HomeMy WebLinkAbout13.F.3. Goals and Objectives Update 13. F 3. CITY OF SHAKOPEE Memorandum TO: Mayor and City Council FROM: Mark McNeill, City Administrator SUBJECT: Goals and Objectives Update DATE: September 1, 2009 Comment: Introduction: At its September 1 st meeting, the Council will hear an update on its two year Goals and Objectives. Background: Beginning in 2004, the City Council has adopted approximately ten "short-term" two year goals, each of which are supported by action steps. The most recent update of these Goals and Objectives is attached. 1. Ensure the City's fiscal health. At the September 1 st meeting, the City Council will consider adopting a preliminary budget and levy for FY201 0, which will see the majority of Shakopee taxpayers having essentially the same city property tax burden for FY201O. 2, Determine and provide high quality of cost effective services, In order to keep the levy flat, three employee positions that have been vacant have not been budgeted for FY2010. This will impact service levels, especially with those positions that had a single incumbent (i.e., natural Resources Coordinator). Other positions will need to fill in to provide those servIces. 3, Make the Downtown and Riverfront inviting, The City will continue to work with residents and businesses in the CR 101/1 st Avenue corridor. It is expected that at least preliminary design criteria will be discussed with the City Council and residents later this year. 4, Continue implementation of the Visioning Initiative process, This update is an example of how the Goals and Objectives are beiong kept visible, but Council should look again at the process shortly after the first of the year. S, Make the Community welcoming place to live and work. Recent changes include a welcoming letter which is going out to new residents via the School District, and the Night to Unite event held in August. 6. Reprioritize projects and staff resources. The economic slowdown has not caused a change in the demand for some services--the number of Police calls is flat so far this year. However, demand for some other services have increased. For example, Shakopee leads the metro-area building permit activity for new homes, while we are also dealing with issues related to foreclosure properties. 7, Protect the Environment. The elimination of the Natural Resources coordinator position means that other staff (Parks, Recreation, and Natural Resources Director, and the Public Works positions) have had to address those activities. This Goal has also provided for green initiatives, which will have both environmental benefits, and save money over the long term in the form of reduced energy consumption. Evidence of this is being seen in the Community Center lighting changes. The City is also more aggressively dealing with encroachments onto conservation easements. 8, Strengthen Shakopee's "small town" feel. Portions of this are being seen in the 10111 8t A venue discussion, relating to pedestrian and bicycle accommodations. 9, Foster community connections. The City is web streaming most of its meetings over the internet, and it recently began an electronic newsletter. 10, Deal with Tribal-related land issues. With a settlement being reached with the BIA on Fee to Trust process issues, the City and tribe can now work on issues of mutual interest, such as service provision. Relationship to Visioning: This supports all of the Goals of the City's Visioning process. Action Required: The Council will be asked to give feedback on the two year Goals and Objectives. 7Iu1--ljtJ~ Mark McNeill City Administrator MM:cn \+ City of Shakopee Two Year Strategy and Action Steps September 2009 Action Steps Parties Responsible Target Dates/Completed Additional Notes 1) Maintain FundBalances Mayor and Council; staff In conjunction with annual This has been the City's practice for many years. General Fund budget process (with ongoing balance to be monitored for future years; budget preparation being monitoring) done in two year cycles for the first time in 2010. In the case of fund balances related to inspections revenues, the City has a formal obligation flowing from the BA TC settlement to make sure that this fund balance does not grow beyond a certain level. That means that each year staff and the Council will have to review the impact on the fund balance for inspections of changes in the inspections budget 2) Maintain Moderate Debt Levels Mayor and Council; staff In conjunction with annual Also standard practice for the City. Need to be aware of debt level budget process and tax impact when ordering projects. 3) Maintain a Stable City-Tax Rate Mayor and Council; staff In conjunction with annual For several years, the City's tax levy has been held at a fairly constant budget process (with ongoing level, The preliminary tax rate for FY 10 is proposed at an amount monitoring) which should result in essentially a flat property tax for a majority of City taxpayers. Need to continue to fund the Internal Service Funds. 1 4) Determine additional funding sources to increase Park and Rec Director, City Ongoing The fund balance anticipated for the end of2009 is $158,700. The the Park Reserve Fund Council and Finance Director City is estimating $120,000 of park dedication funds to be collected in2010. Increase in Park Reserve Fund Balance Dependent upon 1) new development and resulting park dedication fees, or 2) transfers in from other funds Action Steps Parties Responsible Target Dates Additional Notes 1) Determine Project Staffing Requirements Department/ Head Group Annually, as a part of the Preliminary FY \10 Budget calls for elimination 00 budget process; and on an ad positions thru attrition: Graduate Engineer, Custodian, and Natural hoc basis for specific projects. Resources Coordinator 2) Determine the public's expectations of service Department Head group with the Annually, in conjunction with Establish base line expectations, consider doing a professional survey, levels assistance of the Communications budget process. Perhaps if resources available. Scott TPT has just completed both an on-line Coordinator. annually through website mail survey intended for those who don't ride transit and a BlueXpress surveys and other instruments. rider survey that showed generally very high levels of satisfaction with that service. Police Master Planning Task Force has recommended to Council goals and objectives, and prioritized tasks. FD looks to increase its visibility in the Community FD- Relocation of Station 2 to Lions Park area in 2012. Station 3 in Southbridge in 2014. 2 3) Implement Use of the latest Department head group with the Ongoing Telecommunications Commission funded three IT improvements, Technology /Productivity assistance of IT staff which are being implemented: A. Digital Video Cameras in Police Squad Cars. B. Higher level GIS-now has the GIS server and software installed. C. VPN software for employees to access the City network from remote locations. Wireless internet access implemented at the Community Center in 2009 Continue development of GIS/GPS systems and operation use of these systems for Public Works. Current technologies undergoing implementation include Digital Video Cameras in Police Squad Cars, and Mobile Date Terminals in Fire Vehicles. 4) Train and hire quality employees Department head group Ongoing Group of 5 supervisors engaged in a series of classes on supervisory skills._HR is working with Recreation Staff to more efficiently hire quality part-time employees. PW is formulating individual training plans to meet the needs of the department. PD currently has three vacancies - 1 Captain, 1 Records Technician, and 1 full-time Community Service Officer. PD is in process of filling vacant Captain position. FD- Is conducting weekly training sessions and has added an in house EMT trainer. Classes should be ready for other departments mid 2009. Parties Responsible Target Dates Additional Notes 3 1) Coordinate Downtown interest groups-Downtown Administration coordinates Ongoing Council discussion, including local input, needed on future of 1 st Ave Partnerships, Seniors, Arts group, HP AC, Chamber, updates of the City's Vision Ad Hoc ED committee corridor and downtown. Discussions regarding this area are taking etc. Statement as it relates to this goal. through summer of 2009 place as a part of the Economic Development Ad Hoc Committee Community Development established earlier this year, including representatives of the Chamber provides staff to the HP AC and of Commerce and Downtown Partnerships. Four meetings of the CR Downtown Partnership, and 101 Corridor Advisory Committee (CAC) have been held regarding subcommittees. Both the CR 101 reconstruction project, Administration and Community Development staff are acting as resources to the The CD Director. is working with a subcommittee of the Downtown City/Chamber/Downtown Partnership to identify potential grocery users (co-op for example) for Partnership Ad Hoc Economic existing vacant spaces m the Downtown area. Community Development committee. Development Planning staff continue to provide staff liaison to HPAC. 2) Look at the future of the First Ave. Corridor (Bluff Community None set Direction is needed as to whether to actively undertake this effort; to Second Ave.; Rahr to Dangerfields) Development/Planning including a decision on accesses is needed to facilitate County resurfacing of 1 st Avenue. Because of the impact on future traffic levels on CR 101/First A venue of the choice of a central alignment for the next river crossing and the designation of CR 17 as a future principal arterial, the PW Director and the CD Director. continue to stress these impacts through the formal committee processes for these two studies. The CR 101 CAC process convened by Scott County is underway, and includes a component that will look at both traffic and land use impacts in this corridor. 3) Provide for community entryways (monument signs, Community The CR 101 bridge monument and aesthetic enhancements are clean-up for CR 69 railroad overpasses). Provide for Development/Planning complete, and should serve as a design basis for the balance of the CR ways to increase the variety of business on 1 st /City Council 101 corridor aesthetics, as well as monumentation that the City may Ave/downtown wish to construct in other locations in the future. CD Dir. has met with County to identify other potential sites on county roads for monuments; share info with the Chamber of Commerce, who will investigate future sponsorship of the monuments in the future. PWD is working with Scott County to Rehab Bridge in 2011. 4 Action Steps Parties Responsible Target Dates Additional Notes 1) Keep the Visioning Initiative in Front of the Public Mayor and Council; Staff, Ongoing Need to show accomplishments to be tied to Visioning process. New Communications Coordinator page related to Vision and Goals added to City website. One Visioning goal per month will be examined in more detail with Council, including how that will correspond to prioritizations identified in Springsted study. 2) Use Goals & Strengths in Decision Making Mayor and Council, Staff Ongoing Each City Council agenda item identifies a relationship to a Visioning Processes goal; however, the City needs to meaningfully tie goals to decisions made, especially during budget discussion. 3) Do periodic public review of Initiative Mayor and Council, Staff Summer, 2008 Members of Steering Committee last met in May, 2007. Should be updated after 1/1/10. 4) Maintain the Steering Committee; review progress Mayor and Council, Staff, Do in advance of budget. Concentrate on supporting existing goals. twice annually Steering Committee 5) Ensure committees and commissions are vested in City Administrator, City Council, Ongoing PRAB focused on City goals as they determine recreation fees and the City's goals and strengths; use them during Department Heads non-resident fees. decision making. 5 Action Steps Parties Responsible Target Dates Additional Notes 1) Initiate a welcoming package to the City Mayor and Council, Dept. heads; Monthly Welcoming letter from Mayor and Council is being distributed with 2) Encourage Community events sponsored by Communications Coord. new student packets from ISD 720 Continued meeting with different ethnic groups neighborhood groups at Night to Unite (held 8/4/09), Engineering informational meetings, Shakopee Showcase; etc. 3) 3. Meet with Neighborhood groups and City staff active in planning and function of Derby Days 2009. Parks residents and Recreation Director will work with engineering staff to meet with neighborhoods before, during and after park development. Fire Dept. involved at community events. 2) Develop staff awareness/sensitivity/skills to deal Department head group Investigate diversity training for staff. w/diversity & community attitudes. The PD is assisted by Southern Valley Alliance for Battered Women as they have hired a bilingual advocate for women victims of domestic violence. Staff has had contact from Russian-language church who has offered greater community involvement. FD- Looking at different ways to communicate with diverse communities 3) Implement physical accessibility plan Recreation Supervisor Review semi-annually As budget permits for retrofits implementation. i.e.. Trails Parks Department . 4) Increase Transit - Map Resources (i.e., local Community CD Director chairs Scott Transit Planning Team; Marketing employers, restaurants) Development/Shakopee Transit Committee, and attends all Scott Transit Review Board meetings. The UTMP update was completed in 2008. The TPT and TRB are working towards a Transitway feasibility study for both TH 169 and the Dan Patch Corridor. The second ridership survey has been completed, showing high levels of satisfaction with the BlueXpress commuter service The City finally has taken delivery of its back -up coach, and staff continues to seek additional coaches through the Federal grants for expansion. Staff will be working later this year with local employers on an additional reverse commute run. The City map was completed and is available in hard copy and on- line. 6 #~lR.~Jl~i~r!t~~'J,;l,t,cc:lj~~t~~ .S*~ff:lResoutce~ '--',-' -- ".. -' - - - .' - '-, '" -. ,-,., '.., -. ' ',' '~ Action Steps Parties Responsible 1) Establish work plan for the following major issues: a. Community Development a. Complete 8/09 The Compo Plan was finally adopted by the City Council on August a) 2008 Comp Plan Update Dept. b. TBD- 18,2009 b) Community Center Future b. Park, Rec., and N.R. Director C. Ongoing b. Concentrating current facility uses to best utilize existing facility; c) Personnel Issues C. Asst CA; Dept. Heads d. To be determined Small updates to the facility have been made and will continue. d) Annexation Agreement and Phasing for Jackson d. Community Development e. TBD C. Need to identify personnel issues; improve performance evaluation Township Dept. f. Ongoing process; provide better training and development of staff; part-time e) Maj or Transportation Issues e. Mayor, Council; Admin, personnel policy adopted by Council;. Firefighter handbook f) SPUC/City Comm. Devel., Engineering approved by Council in Sept., 2008. f. Council Liaison; Administrator d. County planning staff may facilitate discussions. g. City Council, P&R Director, e. SRF Study on 13/101/18. TH 41 River Crossing Cooridor; Finance Director Transportation Alliance projects; Staff has been meeting with county staff on finalizing plans for CR 21, CR 83 improvements, and CR 101 improvements. Staff also provides substantial support to the "U.S. Hwy 169 Corridor Coalition." F Work on cost savings thru greater energy efficiency projects and sharing of resources 2) Community Center Water infiltration Park & Recreation Staff,_ City Concrete work completed by Completed in 2008. The efCterior pillars require repairs and planters Engineer, & City Council 10/17/ are planned to be ordered to make the entrance to the Community Center invitin . Action Steps Parties Responsible Target Dates Additional Notes 1) Encourage/Educate the Public to Expand Recycling Public Works, P&R Director, Ongoing Council being asked to consider "one sort" recycling at 9/1/09 Communications Coordinator, meeting. Facilities Maintenance Coordinator 7 2) Update Stormwater Plan & Enforce Regulations Engineering As part of Comp Plan update The Comprehensive Storm Water Management Plan was updated to incorporate changes in policies that have evolved since the last update in 1998. . In Sept, 2008, Council adopted a detailed Water Resources Management Ordinance in order to maintain City control of development review and to maintain sole permitting responsibility for construction activities. Storm Water Pollution Prevention Program (SWPPP) compliance inspections are ongoing and annual SWPPP report completed on June 30, 2009. 3) Adopt Natural Resources Design Standards and Parks. Recreation & Natural Ongoing The Natural Resources Design Standards are being implemented in to Preservation of Fragile Natural Areas, and educate the Resources Director the developer's agreement and all other design criteria. The design Public. standards are enforced with all current development reviews.fla.ve Continuing to provide information to public through the web site, recreation brochure and community educational sessions. The NR intern is completing an open space inventory as time allows and continues to work on park encroachment notifications. City is more aggressively enforcing encroachments by adjacent property owners into conservation easements (and park areas) 4) Complete Energy Audit for "City Green Projects", Administration and affected Community Center- SPUC energy audits performed on all City Buildings. and other energy efficiencies throughout the City depts. The Community Center and Ice Arena are seeing a decrease in the Organization. Implement the findings of the Energy C't C 'l D rt t H d Ad' h h h C' f: T' I Y OunCI, epa men ea s energy bill since the lighting upgrade project was complete. u Its t roug out t e lty aCI ItIes as resources or . opportunities become available. 5) Work to incorporate sustainable design criteria. Planning; Natural Resources Ongoing Park and Ride has permeable parkway and bio-engineered drainage swale. If constructed, the second park and ride site will include similar and possibly expanded measures. Second park and ride, to be constructed as part of the CR 21 project, will incorporate similar features and more. Resources design criteria and Park design criteria have been incorporated into City's current engineering design criteria. Action Steps Parties Responsible Target Dates Additional Notes 1) Develop cooperative community-wide Communications Coordinator, Ongoing Web site and direct-mailed Hometown Messenger implemented in communications efforts. staff 2008. Work with School District and SPUC. Monument signs can also communicate City identity. Provide for community gathering points. Police Department continues with Safe School forum meetings along with School District, FD, Probation and County Attorney staff. 2) Develop plan for street design, sidewalks, and Engineering/Community To be determined Trail plan in place. First A venue issue needs to be resolved. Fuller signage for visual connectiveness throughout the City. Development St./Koeper Ave. trail project is being designed and final plans to be presented on September 15,2009. Uniform park signs are being designed and discussed with the PRAB Signs will be_placed in all parks beginning with the new parks. 3) Implement improved customer service techniques Department head group Ongoing Customer service technique parameters to be determined. for City employees 4) Pedestrian Crossings Need work on Jr. High sidewalks; improve lighting on Fuller/Scott. Design for Fuller St bridge over US 169 pedestrian crossing on 9/16 Council agenda. 5)Work with the Chamber or the community groups on City Council, Department Heads Ongoing Partnership needed with Chamber on community promotions special events or community proj ects Parks and Recreation working with the Chamber on "Pumpkins in the Park"; significant City involvement with Derby Days. 9 1) Hold Neighborhood Meetings All departments, depending on Dependent on proj ect timelines Neighborhood meetings are routinely held for PUDs, road and public specific purpose for the for each case works projects, and park development planning purposes. meeting( s) Police Department completed its most recent Citizen's Academy in April, 2009. Police Department had staff participating in Southern Valley Alliance for Battered Women's 25th Anniversary Celebration at Huber Park FD-Continues work on the CER T Program, Fire Prevention Week, and other events. 2) Provide more opportunities for residents to obtain Department head group; Quarterly newsletter in 2008 E-newsletter provided in '08 budget. First direct mail City newsletter information (newsletter, cable, web streaming, stuffers, Communications Coordinator sent in March, 2008. First of quarterly episodes of City TV show - Town Hall Meetings). Shakopee Spotlight aired in April. Fall episode is underway~ Web streaming became operational 8/07. Shakopee Transit/the City has initiated a quarterly transit newsletter, on-bus alerts and web site information regarding new and or changing transit alternatives for residents. All recreation programs can be registered for online. The Parks and Recreation Department provides a significant amount , of information on the website including rental forms and the activity brochure. The Police Department is using the city website to disseminate emergency management information, crime prevention materials and reward flyers, and Crime Prevention tips. FD- Working with schools on Fire Prevention efforts, and is updating its city web information. 3) Support Community Initiatives (i.e., Arts Mayor and Council, staff Ongoing City departments will participate in a Chamber event that will replace Org/Events; Shakopee Showcase; Derby Days; the Shakopee Showcase. National Night Out) CD Director is a part of the Downtown Partnership's Business Development Committee. City Staff assists with annual Derby Days. The Police Department also reaches out to youth through its Explorer Program; the Fire Dept. is reviewing establishment of Fire Explorers' program. 10 4) Identify and reach out to City's diverse population Staff, ISD 720 Ongoing Housing Commission not related to reaching this goal. Need to work mix, (investigate Housing Commission) with churches on how to better make non-native populations aware of City services and opportunities; have established contact at Russian language church. Need to look at incorporating language training opportunities; work more closely with ISD 720. The police have a well-established link to the rental community through their Multi-Housing Officer. Police department has additional resources available for Hispanic Advocacy through partnership with Southern Valley Alliance for Battered Women. Police Department and School District staff worked collaboratively on a grant to fund an additional Hispanic advocate but which was not funded, (summer 2009.) 5)Continue to provide trails to connect the different P & R Director, PW Director Ongoing As development/funding permits. Also working with the county to areas of the City as well as connecting people to public construct trails along county roads. areas. Action Steps Parties Responsible Target Dates Additional Notes 1) Continue to Support a Negotiated Agreement, Mayor and Council; City City and BIA have reached a negotiated settlement on Fee to Trust including Fee to Trust Administrator with other staff as process. needed 2) Continue to Seek Cooperation on Issues of Mutual Mayor and Council/ City Provision of Police services to tribal properties located within the Interest Administrator City limits 3) Expand Partnerships w/Scott Co. & Others NA NA NA 4) Facilitate Development of Non-Tribal Lands NA NA NA Around SMSC Lands. 11