HomeMy WebLinkAbout5.B.1. Ordering Preliminary Engineering Report for 2010 Street Reconstruction-Res. No. 6935 S. {b.I. CITY OF SBAKOPEE CONSENT Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Jeff Weyandt, Assistant City Engineer SUBJECT: Ordering Preliminary Engineering Report for 2010 Street Reconstruction Project DATE: September 15,2009 INTRODUCTION: Attached is Resolution No. 6935, which orders the preliminary engineering report to be prepared for the following streets: . Minnesota Street and Dakota Street, from 7th A venue to Shakopee Avenue . 7th and 8th A venue, from Market Street to east of Dakota Street . Shakopee A venue, from Main Street to Market Street BACKGROUND: Staffhas completed the review of the proposed 2010-2014 Capital Improvement Program which includes street preservation projects on the streets listed above. The above streets have deteriorated and are candidates for reconstruction. Attached is a map showing the proposed study area for the 2010 Street Reconstruction Project. In the preliminary engineering report, staff will investigate street reconstruction along with utility replacement. In order to reconstruct these streets during the summer months of the 2010 construction season, soil borings, a topographical survey and the preliminary engineering report should be authorized at this time. AL TERNA TIVES: 1. Adopt Resolution No. 6935. 2. Deny Resolution No. 6935. 3. Authorize the appropriate City officials to execute an agreement with ITCO Allied Engineering Company to perform soil borings. 4. Authorize the appropriate City officials to execute an agreement with WSB & Associates, Inc. to perform a topographical survey of the project area. 5. Table for additional information. RECOMMENDATION: Staff recommends Alternative No. 1. No. 3 and No.4, so that the proposed street reconstruction project preliminary engineering report can be initiated for possible construction. ACTION REOUESTED: 1. Offer Resolution No. 6935, A Resolution Ordering a Preliminary Engineering Report for the 2010 Street Reconstruction Project and move its adoption. 2. Authorize the appropriate City officials to execute an agreement with ITCO Allied Engineering Company to perform soil borings. 3. Authorize the appropriate City officials to execute an agreement with WSB & Associates, Inc. to perform a topographical survey of the project area. ff(f~ Jeff Weyandt, P.E. Assistant City Engineer JW//pmp ENGR/2010-PROJECTS/2010-RECONSTRUCTION/WORD-MEM-6935-0RDER-REPORT RESOLUTION NO. 6935 A Resolution Ordering The Preparation Of A Report On An Improvement To The 2010 Street Reconstruction Project WHEREAS, it is proposed to improve Minnesota Street and Dakota Street, from 7th A venue to Shakopee A venue; 7th A venue and 8th A venue, from Market Street to east of Dakota Street; and Shakopee A venue, from Main Street to Market Street by reconstruction of sanitary sewer, watermain, storm sewer, concrete curb & gutter, aggregate, bituminous paving and all appurtenant work and to assess the benefitted property for all or a portion of the cost of the improvement, pursuant to Minnesota Statutes, Chapter 429. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA, that the proposed improvement be referred to Bruce Loney, Public Works Director, for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvement is feasible and as to whether it should best be made as proposed or in connection with some other improvement, and the estimated cost of the improvement as recommended. Adopted in session of the City Council of the City of Shakopee, Minnesota, held this day of ,2009. Mayor of the City of Shakopee ATTEST: City Clerk ENGR/2010-PROJECTS/2010-RECONSTRUCTION/WORD/RES6935-0RDER-REPORT ~ WSB & Associates, Inc. Infrastructure I Engineering I Planning I Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 September 3, 2009 Tel: 763-541-4800 Fax: 763-541-1700 Mr. Jeff Weyandt, PE Assistant City Engineer City of Shakopee Public Works 500 Gorman Street Shakopee, MN 55379-1376 Re: Proposal for Surveying Services 2010 Street Reconstruction Project Dear Mr. Weyandt, WSB & Associates, Inc. is very pleased to respond to your request for proposal for surveying services for the above-mentioned project. We are very familiar with the survey requirements for street reconstruction projects in the City of Shakopee. It is our understanding that this project consists of approximately 5300 linear feet of street and utility reconstruction on urban streets near the downtown area. The streets slated for reconstruction are as follows: . Minnesota Street, from Shakopee Avenue to east-west alley, north ofih Avenue . Dakota Street, from Shakopee Avenue to Milwaukee Court . ih Avenue and 8th Avenue, from Market Street to 300' east of Dakota Street . Shakopee A venue, from Main Street to Market Street, including the intersection on Market Street and 100 feet each way on Market Street Our proposal to complete this work is as follows: I. Preliminary Desi2n Surveys: The survey control for the project area will be established with our Trimble GPS receivers. The horizontal datum will be on the Scott County Coordinate System, (NAD 83/86). The vertical datum will be on the NA VD88 sea level datum. This is consistent with other survey projects we have completed for the City. We will provide a complete topographic survey of the project area extending 10 feet beyond the existing right-of-way lines. Cross section data would be collected at 50-foot intervals and, at a minimum, will include the centerline, gutter-line, top of curb, sidewalk, right-of-way line and extend 10 feet past the right-of-way line, as well as any grade breaks along the cross-section. Cross-sections will also be taken and all high and low points along these roadways. All topographic features will be located including, but not limited to, match in points, manholes, catch-basins, hydrants, valves, curb stops, both sides of all driveways every 10 feet extending 20 feet beyond the right-of-way, trees, light poles, street signs, property irons to establish existing right-of-way, and other visible private utility company installations. PILETTER PROPOSALSIShakopeel2010 ReconlO90309ltrjw.doc Minneapolis I St. Cloud Equal Opportunity Employer Mr. Jeff Weyandt, PE Assistant City Engineer City of Shakopee September 3, 2009 Page 2 Manhole reports will be prepared including inverts, pipe sizes, and pipe type of all sanitary sewer manholes, storm sewer manholes, and catch-basins. We will coordinate the boring locations with ITCO Allied Engineering and perform the Gopher State One Call for the locates on the private underground utility installations. After the private utility locates have been marked in the field, we will stake the boring locations and survey the private underground utilities that have been marked in response to our Gopher State One Call locate request. We will coordinate the location of all curb stops with Shakopee Public Utilities Commission. The survey data will be delivered to you in a comma-delimited ASCII file, which will include the point number, northing, easting, elevation and description of all survey shots taken in the field. The survey will be completed and the data delivered to the City within 5-7 working days of the private utilities being marked in the field in response to our Gopher State One Call locate request and the curb stops being located by Shakopee Public Utilities. Weare proposing to complete this preliminary design survey work on an hourly reimbursable basis, with a not-to-exceed fee of $6750.00. II. Construction Staking:: WSB will provide the construction staking required for this project on an hourly reimbursable basis, with an estimated fee in the $18,000.00 to $23,000.00 range. Final cost will depend on the actual needs of the contractor. This estimate includes mileage, hubs, lathe, and final as-built survey data for the City to use in the preparation of the record drawings. Our estimated survey crew rate for 2010 is $140.00/hour for a 2-person crew and $ 167.00/hour for a 3-person crew. We anticipate that the vast majority ofthe work will be performed with a 2-person crew. Weare available to start the preliminary design survey work as soon as it is authorized. Thank you for considering WSB for your surveying services. We look forward to working with you and greatly appreciate the opportunity to assist you and your staff in the completion of this project. If you have any questions regarding this proposal please contact me at 763-287-7181. Sincerely, WSB & Associates, Inc. ~.~ Steven V. Ische, PLS Survey Group Manager P:\LETTER PROPOSALS\Shakopee\20 I 0 Recon\090309Itrjw.doc I!ug, a1 os OS:18a p.2 ITCO ALLIED ENGINEERING CO. AN ALLIANCE OF INSTANT TESTING COMPANY AND ALLIED TEST DRILLING Jobsite and Laboratory Testing, Geotechnical Services Commercial, Residential and Municipal 7125 West 126th Street, Suite 500, Savage, MN 55378 Telephone: 952-890-7366 . www.itcoallied.com . Fax: 952-890-5883 August 31, 2009 Mr. Jeff Weyandt, P.E. City of Shakopee 129 Holmes Street North Phone: 952-233-9300 Shakopee, MN 55379-1351 Fax: 952-233-3801 Re: Proposal for Soil Exploration - 2010 Street Reconstruction Project Weare pleased to submit this proposal for geotechnical engineering services for the above referenced proj ect. This proposa11etter presents our planned scope of work and the associated fees for this proj ect. The purpose of our work would be to obtain information regarding subsurface conditions: The project site is located along Shakopee Avenue from Main Street to Market Street, Minnesota Street from Shakopee A venue to where it ends north of 7u, A venue, Dakota Street from Shakopee A venue to 6th Avenue, and 7th and 8t11 Avenues from Market Street to Y2-block east of Dakota Street, Shakopee, Scott County, Minnesota. The site consists of existing roadways which are proposed to be reconstructed. rTCO Allied Engineering proposes to put down nine borings on the site at locations to be determined. With this proposal we assume that the project site is accessible for a truck mounted drilling rig. Ifwe find that the site is inaccessible to our drilling rig, we will contact you to discuss other field exploration options. Flagging or other traffic control is not included in this proposal. If this is necessary it would be done at additional cost. The borings will be Standard Penetration Test (SPT) borings with samples taken every 2.5 feet. SPT borings are recommended because they provide a more accurate soil profile than other types of borings. We have also included costs for conducting 9 gradation tests and 9 P.1. tests in order to determine the AASHTO soil classes and estimate the R-values. Ifpavement subgrade soils consist of sandy soils the P.I. tests would not be necessary. The results of our field exploration program, along with the boring logs and a boring location diagram would be presented in a final engineering report. The fees for our field exploration are presented in the following table. 1 ~u,g, 3.1 OS OS:lSa p.3 Quantity Units Unit Cost Extended Total Mobilization 1 L.S. $300.00 $ 300.00 SPT Borings (9 borings) 108 L.F. $ 15.00 $1620.00 Pavement Patches 9 Each $ 5.00 $ 45.00 Gradation Tests 9 Each $ 70.00 $ 630.00 P.1. Tests (if needed) 9 Each $ 75,00 $ 675.00 Engineering Report 1 L.S. $300,00 $ 300,00 Estimated Total Project $3570.00 Cost If undocumented fill or poor soils are encountered at the proposed drill site and depths, additional bores or deeper sampling may be required to develop an adequate soil profile. If deeper sampling and/or additional borings are recommended, we will notify you and obtain your authorization, prior to proceeding with this work. The cost for our services would not exceed the estimated total cost given herein, unless unanticipated conditions are encountered and your authorization is obtained. If this proposal is acceptable please sign in the space provided below and return one copy with your original signature. If you have any questions regarding this proposal, or if we can provide additional assistance, please do not hesitate to contact us at (952) 890-5909. ITCO Allied Engineering Company (~~ Robert Sullentrop P. . Proj ect Engineer AUTHORIZATION I, representing (name) hereby authorize (company or self) the above described soils investigation to be performed on the subject property. This authorization provides the right of entry to Allied Test Drilling Company for all required soils investigation work. Payment is due upon receipt of the invoice unless other arrangements are made in writing. SIGNATURE DATE ,----------- -----~--~-----_._-- ~ I I --.J I f- I --.J if) <( I I u (f) er::: I <( :2 I f- I IJ) SHAKOPEE AVE I 0::: f- <( W W ~ f- --.J 0 --.J 0::: ~ :=) <( <( 10TH ~D LL :2 0 IJ) IJ) 10TH AVE f- i [j~~ if) f- :=) :2 3 11TH AVE <( (') 11 TH A :r: w if) --.J ST , , )( . .. . ~ ~ 2010 STREET RECONSTRUCTION DATE: Aug. 2009 DRAWING No. DRAWN BY: JTE 0 800 1 SHAlKOlPElE PROJECT LOCATION MAP ~--- I CXllMNIY1'IdlMlal_ SHAKOPEE ENGINEERING DEPARTMENT