HomeMy WebLinkAbout15.C.5. New Police Building Contract Change Order No. 4 15. c · S ~ City of Shakopee Memorandum CONSENT To: Honorable Mayor, City Council Mark McNeill, City Administrator From: Deputy Chief Poole Date: August 28, 2003 Subject: New Police Building Contract Change Order No.4 INTRODUCTION The City Council is asked to approve Change Order No.4, in the amount of $3,967.00, in favor of C.M. Construction Company. BACKGROUND The new police facility is about 90% completed. This stage of construction has not been met without some changes that have resulted in unplanned costs. Some of the changes are related to items missed in design, others are related to state and local mandated changes, and still others are directly related to contractor discovered need for change to make the building functional. DISCUSSION Change Order No.4 costs are primarily related to items missed in the design phase of construction. These design corrections mean the project needed what was omitted to be whole and should have been included in the original bid had it been drawn into the bid plans. Councilor Link and Mark McNeill did review each of the proposed items for need, purpose and cost and concur with the recommendation. BUDGET IMPACT The total cost ofthe change order is $3,967.00, which consists of work described on the attachment. The amount of the police project contingency prior to this change order $323,051 Less Change Order No.4 $ 3,967 New contingency balance $319,084 RECOMMENDATION Staff recommends Change Order No.4 be approved. ACTION REQUESTED If Council concurs, it should, by motion, authorize execution of Change Order No.4 for the Police building project, in favor ofCM Construction, in the amount of$3,967.00. CH.t\NGE ,. OWNER - ORDER ARCHITECT - CONTRACTOR - FIELD - OTHER - AlA DOCUMENT G701 THIS DOCUMENT HAS IMPORT ANT LEGAL CONSEQUENCES; CONSULTATION WITH AN A TIORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AlA DOCUMENT MAYBE MADE BY USING AlA DOCUMENT 040 I. PROJECT: CHANGE ORDER NO.: FOUR (4) Shakopee Police Facility 476 Gorman Street Shakopee. MN 55379 ORIGINAL ISSUE DATE: June 6, 2003 REVISED ISSUE DATE: August I, 2003 TO CONTRACTOR: ARCHITECT'S PROJECT #: I 536.02 CM Construction Co., Inc. CM Construction Company, Inc. 12215 Nicollet Ave South 12215 Nicollet Ave South Burnsville. MN 55337 Burnsville. MN 55337 CONTRACT DATE: August 8, 2002 CONTRACT FOR: General Construction The contract is changed as follows: 1. Proposal Request # 5. Modifies door hardware and clarifies borrowed lite schedule. $ 1,478.00 (Architect Requested) 2. Proposal Request # 7. Delete system solenoid shut off valve. Separate Fire and domestic water service. $ 1725.00 Add 8" fire service line into building. Extend irrigation coverage. Add remote zone test valve detail and Irrigation detail. (Mechanical Engineer) 3. ASI # 15. Clarify Borrow Lite Elevation W.U. No cost change (Architect Requested) 4. ASI # 17. Sheet E2.0: Relocate receptacle on east wall of 101 to south wall below FA device. $ 310.00 (Requested by Elect. Engr.) 5. ASI # 19. Clarify the arrangement & mounting heights of exterior light fixtures on west building elevation. $ 454.00 6. ASI # 23. Clarification that access to penal fixtures in holding cells will be by front access, and add an No Cost Change emergency power outlet and disconnect switch for each penal fixture, - etc. 7. ASI # 24. Clarifications of Trash enclosure footing revisions. VOID 8. ASI # 26. Change Sally Port O.H. Door track to 2" Low Overhead clearance type. No Cost Change 9. ASI # 27. Misc. glazing revisions. No Cost Change 10. ASI # 29. Simplify Horizontal Mullions. No Cost Change 11. ASI # 31. Coordination of in floor exterior entty canopy sidewalk lighting layout. No Cost Change Total of items # 1 - # 11 ofC.O. # 4 $ 3,967.00 H:\PROJ\l536-02\BUS\CO.#4DOC.DOC . , The original Contract Sum was $ 4.405,000.00 Net change by previously authorized Change Orders $ 50,746.00 The Contract Sum prior to this Change Order was $ 4,455,746.00 The Contract Sum will be increased by this change order in the amount of $ 3,967.00 The new Contract Sum including this Change Order will be $ 4,459,713.00 The Contract time will be unchanged by this Change Order. The date of Substantial Completion as of the date of this Change Order therefore is September 9, 2003 NOTE: This summary does not reflect changes in the Contract Sum, Contract Time or Guaranteed Maximum Price which have been authorized by Construction Change Directive. Authorized: ARCHITECT CONTRACTOR OWNER The BKV Group, Inc. CM Construction Company, Inc. City of Shakopee Address 12215 Nicollet Ave. South 129 Holmes St. 222 N. 2 Burnsville. MN 55337 Shakopee, Mn 55379 Mi n BY: BY BY DATE .~ AlA C ENT G10 I * CHANGE ORDER * 1987 EDITION * AlA - COPYRIGHT 1987 * THE AMERICAN INSTITUTE OF ARCHITECT'S, 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20006-5292 WARNING; Unlicensed photocopying violates U.S. copyright law and. is subject to legal prosecution. This document was electronically produced with permission of the AlA and cannot be reproduced without violation until the date of expiration noted below. 2