INTRODUCTION:
Attached is a cost estimate and drawings for remodeling work for the existing Public Works
Service Building in the area, which previously served the Police Department. This agenda
item is to request Council authorization to proceed with the remodeling work for utilization
by the Public Works Department until a new building is available.
BACKGROUND:
In the 2003 Budget, staff had included $175,000.00 for remodeling and $150,000.00
additional funding for remodeling in 2004 of the existing Public Service Building facility for
use by the Public Works Department, once the Police Department vacates the building.
Attached to this memo are drawings prepared by the Engineering Department and Public
Works Department personnel showing the improvements needed to make the necessary
offices for the Public Works Supervisors, lunch room, mapping and meeting area for Public
works activities. At the current time the existing Public Works building is in need for locker
room space, lunchroom space, meeting and training room, as well as offices for conducting
the business and operation of the Public Works Department. This proposal includes that
much of the work would be done by the Public Works personnel in the removal and
replacement of walls, doorways and other such work as available within the expertise of the
department. The extra cost proposed would be for materials, labor and services that are
beyond the expertise ofthe Public Works Department.
The remodeling of the previous Police Station area will allow the Public Works Department
to have better offices, better work areas for mapping, computerization of pavements, signs
and sewer management and more meeting and lunch room area for the Public Works
personnel. Remodeling of this building will include additional insulation and removal of
mold on the north and east walls of this building, as well as providing the spaces previously
identified. Staff is requesting Council authorization to budget of $25,000.00 for materials
and other contract labor that is necessary to complete the remodeling work. Other contract
labor would include architectural service for structural design, if necessary, as well as
electrical or taping of sheetrock. Staff would also request that the building permit fee be
waived for this project, as it is a City building. It should be pointed that even if a new
building is built, it would be two years to construct. Also, the remodeling would fit future
use of the building, if a new Public Works building is built.
ALTERNATIVES:
1. Approve a motion authorizing $25,000.00 out of the Building Fund for the purpose
of remodeling the Public Service Building in the area that the Police Department has
vacated, as shown on the attached drawings.
2. Do not authorize any funds for remodeling at this time.
3. Table for additional information.
RECOMMENDATION:
Staff would recommend Alternative No.1, to authorize $25,000.00 for use in remodeling
the Public Service Building for materials and other contract labor, as necessary and as
shown on the attached drawings.
ACTION REQUESTED:
Approve a motion authorizing $25,000.00 out of the Building Fund for the purpose of
remodeling the Public Service Building in the area that the Police Department has vacated,
as shown on the attached drawings.
d~/
~ .~
Bruce n
Public orks Drrector
BUpmp
REMODELlNG-12/16/03
CIP Projects 2003 ~ 2008+
Project Manager Project Type: Project Title: Bldg. Remodeling Total Project Cost:
Bruce Lone Facilities Work.Publlc Works/Pollee $175,000
A. Ex enditure Items: 2003 2004 2005 2006 2007 2008
Land & ROW 150,000
Construction
Improvements
Engineering/Admin. 25,000
Total 175,000 ~ ~ . . _
B. Fundin Source:
General Fund
Capital Improvement Funds
Building Fund 175,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
......
I Storm Drainage Fund-Trunk
.....,
0- Tax Levy
Total 175,000.. _ ~ .
Description:
Remedial work of the existing Public Works/Police Station Facility
f Remodeling
Justification:
The existing Public Works/Police Station facility needs to have remOdeling
work to increase the offices, training room, locker room for the
Public Works Department.
Other Comments:
This remodeling can occur once the new Police Station is built and would
allow expansion of the office area, lunch room, locker room, training
room to occur versus leaving the space empty.
Operatina Costs:
Estimate roughly twice the existing costs for utilities and maintenance.
~.
"!l\"""""..""'...'-".. .
' ^_"",c,,\ ,-~ '.0,. ...>.. .' -c, ".." , '.,_ ^ '. ' ,. .,
.,...- .-"- . . 0"''' -, - -_ ., "" ...1 . -4 L.. -' . _ .__" , ,_ .i
CIP Projects 2004 - 2009+
Project Manager Project Type: Project Title: Bldg. Remodeling Total Project Cost:
Bruce Lone Facilities Work-Public Works/Police $150,000
A. Ex enditure Items: 2004 2005 2006 2007 2008 2009
Land & ROW 130,000
Construction
Improvements
Engineering/Admin. 20,000
Total 150,000 - - - - -
B. Fundin Source:
General Fund
Capital Improvement Funds
Building Fund 150,000
Park Reserve Fund
Grants (specify)
Donations (specify)
State Aid
Assessments
Sanitary Sewer Fund-Base
Sanitary Sewer Fund-Flow
Sanitary Sewer Fund-Trunk
Storm Drainage Fund-Base
Storm Drainage Fund-Trunk
Tax Levy
Total 150,000 - - - - -
Description:
Remedial work of the existing Public Works/Police Station Facility
, Remodeling
t
Justification:
The existing Public Works/Police Station facility needs to have remodeling
work to increase the offices, training room, locker room for the
Public Works Department.
Other Comments:
This remodeling can occur once the new Police Station is built and would
allow expansion of the office area, lunch room, locker room, training
room to occur versus leaving the space empty. This budget amount is
in addition to the $175,000 amount budgeted in 2003.
OperatinQ Costs:
Estimate roughly twice the existing costs for utilities and maintenance.
POLICE DEPT REMODEL
MATERIALS
. LUMBER
. SHEET ROCK
. POLY
. OAK TRIM
. NAILS
. INSULATION
. SCREWS
. PAINT
TOTAL MATERIALS $2000.00
. SHEETROCK TAPING $2000.00
. STEEL BEAMS $ 750.00
. HEATING $ 700.00
. ELECTRICAL $ 1500.00
. ROLL OFF DUMPSTER $ 400.00
. REKEYING $ 600.00
. FLOORING $ 850.00
. RENTALS $ 600.00
. PHONES $3000.00
. MISC. $3000.00
. LABOR $12,480.00
POSSIBLE ADDITIONS
. STRUCTURAL ENGINEERING/CONSULTANTS $?
TOTAL ESTIMATE $27,880.00
TOTAL COST NOT INCLUDING PUBLIC WORKS LABOR $15,400.00
- ~r\1> . \? ----' -' - . 1>' V, 'I 1>' v 'I> . \?, . 1>' I> ,
- - - - - - I> "
i --------1
n r J 'L f-' - IiiEaI &i;;i;d' I '. I
/ LI~ L I>
r---~ oco; ~g 00 031 ii' .1
"r= r-:1"")> "z '
::J r '---15 /!: ::J < " ^
;;? 1\ f;1.,; ~ f;1:;} C ~ g;; I ~ ,I
/" /' ,,~ ~ J I . ,/
L ~ ~o=< .
-I 2 ~ ....!il~ \J I. '.1
., \.. ~ I>
, \J1 \j H ] I I "I
_ ~'........ .......... ~~~ z
.. ... H C) I
;. . ~ "I '
:! r > ~ ~ ;::'
'.. ~ .i.... ~ ~ f"T1 I I I> I
. o.i g ~ I:j-
ON r I I 0 '..... ;0, .
~ ~ ; ci== f"T1.
-L 1 ~~: ~ )> I I> I
Cd =" ::J
z< ~
Glm r -
I ~r r
/1 I ~~ .; ~:::::: ~~ rr I' "
,J I I iii '. } 3 ~ ~ . '
c.. --r/ '.... II> 'I
~ - 1111111111 'T= \~ - ~~ I 'L
- ~ 8 8 \j -== -.J .
= r . l- 7'~
- ;0 0 r-- -, ,---
-0 ol h /l~'
=~, I~~) ::J~~:J /u (~I"I
_ ~ ~ I (=:) L ~ [XJln : I I I I I I I / / / \1 H-1+1 I' . . J
I I I /.1\ I> 1
\llZ ~l\ I II
i Ijl>'~
~,.'
F- ~I>
I r rl. ' _,
~ 11 r -.1
P ill I>
: ~ I, I
10 ~ ~ == \j ~ ' I
~ I J f"T1 ~ ~ ~~ uLJ ~ ~ II> I
:t> - f-- ~ ~ ~I 'nr -
r, - 1-- ~ ~ ~I JIl I' ,
fT1 I - f--
I SIlAKOPCE! ___ - f- - ,----, i1 '
-> 0 -- IM/NNESOJ/! - f-- JVlv ~ ~ lIfj . L
:, - '--- ~ ==== .Ill. I>
-, fil
II -1 Y . .
o ..e:xs1\"'RA'Wf ..JI r 'L -===; ) '~
. '~ ~ ../.,
o 7 ~ -il>'r
~i I. -,
--.J L--J I ~ II[ It! '.,
~ ' ,\7' ,\7' \7' \7' \j Ii ~
-4 ~ - b...-.:.- _ ..!l..-' ~ ---1L' -.:. ~. I-il---. I './
l I> 5~ .
I. ' d ~ - J T r 1>' .1
r ~ ~~ LJ I ' ,I
I> ~:::j ~ I I
1 . ~~ ~ ~ 1>' .
l ~ - I, I
F I> I - - - - - - - l -1' 'L
I - I CARPENTRY SHOP I 7 -. .
/ I> ~
I . ,...,--'
VI ~ REVISIONS I ......y...u/y t.ot t... pion
wos ptaporcd by me or under m, dirul
~ PUB Lie WO R K S B U I L DIN G .........ion Oft. !hot I om 0 du'y ROll'....... DESIGNED BY: DA TE: DECEMBER 2003
rl Pro'QIM)tIoI En9""'" under' the 10_' of (he
~ -I Stote of Minnnoto,
~ SlHAKOPlEE - REM 0 DELI N G - DRAWN BY: .ROJECT NO:
C'CNoIllNIIYl'IlIIlIlSl<<:lIll!l7 Date Reg. No. CHECKED BY: SHEET 1 or 1
I . =.=. .= . . ========]~[====J
I, ' 6 ' 6' '6' '6" ' " ' '," , ' , ' , '
I~ .,- ---c - ---'- - - _6~ -~ ~ ~.~ it\ - ___6~ _:~-l
I 1 IE;;;;;d jE;i;i3l IE;;;;;d II;;;;;;;;;od = II;;;;;;;;;od b;;;;;;;;;;;d
1.61 b L \(
r: 61 ~ Q "
r . I 1II ~~~~f MAPPING / MEETING AREA \5J \0- "
I 6 ID ~ ~
6 ,I
I 61 (I~ /1""
I'" u \ fOl II \~
,6 ~ ~
I' I '\.. '\..
'p:: '\..
f61 ~ "---"7 '
I I DAVE'S -
6 OFFICE REMOVE DOORS
I ^ ADD WALL (ADD WALL PARTITION) ADD DOOR
~ 1 _ PARTITr ~
I, ' 61 ADD WALL 1 ~ ) II T II (\ -
, PARTITION / U u U \. "'- -
...-...L...-..+-...- T~.. REMOVE WALL - C \----= / =
l::. PARTITION ~ /i" \ _
REMOVE WALL f..
I 6 1 PART1"''' ':~g:' / !"i""""""".'""" .. ...... "",""" / ~
16 ' I ......... ...... . .......... l..---...". · Ii / (
1 6 ~ ...... .. .. \" (17) LUNC~ ,ROOM ~ r ~ [
, ,I UII ,"- ~ 1\ . /11\ . /I F=-==
I' 6 BILL S : i REMOVE LOAD ~ (1) I "'7
,I OFFICE !~BEARINGWALL ~ ~
b 'I~ . ~ ~.
? [ ... III lOJ[dJll/l
I, 6 I -1ET]lir - - - - V L
16 " 1II ~ I \ \ \J ~
~ ID \.j - - -1 '-nil Jb = I r'11 r'1 .. r-.
1 6 ,'/ \j [Xl: ~
I 6/ ( -
I. . ~"" \J' i\Jr Lfi U ~ LOCKER '" ""
I~ -I r\ ~ ~ == ~ I"~
I I I. 1\ ~ = F '''-.. 1 /
6 ;; 4\ : 5 f- ROOM 1--'
I 1\ ~I, f- 1 1 I I I I
I \( ~
-',
I ~
1Y.1
\........ ~ - II
I ~ ~':~'
o ~
1 [~' ~
180 8
~ I
I SCALE: 1" = 8'
I -
I
I VEHICLE STORAGE
I
I
Ul ~ REVISIONS I h....y <..n'y 'ha' Ih;s pIon
WOI prepared by m. 01' under my cr"'ec\
i!i PUB Lie WO R K S B U I L 0 I N G sup......,. on. Ihal I "" a duly Reg'.'.... DESIGNED BY, DATE, DECEIIBER 2003
rTl Profess.onol (n91f\Ht under the 10_' 01 the
~ ~ Stote of Yinnnoto.
~ SlHfAlKOlPlEJE - REM ODE L 1 N G - DRAWN BY: PROJECT NO,
CClMMUN1Yl'alllSINCB_ Dole Reg. No, CHECKED BY: SHEET I Of' I