Memorandum . 3V~~~1lt:ii ..~
TO: Mayor & City Council
Mark McNeill, City Administrator
FROM: Kim Henke, IT Coordinator
Tracy Schaefer, Assistant to the City Administrator
Jerry Poole, Deputy Police Chief
SUBJECT: New Police Department Building - Video Cabling
DATE: June 3, 2003
Introduction
Video cabling is required in the new police department building for all its
television/video needs.
Background
ill addition to the Category 6 cabling for telecommunications needs, cabling also needs to
be installed to meet police department television/video needs. Staff recommends using
FS Technology, since the company, if city council concurs, will be installing the
Category 6 cabling. Thus all cabling can occur at the same time, which will save on
labor costs and construction delays. The Category 6 cabling will be unable to meet video
needs of the police department, so both Category 6 and video cabling are needed.
Budget Impact
FS Teclmology Group is an authorized state bid contractor, thus has been previously
approved by the state for municipal contracting. The overall bid price includes labor and
materials.
Labor and materials should not exceed $1,579. These funds will be taken from the
police department building contingency fund. The Police Department building
contingency fund is roughly $300,000.
Action
Direct appropriate city officials to enter into a contract awarding the police building
video cabling work to FS Tech, for the amount of $1,579 from the police department
contingency fund.
1
~.
.~
May 30, 2003
Kim Henke
City of Shakopee
129 Holmes Street South
Shakopee, MN 55379
Dear Kim:
FS Technology Group is pleased to present this proposal for the City of Shako pee's voice and data
cable installation for the new police building located in Shakopee, MN.
The people ofFS Technology Group are dedicated to providing the highest quality network
installations at a competitive price. Our number one goal is to provide customers with a smooth and
orderly implementation oftheir cable network. FS Technology Group will work closely with you
and your vendors to accomplish this goal.
If you have any questions regarding my proposal please call us at (763) 425-0330.
We look forward to working with you.
Sincerely,
Chris D. Jones
~
NETWORK INSTALLATION
1. Horizontal Station Locations FS Technology Group will install:
Description Quantity
Single RG6 (for video) 07
2. Additional Considerations
. All cable will be installed according to TWEIA 568A standards which include, but are not limited to,
cable length, pull tension, and bend radius.
. The installation will meet all NEC fire installation standards along with state and local laws.
. Change orders will only be accepted on a written basis or with verbal authorization from Kim Henke or
designated appointee.
. We will work with the City of Shakopee in the final design, installation and service of your
, system.
. We will coordinate with the telephone and computer vendors to insure proper installation.
. All work to be performed during regular working hours.
. Pricing does not include installation of vertical or horizontal cores through concrete floor or wall X-
Ray's or wiremold raceway if cable pathway is not accessible.
. At the end of the project, as-built drawings will be delivered in print. Details of the prints will be
decided upon before work begins, e.g. cable pathways, station identification codes, etc.
. A purchase order or written contract will be required prior to the start ofthis project.
. If demobilization or remobilization is required for this project, additional costs per incident will be
charged to the customer.
. FS Technology Group assumes that all pathways are clear and accessible with the necessary
capacity for the work to be performed as described in the Specifications/Statement of
Work/Scope of Work. It is the responsibility of the client to provide adequate pathways where
deficiencies are present.
. 226 7' Patch Cables are included in the estimate.
. Equipment Cabinets are not included but unit pricing is given in the Financial Summary.
)
FINANCIAL SUMMARY
1. OPTION 1 (Not to exceed based one the "Scope of Work")
A. Installation of seven (7) RG6 cables from the Telecommunications Closet to various
locations.
Materials $ 907.00
Labor $ 672.00
Total $ 1,579.00
I MATERIALS. I PART NUMBER I ~~~'I
Coleman/CC RG-6 Plenum 921015 1,300
Gilbert RG6 F-Connector GF6AHP328 14
Ortronics TracJack Single Gang Faceplate-4port OR-40300546 9
Ortronics Surface Mount Box One Piece OR-40300185 2
Ortronics TracJack Blank Module 10/pk OR-421 00002 1
Ortronics TracJack F-connector OR-63700006 14