify) 310,000 State Aid 310,000 Asse ssments Fund -Base Sanitary Sewer Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk Tax Levy Total - - 1,700,000 - - Des cription: $ l �ii . q ,� ,; � CSAH 17/Vierling Drive intersection improvements. , } 1' ;� " ' , � Jus tification: _ s , ,, ._.. / .. ; ..� F e , I mo- =—` �1. . . ■ ■ ,: --,;,....,-1 4.-- _ � ., ' Id+ . ` . + . Y i � t' ' :;- , i ce ,. i 4 - _. ' e, a ` 1 r � = Other Comm ents: I r .� ''' i i : _ _ , Oper Costs: • P L O C ATION el r •,,, •,••• -'f'-',•::-'1,-,-'-'''s. 2, . - i — sti's, ' ---;','-' -""-', '-'''''''''',. .,: ' 1: i : '-i • ,,,-',' ■ '' ' 1 , • 1 '',`:'=-,' ' LT. ,r;,, I i',!0', ' :::::" — •• : '7.:. :, ..:4 , , -.':=ii:,,,-;:-7, -..;,,, , 1 ,::: - : ii!.:1.-3 - ' ' ..'.,' ', -,.,-,i...:...:::,...=.;:i-L,-,...-.,.:,,,-;,,..,:,.y,,-;--..:-,::;',.,;::,i-,iito-stilmi, !Iii ,,.,.. .1 , i i ,‘ ., , 0 , {` S y El. 11 '.' \itti; '1 '.`i ..;;';':::''''':,:11,1.,17.-:'-' I . , I S r • ! ..t . 0. 4 , , .. 1;1,2, i , r l ' r ( �Ylf1F [ - ,e (1 ➢3 d •�....- x, '= •,zY+'.r-+« x + ..' i.+'F „, __, , ..- • ,----z._«. . sauwazs^r M : . {' s # _ . «rv*»"+"rta Aro .r twmrtrte2.a*6.i * r.5x:'h^'• _.0 CSAH 17 � �.., �,,,� , _,__,.... : ._,---- •• • r a 3 /zr+• x �,F 1,1- t - t r3 ;�•� 1 �.,..-x`. - :r. r.: r ''f y • i I . g t� . ,""w f ( `} ; f , y 1 ,, `!h . " t °{ R .1''' `;. ` 11 I ! 'i { r t s.: r ."� ' w " , 4A yA21 Mx' � u• �� *I rx {. } • tY f }4 �l`. Py'y' :'i Lr 1 g 1 'Y. f-�.; ♦ .$+ � 4 • • .34 P i P r r ' ,._ p yr 3 f � ��"!! - ' L � ;� 3' & ' ” $ p g } 'i � ,F �..;. +( ..-. w� F ` � � 3 $ ... : 46:7:11"::::,'":,:,•:,... VII , 1 ,{ `( '--"' r ( ,.. 1 41:: f; _ � ' . 3f : 1 ;•,-. 1 , , 'R3t4• ' ( • � � � ,r � I � � L '�P�``:;. � $� Ay. •`' L • fl i. � ��I. S _ { rr« i It,: t1 -1' :- Z .+ t - a �' ( a ' e ^j`„,. �. tl a rt'+ � L q _ p --... ' . '" ' i s I 1 A .' {: t+ Y ��??,,�{ �� i cri- iit,�lfla�ll., ;�,�. 1 % r .� i � a, LEGEND ( ! PROPDSED BITUMINOUS ROADWA oil PR CONC. CBO, RAISED CONC. MEbIAN SCALE 1 woes PROPOSED DPOSEO MILL OVERIAY 5 _ .+ 0 2 PROPOSED BITUMINOUS TRAIL (IN FEET) VIERLING DRIVE AT C.S.A.H. 17 FIGURE N0. 2 f:\P \CSAN 12 01 1.0tnp \dwp\5.111543 \CSAN 11 APP1lcollo. 09 2dw9. I ,,''3. 5J 2:09;11 PM 2 V City of Shakopee Capital Improvement Program 2011 -2015 Project Type: Project Manager: $25 Project Title: Total Project Cos Bruce Loney Street Construction CSAH 17 Expansio ,0, A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 12,000,000 11,000,000 Improvements Engineering /Admin. 1,000,000 1,000,000 Total _ - - 13,000,000 12,000,000 - B. Funding Source: — General Fund Capital improvement Fund 250,000 250,000 Park Reserve Fund Grants (specify) Donations (specify) 12,200,000 11,200,000 (County) State Aid 300,000 300,000 Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base 250,000 250,000 Storm Drainage Fund -Trunk Tax Levy Total - - 13,000,000 12,000,000 - Descri ption: } , t - i = y : . Expansion of CSAH 17, from St. Francis Avenue to CSAH 42. z� $ E f 1 i 1 ti p, tf 447;1, , ` - ._ - ; . Justification: -, _' Projected traffic volumes warrant the expansion of CSAH 17. m � { ce' '�; �' M 'f f ,-F4 'Y -. t "I y+t ',- k 7 - 1 41 3 ) 1 :. d z ' , Y* Other Comments: T t r . , ' r ' n -, '" City costs will be for a bituminous trail, storm sewer and concrete curb &gutter. < -'. f ----, � - =. - , . ;A .q,. ; ` .r . r Operating Costs: PROJECT LOCATION 10 City of Shakopee Capital Improvement Program 2011 -2015 + Project Manager: Project Type: Project Title: Extension of Total Project Cost: Bruce Loney Street Construction Valley View & Control Signal at CSAH $1,000,000 17 & Valley View A. Expenditure Items: 2011 2012 2013 2014 2015 Land & ROW Construction 800,000 Improvements Engineering /Admin. 200,000 Total - - - 1,000,000 B. Funding Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) 100,000 (County) State Aid 260,000 Assessments 640,000 Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk Tax Levy Total - - - 1,000,000 - Description: _ =—°w . I ". Extension of Valley View Road to Sarazin Street and construction of a new traffic > A - r , -- - � ) i " r , g k , -y r control signal at the Valley View Road and CSAH 17 intersection. i. � � 1 ! tf1 } s 113a z 3 s rt - -' ? I r f�S Justification: i r. } It . ` ' t.':- Z T : j 1 l ri . , ` _ Growth in the area and traffic will warrant construction of this roadway. Sufficient �-� .- -.. � i � ., ��= traffic movements may warrant the signal system. A warrant study will need to 1 f :1. 0,4 a , , t • ,' be done to justify the signal. . t i t f r t x Y 4' ^ F . r Ira f � � 4 ; 7 � i} � ' \ Awe _ ~ , , 0�S - i' � `: • V ' , � ; - x } V ' Other Comments: E / _ ° =, 1 . . i ., t �, Will need to coordinate the project with the County. � . S. 4 t' 4 ..4. + vn 7 ,.,• er - -� c : �` % Operating Costs: PROJECT LOCATION 11 City of Shakopee Capital Improvement Program 2011 -2015 _ Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Park Asset Various Park Replaceme Projects $710 A. Expenditure items: 2011 _ 2012 2013 2014 2015 _ Land & ROW 55,000 Construction 50,000 80,000 345,000 115,000 Improvements 5,000 Engineering /Admin. _ 5,000 _ 5,000 40,000 10,000 Total 60,000 55,000 85,000 385,000 125,000 B. Funding Source: General Fund Capital Improvement Fund Park Asset Fund 60,000 55,000 85,000 385,000 125,000 Grants (specify) Donations (developer escrow) State Aid Assessments Sanitary Sewer Fund -Base Sanitary Sewer Fund -Trunk Storm Drainage Fund -Base Storm Drainage Fund -Trunk Tax Levy Total 60,000 55,000 85,000 385,000 125,000 ,.. , Description: . .. Park replacement/repair projects. '` : ' �t It te r Justifi � ° s t i� ir;' 3 # arm ;a ll� i { :1 ; � , ;ti� j Replacement of park assets are necessary due to condition or end of life of the • . 7 � r f , asset. M ) t r y x '� Utz _ #• r ', .' ; ' < ' # r1 .4 ti _. .., _ ', '} "." v < i ! , � . y � , - r''''' 1 � ::j � �� +� Other Comments: ' r 4' , r= �� 3 ; Projects includ Lio ns Park Shelter #2 repair, trail overlays, fence replacement, r J �. n � 'A h .Fa y d f 7 , , f ; - , � replacemen 3 -' Tah shelter repair, Log Cabin repair, Lion s tennis court replacement and - , {, . ' ¢ +� ` � Schleperfield lights t. g ge S s 5 - fi r � �; 72.455 k i }-2 ` ra j 2 ti , f Operating Costs: PROJECT LOCATION ► a Project Cost Funding Source 2011 2012 2013 2014 201S Lions Park Shelter #2 $15,000 Park Asset fund $15,000 Trail Overlays $110,000 Park Asset fund $30,000 $20,000 $20,000 $20,000 $20,000 Fence replacement $75,000 Park Asset fund $15,000 $15,000 $15,000 $15,000 $15,000 Tahpah Shelter $20,000 Park Asset fund $20,000 Log Cabin $50,000 Park Asset fund $50,000 Lions Tennis Court $350,000 Park Asset fund $350,000 Schleper Field Lights $90,000 Park Asset fund $90,000 Total $60,000 $55,000 $85,000 $385,000 $125,000 Park Asset Fund Projected Fund Levels 2011 -2015 Capital Improvement Program City of Shakopee, Minnesota REVENUES: 2010 2011 2012 2013 2014 2015 Park Asset charges $ 171,680 $ 171,680 $ 171,680 $ 171,680 $ 171,680 $ 171,680 Interest Total Revenue 171,680 171,680 171,680 171,680 171,680 171,680 EXPENDITURES: Expenditures per List -PARKS 60,000 55,000 85,000 385,000 125,000 Total Expenditures - 60,000 55,000 85,000 385,000 125,000 Excess (Deficiency) 171,680 111,680 116,680 86,680 (213,320) 46,680 Fund Balance January 1* 195,800 367,480 479,160 595,840 682,520 469,200 Balance 12/31* $ 367,480 $ 479,160 $ 595,840 $ 682,520 $ 469,200 $ 515,880