Loading...
HomeMy WebLinkAbout5.B.2. Ordering Preliminary Engineering Report for 2010 Bituminous Overlay-Res. No. 6936 s. f3.1. ' CITY OF SBAKOPEE cn,~~p~~T ' ,.;6 ~ r, l;;'~ ;\\ .;~';' ~<~ ~i ':' Memorandum V. ~ " W'hl ,,~!; I ~~h1 TO: Mayor & City Council Mark McNeill, City Administrator FROM: Jeff Weyandt, Assistant City Engineer SUBJECT: Ordering Preliminary Engineering Report for 2010 Bituminous Overlay Project DATE: September 15, 2009 INTRODUCTION: Attached is Resolution No. 6936, which orders the preliminary engineering report to be prepared for the 2010 Bituminous Overlay Project. The reason for initiating the project now is so pictures can be taken and quantities can be calculated before the ground is covered with snow. BACKGROUND: Staff has completed the review of the proposed 2010-2014 Capital Improvement Program, which includes a bituminous overlay project for various streets throughout the City. These streets have deteriorated and are candidates for a bituminous overlay, which would extend the life expectancy of the streets. Attached are the CIP sheets identifying the proposed study area for the 2010 Bituminous Overlay Project. In the preliminary engineering report, staff will investigate street rehabilitation along with utility repairs. ALTERNATIVES: 1. Adopt Resolution No. 6936. 2. Deny Resolution No. 6936. 3. Table for additional information. RECOMMENDATION: Staff recommends Alternative No.1, so that the proposed bituminous overlay project preliminary engineering report can be initiated for possible construction. ACTION REOUESTED: Offer Resolution No. 6936, A Resolution Ordering a Preliminary Engineering Report for the 2010 Bituminous Overlay Project and move its adoption. 9H-~ Jeff Weyandt, P.E. Assistant City Engineer JW/pmp ENGR/2010.PROJECTS/2010-BITMINOUS-OVERLAY/WORD/MEM6936.0RDERING.REPORT RESOLUTION NO. 6936 A Resolution Ordering The Preparation Of A Report For Improvements For The 2010 Bituminous Overlay WHEREAS, it is proposed to improve 4th A venue, from Scott Street to Gorman Street; Spencer Street, from 4th A venue to Shakopee A venue; Vierling Drive, from Spencer Street to Kensington Drive; and Sarazin Street, south of Eagle Creek Boulevard and Roundhouse Circle by reconstruction of bituminous paving and all appurtenant work and to assess the benefited property for all or a portion of the cost of the improvement, pursuant to Minnesota Statutes, Chapter 429. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SBAKOPEE, MINNESOTA, that the proposed improvement be referred to Bruce Loney, Public Works Director, for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvement is feasible and as to whether it should best be made as proposed or in connection with some other improvement, and the estimated cost of the improvement as recommended. Adopted in session of the City Council of the City of Shakopee, Minnesota, held this day of ,2009. Mayor of the City of Shakopee ATTEST: City Clerk ENGR/2010-PROJECTS//2010-0VERLAY/WORD/RES6936-0RDER-REPORT City of Shakopee Capital Improvement Program 2010-2014 Project Manager: Project Type: Project Title: 2010 Bit. Overlay Total Project Cost: Bruce Loney Street Construction Vierling Drive $275,000 A. Ex enditure Items: 2010 2011 2012 2013 2014 Land & ROW Construction 225,000 Improvements En ineerin IAdmin. 50,000 Total 275,000 - - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid 195,000 Assessments 80,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Le Total 275,000 - - - - Descriotion: I Bituminous Overlay. Vierling Drive, from C.R. 79 to west of Kennsington Drive. ~ Justification: Continuation of the City's Pavement Preservation Program to maintain existing infrastructure. Other Comments: Bituminous overlays are more cost effective than reconstructing pavements. Vierling Drive will be evaluated each year and may be moved up or moved back in the CIP. Ooeratina Costs: PROJECT LOCATION City of Shakopee Capital Improvement Program 2010-2014 Project Manager: Project Type: Project Title: Total Project Cost: Bruce Loney Street Construction 2010 Pavement Preservation $640,000 A. Ex enditure Items: 2010 2011 2012 2013 2014 Land & ROW Construction 570,000 Improvements En ineerin Admin. 70,000 Total 640,000 - - - - B. Fundin Source: General Fund Capital Improvement Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid 410,000 Assessments 180,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base 50,000 Storm Drainage Fund-Trunk Tax Le Total 640,000 - - - - j DescriDtion: Bituminous Overlay. 4th Avenue, from Gorman Street to Scott Street; Spencer ~ Street, from 4th Avenue to Shakopee Avenue; Roundhouse Circle and Sarazin Street south of Eagle Creek Boulevard. Justification: Continuation of the City's Pavement Preservation Program to improve paved roadways. Other Comments: Bituminous overlays are much more cost effective than reconstructing pavements. Streets will be evaluated each year and may be moved up or moved back in the CIP. ODeratina Costs: PROJ ECT LOCATION