HomeMy WebLinkAbout15.F.10. Special Assessment Payoff IS F.I'D . CITY OF SHAKO PEE Memorandum TO: Mayor and Council Mark McNeill, City Administrator FROM: Gregg Voxland, Finance Director SUBJ: Special Assessment Payoff DATE: December 10, 2003 Introduction Council is requested to authorize payoff of the special assessments on the police station site. Background There are special assessments on the police station site for the Gorman Street project. Council previously decided to pay these from the Building Fund over time. Since then, interest rates have changed to the point that it is to the Building Fund's advantage to payoff the assessments. The payoff amount is $87,027.06. Funds are available in the Building Fund to make the payment. This would also simplify the accounting and budgeting processes. Action Move to authorize the payoff of special assessments on the police station site for parcels 27-080002-0, 27-906032-0 and 27-118001-0, code 121 in the amount of $87,027.06 from the Building Fund. )/ Gregg Voxland Finance Director c: \gregg\memo\ CHANGE OWNER oRDER RECEIVED ARCHITECT - - CONTRACTOR - '. NO\! 2 4 2003 FIELD - OTHER 'NESTfY\ C0l\I@r~UCTi()~i We. - AlA DOCUMENT G701 THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AlA DOCUMENT MAY BE MADE BY USING AlA DOCUMENT 0401. PROJECT: Shakopee Library CHANGE ORDER NO.: FIVE (5) 235 So. Lewis St. Shakopee, MN DATE: November 17, 2003 TO CONTRACTOR: ARCHITECT'S PROJECT #: 1536.01 Westra Construction Co.) 4355 Peavey Road, Suite # 300 CONTRACT DATE: May 8, 2002 Chaska, MN 55318 CONTRACT FOR: Complete Construction The contract is changed as follows: 1. Proposal Request # 24. Provide an RPZ on the domestic water line. $ 1,119.00 (Mechanical Engineer Requested) 2. Proposal Request # 25. Provide an additional down soffit mounted down can light in # 214. $ 679.00 (Electrical Engineer) 3. Proposal Request # 26. Change all guardrail vertical pipes from 1" to 1 7/8" extra strong pipe. $ 615.00 (Architect Requested) 4. Proposal Request # 27. Add two type "F" light fixtures in Stairwell "B". $ 1,079.00 (Elect. Engineer Requested) 5. Proposal Request # 28. Add Fire Alarm connection point to the PIV. VOID (Code Requirement) 6. Proposal Request # 29: Civil/Site work: Omit the 3' -0" wide bituminous asphalt pavement ( - $ 980 .00) "blending" strip that was to have been installed along the southern edge of the alley - adjacent to the new concrete curb & gutter, in addition to the "flared out" transition area at the throat of the entrance into the Library site from the center of the alley to the north. This work is shown as Contract base-bid work on Civil Plan Sheet C-l. Provide an itemized Labor & material break showing a credit to the Contract for omitting this work. (Owner Requested) 7. Proposal Request # 30. Provide I (one) additional millwork stub wall to match plan note #27 VOID on Sheet ALL Install as shown between two copiers at the intersection of grid lines 4.2 and C as sho",n on Sheet A 7.1. Provide miscellaneous steel framing and bracing to stabilize stub wall laterally. (Architect Requested) 8. Proposal Request # 31. Install, (add), VBI base in vending area # 103, and custodial room # 107 $ 105.00 (Architect Requested) 9. Proposal Request # 32. Install protective W' clear lexan over the interior wood panels at min stair VOID (Owner Requested) Q:\1536-01\BUS\CO# 5.doc 10. PR #33. Labor add to install addition~l Lutron Dimming system modules to the dimming system. $ 401.00 (Electrical Engineer Requested) RECEiVED . 11. PR 34. Add an interstitial mezzanine work platform & I hour rated access door & hardware to $ 13,053.0QVOV 2 4 2003 the 2nd floor level of the mechanical room. (Owner Requested) IiVESTIV Cr ' " ., "l ,,_IN.cn'OIlf'TlON - '''~ CJ..J , INC 12. PR # 35. Cost to add turkey gritlbeach stone at entry canopies. VOID (Owner Requested) 13. PR # 36. Add two additional exit lights at the north ends of the 2nd floor bridges. $ 626.00 (Fire Marshal Requested) 14. ASI # 22. Delete ACT ceiling infill from heritage room soffits, and install 1 51 floor volume controls No Cost Change to be located in the upper ACT # 2 area (Architect Requested) 15. ASI # 23. In Meeting room # 110, at grid lines "A" & "B", delete the portions oflay-in acoustical No Cost Change in the soffits on the north & south sides of the room. 1nfil these areas with pt' d gyp. bd. (Architect Requested) 16. ASI # 24. Door St-B, Modify hardware group # 22, so that the stair side can be left unlocked. No Cost Change Provide a key to the Owners. (Owner Requested) 17. ASI # 25. Return air grille changes at the wood soffits. Radius soffit revisions. Add wood No Cost Change ceiling under the main stairs (Architect Requested) 18. ASI # 26. Clarification of the mounting location of the "Scott County Library" exterior signage. No Cost Change 19 Cost to furnish 3 additional electric hand dryers for toilet rooms. (Installation already in bid) $ 1,002.00 (Owner Requested) Total of items # 1 - 19_, including all O. H. & Profit, and bond costs = $17,699.00 The original Contract Sum was $ 3,470,000.00 Net change by previously authorized Change Orders $ 107,983.82 The Contract Sum prior to this Change Order was $ 3,577,983.82 The Contract Sum will be increased by this change order in the amount of $ 17,699;00 The new Contract Sum including this Change Order will be $ 3,595,682.82 $ The Contract time will be increased by 0 days. The date of Substantial Completion as of the date of this Change Order is August 10, 2003. NOTE: This summary does reflect changes in the Contract Sum and the Contract Time which have been authorized by Construction Change Directives incorporated into the work by Change Order line item.. 2 Authori~ed: . " hRCHlTECT CONTRACTOR OWNER Boarman Kroos Vogel Group, Inc. Westra onstruction Co. City of Shakopee Address Addres Address 222 N. 2nd Street_ 4355 Pe Ro,d, SllilO~ 129 So. Holmes Street South Minnea Chaska, , 55318 Shakopee, MN 55379 B BY BY Mayor )'cl~ DATE -........~----- RECEIVED NOV 2 4 2003 t!1trfrrftl\ CO' I~r ' '" ,'" ' ~ , .11,... RUCT10N, INC. By City Administrator By City Clerk AIA DOCUMENT G701 * CHANGE ORDER * 1987 EDITION * AlA - COPYRIGHT 1987 * THE AMERICAN INSTITUTE OF ARCHITECT'S, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006-5292 WARNING; Unlicensed photocopying violates U.S. copyright law and is subject to legal prosecution. This document was electronically produced with permission of the AlA and cannot be reproduced without violation until the date of expiration noted below. 3