Loading...
HomeMy WebLinkAbout15.F.2. Fire Station Reroofing Design /S,F;). , CITY OF SHAKOPEE Memorandum CONSENT TO: Mayor and City Council FROM: Mark McNeill, City Administrator SUBJECT: Fire Station Reroofing Design DATE: October 2, 2003 INTRODUCTION: The Council is asked to accept a proposal by Oertel Architects for the design of reroofing specifications for the downtown Fire Station No. 50. BACKGROUND: The downtown Fire Station has a number of structural and building maintenance problem. It was determined earlier this year, however, that the members of the Fire Department preferred to stay at that location for at least another five years, rather than building replacement Station 1.1 on Vierling Drive. In order to extend the building life by five years, those structural and cosmetic issues need to be resolved - removal and replacement ofthe exterior stucco, replacement of pedestrian doors, and what has been determined to be an entire reroofing ofthe existing building will be needed. The total cost of all the components together are far in excess of $50,000, the threshold for which competitive bids are needed. Rather than do the work through a general contractor, it has been determined that as much of this work would be done in house as possible. However, the reroofing part itself exceeds $50,000, and therefore, competitive bids must be sought. Earlier this year, a Fire Station Study Committee made up of Councilor Link, several members of the Shakopee Fire Department, Building Maintenance Lead Duane Toenyan, and the City Administrator met to look at the building, with the intent being to put specifications for bidding together in-house, rather than using a professional architect. However, as we have worked to try to put those specifications together, I have found that it is a complex issue, and am concerned that the project is being unduly delayed, Recently, while meeting with Oertel Architects (the firm that has been hired to do remodeling specifications for the Public Works building), I asked if they would be interested in assisting on the Downtown Fire Station reroofing. Jerry Oertel submitted the attached sheet. As shown, they would put together all the specifications needed prior to the bid process, for $2,500. That is roughly one-fourth the cost that had been submitted by the other architectural firm. However, for a "apples to apples" comparison, additional hours of Oertel's time would be needed for such things as pre-construction conferences, review of bids, project administration, and project inspection. However, given probable additional costs for this extra work, it could still be done for an estimated $5,000. Note that the roofing work should be done first and prior to final sealing of roof edges with an edgecap, the exterior stucco should be removed and replaced. Public Works Superintendent Mike Hullander has worked with the Sentence to Service crew, who could be available to do that over the winter. If STS is not available, we would look to the Public Works crew to do that during down time as weather permits this winter. BUDGET IMPACT: The cost for professional fees, as well as the reroofing contract itself, will come from the Building Fund. RECOMMENDATION: I recommend that the City authorize Oertel Architects to prepare pre-bid plans and specifications for the reroofing of Fire Station No. 50, and also provide additional services to be determined later, The estimated cost ofthis work is $5,000. Councilor Link is in agreement with this concept. ACTION REQUIRED: If the Council concurs, it should, by motion, authorize staff to enter into an agreement with Oertel Architects to prepare reroofing plans and specifications for Downtown Fire Station (No. 50). ~ ~0uJJ Mark McNeill City Administrator MM:th Sep-29-03 09:24A OERTEL ARCHITECTS 651 f?96 51BB P.02 t:.. - OERTEL ARCIIITECTS 1795 SAINT CLAIR AVENUE. SAINT PAUL, MN 55105 TEL: 6511696.5l86 FAX: 6Sli696-S1R8 September 29, 2003 Mr. Mark McNeill, City Manager City of Shako pee 129 South Holmes Street Shakopee, MN 55379 RE: Proposal for Architectural Services Shakopee Fire Station #50 Re-roofing Dear Mr. McNeill, Per your request, we propose to provide the services, as discussed at our meeting last week, to prepare specs for the roofing work at the Shakopee Fir€l Station #50. Included in our scope is the following: On-site-review of the roof Preparation ofa basic roofplan for bidding purposes (i.e. configurations and dimensions) Preparation of specifications for roof demolition, re-roofing and sheet-metal work Providing a bid package for the project Not included in the scope are the preparation of as-built drawings, detailing, testing, on-site construction services and the related construction services. We could provide this on an as- needed basis, working with our hourly rates, or provide you a fee for this as well. To perfonn the tasks identified, we propose a fee of$2,500.00. This will include our reimbursable costs, but will not include the printing of a:1Y bid sets or the costs for advertisements for bid. Please do not hesitate to call Deb Brandwick or myself with any questions. SincereLy, OERTEL ARCHITECTS Jeffrey L. Oertel, AlA. CCS President Sep-29-03 09:24A OERTEL ARCHITECTS 651 696 5lBB P.Ol . . OERTEL ARCliITECTS 1795 SAINT CLAIR AVENUE. SArNT PAUL, MN 55105 TF.l.: 65/ /696-5 /86 FA\:: 65/ /696-5188 FAX COVER SHEET DATE: September 29.2003 TO: Mark McNeill COMPANY: City of Shako pee FAX NUMBER: 952.233.3801 FROM: Deb Brandwick NUMBER OF PAGES INCLUDING COVER SHEET: 2 COMMENTS: Mark, Following is OUf proposal for services regarding the Fire Station #50 re-roofing project discussed at our meeting last week. Please give myself or Jeff Oertel a call if you have any questions or would like to discuss. Thank you, Deb