Loading...
HomeMy WebLinkAbout15.D.3. Order feasibility Report for the Improvements of Valley View Road-Res. No. 5867 15,0.3. CITY OF SHAKOPEE Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director SUBJECT: Authorize Feasibility Report for the Improvement of V alley View Road, from the East Plat Line of Pheasant Run 6th Addition to the East Plat Line of Greenfield DATE: March 18, 2003 INTRODUCTION: Attached is Resolution No. 5867, which orders the preparation of a feasibility report for the construction of Valley View Road, from east plat line of Pheasant Run 6th Addition to the east plat line of Greenfield. BACKGROUND: In the Draft 2003-2007 Capital Improvement Plan, on Page No. 7-92, is the proposed construction of Valley View Road along the Greenfield development. Construction of this existing gravel road to a paved collector street is necessary to provide an additional paved route along these developing residential areas. Valley View Road is shown as a City collector in the Draft Transportation Plan. These collectors include a sidewalk and bituminous trail with the extension of sanitary sewer and watermain, as necessary, and storm sewer included in the urban design street. The City does have a petition and a Letter of Credit from the developer of Greenfield for their share of the assessments associated with this project. At this time there are a number of housing starts in this area and residents will be occupying these houses adjacent to this current graveled surface road. Staff is requesting authorization to begin a feasibility report now, due to the amount of housing starts in this area, and to start the process for possible construction of this collector street this year or next year. On the south side of Valley View Road are agricultural parcels, which could develop with municipal utilities and with the extension of MUSA to these areas. It should be pointed out that these parcels are large enough that the assessments could be placed in Green Acres. However, the inclusion of these assessments into Green Acre status will be there until the property develops. By completing this segment of Valley View Road, the paved collector street system will be completed for Valley View Road to Independence Drive to 1 ih A venue and Marschall Road. Completion of the remaining gravel surface portion of Valley View Road will depend on future development in this area. Staff is anticipating some development proposals to occur this fall or next spring. Staff is recommending the initiation of this feasibility report by the City Council in order to complete the collector street adjacent to the Greenfield development, which will have several residents occupying this area by this summer and complete a paved collector to Independence Drive. Staff is recommending that WSB & Associates be authorized to prepare the feasibility report, provide surveying services and obtain the necessary soil borings to prepare this feasibility report, as shown in the attached extension agreement. Staff is recommending this, as the Engineering Department is not able to perform this feasibility report at this time. ALTERNATIVES: 1. Adopt Resolution No. 5867. 2. Deny Resolution No. 5867. 3. Authorize the appropriate City officials to execute an extension agreement with WSB & Associates, Inc. for preparation of the feasibility report, as outlined in the extension agreement. 4. Do not enter into an extension agreement with WSB & Associates, Inc. 5. Table for additional information. RECOMMENDATION: Staff recommends Alternative No.1 and No.3, so that a feasibility report can begin on the extension of Valley View Road in this area of the City of Shako pee. ACTION REQUESTED: 1. Offer Resolution No. 5867, A Resolution Ordering the Preparation of a Report on an hnprovement to Valley View Road, from the East Plat Line of Pheasant Run 6th Addition to the East Plat Line of Greenfield and move its adoption. 2. Authorize the appropriate City officials to execute an extension agreement with WSB & Associates, Inc. for the preparation of a feasibility report, as described in their extension agreement. BL/pmp MEM5867 I I I g' . II o "O.t::. ' C co 0) ::: II) c l/l 3: M- C "0 m::Q en ' N ~ t>~ E _ co C C 0) t -0) ~ " ::J "0 ~ 0 !!!. ~<!) 5- .. 0) -0 l/l , ~. . > c..... " ~ l! 0)- .lB o 01 E~ m _ 01 ~u ~ Co) C Elll (,) Gl ~ +:3 0) '0' . '0' c .!a > III - 'J 10. N X ~O) g ~ 0) ~ iii c,g =.!a i _ 0 0) .~ 0) o ._::J "0 ... ~ ...; "0 -g'(h I . . "O~ "00 S ' cE ~O::::J COOl 0)3: ~ ~ CI> ~ CI> .0 C col/l -'- <( o $ 3: 0) 0) > en " ;; 0 0)= ~~:J . Co) N "0' =- ::s .- E ~ .- - ~ ' 10. l/loo 3: CO . 1;; SC<5 ~> .E c .- 0 - l/l o 3: CO no - ., o 00 ~'E € "tl' · -- (5Gl Uj'- .. lIS :5"0 uE...52 l/l O _lll _01 C.... - + (50 GlGl GlGl l/l co ~:~ 1'00:: C~l/l...;e.t::.~ R c w~ II) c_~ O-l/lCe-- ~ ' c E~ 0 oO)~ ;;l/l~Gl,g~ ' N ... _> " '" !: .- .. '" >- EO,. E I . _ N l/l> Co)Gl ~O~l/l ' CO') Co) .t: ...... ;;::::> ,0""0)l/l C GlGl Co)-(j) ;e~(j)Gl~Q) c ~= l/l~= l/l~E>~ol/l N ""lIS OGlo>co ::SEl!Q)O-~l/l 0 'I l/l ~> ~ ~ _"0 ~CO - . ~ I · ' 0' to. ~ ~ I _ 0 o ~ ' c cl o · t; 2 0 00 00 Z " _ 0 00 00 .. l/l 0 00 00 0 Glg 6 60 ~~ ., Q.... CO') 0 00 ......C'\I - ~CP g ~ ~II) ~M r- _~ N <(' ~d) ~f UJ to._ ~w 0' " --1 .', l/l Q) ~Q)~ ~",', "0 lIl3:Cl/l::J C co 0 ::J III .... ~ ro~~~~ ' _ -0-0-0"0"0 .. . c"O"O _ c:ccJ::J:: lIle .E. . EGl S C.?:- ::J ::J ::J u..::J ~ E Gl .oJ::J'- u.. u.. u.. Gl "0 Co) Glu..u..~:5 ............Q)Q) ~ to. ~ l/l<( to."O>'EQ)-~ lIlQ)Q)Q)ClCl ~. &! e~~~~ !~~~~IS ~JJJII ~ lIS 0 ::So::-E'i: u..EQ)l/ll/llll EW\U\ul!l!>o ~ c~ ~ 020)Gl- --....Gl-g~ ~~~OO>- lISQ) l~_>~S~~~gO::S+:3C~lllCOCOEE~S~ :ECo) Q)"'Ol/le._O"tlQ):::-~ccoO)Q):::::::::...."" O' ~~ cc~~~cc~X""C\lCrolllC:CC:OOX'" Co)"" xcooEc ::sQ)lllllllll....O_lIllllCOCO--CO ~ Glm w~u_w ~<!)(,)...o.<!)QenCenenenenen... ~ '0' (. to.. . " ~ <C a1 ~ 1 7-92 I ~ WSB & Associates, Inc. WSB 4150 Olson Memorial Highway, #300 Minneapolis, MN 55422 (763) 541-4800 & Associates. Inc. (763) 541-1700 (fax) March 12,2003 Mr. Bruce Loney, P.E. Public Works Director/City Engineer City of Shakopee 129 Holmes Street South Shakopee, MN 55379 Re: Estimate of Cost to Provide Engineering Services Valley View Road Feasibility Report Dear Mr. Loney: According to our agreement for Professional Services with the City of Shakopee and Section I-C-2 (Major Projects), this extension agreement is written to provide you with an estimate of cost for engineering services for the above-referenced project. Weare proposing to complete the work as detailed on the attached scope of services (Exhibit A). The attached work plan describes the approach and tasks proposed to be completed by WSB. It should be noted that the work plan includes preparation ofthe Design Survey and Feasibility Report. Payment of Services would be completed based on the following schedule: Cost Not to Exceed Feasibility Report $7,500 Design Survey $3,500 Total $11,000 The costs for all services will be on a cost-reimbursable basis with a not-to-exceed cost. The cost for soil borings will be paid as a reimbursable cost with no markup. Soil boring costs are estimated at $2,000 to $2,500. It is proposed that all work under the contract would be considered complete after the public hearing and acceptance of the feasibility report by City Council. C:\Documents and Settings\BLoney\Local Settings\Temporary Internet Files\OLK4D3\031203 bl.doc Mr. Bruce Loney, P.R City of Shakopee March 12, 2003 Page 2 Weare available to begin the work plan as soon as authorized by the City, and we anticipate completing the project according to the following schedule, assuming that we receive the notice to proceed on March 18,2003. We would propose to complete the project according to a tentative schedule noted as follows: Order Feasibility Report.... ........... .......... ........ ....... ...... .... ,. ....... ... ..............March 18, 2003 Accept Feasibility Report and Order Public Hearing..................................ApriI15, 2003 Informational Meeting................................................... ............. .............. ...April 30, 2003 Public Hearing, Project Approval and Order Plans...................................... May 20, 2003 This schedule assumes that no unforeseen issues arise. The City of Shakopee agrees to reimburse WSB & Associates, Inc. for these services in accordance with Section N of the Agreement for Professional Services. If this agreement meets with your approval, please sign below and return one copy to our office. Sincerely, WSB & Associates, Inc. Bret A. Weiss, P.R President City Administrator City Clerk Mayor Date c: Charles T. Rickart, WSB & Associates, Inc. Tom Voll, WSB & Associates, Inc. sm C:\Documents and Settings\BLoney\Local Settings\Temporary Internet Files\OLK4D3\031203 bl.doc Exhibit A Feasibility Report Valley View Road Street and Related Improvements City of Shakopee, MN WORK PLAN . Project Management This task includes planning and coordination of all work tasks, establishment and monitoring of budgets, and correspondence with the City of Shakopee on a periodic basis. The project manager will provide technical direction on all aspects ofthe project, review all work products, and prepare monthly progress reports. The project manager will serve a primary role in the many design considerations. . Data Collection Available data will be collected from the City, private utility companies, and adjacent developers as necessary, to prepare the feasibility report. . Surveys~aseMapping WSB will conduct a full topographic design survey of the corridor. Base mapping for detail design will be developed using the survey information collected. . Feasibility Report Preparation This task will include preparation of the feasibility report including developing cost estimates for both street and storm sewer construction and preparation of the preliminary assessment rolL . Public Hearing / Informational Meeting WSB will attend the public hearing and one informational meeting to address any concerns and answer any questions on the feasibility report. C:\Documents and Settings\BLoney\Local Settings\Temporary Internet Files\OLK4D3\031203 Exh A.doc RESOLUTION NO. 5867 A Resolution Ordering The Preparation Of A Report For Improvements To Valley View Road, From The East Plat Line Of Pheasant Run 6th Addition To The East Plat Line Of Greenfield WHEREAS, it is proposed to improve Valley View Road, from the east plat line of Pheasant Run 6th Addition to the east plat line of Greenfield by sanitary sewer, watermain, storm sewer, street construction, bituminous paving, curb & gutter, concrete sidewalk, bituminous trail, street lighting and any appurtenant work and to assess the benefitted property for all or a portion of the cost of the improvement, pursuant to Minnesota Statutes, Chapter 429. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF SHAKOPEE, MINNESOTA, that the proposed improvement be referred to Bruce Loney, Public Works Director, for study and that he is instructed to report to the Council with all convenient speed advising the Council in a preliminary way as to whether the proposed improvement is feasible and as to whether it should best be made as proposed or in connection with some other improvement, and the estimated cost ofthe improvement as recommended. Adopted in session ofthe City Council ofthe City of Shako pee, Minnesota, held this day of , 2003. Mayor of the City of Shakopee ATTEST: City Clerk