Loading...
HomeMy WebLinkAbout15.C.1. Authorize Feasibilty Report for 2004 Projects-Res. No. 5994, 5995, 5996 Js, c. J , CITY OF SHAKO PEE Memorandum TO: Mayor & City Council Mark McNeill, City Administrator FROM: Bruce Loney, Public Works Director SUBJECT: Authorize Feasibility Report for 2004 Projects DATE: December 16, 2003 INTRODUCTION: Attached are Resolution No.'s 5994, 5995, and 5996, which orders the preparation of a feasibility report for the construction of Valley View Road, from the east plat line of Greenfield Addition to c.R. 83; reconstruction of Maxine Circle, Marcia Lane and 29th A venue within Weinandt Acres 15t Addition; and bituminous pavement rehabilitation for streets in Prairie View Subdivision. Also included for consideration in these feasibility reports is for improvements to Tahpah Park to be included in the Valley View Road improvement project. BACKGROUND: Staff has completed review of the 2004 Capital Plan for potential projects in the upcoming construction season. In the 2004-2008 Capital Improvement Plan, staff has reviewed the projects that could be potentially done next year and they are as follows: . Valley View Road, from the east plat line of Greenfield Addition to C.R. 83 . 2004 Rural Street Reconstruction, which are the streets of Maxine Circle, Marcia Lane and 29th A venue within Weinandt Acres I st Addition . Bituminous pavement preservation of the Prairie View Subdivision streets located south of 10th A venue and west of Apgar Street . Also, staff would like Council to consider the Tahpah Park parking lot pavement reconstruction project as part of the Valley View Road study in order to provide updated costs and for possible funding with an assessed project such as Valley View Road. The 2004 rural street reconstruction project in Weinandt Acres 1st Addition was petitioned for by the residents of Weinandt Acres due to the condition of those streets, which are severely deteriorated. Valley View Road is shown as a City collector in the City's Transportation Plan. These collectors include a sidewalk and bituminous trail with the extension of sanitary sewer and watermain, as necessary, and storm sewer included in an urban design street. The City does have a potential development on the north side of Valley View Road known as Park Meadows and it is very desirable to have a paved collector street in this area for access to C.R. 83. A significant amount of residential development in this area would be greatly enhanced with a paved collector route to relieve the traffic volume on CSAH .17. The 2004 Pavement Preservation Program would like to include the bituminous mill and overlay of streets in the Prairie View Subdivision area. These streets were included in the 1997 Pavement Preservation Project, but were deleted due to funding at that time. Staff would like to study these streets and include rehabilitation of these streets into the Holmes Street, from 3rd Avenue to 10th Avenue feasibility report, which is currently being done. Staff would also like to include the Tahpah Park parking lot reconstruction in the feasibility study to provide Council an updated cost for this project, and also to include this project in an assessed project such as Valley View Road for possible funding. Also included in this memo is a 2004 project map which has been updated recently to give the Council an indication of potential projects in the City of Shakopee for 2004. Staff believes it has the resources and time to prepare feasibility studies over the winter, and would ask Council for authorization of these feasibility studies for possible inclusion in the 2004 construction program. Ordering of the feasibility reports does not approve the projects. Staff is recommending that WSB & Associates, Inc. be authorized to provide surveying services for the Valley View Road feasibility report and the 2004 street reconstruction feasibility report. Also, staff would like Council to authorize the cost of necessary soil borings in preparing these feasibility reports to obtain the necessary information in providing the most accurate costs for these projects. ALTERNATIVES: 1. Adopt Resolution No.'s 5994, 5995 and 5996. 2. Deny Resolution No.'s 5994, 5995 and 5996. 3. Authorize the appropriate City officials to execute an extension agreement with WSB & Associates, Inc. to provide surveying services and other engineering services, as necessary, to assist staff in preparing the feasibility report for Valley View Road and the 2004 rural street reconstruction. 4. Do not enter into an extension agreement with WSB & Associates, Inc. 5. Authorize staff to obtain soil borings for the preparation of feasibility reports. 6. Do not authorize staff to obtain soil borings. 7. Table for additional information. RECOMMENDATION: Staff recommends Alternative No.'s 1,3, and 5, so a feasibility report can begin on the extension of Valley View Road to C.R. 83, the 2004 rural street reconstruction project in Weinandt Acres 1 st Addition and a bituminous rehabilitation project in the Prairie View Subdivision area in the City of Shakopee. ACTION REQUESTED: 1. Offer Resolution No. 5994, A Resolution Ordering the Preparation of a Report on an Improvement to Valley View, from the East Plat Line of Greenfield Addition to County Road 83; and for Tahpah Park Improvements and move its adoption. 2. Offer Resolution No. 5995, A Resolution Ordering the Preparation of a Rep01.}: on an Improvement to Maxine Circle, Marcia Lane and 29th A venue within Weinandt Acres 1 st Addition and move its adoption. 3. Offer Resolution No. 5996, A Resolution Ordering the Preparation of a Report on an Improvement to Pierce Street, Shumway Street, McDevitt Street, Thomas A venue, Hennes A venue, Menke Circle and Menke A venue in the Prairie View Subdivision and move its adoption. 4. Authorize the appropriate City officials to execute an extension agreement with WSB & Associates, Inc. for surveying services and other engineering services, as needed for the preparation of these feasibility reports. 5. Authorize staff to obtain soil borings for the preparation of these feasibility reports. ~& Public Works Director BUpmp FEASIBILITIES-12/16/03 RESOLUTION NO. 5995 A Resolution Ordering The Preparation Of A Report For Improvements To Maxine Circle, Marcia Lane, And 29th Avenue Within Weinandt Acres.! st Addition WHEREAS, it is proposed to improve Maxine Circle, Marcia Lane and 29th Avenue within Weinandt Acres 1 st Addition by storm sewer,. grading, aggregate base, street reconstruction, bituininous paving, street lighting and any appurtenant work and to aSSeSS the benefitted property for all or a portion ofthe cost ofthe improvement, pursuant to MinnesotaStatutes, Chapter 429. . -- .. NOW,JllEREFORE,BKJTRESOL YED BY JIIE CITY CQUNClh9FTlIE.. . . ., --',' ... ... .,'.. -. .'... . ,.,' . '. . ',,", ,"" CITY OF.SIIA.I<pPEE, MINNESOTA, that the proposed improvement be re.ferred to Bruce' Loney, Public W ork~Director., for. study and that he is instructed to report to the Council with all. convMnient "~peed advising.. the C<?llI1cil ina preliminary way as. to whether...the propos~~.~.. ;;~m9~~P:~~tj~fe!!~ip!~~n(ta~ t~tvyhetherjts.hollldbest be madeas.prop9sed;:9,t;.j!1.9W.m~ti()ll with.. . some. other improvement, and the estimated cost oftl1e improvement as recommended.,... . ._...",_. ~-_. ".- _p...,': A.dopted in . .sessionofthe City Council ofthe GitY()fo~h*()l?ee, . Minnesota, held this day of , 2003. Mayor of the City of Shako pee ATTEST: City Clerk 1--- .------ --- ---- ---- -- - ___n______ I ry: I 0 WOOD DUCK TR. WOOD DUCK TR. I 3; tL ]D w :; I w z ~ w <{ I- ~ I'\OGE AVE --l (j) I DR. z 'tjo\...r w I 0 I I I I I AVE. 42 I I 1000 0 1000 ~ I I SCALE: 1" = 1 000' I )( I I I PROJECT LOCATION MULBERR CIR. NORTON DR. SYCAMORE CIR. I I I I ] I I ~=t-=:-=.,-- I PROJECT LOCATION MAP ~=-=I:::..:t-~.: DmONID 1M GAlt: IXCDID: 1Q. 2CI03 1 -..- I WEINANDT ACRES ClRA"lI'l':: ... -"" o.MDa'&........... Dolo R... No. -... ,..., I I I ~, CIP Projects 2004 - 2009+ !i Project Manager Project Type: Project Title: Total Project Cost: Bruce Lone Street Reconstruction 2Q04 Rural Street Reconstruction $300,000 ! , A. Ex enditure Items: 2004 i2005 2006 ,2007 2008 2009 Land & ROW Construction 240,000 Improvements Engineering/Admin. 60,000 Total 300,000 ~ . - - B. Fundin Source: General Fund Capital Improvement Funds Tax Increment Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments 75,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Flow Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy Total - - Description: Rural street Reconstructicm for: SUBJECT 29th Avenue,Marcia Lane.:md Maxine CircleinWeinandt Acres. SITE ~ Justification: To rehl=lbilitate bituminous street pavements that have severely deteriorated or in heed of resurfacing. . RESOLUTION NO. 5996 A Resolution Ordering The Preparation Of A Report For Improvements To Pierce Street, Shumway Street, McDevitt Street, Thomas A venue, Hennes Avenue, Menke Avenue, Menke Circle; South of 10th Avenue And WestQf Apgar Street And North Of Westwind AdditiQu WHEREAS, itisproposedtoimprove pierce Street, ShumwayStreet,McDevitt Street, ......Thomas AVeIlue;Heiil1esAvenue, Menke Avenue, Menke Circ1e;..sbtith of lOth. Avenue. and. west of Apgar Street and north ofWestwind Addition by sanitary sewer, watermain,storm sewer, street constnrction,bituriiil1otiSMpa.viIlg; curb ..8l.... gutter, '.streetligllting ahd:any)~~purtenantwork.. and to assess'-tlie benefitted:property for all or"aportion.of theco~(:oftheimprovement,.. pursuant to . . Minnesota Statutes,. Chapter 429 . . .-.~---_._-- _..,-,-,.,.. .NOW,.THEREFORE, .BE...IT. .RESOLMED....JJY~THE.~CIl'YCOUNCIL-.OF:...THE ... CITY OFSHAKOPEEr'MINNESOTA,that theptopdSed improvement be referred to Bruce . LOney,PtiBUc!'W-orksfDirector,fofstudyand thatheisil1structe<lt()' report tothe€ouncil with convenient spe~~ advising the Coullcil ina pr~liminary way as to whether the proposed" improvem~ntisfeasibleandas to whether it should bestbe-tnadeas proposed or in connection with .... some other improvement, and the estiIl1~ted costoftheimpfovenient as recommended. '-'--- ,...."'".....,.,,, session of the~r;ityCoimcilofthe City of Shakopee, Minnesota, heldthis..c.:...... ...dayof ,,:2003. Mayor of the City of Shakopee ATTEST: City Clerk --- - ---------- -- --- ----- -- ---------- - - ---- ----- -- -- --- -- - - - ------ --- ------- --- ---- ---------------- -----~-- I I )( - 1000 0 1000 ~ ~ I iI\l SCALE: 1" = 1000' ill III a '" ..~; ill L'iI ~'''' A ~ 0 ~L--C2t]Q~U~U\aU\nbj~LJLJ ~C]aBDeJQQ~QQoOGJD~ ~ ~ W\JBto ~V( wQQ\JD~ ~S~,~OPL >- W. SH K:' ~ AVE. E. SH KO EE ~ ~ [j ~ [ill[]l] ~ l][]Q lJ DO ~ w 3; n:::: I- 0 n:::: w (/)VJ 0 2 <( I- 0 lj 2 SQ w z >- n:::: :::l 0 0 3; -l -l 3 =:J <( 10th d ~ ~ ~ ~ :t [2 ~ t::l :> AVE. 2 E. I w ~Dl]l] ::2 2 0 ~ (/) (/) (/) E. 11th MENKE F CIR. AVE. SHEET NO. I!IIII!iII PROJECT LOCATION MAP ~-'::-="'-- _ll't. ~=t.::..~~t...~ 1 SHAKoPEE -,,- PRAIRIE VIEW 1 ST ADDITION ou.wav: a..w...4._. .... Ref. Mo. _ll't. """ I ~ . ,. . ... .... :hi\ : : CIP Projects 20,04 ;'2ll09:t- Project Manager Bruce Lone $100,000 A. Ex enditure Items: 2008 2009 Land & ROW Construction Improvements Engineering/Admin. Total - - B. Fundin Source: i General Fund Capital Improvement Funds . i Tax Increment Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid Assessments Sanitary Sewer Fund-Base Sanitary Sewer Fund-Flow Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy Total i - - Description': ;,; ',[c,. '!i .'. ,... ... l3ittlmi~oul1j,millancl oIJer1aypfstreets inJPrairie View Subdivision area. , i ti ~1!1 II ' ..", l"'!i~i :,: '~, i' \r ,i. L.. ' '; 1 ~ !l ',J:i : ~. ,: I"';: ; ':, !, 0.: _ :. ..' )',' .,1 Justiflpatt()n:.. ,: ,i' ,.; I ContihtIe main{Emance of the City's'PaveHllent Preservation Program. t .1,;' i ! i.' RESOLUTION NO. 5994 A Resolution Ordering The Preparation Of A Report For Improvements To Valley View Road, From The East PlatLine Of Greenfield Addition To County Road 83 And For Tahpah Park Improvements - . WHEREAS, it is proposed to improve Valley VieW Road, from the east plat line of Greenfield Addition.. to County. Road 83 by sanitary sewer;watermain,.. storm sew.er,-street constrUction, bituminous paving, curb &-gutter,'concrete sideWalk,. bituminous trail, street lighting and any. appurtenant work; and for Tahpah Park improvements-'byreconstructionofparking-lot, ,.----. . .replacing.existiIl,g play .-equipment,. construction ofnew:parkirigloJfJfea'and,aIl}' appurtenant o.and to assess the benefitted property for all or aporti6n ofthe GostoHheimprovement,pu.fSuant to MinnesotaStatutes; Chapter 429 . .NO\,y,.TH-EREFORE,BEIT RESOLVEnBY..;T.lJE,..~Ja:):,;~COUNCILQ:JrTH:E......"::.~ .","' CITY OF SHAKOPEE,'MINNESOTA, that the proposedimproyement~;be referred to Bruce u' ._'..,,~ "'::'''''"''':3' Loney, PublicW orksDirector,. for-study and thatheisinstrll~t~d:'Jq:'teporLto theCo1,.lp,~H.\Vithall...-. "\0:' ..~, convenient speedadvising.the Council in a preliminary way as to whether --the-proposed -- -improvement is Jeasible and asto whether it should best be madeasjJroposedor in connection with . . some other improvement, arid the estimated costofthe impr()yeP1ent~.r~co:ttlIl1ended...c- .- .',-'-' ..... '~'. ...'~ ..._.__.m Adopteclin session of the CityCounciloft~~i~xgt~hakopee, Minnesota, held this.- ~~, - . day of ,.2003. Mayor of the City of Shako pee ATTEST: City Clerk CIP Projects 2004 - 2009+ Project Manager Project Type: Project Title: Total Project Cost: Bruce Loney Street Reconstruction Valley View Road Construction $600,000 A. Expenditure Items: 2004 2005 2006 2007 2008 2009 Land & ROW Construction 475,000 Improvements Engineering/Admin. 125,000 Total 600,000 - - - - - B. Fundina Source: General Fund Capital Improvement Funds Tax Increment Fund Park Reserve Fund Grants (specify) Donations (specify) State Aid 175,000 Assessments 425,000 Sanitary Sewer Fund-Base Sanitary Sewer Fund-Flow Sanitary Sewer Fund-Trunk Storm Drainage Fund-Base Storm Drainage Fund-Trunk Tax Levy Total 600,000 - - - - - ~E~ "'. 169 Description: CIR. . -- .~ ~ \,...,--pr ::::.:- Local street collector with sidewalk and trail on existing gravel surfaced ~ ~~ Vallley View Road for 1/2 mile. C," ~, ~ ~ Dean La.l-<e l> MPOTE:CITD CJDR. ~ Justification: .f Improved street collector will be needed due to development and improved Ii! traffic. 'D. i! + ~ Other Comments: Property to the north is in MUSA; south side is not and creates problems with assessments. City has allocation of floating MUSA and should apply. ..... VOODLAND T ,,",EETG"AS' 0'". ~ ,+~:EElI" I CIR. Operatina Costs: ~ m~S ~ T E LOCAT~ON -- ---- - _.~---- = 12th AVE. ~ A ~L 1 ~ - , CRETARIAT DR. I ~~~ V ~ --0 1:J ~ 0 .-L... ~ UP]} )( ::{ c3 <l: ?;::{ AVE. E. ~ CAVE 83 w (.) z w 0 z w CL 1000 0 1000 w 0 ~ I ~ SCALE: 1" = 1000' :E ro C::u ):>s:: S::O UlZ 0 PROJECT LOCATION ~ OW [ -10 > . 0::: ?U :::l () >- 0::: 0::: ELS'?>x... RD. SHEET NO. ~ ~-':~=IIt1" PROJECT LOCATION MAP ............. -:.:: l::.::t,.. ~.: -... O4lf: ~1o.2IOO3 1 .......- I VALLEY VIEW ROAD ..... ... "'"~"'" o.-.m__ Dolo MOo -... ''''' I I w > 10th <( z z w Z f- W 0 0 0 (.f) c:t: (.f) Ct: Z (.f) f- :::J ::,::: Z 0 c:t: >- (.f) m u 0 (.f) w U z <( ::2: 0 LL Z -:> <( LL :::J <( ::2: w AVE. W. > -:> 0 (.f) ::2: 0 <( ::,::: 0 -1 Ct: <( 0 W 0... -1 19. >- f- LN. Z. PROJECT LOCATION l.J.. 1000 0 1000 ~ I SCALE: 1" = 1000' 15 128th ST. W. SHEET NO. ~ PROJECT LOCATION MAP ~..." ".::-.= "')'-- -... ....1ItItt1_....,............ OAU: I:lO:D8Jl 10. 2OQ.1 ............. "... ... .. ... ., .. 1 SHAI<OPHH -..- TAHPAH PARK Dlt\1IC 1'1': Il1H MMCt... -..,,-- 00" . No. ........,... IOFI City of Shakopee Capital Improvement Program 2.004 - 2009+ ~ Project MaAager Project Type: Project Title: Total Project Cost I\J Mark McQuillan Community Park Development Tal1pah Park Improvements 549 000 I ~ ~ I A Ex enditure Iterns: 2004 2005 2006 2007 2000 2009 I\J lSl land & ROW lSl Construction W 300,000 Improvements 140,000 65,000 I\J .. Engineering! Admin- 44,000 IJl lSl Total 484,000 - 65,000 - - - \J 3: B Fundin Source: General Fund Capilallmprovement Funds II Xl Park Reserve Fund 0 Grants (specify) 3: Donations (specify) 140,000 65,000 (/) I State Aid l> 7\ Sanitary Sewer Fund-Base 0 \J Sanitary Sewer Fund-Flow IT1 Sanitary Sewer Fund-Trunk IT1 \J storm Drainage Fund-Base l> Storm Drainage Fund-Trunk Xl 7\ Tax levy 344,000 (/) Tota: <W4.000 - 65,000 - - to IJl Description: I\J This project makes improvements 10 Tahpah Park, including construction of two new youth I\J W ~- baseballlields, reconstruction of Ihe old parking lot, and replacing the existing play equipment w w 2.004 - Construction: Reconstruct parking lot, replace playground equipment, $344,000 (tax levy) (0 W 2.004 - Improvements: Inslall 2 new youth baseball fields, $140,000 (Baseball Assoc. donations) ~ 2004 - Engineering/Admin: Design and engineering of parking lot and playground: $44,000 (10% of project costs) (lax levy) 2006 - Improvements: Installation of Lights on Field 4: $65,000 (Soflball Association donations) Justification: The original parking 101 has exceeded its life expectancy of 20 years, and there is a portion of the lot that has never been finished. We have identified a significant need for additional baseballlields, and the Baseball Association is commilted to raising the funds for construction ollhese fields. Most of Ihe playground equipment, which is 2.0 years old, has reached its life expeclency, and mal1{ pieces have been removed. J Other Comments: Some work is contingent on donations. ~ OperaUnQ Costs: The estimated operating costs for two additional baseball fields is approximately $2,000 per year. \) Another softball field with Ii hts would add $400 er ear for 0 eratin 4 nic his er week. ~ w.w. / ~ . Ff . 0 ~N ~\\p,. V ~ - J;. .1iiyr. '-' f\)Y' E-.....-' ;2', / " :,. A f-,e, 0 ~'f ~ffj>. f-t o V,C(/f///,J 0 . ". / cc 0 \ 0 /' f:jff> > ..~ 0~ \ " (,n e ~ ~ (; f/?ff'ip,>. ,t'. . ~.. - - IN' //';////////> I - -- \ - HENNEP:?'",~" dffi~f/ff1!!M?-' I ~ - - - 0,\) \ iff. ?ff." ;L~/fff 0 - -') --., ~/////j K/J/}// CHANHASSFN .-. _ SCOTT C; Ift~ii!:ii:jjffjjffi%~ , :3 ~-''''f ,;;;;;;"+ Volley Pork 6th 'LP' "''<':0131#/,Y,"- " ~ ~, ," ~ "'--h _ Outlet PiP~ Ii Signal ~ ~. '1 "'+--. 10 lo. ~~ ~ Improvements, ~ ~ ~... _ . ~I . ~~~. "Ai1. ~~" ~-::< """;'''''''''' > C~ ./"'- ._..._~_= = = '<:if' '''''''l~;;. ....~...~. ./A' ~ 'Iilli~"'~,'~_, ./ i\" ff """"~....,.~~~ ...- (,0 Shenondoah ! ~. "'" 11 ,Js.. t; :,,_ _ S Business Park . '" " ~ .. <;>>'.'" In'on 15:0" I ~r. ~"W.~ Cil,o p ':- ~~r. ~. ~~ -- Ollro'Qd -, ~ \ ~ h l ~ r " J> ~J JiVlr~~ 'I' ~ .. ~ j ~ =. ~ Valley Green I 3; .... ~ B""o;: _~"k.J _ JA ,) EO~t1~;o~o~;;~ ~ l!l:J-~=\g- -- / ~=~._,= ~ i ~, ~~-=. --=7bt::~F:.:oif€.'-,. j ,. J I Itl \: fGr~~~.,. '~ /!-j,/"4 ~ J i Ifftif:~/~~/. . '-~'t,' J . ~ '~~~~""v/..// ,_~.. ' Wjf //fj/ //?;[ '''"'-- ,r' ' !P ,\ ..J.J;O;;;:~ '"" .& ( I //11 , ," , , ?Ji..;" _'" y-</ /1#/ff ~ \ ./r ) " , . ~--, = JI.. . ... Y!"'//ff/ffff{f.//j/'lJ ~:-:7,+", +r ..... "\ """m>,o"/:.;.iI.,,//1;"{;/I: '/.". ., . . . J!-J~'" ~<4r//, r,II,_ <::;;" Pike Lake Trail .' I '(I~ / Extension" , . J~ JJ r.'}<, 1\3~ 1 " . "':.., . ~ Rl~~::/;III.. ~)'~tl "" J~7 = 1 "_ _.,=f~ , ~.~,"'''' s olf - *U' Z~ @@ ~ r~' ~, ('Jrod"'ft:';;. _ 0.: r ~ - - - - Jr!t/~ SO\I TR'" .~ ~ l1fjlZ c, t:.J ,= _.__L ~'" "or''''", i ~ t j. ~ 0 ~ {f!J. r r" = /- ~ "I;;:'"' oOk'l''" ~ J. 9 ,if I l._ · J · '"^"'- P".,/,i,,,, ! - I "",,,,,, .l< r~->..~.. tI!l1" OIl /'\ L ,~k fff; PFIOR LAKE .I ] ~~.~ -;ffj/, ;ff/, ~I . ~~ -- ///fJ; ~/~,~' ~) .Q~ = '~., /f;:~; / , < f i ! . i i ': . . .,! .. <!i)-<!jF 1 . % J( [I ~ 'I + I l~ . 2004 Projects/Improvements "".- 1".. - r\I\I\I\I\I\I\I Public Improvements '~ ~ 'io ~ \-J.lllPJ~.<',L ~ IXXXXXXXl Private Development & Improvements s~:," _ 1500' " ~.:> 0.. DQQQQQQ<J Other Improvements t~ 'J "~I - ,- = "'!9' '" A'!f., =='J~ r - - - REVtSED: DECEMBER 9. 2003 ~~l=-- "=.. =--n " ~ ~;:< I [i)) I 1<, II II ii:1 I ~ ~ c\ hr_ -.~ -_._~--- -- ,- DEC-1Ei-2003 14: 16 WSB & ASSOCIATES (O"')J'-I.L.LI<:.J<:.J I aCJ~ A ) ~, C I \WSB - &: Associates, Inc. December 16, 2003 Mr. Bruce Loney, P.E. ft. . Public Works Director/City Engineer City of Shakopee ., 129 Holmes Street South .\ Shakopee,~ 55379-1376 Re: Estimate of Cost to Provide Preliminary Surveying and Easement Preparation Services for Weinandt Acres and Valley View Road Projects Dear Mr. Loney: According to our Agreement for Professional Services, within the City of Shakopee and Section I-C-2 (Major Projects), this extension agreement is written to provide you with a cost "not to exceed" for preliminary surveying services for the above-referenced project. >f;;..::: . The following process will be followed; PRELIMINARY DESIGN SURVEY: . Survey based on County coordinates for horizontal control. . Survey bench loop for verification of benchmark elevations. . Surveying will include cross-sections and topo to the front of buildings. II All stonn sewer and sanitary sewer inverts will be surveyed for as-built conditions. "", . All intersections proposed to be serviced with stonn sewer will be surveyed for as-built conditions. II Centerline profile elevations will be shot every 50 feet. . . . The centerline-centerline location will be established at all crossing streets. . The surface elevation and location of all castings and gate valves. . A point plot hardcopy and electronic file will be provided. ,. . Electronic base map will be prepared from the survey data. EASEMENT EXHIBITS It is also our understanding that you wish to obtain a cost estimate for the preparation of ~ ~ " .- the easement exhibits needed for both sites. We have estimated that five (5) parcels will :. 41500lsorl require right-of-way acquisition on the Weinandt Acres site and four (4) parcels on the Mem~rial;~lghWay Valley View Road site. OUf proposal includes the cost associated with the preparation of ~~;", the individual easement exhibits. ~ft Suite 300::j.: r~.7 Minneapoli~. : :.;ls., . :; :- -: ,~. ... . . .",", t~. ':innerota .. (i, 55422 , .;" ~ . :J J.':". !.' 763.541.4800 F :\WPWrN\Proposul\Shakopec\121203 bl.doc :~ 763.541SZ00FAX Minneapolis. St. Cloud. Equal Opportunity Employer . 'C . . ~".:' . . . .' DEC-16-2003 14: 17 W~~ ~ H~~UL1HIC~ 1'-'-...Jo,J'.\......I~..... 1.__ . , Mr. Bruce Loney, P.E. ~ City of Sltakopee, MN October 16, 2003 Page 2 We are proposing to complete this work on a cost "not to exceed" basis as follows: Preliminary design survey Weinandt Acres: $5100.00 Preliminary design survey Valley View Road: $4350.00 Easement Exhibits Weinandt Acres: $720.00 Easement Exhibits Valley View Road: $576.00 Total: $10,746.00 We are available to start this work as soon as it is authorized and look forward to the opportunity to serve you. We will develop a schedule for completing the surveying upon authorization to proceed. The City of Shakopee agrees to reimburse WSB & Associates, Inc. (WSB) for these services in accordance with Section IV of the Agreement for Professional Services. If this agreement meets with your approval, please sign below and return one copy to our office. Thank you for considering WSB & Associates, Inc. for your surveying needs. We look forward to working with you on this project. If you have any questions regarding this proposal, please call me at 763-287-7181. Sincerely, WSB & Associates, lite. '&-fA- vJ~ {... Steven V. Isehe, R.L.S. Survey Group Manager City Administrator City Clerk Mayor Date F :\WPWI~\PL'op(lsar..shakopee\121203 bLdoc TOTAL P.03