Loading...
HomeMy WebLinkAbout15.F.12. receptionist Desk Modifications IS.F I~ . CITY OF SHAKOPEE CONSENT Memorandum TO: Mayor and City Council FROM: Mark McNeill, City Administrator SUBJECT: Receptionist Desk Modifications DATE: April 1 0, 2003 INTRODUCTION: The Council is asked to approved work to reconstruct the City Hall reception desk, to bring it into compliance with Americans with Disabilities Act (ADA) requirements. BACKGROUND: An inspection by the City's risk management consultant last year provided a list of items which need to be addressed by the City in order to reduce the risk of claims resulting from "ergonomic" issues. In short, employers are obligated to minimize injuries that result from repetitive motion events. Recognizing that "one size doesn't fit all", such things as chairs, desk heights, and the like need to be made adjustable. One area that is not easily converted is the receptionist area in the lobby of City Hall. Especially because the work area is staffed by multiple part-time employees, there is a need to provide for adjustable work surfaces, in addition to providing space for the "tools" used by those employees - computer keyboards, fax machine, photocopy machine and the like. There is also a need to redo the mail slots so as to provide for more security during non- work hours, as well as meet ergonomic concerns. Finally, there is also a need to secure the rest of the work area for after hours operations. Last year, the City contacted BKV (architect for the library and police building), and obtained the services oftheir interior design specialist to design a workstation, and to seek Requests for Proposals. Proposals were solicited in December; on March 6th, three proposals were received. The proposals ranged from value from a low of$8,361, to a high of$11,590. The low proposal was submitted by D & J Fixture Corporation of Gaylord, Minnesota. BKV has had experience with this company, and has very positive things to report about their quality of work. BUDGET IMPACT: The $8,361 is not provided in the FY 03 budget. Last year, the City did acquire ADA furnishings and made some other ADA modifications with unbudgeted dollars from the FY 02 budget. However, these revisions need to proceed as soon as possible; the City has already received notification of one potential carpel tunnel concern. In consulting the Finance Director, we recommend that the money be taken from the Council contingency fund. After a $7,000 reduction for aerial photography (elsewhere on the April 15th agenda), this would leave a balance of$34,639, I am also aware that D & J did express a comment relating to the proposed design, and may make a proposal to modify the initial plans. If that results in a change of contract amount, the Council will be advised. RECOMMENDATION: I recommend that a contract to reconstruct the City Hall receptionist work area be awarded to D & J Fixture Corporation of Gaylord, Minnesota. ACTION REQUIRED: If the Council concurs, it should, by motion, accept the proposal ofD & J Fixture Corporation of Gaylord, Minnesota, to reconstruct the City Hall receptionist work area to meet ADA and functional issues, at a cost of$8,361. ~JL~ Mark McNeill City Administrator MM:th Tuesday, March 04, 20033:35 PM Jeff Erkenbrack 507-237 -2990 p.01 ~ Attention: Suzy Groves Date: 3/4/03 Company: BKV Group Number of Pages: 2 .. Fax Number: 1-612-339-6212 Voice Number: 1-612-373-9130 From: Jeff Erkenbrack Company: D&J Fixture Corporation Fax Number: 507 -237 -2990 Voice Number: 507 -2~37 -5440 Subject: Shako pee City Hall ---_.- Comments: !T 0 follow is the proposal you had asked for. There are a couple of I loptions listed on the proposal so, please read carefully. I iln regards to the cabinet for the printer, we feel this will not work as Idrawn. The cabinet is to wide to go with a single "pocket" / "bi-fold" I !door, there is just to much weight hanging off of the hinges. Also, thel [pullout shelfis just to wide as well, it will "sag" out. I propose double I ipocket doors (one on each side) and a smaller pullout for the I iprinter. I i I I ' , I !Thanks for the chance at this project. I , ' i I I Jeff Erkenbrack I I i -~--- -----"._------~- , Tuesday, March 04, 20033:35 PM Jeff Erkenbrack 507-237-2990 p.02 . , D&JFixture Corpora'ion Since 1995 r.o. Box 241 830 Main Ave. Easl Gaylord, MN. 55334 PhODt. 1-507-237-5440 Fax 1-507-237-2990 Proposal TO: BKVGroup RE: Shakopee City Hall 222 North 2nd. Street Shakopee, NIN. Minneapolis, MN. 5540 J DATE: March 04, 2003 WE BID THE FOLLOWING ITEMS LISTED. ITEM# 1. Reception Area: Hardwood Gate with Hardware, Hardwood faced Reception Desk with painted reveal. Hardwood edged countertop!J' with laminate. (2) three drawer cabinets with lower drawer set up with intragal hanging file rails, no locks. Printer cabinet with pullout shelf, melamine interior, laminated exterior. Mail center, laminated all exposed surfaces and 118" "plexi" glass shelves with rolledfront edge for labaling. Area between work top and "check" ledge to have cork hoard wrapped in fabric. Option #1. We d" finishing: Stain, 3 coats lacquer. (Spray Finish) Add $450.00 to price below. Option #2. We do lnstallation: Add $1,200.00 to price below. --------------------------------------------------------------------- *PRICE IS FOR MATERIALS AND LABOR TO BUILD AND DELIVER **FINISHING BY OTHERS **[NSTALLED BY OTHERS **SALESTAXINCLUDED --------------------------------------------------------- ***ITEMS LISTED ABOVE WILL BE AS SPECIFlED, SHOP DRA WINGS fYlLL BE PROVIDED. NO CHANGES WILL BE MADE WITHOUT PRIOR APPROV AI, OF THE GENERAL CONTRACTOR. A ONE YEAR WARRANTY WILL ACCOMPANY TilE FINAL INVOlCE. Six Thousand Seven Hundred Eleven Dollars and Zero Cents. $6.711.00 Terms: 30% Down Net 30 Days. Proposed By:-HgrAen/HYT~ Propo.ml mo.y hI': ",itl"Jrawll ~f,~\ Accepted By: Date: F;le: m:\ SIII.kopeeCl)'Hal/.WPS monterey 800.678.4640 xl00