INTRODUCTION:
Scott County has received additional funding on an interchange improvement for the
intersection of C.H. 17 & C.H. 42, as previously identified in the C.H. 17 Corridor Study.
The County will make a presentation on their road design.
BACKGROUND:
In the 2009 corridor study for C.H. 17, there were three alternatives shown to improve the
intersection of C.H. 42 & C.H. 17. Option No.1 was a standard traffic control signal
design, No.2 was a round-about design and No.3 was an interchange design. Attached
to this memo is the interchange alternative as contained in the C.H. 17 Corridor Study.
Since this plan has been approved, the County has seeked additional funding for an
interchange alternative and has secured approximately $1.3 million of American
Recovery and Reimbursement Act (ARRA) funds through a partnership with the
Shakopee Mdewakanton Sioux Community and $1.8 million dollars of funds through
Highway Improvement Safety Program (HISP). With these funds, the County would
supplement this project in their TIF program and is moving forward on an interchange
design with this project to be built in 2011. The County will make a presentation by its
Project Manager, Greg Felt, at the Council meeting to show the preliminary design which
also attached to this memo. The County is presenting this to the City Council prior to an
open house which is scheduled for March 22, 2010 at the Scott County Maintenance
building. The purpose of this presentation is to present this information to the City
Council prior to that meeting and also to receive any comments, questions or concerns
with this project.
ALTERNATIVES:
1. Provide the County any comments in regard to the preliminary design of the
interchange at C.H. 17 & C.H. 42 after a presentation by the Scott County
Highway Department staff.
2. Table comments until after the open house on March 22,2010.
RECOMMENDATION:
Staff would recommend Alternative No.1, to look at the design and see how it impacts
the City of Shakopee, particularly at 29th A venue and Marcia Lane.
ACTION REOUESTED:
Provide the County any comments in regard to the preliminary design of the interchange
at C.H. 17 & C.H. 42 after a presentation by the Scott County Highway Department staff.
~obI.
Public Works Director
ENGR/2010-PROJECTS/2010-COUNCILIPRELIMINARY-DESIGN-CH. 17-CH.42
-
!
I
I
I
I
I
I
I
I
I
I
I
I
I
1
!
I
'"
. a xl;u-;dd'tf iiI
~. ddY~ .
' 9 KIPu. Y I .
- ~ 'tf xlPuadd'i :
- -----;xIPuadd'tf A
..........-. ::> x I P u e d d 't i
Iii
--- - - -~------------ ----_.~-----
I
I
I
i
I
I
I I
! I
I I
I
I
j
I
I I
I
I
High Tee Alternative 3-5-1 DC
.