HomeMy WebLinkAbout4. GIS Update
Lf, b. I (P.
~
CITY OF SHAKOPEE
Memorandum
TO: Mayor & City Council
Mark McNeill, City Administrator
FROM: Bruce Loney, Public Works Director
SUBJECT: Public Works Workshop Items
DATE: March 24, 2009
INTRODUCTION:
The Public Works Department would like to update and/or discuss three areas with these being a
GIS update on Public Works Activities, various Policies and a Public Works Organizational
Study.
BACKGROUND:
I GIS UPDATE I
Staff would like to inform the City Council and the Telecommunication Advisory Committee
(T AC) of the progress made to date and how the R&D funds from the T AC have been utilized.
The Public Works Department started developing the GIS system in 2006 by hiring WSB &
Associates, Inc. to design the system and to be the GIS Coordinator.
In November, 2007 a GIS Specialist was hired to begin implementation of many of the day to
day tasks. In 2008 and into 2009, progress is being made with the GIS web server
implementation project to replace LOGIS MAP with an internal web based GIS server.
A presentation will be made by staff to show the progress on how GIS is being used in the
managing the assets in parks, street, sewer and surface drainage systems.
I POLICIES I
In the second item of discussion, staff would like to update Council on the various policies being
developed for Public Works activities. These policies are as follows:
. Street Sweeping Policy
. Sidewalk/Trail Policy
. Tree Maintenance Plan
. Storm Drainage System Maintenance Policy
",A,' .
The Street Sweeping Policy is attached and is a result of staff s investigation of adding a second
sweeper. Previously, a second sweeper was included in the Capital Equipment List in 2008 and
Council directed staff to investigate the options of purchase, renting, leasing and contracting.
Mike Hullander will present the results of the study and staff s determination on how much
sweeping is recommended.
Previously, on July 24, 2008, a report prepared by the Minnesota Local Road Research Board
(LRRB) was given to Council as information on sweeping practices. Staff utilized this report
extensively for the preparation ofthe Draft Street Sweeping Policy.
Conclusions from the year long study on sweeping and sweeper options are a follows:
1. The City is not doing as much sweeping as recommended by the LRRB report. Currently
we sweep every street two times a year and the downtown every week.
2. The best option for the City is to purchase, as the cost analysis done by Mike Hullander
indicates the City is cost effective to contracting rates and renting or leasing is not an
option with Regenerative Air Sweepers.
Items for discussion will be if the draft policy is acceptable or if there are changes that would be
recommended. To meet the frequencies listed, a second sweeper would be needed.
Also, discussion on the cost analysis for a Regenerative Air sweeper which is being
recommended.
I SIDEW ALK/TRAIL POLICY I
This policy has been updated from the November 25, 2008 meeting to include trails. Mike
Hullander will present the draft.
I TREE MAINTENANCE POLICY I
Staff will update the Council on the progress for a maintenance plan and the tasks done already,
namely the tree inventory. It is staffs intent to have a plan with criteria and policy prepared this
year. Mike Hullander will present the plan progress to date.
I STORM DRAINAGE SYSTEM MAINTENANCE POLICY I
Finally, the Storm Drainage System Maintenance Policy is a policy to guide staff on inspection
and maintenance activities on various storm water facilities. Attached is a draft policy that has
been formulated utilizing a LRRB on Stormwater Maintenance, BMP Resource Guide. Staff
will present its preliminary findings and the policy will be useful in scheduling maintenance
activities and for reporting requirements associated with the National Pollution Discharge
Elimination System (NPDES) program.
Staff would appreciate any feedback on the policies being presented.
I 2009 PUBLIC WORKS ORGANIZATIONAL STUDY I
Finally, staff would like to present the findings of the 2009 Public Works Organizational Study.
Staff authorized a $2,000.00 study to review the Public Works Maintenance and Operations
Divisions, particularly in the area of structure to meet the demands ofthe department.
Staff in 2003, had SEH prepare a thorough study with 17 recommendations. Attached to this
memo is a memo, dated February 11,2009, with an update on the recommendations. As can be
noted, many of the recommendations have been completed.
The purpose of the 2009 update study by SEH was to review the Public Works Organizational
Study. Staff has utilized temporary leads for three years to assist the supervisors in managing
areas or in their absence.
Attached to this memo is the update study for 2009 and the study has eight priority
recommendations and six consideration recommendations for staff and Council to consider.
The main priority recommendation is for the City to consider permanent crew leads/foreman
positions to support management in managing crews, documentation and monitor various
activities. Three organizational charts were prepared and included in the study. Staff will
present the recommendations and the three organizational charts for discussion, with a
recommendation for 2009 to use temporary lead assignments from April 15 to October 15.
Hiring four leads for six months has an estimated cost of $6,500.00 and sufficient funds exist in
the street, fleet, park and utilities budgets.
ACTION REQUESTED:
Discuss the various items in the Public works Department and provide comments/direction.
~e*;(
Public Works Director
BUpmp
ENGR/2009-PROJECTS/2009-COUNCIUWORKSHOP-ITEMS
--- - - -- -- -- - - -- - - -- - --- -- -- --- - -- --- --- --
'>
~.~
- ~~
:::r- Q -t
Q.~
":s
~~
~t.,
3""
o~
~ '2.-
I --- --- -----
GIS and Asset Management
I
Ul2date
I
I
. - - -
~7
i A
I WSB
I
I
I SHAKOPEE & Associates, Inc.
-- - ----- -- ------ - --- ---- - -- ---- -- -- -- -- -
Outline
-- -
. Overview
. Review 2008 activities
. Examples of output
. Overview of 2009 work plan
. Questions
-~ ----
GIS and AMS Overview
. ---
. GIS is a computerized system for managing,
analyzing, and displaying all forms of geographically
I referenced information
. AMS is a computerized system to:
0 Track estimated and actual costs
0 Predict asset performance
0 Manage maintenance activities
0 Reduce liability and exposure
0 Maximizes existing budget dollars and helps plan future
budgets
0 Extend life of infrastructure
Goals
-- .... I
. In the final phases of implementation
0 Data Development I
0 Implement System Tools and Procedures I
Perform Pilot Project
0 I
0 Educate staff
0 System Management I
0 Evaluate System I
I
. Rolling out tools for decision makers I
Allow decision makers to quickly analyze cost
0
implications of management strategies I
. Focus on efficiency I
. Focus on integration I
I
I
----- -- ------- ------ ----- ---- ---- - ------ --- --- ---- ------ ------ ------- -- -- --- ---- ----- -------- ------
Year in review
--.. -
- -
. Expanded timesheet to all public works
departments I
. Implemented CALLdirector I
I
. Integrated timesheets I
. Deployed canned flexible reports I
I
. Wireless data entry via VPN I
\
. Final Implementation of GIS Web Server I
I
. Started to GPS Sanitary Sewer I
I
. Tree Inventory I
I
I
\
I
--.---- -~~ -'--.---
I CALLdirector
I ----
- - - -
"''''' ""'. . -.->P.::d'C ~. -. .' ".... ,," ~~"::::11
. , . " . , , .
; J @ Q ~gl~.:lJ.~ ill I ,",.,.,~ 'J'I"': "'.:l~J..J::! L1@ ~~ ~J(8 ~.lO7% .~ '~lil:.u Read ~! : ~ ll= i,;'; ~~ /'0/ . ...
Implemented fall : Eire ~d~ 'tiew Insert FQ.rmat lools T~e 'tl,indow tielp POF ~Teate! Type a que::;tron for he~p . X
I . lQe;;i! ], ;~ J.. Verdana .:.8.5 . ~., B I !! I~"'" ""I j= ;= 11" ~I" ~
I .
. --'
GJ ' . . B' , . . 1 . , ,~ . . ' , '3 , . . 4 . . , . . , ' ..h.. ~ , , . ~ ' , '01 ' . , ~
i of 2008 Work Orders
I
- F,ltlitr (w,;.,k O!d,er :'W../mb<<, 0=; "'ro$~23"',l
Woridng $@t Filter (( \StO;O /)~t.= ~...-ro.tl i$ ",,~'t.Mf'> ~st 0 m"I'It.l>>s 3) ~ (. \Sto,'" D~t"" Act;}1I1 is ri>.}tl))
Track most calls Sort l1;'Offl C.'del. NI..mbet
. GtOUP ~ De:;>l1t.>tm~f"/t, W<"."k O,wd~,' Nt..'mb.:."
-
Work Orders
received and Department
. Work Order Number 108423 ~ Completad
Issue Street SiQn Priority HiQh
actions taken Activity Street - Signs Start Date Actual
N Address Number Stop Date Actual 12/4/2008
Ro ute D.UBUN.lN Repeat Inte..al
Assi gne d To Todd Schumacher Entered By ~
In the of - Details Caller stated the Stop Sign Notes
. process l&a.S hit at the corner of
Dublinj.,Q 8< Dublin W
~ ~ Only a block
re-evaluating I'tQlll SlmEatl:l School.
labor. Actual
- Start Date ID Actiwity Total Hours Cost !
SOP 12/4/2008 102233 Replacs Support 1.00 $33.00
Entry Count: 1 $33.00
~
Equipment - Actual
Start Date ID Actiwity Total Usage Cost
. Entry Count: 0 $0.00 ~I
Material - Actual
-' Start Date ID Actiwity Quantity Cost
Entry Count: 0 $0.00
- Other - Actual I
Start Date Contract Actiwity Account Cost
Entry Count: 0 $0.00
~
Total for 108423 $33.00
- Total for Signs
war>: Order CoU1t 1 ~J
.
~ "
,; ....@! .~ '" ~ 1 .
- ~'i - ~w
,.,
Page 2 See 1 212 At 2.4" Ln 11 Col 43 PE( TPl E.\T QVR ~
,'---
!
I
Work Orders
I
r. .__-_;-~~~~~---- - --~-~.~
-a Work Orders Report ('5) .rtr ~ Hlcrosoft Word a ~ s ~ j
LiJ @ Q ], aJ~ !.!l!~ ofll ."", ,~ J I. " . 1"' . I ~J .}::J C@ .. 4} I ~ ~ 107'1. :: ,,., I.::u Read IJ l"'" I := ~i" ~i" L .." . ..
: Eile ~d,t '!.iew Insert FQI"rMt Iools T~ble ~indow t:!.elp PDF ~reate! Type a question for help . x
1Q <.:il '. ~ L Verdan, ~ 18 . A . J[!] I U I~ ~ ~ I ,- .- ."'."' Ii
. :'-- " - _ g g ~ 1=:= ~r- ::.1'"- ;~ --'
GJ ;,,' BL. . . : . ~ ' . ~ . 3 . , I ' , 4 . ~ ' . . : ' . . ~ '6' '1 ~
Work Orders 1
Filter (W~fk Ofd-ftJ !if(}mpeT ~ .Stm-J")
Working SElt Filb<r ({.\St",p D..tc Actu.)! is wi4:..~.in Il:tst D f'r.<N1t.~.s J} 0" (. \St(>p Dit!;@A..."tuilJis r....u'I))
Sort Worl< Orde.r Number
Group By O~dttmeht, W.::>,~.1.:: OTdeT /tI/Jmt:~u
Work Orders
Department
Work Order Number Strn.3 Statu s Completed
Issue Storm Drain priority High
Activity Storm - storm Drain Start Date Actual
Address Number 2101 Stop Date Actual 3/24/2009
Route EAGLEWOOD CIR Repeat Interval
Assigned To Keith Raines Entered By Ueurissen
Details Storm drain by home is Notes
pluQQ8d and water is
accumulating. Resident
works for Scott County.
Labor. Actual
Start Date ID Activity Total Hours Cost
3/23/2009 102236 Jetting 2.00 $68.00 r
Entry Crunt: 1 $68.00 I
r
Equipment - Actual I
Start Date ID Activity Total Usage Cost
Entry Crunt: 0 $0.00 I~ i
-
Materi al . Actual
Start Date ID Activity Quantity Cost I
Entry Crunt: 0 $0.00
Other. Actual
Start Date Contra ct Activity Account Cost I
L...
Entry Crunt: 0 $0.00
Total for Stm.3 $68.00
Total for Storm Sewer Maintenance
Work Order Count 1
J
l~
.
0
;
" " '" :> r;J r.D ~- - - 1!1J
1')1
Page 2 See 1 2/2 i<J: In Coi PEe TRK EXT .~,',...P
----- - -----.------
Timesheets and reporting
I - - -
-- - -
- - -[g) ---- - ~
tIl!:!.!!!!"~~ .__. .. .. - . . .-. . ;R ~i.lte! .bl.S~ar~ ~t!.... .-..-- .--.. . -
Implemented E mer Slop Dale. ,n 2/3112008 81 Enter Start Date: r DSI01120D8 =:B1
. l__~.__ ,
I Help I I Bctivate I [ Cancel [ [ Help I I Activate l [ Cancel I
timesheets for all
PW Staff
I nteg rated dig ital ~
. 0633
Il,usi!!.ess Unit Entry Date A'i1ivitv_ I,!st ~ame Total Hou,tS Cost
timesheets with 0633 10/16/2008 Football Fietd . Bisek 1.00 $33.00
2:23: 10 PM Striping
0633 5/1/2008 Softball Field - Haeg 1.00 $33.00
2:23:31 PM Bases/Rubber/H
City wide orne Plate
system 0633 5/2012008 Softball Field - Heyda 1.00 $33.00
6:45:33 AM Grooming
0633 6/6/2008 SOftball Field. Fl;end::ohuh O.se 516.50
6: 19:32 AM Grooming
0633 10/28/2008 Football Field - Bisek 0.50 $16.50
GIS staff develop 2:26:29 PM Stliping
. 0633 10/23/2008 Softball Field - Haeg 3.00 $99.00
2:26:38 PM Grading
0633 6/3/2008 SOftball Field - Fliendshuh 0.50 $16.50
10:16:59 AM Grooming
the tools for others 0633 6/1212008 Baseball Field - Heyda 0.50 $16.50
6:5~:02 AM Grooming
0633 9/16/2008 Football Field - Bisek O.se $16.50
2:20:11 P~l Striping
0633 6(4/2008 Softball Field. Fliend~huh 0.50 $16.50
to use 1C::::22 AM Grooming
0633 5/29(2008 SOftball Field. Gieseke 0.50 $16.50
2:23:41 PM Grooming
0633 6(10(2008 Baseball Field - Heyda 0.50 $16.50
2:27:28 PM Grooming
Uniform set of 0633 6/9/2008 SOftball Field. Friendshuh 1.00 $33.00
. 2:22:59 PM Grooming
0633 5(1/2008 Softball Field - Friendshuh 0.50 $16.50
::20:01 PM Grooming
0633 10/20(2008 Softball Field - Haeg 1.00 $33.00
i ntu itive tools :::1::2 PM Grading
0633 5/:8/:008 Softball Field - Gieseke o.se $16.50
1:27:37 PM Grooming
$610.50
Total for SWEENEY ELEHENTARY
$17,795.25
Total log 529
-
-
v
-------~._,--_.- -----~---
EguiRm~nt Maintenance
I ~
"",--<""n""" ""-_ ._ < ~. ~.._ ... " r_ ~_....- __ . "'_~ ___, - ~- ......., < ~- , ~ << -~~'.~~ __ a-
I~ Filter by S!art Date .... m ill Filter by' ~top Q'!t'l
Enter S larl 0 ale: 'PS/01/2008 6J Enler Slop Date: in 2/3112008 Ell
I
[ Help I 1 Activate J I Cancel I I Help I I Activate 11 Cancel I
I {;J. $
^
0625
~tb1!Y __ _lirsl~a.!!le - !-i'5t Name Start Date Total HOllrs Cost
Maintenance
Equipment Chad Bonine 9/3/2008 1.00 $33.00
Maintenance
Equipment Chad Bonine 12/16/2008 4.00 $132.00
Maintenance
Equipment Chad Bonine 6/9/2008 1.00 $33.00
Maintenance
Equipment Chad Bonine 6/19/2008 1.00 $33.00
Maintenance
Equipment Chac Bonine 12/1/2008 1.00 $33.00
Maintenance
Equipment Chad Bonine 12/8/2008 5.00 $165.00
Maintenance
Equipment Chad Bonine 6/10/2008 1.00 $33.00
Maintenance
Equipment Chad Bonine 11/12/2008 8.00 $264.00
Maintenance
Equipment Chad Bonine 10/22/2008 1.00 $33.00
Maintenanc€
Equipment Chac Bonine 5/13/2008 1.00 $33.00
Maintenance
$13,866.75
Total For 0625
Lo~ Count 429
$13,866.75
Total log 429
3:
-
v
-- ---
I Snow removal
I --..
--- - - --
I .. . , ., _00 .. -- ~." - --_.. - ~- .------
ra Sidewalk Snow Rel1loval.lldf . Adobe Reader - L;]g)f3
Eile !;:dit :iiew ~ocument 10015 ~ndow tielp x
t~ *j () t~ 019 :: ~~ .v~. S E3
.'C.." . ~.
Sidewalk_SnowRemoval ^'
-A'Ctivi~ .. - Overtit;; 1 'Cost" ~oa: - O~erti'l'@ 1 t!2,Ur5.. ... Total Hours
Maintenance -
Snow Removal
I Sidewalk $0.00 $136.00 0.00 4.00
Maintenance -
Snow Removal
Sidewalk SO.OO $68.00 0.00 2.0J
Maintenance -
Snow Removal
Sidewalk SO.OO $165.00 0.00 3.50 It; "t) f90~i%}.
Maintella/'\Ce -
$nevi Removal last Name Whitaker ^
Side~"alk SO.OO $132.00 0.00 4.00 Activity Start Date Total Hours c;.ost First Name Business Unit
Maintenance -
Snow Removal Streets - Snow 12/23/2008 3.50 563.00 Keith 0424
Removal
Sidewalk SO.OO $236.00 0.00 5.50 Streets - Sno..... 2/26/2009 3,25 558,50 Keith 0424
Maintenance - Removal
Snow Removal Streets - Snow 1212312008 0.00 SO.OO Keith 0624
Sidewalk SO.OO $65.00 0.00 2.50 Removal 042~
Maintenance - Streets - Snow 12/17/2.008 4.50 561.00 Keith
Snow Removal Removal
Stree~ - Snow 2/21/2009 5.00 $90.00 Keith 0424
Sidewalk SO.OO $165.00 0.00 3.50 Removal
Maintenance - Streets - Sno\'.: 1~9/2008 5,75 $103.50 Keith 0424
SnoYJ Rf:TTlova\ Removal
Side~"alk $0.00 $236.00 0.00 5.00 Streets. Snow 12./21/2.008 6.00 5108,00 Keith 0424
Removal
Maintenance - Streets. Snow 12./3/2008 4,50 $81.00 Keith 0424
SnoVl Removal Removal
Sidewalk $O.CO $102.00 0.00 3.00 Streets - Snow 1'2./31/2008 4.00 $72.00 Keith 0424
Maintenance - Removal
Snow Removal Streets - Snow 12/15/2008 4.00 $72.00 Keith 0424
Sidewalk $51.00 $51.00 1.00 1.00 Removal
MaintenarKE: - $729.00
Snow Removal Thursday, March 19.2009 35 of 36
Sidewalk $0.00 $102.00 0.00 3.0J
MaintenarKE: -
Snow Removal
Sidewalk $51.00 $51.00 1.00 1.00
Maintenance -
Sno~i Removat - Snow Plowing
Sidewalk SO.OO $204.00 0.00 6.00 -
Maintenance - T ot.1 For Whit.ker
Snow Removal Total Hours 4342..25 $161,546.75 -
$3,357.00 $14,882.00 v v
11.00 X 8.50 in 1<111- -. ::-- -.IUI . - .:1 >
~
-~, ~- ---- -- ---
, Watering_ flowers
~ ~Io~er~:p~f. ~'d~~~~~a~~~ _.~- '_.~- -" '-"'-' --_.~. -.'~.~ ".- ~-,.. --- '" -.-:'" ~.~~."~.._-=~-=~_-==.t;}(Qj~
Eile !;:dit ~iew Q.ocument Iools i!lI.indow tielp x
'Oi
~ * I i:J. ii ~ 0 I 5 II \~ ~!.> 189.5% I. II ~. 1M:: I Find I.
$1,015.25 ~
Total For DOWNTOWN
Log Count 16
Asset ID PUBLIC WORKS
Start-Date last Name- ActiVity Total Hours Cost
3/27/200'8- --Fm;nd5huh-Pa~ 4.00 - - - S132.00
Tree/Shrub/Lan
dscaping -
Flo.....ers
$132.00
Total For PUBUC WORKS
Log Count 1
$3,074.63
Total Log 68
v
--------'- -- -" ----~-----'--
, Landsca_p~ Maintenance
File Edit View Document Iools Window Help x
> * {;J. ~ ~ 0/15 <:J 0 190.1% I. 'IE!; E:3 "IF,ne, I.
~
Asset ID TAHPAH
ACtivity . - Total Hours Cost
~rk fuei5tirub/~dscaprng':"PrUr;ing 8.00 -$264.00
Park Tree/Shrub/Landscaping - Pruning 7.50 $247.50
Park Tree/Shr.Jb/Landscaping - Pruning 2.00 $66.00
Park Tree/Shrub/Landscaping - pruning 2.00 $66.00
Park Tree/Shrub/Landscaping - pruning 1.00 $33.00
Park Tree/Shrub/Landscaping - Waterin(; 2.50 $82.50
Park Tree/Shrub/Landscaping - Pruning 2.00 $66.00
Park Tree/Shrub/Landscaping - Pruning 8.00 $264.00
Park Tree/Shrub/Landscaping. pruning 8.00 $264.00
Park Tree/Shrub/Landscaping - pruning 2.00 $66.00
Park Tree/Shrub/Landscaping - Pruning 2.00 $66.00
Park Tree/Shrub/Landscaping. Pruning 1.00 $33.00
Park Tree/Shrub/Landscaping - Pruning 1.00 $33.00
Park Tree/Shrub/Landscaping - Pruning 8.00 $264.00
Park Tree/Shrub/Landscaping - Pruning 7.50 $247.50
Park Tree/Shrub/Landscaping - Waterin(; 2.00 $66.00
$2,128.50
Total For TAHPAH
Log Count 16
Thursday, March 19,2009 14 of 15
Shak Landscape Maint
$22,297.00 -
Total Log 566
,v.
----
I Sewer_~_~tting
0"
'111- .',1- t .
Window Help x ',." ., ",,,...;cioi, """","~;.,""" . . -,
"
CD/I l~ <!~ j 100% :. ' ~ rn Eile ~dit :iiew ~ent Iools ~jl"'ldoH tielp x
$ [2/3 l:l ';!:l [100% ~ . ~ E3
^ ^
Jetting
I.!? !.ellgUl
5E818-5E819 168.18 ft
Jetting Hour Log 5E819-5E810 138.36 ft
5E820-SE821 115.58 ft
Jetting Hour log SE821-SE822 126.01 ft
SE822-SE824 108.53 ft
ID 102223 SE824-SE823 185.00 ft
StarCOate Total HOllrs SE824-SE825 86.13 ft
Cost SE825-SE826 65.00 ft
--...-- - -
3/9/2009 8.00 5272.00 5E842-5E843 80.16 ft
3/10/2009 8.00 5272.00 - 5E845-5E844 103.58 ft
3/13/2009 8.00 5272.00 5E846-5E845 105,22 ft
5E847.5E846 95.12 ft
$816.00 5E847.5E848 108.52 ft
Total For 102223 5E847.5E848 108.52 ft
Log Count 3 5E847-5E848 108.52 ft
5E848-5E849 134.10 ft
ID 102228 5E849-5E850 128.58 ft
~1i;rt'i5ate TotarHours Cost- 5E850-SE8SI 195.11 ft
---- ..."... Total Length 2,260.43
3/16/2009 8.00 5272.00 Entrv Date 3/19/2009
3/17/2009 8.00 5272.00 II? -length
3/18/2009 7.00 5238.00 5E803-5E802 205.00 ft
$782.00 5E804.5E803 175.41 ft
5E827-5E816 110.87 ft
Total For 102228 5E827-5E847 326.51 ft
Log Count 3 SE827-SE847 326.51 ft
ID 102229 SE828-SE827 225,98 ft
SE829-SE828 99.18 ft
Start Oate - Total Hours Cost 5E830-5E829 85.36 ft
- - -- 5E831-5E830 162.53 It
3/4/2009 2.50 585.00 -
3/9/2009 8.00 5272.00 5E837'5E838 182.52 ft
SE838-5E839 81.49 !t
3/10/2009 8.00 5272.00 5E840-SE841 320.44 ft
3/11/2009 2.00 568.00 Total length 2,401.78 L_
3/13/2009 8.00 5272.00
3/16/2009 8.00 5272.00 Grand Total Length 18174.1775918
3/17/2009 B.OO 5272.00 Total Events 123
3/18/2009 8.00 5272.00 LY_
$1,785.00 a.sox 11.00 in !< 1 ;:Jf I 1>1
-. '1<1 ------ ..~ - .-- - ~
IIU I f>l
- ~
I
i
T ree..lnventory
I --- - -
Row Labels Number
Evergreen 695
19 ft - 30 ft 150
Cedar 16
Fair 2
Good 14
Pine 20
Excellent 12
Good 8
Spruce 114
Excellent 70
Fair 2
Good 42
2ft-8ft 225
Arborvitae 17
Good 16
Poor 1
Cedar 1
Good 1
Fir 4
Excellent 1
Good 3
-~ ~.'- - ,,-,-,..,-- --- -----'- -
I SigrlS -- ..- - -
I
I
I . 90% complete with Sign GPS collection
:
Todd S. will be working proactive planning .
I . on In
2009
Qji;~~ _~'__~_ ____ __~..~ - .. r- , ,~ - - - - - '-. ----..-"-~-----_rn~
1 Sign !nfor;;'atio~' 10: 11000 -, fi'~TF(HN()1 ()r,y
Features Attachments
- -
MUTCD Cod. 03'-:] r '- - r 0-'--'
i Description: StleetN"me ~~~r7r~'
Symbol: ~
5h~pe.. RectMg\e E MAIN ST I I
, .
,-
Text: [STREET) ..., I'
Height: Bin '.
Width--
location r 'Ir~ ;, ..
District C--SJ RouleAheod [ Ell
Route: ! Ell Roote Bock: Ell .... '" . p
Address #. a I'
D.etails ---.... 1/jI"'~'tll)( H . ~ ~'
Sign Fedures I Support Features I Inspections Events I
OriQ" I I R epl.ced: : 08/19/2008 I .I!~ New Sign
~ ~ Iii! S.ve Sign
Notes 2l E'mei\Sign
e Vjev..I Signs Repolt II
-i:':jl,,!,!,!~~!'f! ""'~~~ ~.,..!I! - .m..'m,~,.J ~
- - _.-'-- -"""!-
__,,' ._.-. _n ,...,.._..._,..., ,._ ,,_.
~ --
I GtS W~b. Application.
. Replace LOGIS Map with internal application
. Reduce annual costs from $32,400 to $5,000
. Add functionality
. Implement in a way that City's GIS Specialist has
control
. High quality mapping tools
. Expandable in the future
. Integrated with Cartegraph
- I
!
Storm and Sanitary Sewer
I --
- - - -
Have VPN set staff enter data . the fi e I d
. up so can In
I
Collecting GPS data I
. I
. Will be entering outfall inspection data this year I
Adding televising data .. - ~- --- ~ ~ ~ ~ -"" y~ - , .- - .. - - LJtg]~ I
. ~~~~~aph.~4vi&a.J!!_~~WUlvi~--=-[M~ins] ~__~ -~- - -- --- --- -- - --
~ EiIe ~dil: ~jew fQrm~ Fifters B.ecOfds actiOns ~IS ReQ.OI'ts lools W.indow !::le!P _ Il' x I
..~ lli{j I ~~-=..n~~_~~ ;('~,~~~~~-'~~~~=~'~iT~-\.-n@-=~:~T~I-~=--==--- ._,--.._,~--
. . ,. ",.' ,
- ..
EN 'dl: '{JfM~...--t ~fV'lM 10015 Mo.-.utd ~tiOt> . SEWERview -
~CrMI~ptf". $i~Fm. ~f;qlG't. &JSlwt"""'Mtg9 QSooc..n9 /S'q:l9 ~fOl'ms. ",;;;~&Carrn<<1.. Isewer Main Inform";'tion ID:~209'VP2'O 11 V'd t,1rl('(,uph I
,f/pyTFrHNn! ()(;y
:.:Jd 0 El' I I~~~ :J ~J~:~J ~ E:3 il'..___n---'O . O' n
FeatulC$ 1 eo
~ ~l~ Type ~--EJJ M~~~ F ~ I
-~
~ Visu-Sewer Clean & Seal, Inc. l"",th ' 266.99932304 EJ! Diemeter:
'~,'....:L,.,1.;-i
7905 Beech Sreet NE. Fnd~y. MN ~-.s432 SHAKOPEE location I
Tel.: 17631 252-oOC4 - F';;lJc (763) 252-Ol}o.."18 Q~ Location De-saipOOr!:
Web: ww..'i.V,Sr;-5eYtt.;'f.COfll CCTV ROUI, r--E!JJ l-~~
Upstream MH Cownstream MH DlStrrct __ ~ I I
VP 210 I VP 209 I j SiMvi""'C=_~ ~ I
OJote Job Numbtlr LOe.Jtlon l$t,...t) U$. or Sewer ~.
12i1.'2l)OO II 08252 M~l II SCOTT ST II S,l"~itarv
Pipe SIr.. M..'.r1i11 JI. SpiIoelng snilolM Flow Oir.etlon Surv,y Ol...ction lo!lstJetted:
I 8 I I Po,'vvi'W/ Chkl~ I I 12 II Circu~ar II S II Downstre.l'l'1 I l&tTelevis.ed: f'EX-> " .., I
p,...cl~nlno W'o1th.r Surfae. US MH O.pth OS MH O.oth Truck No. i Lo!Isllnspecled: .l.~ ~C1B. 'S!!J~ .:-~.
Jenina II Snow II Asohall II 0 II 0 II 231 I ~~i "J
MKlla No. OVO Tltl. No. lISurw~~ I Tota~;"gth \ \ Surwvor Cert!fle.lIt. No. ~~ .- ~ <t~I'I~I_ I
17 If 07 ,. \1 U-1207-6156 I -l beta1J~ . .,
Comments
N'A I Prolile I Mo!II'lholes I Lo!Iteto!lll Jnspecticrn I Events I
-:f :~~j.:": pDetailedProl~e
p~jtion COllt. COmllMnl a~J 1al€j~....1Il Zo,,", -'~,:::=--~:::::.~::::::~---=:--:::__-=_ ;I~ New Main I
MHVP21Q -
F.. II So!IveM.,in
v &:j E.rM~ MMl
TF TaP. FaCIOI)"M.lde 3
TF Tap.FaCIOI)"Maje , SrGNview
WORKdirectar eVleW Mn Report I
PARKview """
STORMview Right click and draQ toZoorn .
lefl clck <YId dlag 10 PM.
TFA T3(I. faaof)' M.:tde: Act..~ 10
TF Tap.FaclOl)"~ 2
- ~Pm
Tot,,): 3229 Filter ~.:;-
.
c--- -" ---' --.-"" '---'- -- ,--- ---' -, - ------ -, ,-
2009 Work Plan
I - - ---
-- - - ..
. Complete GIS Server Implementation and
I
Launching Shakopee GeoLink
I
\
. Tree trimming/maintenance
. Sign Maintenance
. Playground inspection using VPN
. Continue to improve the system
. Outfall inspections
. Utilization of sign data
r------~ -,-,------' -- -, -,- - -- ---,- -
Self Assessment
I --- - - -
--- - -
. Technology is well accepted by staff
. Several operators were early adopters of
technology
0 Will help with modification of work order system
0 Will help move sewer module forward
. New uses for technology are being found
. Staff are now using complex GIS and Asset
management tools with very little assistance
. GIS Specialist is handling the majority of the system
management
. Consultant staff implement complex tools I
- -~-~---- --- ,-
I Tel eC.Q m ._f un din g
. System relies on a numerous Telecom funded
initiatives
0 VPN for mobile
0 ArcGIS Server software
0 Server hardware
0 SAN based storage
0 Training
0 System development
~- -'-- ----",--- ----' ----' ,--' --", --
I SUJ1).ma_ry .
. Shakopee GeoLink is in final. testing
. AMS is in production mode
. System is used daily by all PW operators
. Rolling out tools for decision makers
0 Allow decision makers to quickly analyze cost
implications of management strategies
0 Using the tools to generate policy
. Ability to easily add new assets
. Focus on efficiency
. Focus on integration
,-----' --- - -
I - --
--- -
Questions?