HomeMy WebLinkAbout5.B.5. Waiver of Noise Ordinance for Construction on 101
s: 13. s-.
.
CITY OF SBAKOPEE CONSE~Jr
Memorandum
TO: Mayor & City Council
Mark McNeill, City Administrator
FROM: Bruce Loney, Public Works Director
SUBJECT: Request of Bituminous Roadways, Inc. for Extending Work Hours
DATE: September 15,2009
INTRODUCTION:
Bituminous Roadways, Inc., the contractor for the County Road 101 Improvement
Project, from Sarazin Street to 70th Street, has requested that City Code Sec. 10.60,
Noise Elimination and Noise Prevention, Subd. 3, Hourly Restrictions on Certain
Operations, be suspended for certain work hours.
BACKGROUND:
The above named section of the City Code restricts the hours of operation from 7:00
A.M. to 10:00 P.M. on weekdays, and from 9:00 A.M. to 9:00 P.M. on weekends and
holidays.
Bituminous Roadways, Inc. is requesting a suspension on the hours to allow for work 24
hours a day, Monday through Saturday, from September 28 to October 17, 2009. The
contractor is looking at six to eight days within this time frame.
This request is being made due to the amount of bituminous mix to be placed in a short
time for the project and to place the bituminous mix at times to minimize traffic
disruption.
Staff would recommend that if the suspension of hours is granted from September 28 to
October 17,2009, that the approval is subject to the following conditions:
1. Approval is contingent upon minimizing noise exposure.
2. If property owner complaints are received by the City, the suspension can be revoked
at the discretion of the City Engineer.
3. No work on C.R. 101, from Sarazin Street to Shenandoah Drive, from 10:00 P.M. to
7:00 A.M.
If Council approves the suspension, a public notice to meet the City Code requirements
and notice such as a news release would be placed in the Shakopee Valley News.
ALTERNATIVES:
1. Approve the suspension of City Code Sec. 10.60, Noise Elimination and Noise
Prevention, Subd. 3, Hourly Restrictions on Certain Operations, per this memo, and
direct staff to publish notice of the suspension terms with the conditions as
recommended by staff.
2. Approve the suspension of City Code Sec. 10.60, Noise Elimination and Noise
Prevention, Subd. 3, Hourly Restrictions on Certain Operations, for some other period
of time as determined appropriate by the City Council, and direct staff to publish
notice of the suspension terms.
3. Do not approve the suspension of City Code Sec. 10.60, Noise Elimination and Noise
Prevention, Subd. 3, Hourly Restrictions on Certain Operations, D.
RECOMMENDATION:
Staff recommends Alternative No.1.
ACTION REOUESTED:
1. Offer a motion approving a suspension of City Code Sec. 10.60, Noise
Elimination and Noise Prevention, Subd. 3, Hourly Restrictions on Certain
Operations, D, per this memo, and direct staff to publish notice of the suspension
terms with the conditions as recommended by staff.
~'f?:t)
Public Works Director
BUpmp
ENGR/2009PROJECTS/2009COUNCIL/EXTEND-WORKING-HOURS-BlTUMINOUS-ROADW A YS
..
BITUMINOUS ROADWAYS, INC.
6898 HIGHWAY 101 EAST / SHAKOPEE, MN 55379/ PHONE (952) 233-1660 FAX (952) 233-0686
September 9,2009
City of Shakopee
129 South Holmes St.
Shakopee, MN 55379
Attn: Bruce Loney
RE: CP 101-05/SAP 70-701-05 CTB and CP 101-06/SAP 701-04 CTB
Per environmental control ordinance Section S-11 (1803.3) LIMITATIONS OF
OPERATIONS - Bituminous Roadways, Inc. is requesting exception per Section S-11.2 -
during of the above referenced project.
S-11.2 - Construction operations will be restricted to the hours between
7:00 a.m. and 7:00 p.m. Monday through Friday and the hours between
9:00 a.m. and 5:00 p.m. on Saturdays.
We respectfully request the following;
Flexibility to extend the work hours as stated above. To be variable
Monday through Friday and Saturdays, dating from September 28th, 2009 to
October 17th, 2009. We can not give specific dates and or times but are
considering 6 to 8 days within the time frame as stated above. This request is due
to inclement weather conditions and other factors that we have no control over.
Responsible contacts: Ron Pechia, Superintendent (952) 233-1660 office or
(612) 366-2825 mobile or Jim Pechia, Superintendent (952) 233-1660 office
or (612) 366-7944 mobile.
After reviewing this submittal, please contact me with any question you may have. Your
immediate response to this request would be greatly appreciated.
&g;IY, dk-
. ~ {'
a~ Olson, Bituminous Roadways, Inc.
Est.
Affirmative Action Employer / Contractor
I.c:~' SCOTT COUNTY HIGHWAY DEPARTMENT MINN. PROJ. NO......... .............................................. ......................... .................
/Scott GOVERNING SPECIFICATIONS
CONSTRUCTION PLAN FOR ...to..!.~q.t!Q,....Qs9..JI.?<.I.I!o.E.:....f..613..R!.g....~...I3..!.Tl,J..~.!.t!.9..lJ..?....Qy.!~B.!o.6.:r:...... ll-lE 2005 EDITION OF lliE MINNESOTA OEPARlMENT Of' lRANSPORTAllON
'"STANDARD SPEClRCAllONS F'OR CONSTRUCnON- SHAlL GOViRN.
AlL 1RAFFIC CONTROL OE\JlCES AND SIGNING SHAll. C(lNFORl.4; TO THE:
MMUTal, INaJJDJNG FJElD MANUAL FOR lWPORARY TRAFFIC CONTRa.
ZONE LA'I'OUTS.
LOCATED ON ...Q,?:..6:.I::f.:....!.QJ..... LOCA TION ..f?Q9.....s~?:r...9..f....?.A~.6.:z:I.~.....?..I:....IQ ..Q.:??..MI.!o~....~E.:?..I....Qf....Y.A!O!OIO;.Y....F.:.~f3.!) ...I?f3.!.Y..~...!t:!....I.f:I.E.:..<::.II.':f....Qf.....?..1::f.6.!).QP..s.E.:.. SHEET INDEX
~
I 111LE SHEET
FRONTAGE ROAD 2 ESTIMATED QUANT'S, CONST. NOTES, BASIS FOR EST'D QUANT'S
COUNTY PROJECT NO. 101-06 3-' CSAH 101 & fRONTAGE ROAD TYPICAL SECTIONS
GROSS LENGl1:I ............1.1.t:'!:9..Q.:QQ. FEET ..?;~.1.9.1i1. MILES GROSS LENGTH ........_....;?.l~.?.J~!:Qg. FEET g~.~:1Q. MILES 5 NMC LOOP DETECTOR DETAIL
~~:?~~~~~e~Gffi.........g:gg ~m &:&8.& ~lli BRIDGES-LENGTIi 0.00 FEET p.OOO MILES
NET LENGTH .................:n;'iQ!):;!):Q: FEET .?,l?~. MILES ~~~~~OG~-~:.~.~~~:;~;~;~~: ~m: K~~: ~:~~ END S.A.P. 70- 701-004 CTB
END C.P. 101-06
STA. 241+00
BEGIN S.A.P. 70-701-004 CTB THIS PLAN CONTAINS ~ SHEETS.
BEGIN C.P. 101-06 DESIGN DESIGNATION - EAST OF C.S.A.H. 83
STA. 127+00 ADT (Current Year)' (2009)
= ............ ...........................22..1.l5...
ADT (Future Year) (2029) = ................................... ....,42..1.35...
HCADT (Future Year) (2029) = ....... ..................................>.911...
LOCA nON MAP FUNC110NAL CLASSIFICA 1l0N: .............................~f...:h.~!.~9.~..~.~~...
NO. OF TRAFFIC LANES: ...........................................................................4...
NO. OF PARKING LANES: .........................................._m........................9...
END FRONTAGE ROAD SHOUlDER ,""OTH. ............................................~:...I.~;?,I.~~..I...l.Q:..9.!!l?!~~..
ST A. 33+ 79 STRUCTURAL DESiGN:..... ... ........................... ................................l9...IoD...
~ R VALUE:...........1.5.............N 18 FACTOR.. ...... ......... ........~.HZ,~1.L
DESIGN SPEED: .............................................. ___.... ..._.............. ........... ..........
)t DESIGN DESIGNATION - ~ST OF C.S.A.H. 83
~
ADT (Current Year) (2009) = .........................................H.2.65...
ADT (Future Year) (2029) = .........................................27...1.45...
HeADT (Future Year) (2029) = ............... .............................>.911...
FUNCTIONAL CLASSIFICATION: ........_...................~~:...~.I~Q~..!.':~.~~~...
NO. OF TRAFFIC LANES: ,..................h_........... ........_........ ................ ........
NO. OF PARKING LANES: ... "'...................... .............................................
SHOUlDER ,""OTH. .................... .....................X..!~~!.~sL!.9.'...9.!!l?!~~...
SlRUCTURAL DESiGN:............. ...................... .................................lQ..I9JJ...
R VAWE:...........l~....m......N 18 FACTOR................m.............2..~:;.Q..:;Q:;...
DESIGN SPEED: ................ ........................................................................ ........
PROJECT LOCATIONS
COUNTY ....'i'.Q9.II...........
DISTRICT MElEQ..............
......
SCALES
PLAN ~
PROFlLE_~ I HEREBY CERTIFY niAT lltl$ PLAN WAS PREPARED BY ME OR UNDER NY DIRECT
SUPERVISION AND THAT I },)A A DULY UCEHSED PROFESSfOHAL ENGINEER UNDER
INDEX MAP_~ THE LAVI'S Of' THE STAn;; OF MlNNESOTA.
X-SECTION-=--,---, .....~J:l0...~..........m...DATE.~.MQ..~.
DANIEL M. JOB uc. NO...........1;j~.!!L........
Sheet No. 1 of 5 Sheets
F:IP\OVERl.AYS\2009 0Ver1ays1dwg\101.06 TITLE.dwg, LayouI1, &'1120091:14:47 PM
~
....... SCOTT COUNTY HIGHWAY DEPARTMENT MINN. PROJ. NO. ....................................................................................... ..............
I ~~'" GOVERNING SPECIFlCA nONS
(scott lHE 2005 EDITION CF THE MINNESOTA DEPARTMENT OF 'TRANSPORTATION
CONSTRUCTION PLAN FOR ...M!.h,~I~.Q,....QE.:Q:r.E.;XI1\,s....f.~.!?~.I9.,....!?!.:r.l,I.M.!N9.l,I?....9.Y..~R.L..6Y.,....?I.9.I;l.~.L.....?~:r.E.;.M ..~....!?9.X...gl,l.~Y..E..B:r.....RsP\,Ags.M.~I;l.:r.... -STANDAAD SPEClACAlIONS FOR CONSTRUCTION- SHALL GOVERN.
ALl.. TRAFFiC CONtROL DEVICES AND Sl~ING SHAll.. ~FOIUr.I AND BE
lNSTAL1.EO IN ACCORDANCE TO THE MMUrco AND PART 'v1. .AELD
MANUAL FOR TEUPORARY TRAme CONTROL ZONE LA"I'OIJ'Ts-.
LOCATED ON ...g.:.?.:.6:..tl.:....19..1.... LOCA nON ...Q:..?1J....M.!.L..E.;...'I{~?.T....Q.f....y.6I,..L..E.;::r:....~.6.R.~....Q.!3.!ys...:r..Q....???:.....'<<s.?.I....Q.f.....?..Q~.\:1...?..If3~E.;:r....\!;l...:r..tl~....g.\:r..x....QF.: ..?.!:i.~.!5.QP..~.~.. SH EET INDEX
~
1.01 TIllE SHEET
1.02 EST"O QUANiS. CONST. NOTES. BASIS FOR EST'O QUANT'S
COUNTY PROJECT NO. 101-05 FRONTAGE ROAD 1.03-1.05 TYPICAL SEC1l0NS
GROSS LENGlH .............,~.t;?.g.Q.:Qg. FEET .1.~'.Z4. MILES GROSS LENGTH .............~AZ.?~:9.Q. FEET Q...g.~!? MILES 1.06 GE:OMETRIC REVISIONS AT VALlEY PARK DRIVE
BRIDGES-LENGTH 0.00 FEET O.QOO MILES ~~~~~ON~EmGfH............g:8g ~~i g~:8S.8: ~:~~ 1.07 BOX CULVERT DETAILS
~~~'r.:",.~~-~~.:~:::~~~~g~g8: ~m ~;;~~~ ~m 1.06-1.11 BOX CULVERT STANDARD SHEETS
NET LENGTH ....... ........:::1";.?7.~;9:Q: FEET 9...Q.g~. MILES 1.12 BRIDGE SITE SURVEY SHEET
END SAP. 70-701-005 CTB 1.13 TURF ESTABUSHMENT & EROSION CONlROl
1.14-1.16 EROSION CONTROL STANDARD SHEETS
END C.P. 101-05 2.01-2.12 SIGNAL PLAN FOR CSAH 101 AT VALLEY PARK DRIvE
STA. 303+00
BEGIN SAP, 70-701-005 CTB
BEGIN C.P. 101-05
STA. 241+00
NEW BRIDGE NO, 70J49 THIS PLAN CONTAINS ~ SHEElS.
BOX CULVERT REPLACEMENT
LOCATION MAP STA. 276+73.74 DESIGN DESIGNA nON
ADT (Current Year) (2009) = ............... .................... ..Z2..1.l0...
ADT (Futuro Year) (2029) = ......................... ........... ...42.1.30..
HCADT (Future Year) (2029) = .............................................S.911...
FUNCTIONAL CLASSIFICAllON: .......................,.....~~:...~!.~9.~..~.~~...
NO. OF 'TRAffiC LANES: ................}................................................ .........~...
'9," NO. OF PARKING LANES: ..........................................................................9...
SHOULDER WIDTH. ............................................~:.J~~.~Qg..L...~.9.:..Q~!R.~..
':\r STRUCTURAL DESiGN:......... . ................................ .........................19..10"-..
R VALUE: ...........lS.............N 18 FACTOR................................J.lf.~,J.7.,...
.t~J ' ..--' "." DESIGN SPEED: ......................................................... ................... ... .............
;( DESIGN SPEED: .......................................... ..................................................
,'," ~ BASED ON: .......................................................................... ......
HEIGHT OF EYE:...... ............ HEIGHT OF OBJECT: ......._. .....
DESIGN SPEED NOT ACHIEVED AT:
STA. ........................ TO STA. ........................ .......m MPH
PROJECT lOCAllONS
COUNTY ....~9.QIT .......... .
DISTRICT METlW............
~ -
..........
; SCALES
PLAN -
PROFlLE_'--------' I HEREBY CERTIFY THAT THIS PLAN WAS PREPARED BY ME Oft UNDER MY OlRECT
SUPERVISION AND THAT I AM A DULY UCENSS) PROFESSIONAL ENGINEER UNDER
INDEX MAP_~ lHE LAWS OF THE STAlE OF MINNESOTA.
~~~........~~:..~~:~~::;,~;~~:::
X-SECllON--=- '--------'
END FRONTAGE ROAD
STA. 27+76 Sheet No. 1.01 of 1.18 Sheets
F:IP\QVERlAVS\200Q o...e<Wp\ltNg\~\)1.OS TTTlE.dwg, layout\, 6111200912:57:19 PM